Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6240301_Stormwater Report_20240709
Project name: Ambrosia Farm Subdivision County: Harnett Address: Mclean Chapel Church Road STORMWATER IMPACT ANALYSIS Mclean Chapel Church rd. Harnett County, NC STRONGRC K ENGINEERING GROUP C44_1 Prepared by: Spencer Cashion •o. SEAL �; 040779 ;6 Reviewed by: r sj.<4:1,G INE •�� Chris Thompson, P.E �iOp •• M•:`r`N` The STRONGROCK Engineering Group, PLLC r�iiJ,,,,1���• PO Box 99552 0 7/0 3/2 0 2 4 Raleigh, NC 27615 984.200.1932 (o) 833.241.3773 (f) Table of Contents 1. Narrative 3 1.1 Project data 4 1.2 Site History and Project Description 4 1.3 Calculation Methodology 4 1.4 Results 4 2. Reference Materials 5 2.1 NOAA Rainfall Data 6 2.2 Web Soil Survey Map 11 2.3 Harnett County Soil Map 14 2.4 USGS Topographic Map 19 3. Peak Flow Analysis Hydrology and Hydraulics Modeling Curve Number and Time of Concentration Calculation 21 3.1 Pre Development 22 3.2 Post Development 29 4. Drainage Ditches and Piped Channels 46 4.1 Drainage Ditch Drainage Area Map 47 4.2 Drainage Ditch Calculations 49 4.3 Piped Channel Drainage Area Map 56 4.4 Piped Channel Calculations 58 5. Cross Pipes 62 5.1 Cross Pipe Drainage Area Map 63 5.2 Cross Pipe Calculations 65 5.3 Existing Cross Pipe Calculations 73 6. Appendix A: Hydrograph Model Results 78 2 1 . Narrative 3 1.1. Project Data Name: Ambrosia Farm Subdivision Parent Pin: 0556-78-1684 & 0556-68-4765 Address: MCLEAN CHAPEL CHURCH ROAD Property Boundary: PHASE 1: 14.47 ACRES Proposed Open Space: 15,714 SF (0.36 AC) Proposed Impervious Area: 140,273 SF (3.22 AC) Proposed Impervious Percentage: 22.50 Proposed Average Impervious per Lot: 4,500 SF (0.10 AC) Land Disturbance Area: 130,087 SF (2.99 AC) 1.2. Site History & Project Description The project site is 14.47-acres consisting primarily of undeveloped grassed and wooded areas and is phase one of a multi-phase development totaling 84.36-acres.The development proposes 26 residential lots in phase one and all of the associated infrastructure including roadways and public utilities needed to facilitate development. The site is not part of the county's conservation zoning but is partially within a WS-IV watershed area. There are no water courses, impoundments or wetlands within the project boundaries for phase 1 however, there are wetlands and an existing pond Northeast of the site that will indirectly receive runoff from this site. The site is located within the Cape Fear River basin. Structural and non-structural BMPs shall be used to ensure there is no net increase in peak flow leaving the site from the pre-development conditions for the 5, 10, and 25 year storm events. A total of 5 drainage ditches along with 2 cross pipes have been proposed to meet these requirements. 