I NCZOgp • CONSTRUCTION SCHEDULE ' L 300 \ / \ \ I i ( I I \ \--, \ ) I , , , , ,
ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY
® NC xwrn I.Obtain all necessary permits and plan approvals.Erosion and Sediment Control(E&SC)permit and a Certificate of Coverage / NCGS 113A-54.1°IS AVAILABLE FOR USE IT CAN BE COMPLETED BY HAND OR
1�, . (COC)must be obtained before any land disturbing acnvifesoam.campy of the E&SC pvmd,the COC and abW copy of the / \ `- 1 I I COMPLETED AS AN EXCEL SPREADSHEET.
plan mustbI kept on site,preferably in a permits box,and accessible during inspection. / 1 I AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED
' ' A Install gavel wnatroction entrances first,then silt forces,reinforced silt \ `, I I I I \ EROSION AND
utlets and wanks. / \ \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A
3.Finish clearing and grubbing any necessary areas on Me lots as they are started. I NCAC 048.0131 STATES THAT°...URE ORNTAPON SHALL BE ACCOMPLISHED BY
n emiNC Rowo o ROAD 4.Resin to`grading and excavation activities
I INITIALING AND DATNG EACH MEASURE OR E SHOWN ON A COPY OF THE
5Rmoa \ 'C• FIRMA
Lpol S.Begino undone with nuua.wnswamn as 110155 / ` / \ I I I \ APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING,
6.Finish all rough Igmding and n°uao construction.All areas not disturbed for]days needs m have temporary or permanent ` ,yq8 I \ \ DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE,
Install
ed. \ I / l\ \ \ ` V PRACPCE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION
L
.In neno andPats. \ \ks d.REST 10.Thtradn= combined self-inspection farm found on the DEMLR website 1
Otip M1tlps://wwelvemoMs/eboudinspectiofoamshandekeptonsiteeandamwalefortmwectiprogram/imes.Ic isrecotimendedam. 12
111 \ ' ` \ 1 \ \ ` \ SODDING
Twelve monma Mc...athbx.Ref:,formsshall bekeptonaim end available for inspections[all times.It isrecommendeda l\ \`
i copy be kept inapermns box.Ref G.S.113A-54.1 through G.S.113A-5]Sxtions lSA NCAC 04A.0101[luough lSA
ty.svyegfa NCAC 04E.0504 General Permit ECG 010000 NPDE$for Canstmction Activities. \ `_ 1 \ \ ��
90 \ II.Self-inspection for erosion and sedimentation central measures are to be performed at least once every seven calendar days and
SITE y whin hours of everysin event Man finch.Anyn ddrepast shallbem de immedieUly to maintain measures 10
`cC designed.All ESC measures shall be maintained as specified in the construction details on this plan.A rain gauge shall be installed'Ma
1 ` \ \` \
R, o mthepmjwtaitefrmmmbadmg. J \ \ \\ \ �S®
.p 12.Inspection and final acceptance letters.When the project is complete,the pcmettees shall contact DEMLR to close out the E&SC axes ulo,auaMlxs metes.
e "If-1TROAo Plan After DEMLR Informs the permlttee of the project close of.via inspection report,the prnnittee shall visit
Se* "If-1010 "deguega-NCG01"to submit an electronic Notice of termination(e-NOT).A 9120 annual general permit fee will be charged
yg'a until...LOT has been filed out. \ \ \\ \ \S
ccettEct-
•
•
•
•
•
•
am soo ACHIEVE FIRM ZtrE.l,i A..ill'TTLTui7Ø \
ON ESTABLISHED-in 2-3
$ 1 /L
\ \ \ \ \VICINITYMAPI \ \ - \ \\I I - ct, -- \\\ V \ mwt
DATE: PAGE: 1 J ---7
°a°"u"°tx.
MIN faILTPENDE \ �2W ' n \ 14 \ '� -�
Ga CONSTRUCTION 2x0 \
illlllllll IIIIIIII (IIIIIIII .°T. A V - - - _ , � V 7 .
