Loading...
HomeMy WebLinkAboutSW6240301_Plansheet - Grading/Drainage Plan_20240709 PROGRESS PLOT DATE: 07/09/2024 CD } [if Co uj LEGEND: N Q C 0 STORM DRAINAGE PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR / // // / / / / / / / / // // // / / J ■ ■ ■ 01 L PHASE LINE / / / // / / � / / / � / ' // / / I I Cn z Cn _j Lu z NOW OR FORMERLY GERALDINE BRADFORD SUBDIVISION / I / / ' / SILVER QUEEN COURT 50'RIGHT OF WAY DB: 2000; PG: 375 I / / / / // / o 0 I` z 28 1 / / I\ I N N �� ,tip ti� / / - - o�'F�S8j0•�Z�� .9 V PROPERTY LINE(TYP.) / / / I // / / / / - - SEAL 0 r. • 040779 Z ti PHASE LINE t� I PHASE II / I '%�yR M. GRADING NOTES: w 9 20241�,,\, Cn 1. CONTRACTOR SHALL CALL"NORTH CAROLINA ONE CALL" L 1 AT LEAST 48 HOURS PRIOR TO DIGGING TO HAVE I I _ _ _ _ _ _ _ I L I - - - - ' /- - - - - - I� I / - - - - - ' - - - - - - ' - - - - ' / / / ( 800-632-4949) I I I I I L I / I I I / I I �/ J I I / I / / / EXISTING UTILITIES LOCATED.REPORT ANY DISCREPANCIES TO 1 1 I I I / / I / / I / i THE ENGINEER. 0 I I 'I I � I � I /I / I I I ELEV:210.40 2. CONTRACTOR TO COORDINATE ACTIVITIES WITH UTILITY U COMPANIES INVOLVED IN ANY RELATED RELOCATION(I.E. d PAMUOWER POLES,TELEPHONE PEDESTALS,WATER METERS, ETC.). Of E 3. EXISTING UTILITIES SHOWN ARE BASED ON FIELD SURVEYS AND w THE BEST AVAILABLE RECORD DRAWINGS.THE CONTRACTOR z SHALL VERIFY CONDITIONS PRIOR TO BEGINNING o n �I-T - - - _ _ - I I / I I / / \ / I II \ CONSTRUCTION.ANY DISCREPANCIES BETWEEN ACTUAL FIELD z CONDITIONS AND THE PLANS SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY. c�L \1m I 4. ALL PROPOSED SIDE ROAD SWALES,DITCHES,CROSS PIPES U p \ m =/ / / I \ \ I \ AND DRIVEWAY PIPES SHALL BE PROTECTED BY EROSION N CONTROL MEASURES AS SHOWN AND SPECIFIED ON THE EROSION CONTROL PLAN. 0 W z O 5. A P.E.OR AN R.L.S.SEAL IS REQUIRED ON ALL AS-BUILT U) Of 220 - II \ 1 X I I I - t + 33 1 ® 1' 5Q 1 // © 0� ' �1� _ �/ \ 10 I 1 1 I \ IMPERVIOUS SURFACES. z I~_ l o I ✓ / \ I I \ \ 6. THE CONTRACTOR IS RESPONSIBLE FOR REPORTING ANY U DISCREPANCIES IN THE CATCH BASIN ELEVATIONS OR THE J = \ PROPOSED PIPE SLOPES TO THE ENGINEER.THE CONTRACTOR z O C I / 1 12 1 13 IS ALSO RESPONSIBLE TO REPORT ANY CONFLICTS BETWEEN / / / \ \ I O O_ ` I \ ANY UTILITY,STORM DRAIN LINE,WATER LINE,SEWER LINE OR a - \ III 1 W nl I / / I / / I \ I \ I \ ANY OTHER PROPOSED OR EXISTING STRUCTURE TO THE a I \ I ENGINEER. O co \\ 1 I5X1I III �I I � I / / I I I I \1 \ Uti \ \ 1 I Q I I I k I I - / I \ 14:1 \ 7. A LAND DISTURBING PERMIT ISSUED BY NORTH CAROLINA \ / DEPARTMENT OF ENVIRONMENTAL QUALITY WILL BE REQUIRED U U \ I D J z \�2 \ \,p �\� I � I I I � - - / / / / / / I I PRIOR TO THE COMMENCEMENT OF ANY LAND-DISTURBING Z 18I I / ACTIVITIES. 