1.3. Calculation Methodology ➢ Rainfall data for this area in Harnett, NC region is obtained from NOAA website. This data contains a depth-duration-frequency (DDF) table describing rainfall depth versus time for varying return periods in the area. These rainfall depths are input into the meteorological model for peak flow rate calculations. ➢ Using WebSoil Survey, the on-site soils were determined to be of Hydrological Soil Groups 'A', 'B', and 'C'. Since the method chosen to compute pre- and post-development peak flow rates and runoff volumes is dependent upon the soil type, care was taken when selecting the appropriate Soil Conservation Service Curve Number (SCS CN). ➢ The SCS method was used to calculate time of concentration and Auto CAD Civil 3D was utilized to determine the pre- and post- peak flow rates. 1.4 Results Rainfall Event 5 year 10 year 25 year POI Pre-Dev(CFS) I Post-Dev(CFS) Pre-Dev(CFS) I Post-Dev(CFS) Pre-Dev(CFS) Post-Dev(CFS) POI#1 38.41 36.15 51.52 47.68 71.18 64.73 POI#2 0.64 0.35 1.17 0.42 2.06 0.52 POI#3 9.36 5.81 15.14 9.97 24.31 16.65 4 2. Reference Materials 5 2. 1 NOAA Rainfall Data 6 NOAA Atlas 14,Volume 2,Version 3 0° Location name: Bunnlevel, North Carolina, USA* ?,' p Latitude:35.3101°,Longitude: -78.8141° a none % Elevation:237 ft** 1 'o, ITS o, *source:ESRI Maps "w 4.M^M�.'� **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 5.22 6.13 7.10 7.88 8.77 9.42 10.0 10.6 11.3 11.9 (4.75-5.76) (5.59-6.78) (6.47-7.85) (7.16-8.69)_ (7.93-9.65) (8.50-10.4) (9.00-11.0) (9.47-11.7) (10.0-12.4) (10.4-13.1) 10-min 4.16 4.91 5.69 6.30 6.98 7.51 7.98 8.41 8.95 1 9.35 (3.79-4.60) (4.47-5.42) (5.18-6.28) (5.72-6.95) (6.32-7.69) (6.77-8.25) (7.16-8.77) (7.51-9.25) (7.91-9.83) (8.20-10.3) 15-min 3.47 4.11 4.80 5.31 5.90 6.34 6.72 7.08 7.50 7.82 (3.16-3.84) (3.75-4.54) (4.37-5.30) (4.83-5.86) (5.34-6.50) (5.71-6.96) (6.03-7.39) (6.31-7.78) (6.63-8.24) (6.86-8.61) 30-min 2.38 2.84 3.41 3.85 4.37 4.77 5.15 5.51 5.97 6.34 (2.17-2.63) (2.59-3.14) (3.10-3.76) (3.50-4.25) (3.95-4.81) _(4.30-5.24) (4.62-5.66) (4.91-6.05) (5.28-6.56) (5.56-6.97) 60-min 1.48 1.78 2.18 2.51 2.91 3.23 3.55 3.86 4.28 4.62 (1.35-1.64) (1.62-1.97) (1.99-2.41) (2.28-2.76) (2.63-3.20) I (2.92-3.55) (3.18-3.90) (3.45-4.24) (3.79-4.71) 1 (4.06-5.09) 2-hr 0.869 1.05 1.31 1.52 1.80 2.02 2.25 2.48 2.80 3.06 (0.783-0.976) (0.948-1.18) (1.18-1.47) (1.36-1.70) (1.60-2.01) (1.80-2.26) (1.98-2.51) (2.18-2.77) (2.43-3.12) (2.63-3.41) 3-hr 0.615 0.743 0.930 1.09 1.30 1.48 1.66 1.86 2.13 2.36 (0.555-0.691) (0.671-0.835) (0.838-1.04) (0.978-1.22) (1.16-1.45) (1.31-1.65) (1.46-1.86) (1.62-2.07) (1.84-2.38) (2.01-2.63) 6-hr 0.368 0.445 0.557 0.653 0.783 1 0.893 1.01 1.13 1.30 1.45 (0.334-0.409) (0.404-0.494) (0.504-0.618) (0.590-0.724) (0.702-0.866)1(0.795-0.987) (0.890-1.11) (0.987-1.24) (1.12-1.44) (1.23-1.60) 12-hr 0.215 0.260 0.328 0.386 0.466 0.535 0.608 0.686 0.798 0.894 (0.195-0.240) (0.236-0.289) (0.296-0.365) (0.347-0.429) (0.416-0.517) (0.474-0.591) (0.533-0.670) (0.595-0.756) (0.682-0.880) (0.753-0.985) 24-hr 0.127 0.154 0.196 0.230 0.276 