I / i / �� \ DATE: PAGE:
TaP orsLTE ' x
SILT)
MusT eE AT Lrns - - \ FENCE / a�L
AsovE THETo , , :t
\ ---- �i __ ••CONSTRUCTION �r rT
THE WASHED s E 28=_ SENTRANCE 19 / \ \ "q" "B" "C" "D" "E" "F" -••G•• "H"
STER FENCE POST
.11
HARDWARE FRONT VIEW W�ATTL/E\\ ll` \ �� '' ��
WIRE FENCE �a€INF�RCEO \ If s r q ty vF i7 ✓! ✓! `�' `�'
SILT FENC i waaE CLOTH `\soft \ V O�LET Aft r_ \ ti G T b 1ti
FILTER FABRIC.
I M MAX, CLOTH D TRENCH 2T� �ENTRANCCTION SIFT �_ 1Tous R ll II. Moos .__1- HHOUs%ra THOUS HOUS 4HOUSwnsnED I cos EL PEN \ ENTRANCE 20 FEN E \ \ \ ICIICI ,_1
• i oN caouxD NOTES g FILTER FABRIC rvro soLDORouNo� \\ 2T% 4 REINFORCED 1y A \ )� \ Eop vw-Tta-e-T man. me-mireN--s-T lip.• > M-
1 1 Hardware cloth and gravel should overlay the silt fence at least 12 \ SILT FENCE y�., %T
Inch
°y r j 2 Stone outlets should be placed on low elevat on areas of s It fence / a� «;S;OUTLETx 5 T 1 290 LEGEND 1..If needed,Tree Protection fencing should be installed along the buffer zone wetland
`\\ and based on field tend floras O O q cON UCTION
BURY WIRE FENCE AND
eUars oPUPPEx Eo°EINTENANCE. �O \ / % ENTRANCE„,_ Y 21111 N boundary and/or around protected Vees prov d'nga otitis of at leasti z5 feet for each
/ 1SILT FENCE inch of Vunk tl ameter
I WATTLE
or 1 Per NCG 01'nspecl outlet at lest onceaweek and after each l'nch or OyO / = ITS 2.Install S'It Fence on the low elevat on sties of each lot Install Slt Fence ougets shown on
HARDWARE CLOTH FILrER raeRC NTRENcx greater ra stroll event Complete tiny requ red repo rs tamed ately O _ _ -- 'gram an I rY P pen
2 Freshen stone when sediment accumulafon exceeds Mat
FORCED I�`�___ do-WADDLE ELT SOC. , schemat Gtl a end feed adjusted,f owners or b a for l each lot s t at low points.If are
3 Kea h free of debris to tle atle to flow O Z \ SILT CE . s Y\ \0
s contiguous and have different land or builders, lot should have individual Silt
p toes prov qua ¢ y2 OUTL N 2, Fences.
4 Remove sediment when half of stone outlet is covered. Z -� \ I ® 3.Install requ red Silt Fence wtti n 10 feel of property Ilne to ensure there Is no conflict with
5 Replace stone as needed to facilitate de-watering.
..\NC-Envirpnnenub/pay SECTION VIEW - / : STRUCT•N o\ 1 \ \ - CONSTRUCTION ENTRAN septic system.It is the responsibility of the builder to ensure the lnatallabon of sediment
J LIMITS 1 control measures does not impact the septic system and repair area(s).
SILT FENCE OUTLET �� , - tiA \\ \1 1 \ \ 4.Atleast one Coeo-ebonEnhaeeiExdistobeinsMIled per..
\ \\ 5.Waste bins and other areas dedicated for managing building material waste shall be at
least 50 feet away from stone drain Inlets or drainage ditches unless It can be shown that
\ \ \ 1 \ / no other alternative exists.If this separation cannot be achieved,these areas must be
\\22 /\ contained behind Silt Fence
2 25 R4\ a(meta downstream oftl disturbances should be protected;streets should be swept when
DATE: PAGE: --� - \ Detailsf from the SIt Fenconstructiontnt activity
e 09tsC present.