2 \ 1 I I INV OUT:213_83 i - - _ I I t I / / I ' ' / I I I \ I I 8. ALL EXISTING VAULTS, MANHOLES,STORM DRAIN STRUCTURES, a \ \ II I v I I PIPE-03 I / / / \ I I VALVE BOXES,CLEANOUTS, ETC.SHALL BE ADJUSTED AS W INV OUT:210.82 J ' ' '�u - -0 - - - - - / \ �� -1 L / L - - - - - L - - - - - I - - - - - \� J 3 1 NEEDED TO MATCH FINISHED GRADE. U - - - - J L - - - - - L - - - - - - -C J G J L - - - - - L - - - - - J J J - - - - - - \ 1 I 16 LF 18"CORRUGATED PIPE @ 0.50% / < 00 cn % I 0 m r / / 50.00' 9. ALL BACKFILL,COMPACTION,SOILS TESTING, ETC.SHALL BEOf \ INV IN:213.62 I I I \ / � o � \ I I � 1 1 - I - / I I E c7 I I I - - - - - T I I PERFORMED B THE OWNERS INDEPENDENT TESTING CD 1 = \ / - - / o o \ I PIPE-02 PUBLIC ROW CD =:- INV IN:213.91 I I - - _ - - -I - I z - - I / / - - I I - - - - - - I - - - - - - - -I - - - - - \ LABORATORY.Y \ - - �- - - - - - - - - - I - - - - - - - oo - - -_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 48LF18"CLASS IV RCP@0.50%, - W\ W 10 ALL SPOT ELEVATIONS INDICATED ARE AT EDGE OF PAVEMENT UNLESS NOTED OTHERWISE.ALL ELEVATIONS ARE BASED ON NC W \ - - - -- GRID NORTH NA W 11.A PRE-CONSTRUCTION MEETING WITH NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY MUST BE z F \ \ Al - - =216 - - - 215- - - - - -� - SCHEDULED PRIOR TO ANY WORK,GRADING OR INSTALLATION Z W w 216_ ` / \ / OF EROSION CONTROL MEASURES. `S PIPE- 01 218 / w 12.ALL HANDICAP PARKING SPACES AND STRIPED ACCESSIBILITY 68 LF 18"CLASS IV RCP @ 0.80% I " ' 21 j�\ / w 't o 0 0 _ AISLES ARE TO HAVE NO MORE THAN A 1:50(2.0%)SLOPE IN ALL � U) E= \77- INV- - - - - - - - - I DIRECTIONS.ALL SIDEWALKS ARE TO HAVE NO MORE THAN A ♦� J1:20(5.0%)SLOPE FOR THE LENGTH OF THE SIDEWALK AND NO z - - - - - �- - - - - - - - - - - -_- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - \- - - - - - - \ MORE THAN A 1:50(2.0%)SLOPE FOR THE WIDTH OF THE 0 2 INV IN:213.57 I - - I / I I i _ - \ I I I I I \ ` SIDEWALK. Z - -214_ INV OUT:213.08 t>;_=' PIPE-04 I / I - - i I i i I IN:211.06 13.IF CONTRACTOR NOTICES ANY DISCREPANCIES IN ANY OF [A c' I -=1 16 LF 12"CORRUGATED PIPE @ 0.89%r - I - - - - - - I I I THESE SLOPE REQUIREMENTS, IT IS THE CONTRACTOR'S U / \ I - F ' / F r , / RESPONSIBILITY TO CONTACT THE OWNER PRIOR TO PLACING uj INV OUT:213.43 - - - - / I / Z II/ 11 I I I I I / ANY HARDSCAPE SO THAT A SOLUTION CAN BE FOUND.\ Q 1J 1 1 I 1AMBROSIA WAY i I I 14.SPOT ELEVATIONS ARE GIVEN AT THE MAJORITY OF THE MAJOR = 50'RIGHT OF WAY \ I I I I I I I I I // BREAK POINTS BUT IT SHOULD NOT BE ASSUMED THAT ALL 0 NECESSARY SPOT ELEVATIONS ARE SHOWN. DUE TO SPACE � LIMITATIONS,THERE MAY BE OTHER CRITICAL SPOTS NOT LABELED THAT SHOULD BE TAKING INTO CONSIDERATION.THE U CONTRACTOR SHALL REVIEW THE GRADING PLAN IN DETAIL AND Lo -I I I I I I I I / SHALL ENSURE THAT ALL CRITICAL GRADE POINTS ARE STAKED Co \ \ I AND FOLLOWED TO PROVIDE POSITIVE DRAINAGE. 