HomeMy WebLinkAboutNCC241134_ESC Approval Submitted_20240715 From: SVC_DoNotReply-DEQPermits<DoNotReply-DEQPermits@deq.nc.gov>
Sent:Tuesday, March 26, 2024 4:02 PM
To:Toyota Battery Manufacturing, Inc<april.mason@toyota.com>
Cc: Miller, Vickie M. (Raleigh) <vickie.miller@hdrinc.com>; Chapman, Brandy<brandy.chapman@hdrinc.com>
Subject: NC DEMLR- FROF Application Approval with Modifications Needed CRM:0116007
Some people who received this message don't often get email from donotreply-deqpermits@deq.nc.gov.Learn why this is important
CAUTION: [EXTERNAL] This email originated from outside of the organization. Do not click links or open attachments
unless you recognize the sender and know the content is safe.
:-4A,'&c)c, .4
zct ois /�a
I1171-It .
17I O�
1ti `es a11- 12. 076
s•`* QUAM\nu'
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
i
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
03-26-2024
Toyota Battery Manufacturing, Inc
151 Engineering Way
Georgetown, KY 40324
RE: Project Name:TBMNC East Quad
Acres Approved: 246
Application ID: PA-003534
Permit Number: RANDO-2024-0107
Address:5938 Julian Airport Road
City: Liberty
County: Randolph
River Basin:Cape Fear
Stream Classification:WS-III: Water Supply III
Plan Type: New Plan
Dear Toyota Battery Manufacturing, Inc,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are
listed below. The Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years
following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B
.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI)
form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit.After the form is
reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After
the fee is processed, you will receive the COC via email.As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity.The eNOlform
may be accessed atdeq.nc.gov/NCG01. Please direct questions about the eNOlform totheStormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a
new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
2
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan
and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this
project.
Modifications Required for Approval:
A dominant strategy for erosion control at portions of the overall project involves pumping sediment
through a silt bag and this is likely to occur prior to 3-5 days of standard design settling time. It is
recommended that polyacrylamides be added to diversion waddles and/or basins when
practical. This would maximize the potential for settling of sediment before the pumps/silt bags are
utilized. This site must be managed to prevent violations of surface water quality turbidity standards
in the receiving streams.
It is recommended that you install any piping at the perimeter of your project during a dry period
and replace the silt fencing immediately after placement to maintain the perimeter of your project.
General Comments:
1. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application.
2.Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800
and asking to speak with the Land Quality inspector for your county. Permission must be obtained and granted
from NC DEQ DEMLR prior to the removal of any ESC measures. [GS 113A-51, 15A NCAC 4B .0120]
3. Any off-site borrow and waste required for this project must come from a site with an approved erosion
control plan, a site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid
Waste Management. Trash/debris from demolition activities or generated by any activities on site must be
disposed of at a facility regulated by the Division of Solid Waste Management or per Division of Solid Waste
Management or Division of Water Resources rules and regulations. [15A NCAC 4B .0110]
4. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If
the approved erosion and sedimentation control measures prove insufficient, the applicant must take those
3
additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115]
5. The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to
yearly NCG01 fee payment due dates. Be advised the project requires a closure inspection report by DEMLR
prior to filing the Notice of Termination (NOT) to terminate NCG01 coverage. The closure inspection should
not be requested until after the site has achieved full vegetative stabilization and measures have been
removed. The removal of temporary ESC measures, including basins, requires prior approval. Often, a full
growing season is necessary between initial seeding/mulching and removal of measures. Please plan your
construction accordingly to avoid contacting our office prematurely for a closure inspection. Also be advised
you may be asked for representative site pictures prior to a closure inspection. [General Comment]
Your cooperation is appreciated.
Sincerely,
Tamera Eplin, PE - Regional Engineer
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Attachment: Certificate of Approval
North Carolina Department of Environmental Quality I Division of Energy,
DEQ,\V Mineral and Land Departments
Q� Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite
300 I Winston-Salem NC, 27105
336-776-9800
Dewrtmefft of EmromeiRal llrailr
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.