Construction Entrancesand other
s t sock/watt a s t Sock/watt a NOTE: / \ providedoon additional sheets Eros ontand sediment control details are not drawn to
are
�O �I aeambe our - - e9ava eta Pmlecaon v Lc°gum,DaTE.1,12/2020 scale TYPICAL LOT LAYOUT WITH ROADSIDE DITCHES
MY \V 1\ 3� V\ \�
262-
17� g may hae„ba=tn'
sediment
-rnclr n.. a -- \l
'Lr=lr ll- . FI unTnanymm romppel I I 55
tr n'I Stakes 12 .'I Stakes S. male)Mould bbeeao.lsimmpaalle. / \ �_ �� • \ \aL\ DATE: PAGE:
SECTION SECTION m ,Dm�hem.tee nfa \ 4
p altanNw I�:maal�bam //
Pat ouldbelmtadat edge or.land niel.sho The
dsligheuyusb�to _ _Bennett-Road- �1V-2Il� \ A \\ A
A.Mar' < a,My. from g around the and a -
i I) ii! 4. Oak or ether durable WI°°°r of GROUND STABILIZATION - \\ -\ \ '-
'°aplacedverUcally plumb,through Ow a �na with a SITE AREA STABILIZATION / - - \ \ \ \ \ J \\ Orpa / •
maximum interval of 4 feet or EXCEPTIONS ` 4
h DESCRIPTION TIME FRAME \ \ \ AGE
UNTRENCT°od Mulch l 2 height r Com INSTALLATION log st g rid a Mn a 1 PERIMETER DIKES, 7 DAYS NONE / . \\ \ \ \ \ \ QJ �_����_I mMaN
HE SWALES,DITCHES
.."`"m,°"m.m..`�...t°.`°`t"`...,..,r..,..,,,,. &SLOPES \ i 1 1 1 1 1 1 1 1 1 1 1 1
sock..to hold it in plam during°memo..saMETR cv rcx xnu sow RATES 1. Inspect silt sock/wage at leak-Meekly and after
a. HIGH QUALITY 7 DAYS NONE / /
�- �_ \ \ ` / R
Remove WATER ZONES \ \ \ \ •'. .. _ 7...Z1 1 1 1.4I I I I 1 1#
mrumo-enenad I se Oman po ee COMPOST,i s(aig:m)also:m)Ciao:I) a(21 a ° r" SLOPES STEEPER 7 DAYS IF SLOPES ARE / �� \ \ \� \ �, e s"""'
IMO THAN 3:1 10'OR LESS IN \ \ \ - ?i'� 4'Sheet P wwy sot sock/Mginmlas� (;aa chi czzgrmi (tr«°t°) (tare m) ( ) s LENGTH AND ARE \ \ \ / \ \ \ \` \ / Tr':i""PS .z`vo
w la a' nragea 'mdaeare' NOT STEEPER \ s"n
me,ue°Ri: g'0 glljn )mix 22.5 grain ' e shall
dtenm until
am THAN 2:1, 14
13 a1 Daa [za1 ea,. m nparma�armanma awe. a DAYS ARE /\ / \ \\ \ \ Construction, Maintenance:
/m/m) /m/m) /m/m) /m/m) /m/m) ALLOWED / ,....,./.
\ \ \\ \ --- 1 Clear the entrance and exit area M all vegetal On roots,and other Objectionable 1 Per NCG01inspect tl t k and after each 1 inch or
SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION / \ \ \ material and progeny grade it. greater rz nlall,make any reamed repays Immediately.
SLOPES 3:1 OR 14 DAYS 7 DAYS FOR ( \� \ z.Place me Ito the acme d and shown on me grave pad prevent/ \ \ \\ grave p grade pans,and 2.Maintain the din a conditionmud or sediment
FLATTER SLOPES GREATER ( 1 smooth iL from leaving the construction site.This may require periodic
THAN 50'IN \ \ S \ \ 1 3.Provide drainage t°tarty water t°a sediment trap or other suitable outlet. toptlressing with 2 ieh stone.