15.ALL STORM DRAIN PIPES SHALL BE PROTECTED WITH STONE FILTER PROTECTION AFTER STOPPAGE OF WORK EACH DAY w z of � / 1� _ rI I 1 i 1 / / / - `r -I _ 1 i 1 i -1- \ 1 1 // (SEE DETAIL SHEET). o z = cn \ \ 11 x III 14 1 I 1 1 1 1 1 1 1 1 1 1 1 26 43 16.EXISTING VEGETATION WITHIN TREE PROTECTIVE AREAS SHALL a � U) \ 1 I 18 19 O REMAIN UNDISTURBED UNLESS NOTED OTHERWISE.ANY AND Y p U O O O \ O I ALL LANDSCAPING AND EXISTING TREES&SHRUBS TO REMAIN U w a Co > - -211- WHICH ARE DAMAGED DURING DEMOLITION OR CONSTRUCTION 0 ~p ❑ m 1 1 I 1 I I I SHALL BE REPLACED BY THE CONTRACTOR USING A LICENSED O z z w I` - - - - - 1 I I / 1 z O w z z LANDSCAPE CONTRACTOR AT NO ADDITIONAL COST TO THE U ui O U z10- _ II X I I 1 - _ _I_ _ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 / 1 � 1 i OWNER. c¢) w _ 17.THE GRADING CONTRACTOR SHALL COMPLY WITH ALL STATE cn � ❑ ❑ O \ \ I CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON _ J _ _ _ AND OFF-SITE.THE GRADING CONTRACTOR SHALL MAINTAIN ALL 209 - X I �- - EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR a AS DIRECTED BY THE EROSION CONTROL INSPECTOR OR THE z ARCHITECT. J ,- _ _ 1 - _ _I O Z 208 - \ 24"EXISTING RCP I \ I - _ - - - -I- I I -I- _ _ I_ I I \ I I I 18.THE GRADING CONTRACTOR SHALL BE RESPONSIBLE FOR III I - OFF-SITE DISPOSAL OF ALL CLEARING AND GRADING WASTE r U Q _ \ Y MATERIALS GENERATED DURING CONSTRUCTION AND FOR J -207- OBTAINING ALL APPLICABLE PERMITS FOR OFF-SITE STOCKPILES z W ' I - - - I � - - U) O li L I I \ I - J I AND/OR WASTE AREAS 0 - - - _ - - - - - _ - - - -��\ - - - - - - - - - O z W NOW OR FORMERLY - - - - - - - zo9- - _ \ \ - - - _ - - - - - - 0 Z JANISN. LEWIS ` � � � / _ - _ - - - - - - - \ � \ \\ \ \ 11� \ I� / � \ DB: 1217; PG: 280 �/ / - ` - - - - - - - -zos - - - + _ � � - _ _ W z a i - - � \ \ z z PIN#: 0556-67-8389 ��� - - _ / - - - - - NOW OR FORMERLY - - / ' - - - - _ _ ` \ Q - -207- - , , , NOW OR FORMERLY LL = ROY G. GREENE DANIEL G. BETHUNE UTILITY SEPARATION NOTES: - - _ DB: 1011; PG: 93 - - 206_ \ \ \ \ \ \ DB: 1868; PG: 434 z Z MINIMUM VERTICAL SEPARATION BETWEEN UTILITIES: PIN#: 0556-77-4494 / - - - \ \ - - \ PIN#: 0556-87-1596 2'STORM SEWER/OTHER UTILITIES NOT LISTED ' .2°5 \ \ _ - J O O a 2'WATER MAINS(POTABLE WATER OVER POTABLE WATER) \ \ , _ - J 0 W � Y - 2'RECLAIMED WATER LINES(POTABLE WATER OVER RECLAIMED WATER) MM J&FINAL EARTH GRADE STORM DRAINAGE NOTES: W W ` 2'SANITARY SEWER `I, 5 3 CROSSING A WATER MAIN OVER A SEWER. 1. ALL STORM DRAINAGE PIPES SHOWN ARE TO BE CLASS III REINFORCED U 0 WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER,THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 24 INCHES CONCRETE(RCP)UNLESS NOTED OTHERWISE. a ABOVE THE TOP OF THE SEWER, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 24 INCH VERTICAL SEPARATION-IN WHICH CASE BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. 