HomeMy WebLinkAboutNC0085863_technical Correction_20181204Roy Cooper
Govenor
Michael S. Regan
Secretary
Linda Culpepper
Director
NORTH CAROLINA
Envtronmenraf QuaUfy
December 4, 2018
Shannon V. Becker, President
c/o Amanda Owens, Manager Environmental Compliance
AQUA North Carolina, Inc.
202 MacKenan Court
Cary, North Carolina 27511
Subject: Correction Change Pages - Permit NCO085863
Waterfall Plantation Water Treatment Plant (WTP)
off Mica Mine Lane [NCSR 1923], Wake Forest
Wake County
Dear Mr. Becker:
At the request of your staff, and after further review, NPDES Staff noticed an error in your permit for the
subject site. DWR has therefore generated change -pages to address this error.
Please insert these change -pages (3 and 4) into your active NPDES permit and discard the old pages.
Please note that this permit is not transferable except after notice to the Division. The Division
may modify or revoke and reissue this permit. This permit does not affect your legal obligation
to obtain other permits required by the Division of Water Resources, the Division of Land
Resources, the Coastal Area Management Act or any other federal or local government.
If you have questions concerning this permit correction, please contact Joe R. Corporon P.G.
Uoe.corporon@ncdenr.gov] or call his new direct line (919) 707-3617.
Sincerely,
Linda Culpepper, Director
Division of Water Resources
Enclosure [issuance final NC0085863]
CC. NPDES Permit file
Central Files
cc. RRO, Attn: Danny Smith; Vanessa Manual; OCU, Maureen Kinney
AQUA, Amanda Berger, Manager Environmental Compliance [aaowens&quaamerica.com]
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11617 Mail Service Center I Raleigh, North Carolina 27699-1617 — 919.707.9000
Permit NCO085863
PART I
A. (L) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS
[ 15A NCAC 02B .0400 et seq.,15A NCAC 02B .0500 et seq.];
Grade I Physical Chemical WPCS [15A NCAC 08G .0302]
During the period beginning on the effective date of the permit and lasting until expiration, the
Permittee is authorized to discharge filter backwash from Outfall 001. Such discharges shall be limited,
monitored and reported 1 by the Permittee as specified below:
IEFFL hTT _
■/ry' _
'VV HAKA AV �CSV`
-41
(P""AR�4METER :CODE)
LIMIT;
_ .e..l _ � _
MO0 ING.;tE S
�[�; _p mot.• `{iiy:-�,.1��` - ��1�-.L1:. is •I ss..
I .....
rA
_Y
t
Ayera' a
-7YA�i
. y
_:11�Iaxuum
1Vleasurem"end'
- FEE urn
Smp:Ie `�me
a ���
r�oca on
Flow
50050
2/M011thly
Estimate 2
Effluent
Total Suspended Solids
(TSS)
C0530
30.0 mg/L
45.0 mg/L
2/Monthly
Grab
Effluent
Total Residual Chlorine
50060
28 µg/L, 3
2/Monthly
Grab
Effluent
pH [standard units]
00400
Not < 6.0 or > 9.0 s.u.
2/Monthly
Grab
Effluent
Turbidity (NM
00070
Monitor & Report
Monthly
Grab
Effluent
Total Manganese (µg/L)
01055
Quarterly
Grab
Effluent
Total Hardness (mg/L)
00900
Monitor & Report
Quarterly
Grab
Effluent
Total Nitrogen (TN) 4
C0600
Monitor & Report (mg/L)
Semi-annually
Calculated
Effluent
Total Phosphorus (TP)
C0665
Monitor & Report (mg/L)
Semi-annually
Grab
Effluent
Footnotes:
1. The Permittee is required to submit discharge monitoring reports electronically using the
Division's eDMR system program [see A. (2.)].
2. The Permittee shall determine waste -flow discharge by estimating the rate, duration and number
of backwash/rinse events.
3. The Division shall consider compliant all effluent TRC values reported below 50 µg/L. However,
the Permittee shall continue to record and submit all values reported by a North Carolina
certified test method (including field certified), even if these values fall below 50 µg/L.
4. For a given wastewater sample, TN = (NO2-N + NO3 N) + TKN, where TN is Total Nitrogen,
(NO2-N + NO3 N) is Nitrite/Nitrate Nitrogen, and TKN is Total Kjeldahl Nitrogen.
Condition:
The Permittee shall discharge no floating solids or foam visible in other than trace amounts.
Page 3 of 7
Permit NC008586'3
A. (2.) ELECTRONIC REPORTING OF DISCHARGE MONITORING REPORTS
[NCGS 143-215.1 (b)]
Federal regulations require electronic submittal of all discharge monitoring reports (DMRs) and
program reports. The final NPDES Electronic Reporting Rule was adopted and became effective on
December 21, 2015.
NOTE: This special condition supplements or supersedes the following sections within Part II of this
permit (Standard Conditions for NPDES Permits):
• Section B. (11.) Signatory Requirements
• Section D. (2.) Reporting
• Section D. (6.) Records Retention
• Section E. (5.) Monitoring Reports
1. Reporting Requirements [Supersedes Section D. (2.) and Section E. (5.) Ml
The permittee shall report discharge monitoring data electronically using the NC DWR's Electronic
Discharge Monitoring Report (eDMR) internet application.
Monitoring results obtained during the previous month(s) shall be summarized for each month and
submitted electronically using eDMR. The eDMR system allows permitted facilities to enter
monitoring data and submit DMRs electronically using the internet. Until such time that the state's
eDMR application is compliant with EPA's Cross -Media Electronic Reporting Regulation
(CROMERR), permittees will be required to submit all discharge monitoring data to the state
electronically using eDMR and will be required to complete the eDMR submission by printing,
signing, and submitting one signed original and a copy of the computer printed eDMR to the
following address:
NC DEQ / Division of Water Resources / Water Quality Permitting Section
ATTENTION: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
If a permittee is unable to use the eDMR system due to a demonstrated hardship or due to the
facility being physically located in an area where less than 10 percent of the households have
broadband access, then a temporary waiver from the NPDES electronic reporting requirements may
be granted and discharge monitoring data may be submitted on paper DMR forms (MR 1, 1. 1, 2, 3)
or alternative forms approved by the Director. Duplicate signed copies shall be submitted to the
mailing address above. See "How to Request a Waiver from Electronic Reporting" section below.
Regardless of the submission method, the first DMR is due on the last day of the month following
the issuance of the permit or in the case of a new facility, on the last day of the month following the
commencement of discharge.
Page 4 of 7