LENGTH \ \ 4.Use geotextile fabrics in order to improve stability of the foundation in locations 3.Immediately remove all objectionable materials spilled,washed or
ALL OTHER AREAS 14 DAYS NONE EXCEPT ) \ aubied to seepage or high water table. tracked onto public roadways.
WITH SLOPES FOR PERIMETERS -� \
FLATTER THAN 4:1 AND HOW ZONES) / \ I \ CONSTRUCTION ENTRANCE/EXIT
\J \
DATE: Wye FenceFilter Fabric PAGE: �� \ ./
trergugtaet enmulrore tan woe Fence Wire and
t `/ \ // say \
Steel Post thoroughly
General Erosion Control Notes / 7 \
...Ppe1\ e M E , f _ Upslope 1.Only the =shownshall be disturbed - �� - / \ PAGE 1 of 2
pinatepr ' I z. All disturbed preps nett be grassed and _ \ I I I \ \ TOTAL DISTURBED ACREAGE: 1.42 ACRES
Wire ties anr,d, mulched as soon as Ross'bte and maintained
ipeen°vent dyer s established. - - \ / LOT EROSION CONTROL PLAN
e < I I I \\ \ LOTS 19 - 21
f, ta;° :gin lid \ 1I \ TURLINGTON
1 Filter Fabric \ J \ \
Construction: / \ / ` I
2.TEsurehar. lanrobtheamay irnpouM volumes of e ceedomwnea ; synthetic filterRaBBBECR°"VIEW MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION ACRES
sufficient lure of the �re) Hig mn�a
S.Construct the sea lrsed0erely n theem anuouaM. bla at u'0elengthpport 055eeMM..mini um oveineoWhen
he note are
FOR
strength bottom of M by e Me masnnstenad»wrelvmma ppempen faolma Me
General-All measures will be inspected and corrections made after runoff producing falls,or at least once per week minimum.The builder will insure that the construction activities on an particular lot do not adverse) affect an of the installed erosion control measures.If lot construction dictates,measures will be
a.Support as eooeL Wire or
me.000ned w;mdmto,namemePeaid mein ma Po.-Ekte 1 Pece p grain P any adversely Y
at a pairsim ediarely relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. A<7CG RESIDENTIAL LLC
M1osupO xlenceIs us..space posts a maximum of a feet apart sulpports should be driven 2,should9her.,r5c�of allseom00 fence meepee.mar,decompose.
Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the Construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all
securesMngthgie becw"lasroaPstapechg do.not requireaMe mesh support.m.securely objectionable materials spilled,washed,or tracked onto public roadways. GROVE TOWNSHIP HARNETT COUNTY
e.�BtenMeniterfabricdirectlytoposts.WereorMasticalpIleee000dhaveaminimumof50poundtensaa Remove
S111 Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insureSCALE: 1x=1 JUNE 2024
3. .cam m y nu,es eaaa and a inches v e proposed line ofge poets and a Man �ammo"rare undermining the farure aMring that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. oOr
Os .in thethe Mich .l tat 4I mRainey° Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth GRAPHIC SCALE
.es000i2 Inches oratebne alonga+e bottom andelae of the trench. and Otte theaea m grade land stabillizeln lithe mmnbubng 100 0 50 iW 200 400
soil placed over me ebertabdc end compact.Thorough compaction or me badmu is 4 drainage area has been properly stabilized. and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible.
10.Onml fence
rforma to a. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be = MMI
° repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass.
sera Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height Removed ( IN FEET I
.ANC-Envircomen tol.Jpeg SILT FENCE sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 ft.
JReinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305
fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE SF-0106
LAST SAVED:5/29/2024 4:21 PM LAST PLOTTED:5/29/2024 4:39 PM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\oAO RESIDENTIAL LLC\23-2855-09 TURLINCTON ACRES-EC\PLPNS\TURuNOTONEC-LOTS19-21.DWG