2. ALL PIPE JOINTS SHALL BE MADE WITH PREFORMED JOINT SEALER,WHICH CROSS A WATER MAIN UNDER A SEWER. CONFORMS TO AASHTO SPECIFICATION M-198 FOR TYPE B FLEXIBLE PLASTIC � � LL GASKETS UNLESS OTHERWISE NOTED. 11 WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER, BOTH WATER AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO 3. ALL BACKFILL SHALL BE NON-PLASTIC IN NATURE, FREE FROM ROOTS, L V WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING.A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING.THE DESIGN VEGETATION MATTER,WASTE CONSTRUCTION MATERIAL OR OTHER SHALL MAINTAIN VERTICAL SEPARATIONS TO SATISFY STATE MINIMUM REQUIREMENTS WHERE THE DUCTILE IRON PIPE IS USED TO SATISFY THE HARNETT REGIONAL WATER REQUIREMENTS ABOVE. OBJECTIONABLE MATERIAL.SAID MATERIAL SHALL BE CAPABLE OF BEING MINIMUM HORIZONTAL SEPARATION BETWEEN UTILITIES: COMPACTED BY MECHANICAL MEANS AND SHALL HAVE NO TENDENCY TO 3-SEDGE OF PAVEMENT FLOW OR BEHAVE IN A PLASTIC MANNER UNDER THE TAMPING BLOWS OR GRAPHIC SCALE DRAWING - 5'STORM SEWER, POWER POLES AND OTHER UTILITIES NOT LISTED PROOF ROLLING. 10'SANITARY SEWER AND RECLAIMED WATER MAINS OR ASSOCIATED LINES 4. MATERIALS DEEMED BY THE OWNER'S REPRESENTATIVE AS UNSUITABLE so 0 25 5a 00 200 SHEET 2 ANY NON-PERMANENT STRUCTURES OR IMPROVEMENTS FOR BACKFILL PURPOSES SHALL BE REMOVED AND REPLACED WITH - 25'ANY BUILDING FOUNDATION,BASEMENT,SUBSURFACE STRUCTURE SUITABLE MATERIAL. 2 - 30'ANY SWIMMING POOL 5. BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER C�6 0 LATERAL SEPARATION OF SEWERS AND WATER MAINS PIPE IS LAID.THE FILL AROUND THE PIPE SHALL BE THOROUGHLY WATER MAINS SHALL BE LAID AT LEAST 10 FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 10 FOOT LATERAL SEPARATION, IN WHICH ( IN FEET CASE: COMPACTED TO 95%OF THE MAXIMUM DRY DENSITY OBTAINABLE WITH THE 1 inch = 50 ft. THE WATER MAIN IS LAID IN A SEPARATE TRENCH,WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 2 FEET ABOVE THE TOP OF SEWER STANDARD PROCTOR TEST.THE TOP EIGHT INCHES SHALL BE THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED ATONE SIDE ON A BENCH OF UNDISTURBED EARTH,AND WITH THE ELEVATION OF THE BOTTOM OF COMPACTED TO 100 PERCENT STANDARD PROCTOR. 6 UNDER NO THE WATER MAIN AT LEAST 2'ABOVE THE TOP OF SEWER. UNBACKFIILL D TRENCHES EA TERLPIPE HAS BEEN PLACED. RISE IN THIS PLANSET AND ANY ASSOCIATED DOCUMENTS ARE PRELIMINARY AND NOT AUTHORIZED FOR CONSTRUCTION 06 OF 23 UNTIL SIGNED, DATED,AND OFFICIALLY RELEASED FOR CONSTRUCTION BY THE ENGINEER OF RECORD. PROGRESS PLOT DATE: 07/09/2024 _ m a w Co 0 U) > J w I z SEAL r• 040779 \ X 135 \ \ \ \ \ / \ ( I — ~ - - \� \\ \\ < 7/9/2024 DA#2 DITCH 2( ) 975,851 SF (22.40 AC) \ \ o Lu Lu / /l I / �� \ c� v _�j #3 \ I I 1 I 1 I 0 * z / \ // // // _ _lam - 1 1 I I _ � � - � I �`, / � � / � \� Iz � / a — _ \ v� aA a JD LLI 30 CD Lu LU I � / \ \ \ \ \ \ W w � zcn 40 zw SILVER QUEEN COURT \ \ I Z YUJI 50 RIGHT OF WAY U H p IJ 1 / �\ I I n J �/ /28 l o = I I l z — I . 5 / / I cncr N N N 2 N �� �' �,�, 11 i 1 I I / / I o I \, DA#1 (DITCH 1) — — / / T/ �— — / / \2 7I \ I I 037,493SF (0.86AC)1 � � 1 LEGEND: T _STORM DRAIN LINE n a r — /' � \ \I I I \ \\ \\ \ \ DA#1 (DITCH 1 ) Z c, J T9 I b ooI �I �n 2 DA#2 (DITCH 2)� m I XU)� _ U � ❑ a } } I , I I I II I , I I I I I \ \ \ \�� �I k ►► I I I I \ \ o� O~ � ❑DA#3 (DITCH 3) z zm z"21s m m w z o W LJ _ J U UL — JL — J J — L J � — J Q U Q W \ U W 2 ? DA#4 (DITCH4)o ❑ ❑ U — °❑Y° \ \ \ \ \ \ \ I — \ — — — DA#5 (DITCH 5) Q \ \ \ \ \ \ \ \ \ \ \ \ \ I \ \ \\ \ \ W C7 - — I C1 216 -z L2 z 215 A #_` — T� —� -�- - - - - - - - - - — - - - - - - - - \- - - — EXISTING5' CONTOURS 0 -214 _ O I I I — — ,I — — �'� I — I r — I I 1 I — I r — r \ \\ \ \\ \\ \ \ \\\ \ \ \ \ \ \ 1 \ \ \ 0 �„ I I I DA#3 DITCH 3 I 1 / I DA#4 (DITCH 4) I III / \ EXISTING 1' CONTOURS ~ _ \ \ \ \ \ \ \ \ \ \ \ � k � — ( ) 2�a-I (AMBROSIA WAY 7,344 SF (0.17 AC) I II i w I 2,984 SF (0.07 AC) / 50'RIGHT OF WAY I / , , / , _ �\\\\\\\\�\\\\\\\�\\\\\\\�\\\\\\\\\\\\\\\\\\\\\\\\\\\�\\\\\\\�\\�\\�\\\\\\\\\\\\\\\\\\\�\\\\\\�\\\\\\\\\\\\\\\\\\\\\\\\\\\\ /\�III\ III nI • -I II I1I_ _- - I �I �l I- -- _ _II-aI,-III 1121 - 1I I1 1 -I�II hI 1,�1 � 1I D A#5 (DITCH 5) � TEMPORARY DITCH U� Q=� O 3,467 SF (0.08 AC) O ,213, } _ a -211- - IF 2- -210— \x a — WLu �209 — -TI \\\ \ \ \\ \\ \\ \ \ \ \ \ \ \ \ \ \ \ \208 r Q z \ \\ \ \ \\ \ \ \ \ \ \ \ \ \ I \ fl xll I I (-- - - ' III I I I I / - - _ - - LL = _ _ - - - _ - , C� z Z a NOW OR FORMERLY / J - _ _ - - - -zo9 - - - - - - \ \ _ - - - - - J z a JANISN. LEWIS ^ _ - // - - - - -2os � = -- - - \ _ o - NOW OR FORMERLY roll W Q PG: 280 - // _206_ , / — = _ _ m w DB: 1217; NOW OR FORMERLY —2°�' � _ — \ \ 1 I 1 ROY G. GREENE _ _ _ - _ PIN#: 0556-67-8389 � � / _2p5 � , _ - _ \ DANIEL G. BETHUNE _ � _ , , � � , � _ _ _ DB: 1011; PG: 93 \ Q DB: 1868; PG: 434 _ - � / � _ . - _ - (� L) PI NM 0556-77-4494 - - - ' ' '/ ' - - ' Q n - \ PIN#: 0556-87-1596 � � � �_ � \ \ I I X \ 1� I 1 \ \ \ \ \ � \ \_ - - - � / / � 20� � \ _ � \ � �\ - - - - - Lu cnI \ I \ / / / - - - - - - - - - - - - \ \ \ \ \ \ \ \ } GRAPHICA DRAWING SHEET \ � I \ \ \ \ \ .--_ / / • �, .�^�� � , 1 / III �\ \� C 6.1 ( IN FEET ) 1 inch = 100 ft. I I \ -T \-� // / // / r ' / / ^ \ � - - - - _ _ � � - - - / � / / //�/ � / l , f � -, \ \ 07 OF 23 I I I \ \ \ \ \ \ \ \ \ 1 / / i r / - — — - THIS PLANSET AND ANY ASSOCIATED DOCUMENTS ARE PRELIMINARY AND NOT AUTHORIZED FOR CONSTRUCTION UNTIL SIGNED, DATED,AND OFFICIALLY RELEASED FOR CONSTRUCTION BY THE ENGINEER OF RECORD.