0.315 0.354 0.396 0.454 0.501 (0.117-0.138) (0.142-0.168) (0.180-0.214) (0.211-0.250) (0.252-0.301) (0.286-0.342) (0.321-0.385) (0.358-0.431) (0.408-0.495) (0.448-0.547) 2-day 0.074 0.089 0.113 0.132 0.158 0.179 0.201 0.224 0.256 0.282 (0.068-0.080) (0.082-0.097) (0.104-0.122) (0.121-0.142) (0.144-0.171)1(0.163-0.194) (0.182-0.218)1(0.202-0.243) (0.230-0.279) (0.252-0.308) 3-day 0.052 0.063 0.079 0.092 0.110 0.124 0.139 0.155 0.177 0.195 (0.048-0.056) (0.058-0.068) (0.073-0.085) (0.085-0.099) (0.101-0.119) (0.114-0.134) (0.127-0.150) (0.141-0.168) (0.159-0.192) (0.174-0.211) 4-day 0.041 0.050 0.062 0.072 0.086 I 0.097 0.109 I 0.121 0.137 0.151 (0.038-0.044) (0.046-0.054) (0.058-0.067) (0.067-0.078) (0.079-0.092) (0.089-0.104) (0.099-0.117)1 (0.110-0.130) (0.124-0.148) (0.136-0.163) 7-day 0.027 0.033 0.040 0.046 0.055 0.062 0.069 0.076 0.086 0.094 (0.025-0.029) (0.030-0.035) (0.037-0.044) (0.043-0.050) (0.050-0.059)1(0.057-0.066) (0.063-0.074) (0.069-0.082) (0.078-0.093) (0.084-0.102) 10-day 0.022 0.026 0.032 0.036 0.042 0.047 0.051 0.056 0.063 0.068 (0.020-0.023) (0.024-0.028) (0.029-0.034) (0.033-0.038) (0.039-0.045) (0.043-0.050) (0.047-0.055) (0.052-0.060) (0.058-0.068) (0.062-0.073) 20-day 0.014 0.017 0.021 0.023 0.027 0.030 0.033 0.035 0.039 0.043 (0.013-0.015) (0.016-0.018) (0.019-0.022) (0.022-0.025) (0.025-0.029) (0.027-0.032) (0.030-0.035) (0.033-0.038) (0.036-0.042) (0.039-0.046) 30-day 0.012 0.014 0.017 0.019 0.021 0.023 0.025 0.027 0.030 0.032 (0.011-0.013) (0.013-0.015) (0.015-0.018) (0.017-0.020) (0.020-0.023) (0.021-0.025) (0.023-0.027) (0.025-0.029) (0.027-0.032) (0.029-0.034) 45-day 0.010 0.012 0.014 0.015 0.017 0.018 0.020 0.021 0.023 0.024 (0.009-0.011) (0.011-0.013) (0.013-0.015) (0.014-0.016) (0.016-0.018) (0.017-0.020) (0.019-0.021) (0.020-0.023) (0.021-0.025) (0.023-0.026) 60-day 0.009 0.010 0.012 0.013 0.015 0.016 0.017 0.018 0.020 0.021 (0.008-0.009) (0.010-0.011) (0.011-0.013) (0.012-0.014) (0.014-0.016) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.021) (0.019-0.022)1 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical 7 PDS-based intensity-duration-frequency (IDF) curves Latitude: 35.3101°, Longitude: -78.8141° 101 Average recurrence interval '-- (Years) t_ L c \ � — t �_ • 2 I10_1 - •\\ — 100 .a — 200 a \ 500 -`-- — 1000 -- 10-2 - r 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 c c c c c " " " >. >,>, >, >, >. >, >,>, '— •E •— •— '— L L t t ro ro to N to r0 N N ro E N A lb N 4 -O -O-O 7 7 -0 -0 -0-0 ull O 4 m Duration N N t` O N m v 101 - - - _— - L- L C — Duration .Z' 10° c — 5-min — 2-day — t0-nln — 3-day c 15-run — 4-day •y — 30-min — 7-day ;° 10-1 — 60-min — 10-day a. .� — 2-hr — 20-day a` — 3-hr — 30-day — 6fir — 45-day 10-2 — 12-hr — 60-day U ' I U I — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT1 Wed Sep 20 16:19:45 2023 Back to Top Maps & aerials Small scale terrain 8 • 1 it _ _ , ., . .. .... bIralke rtowni ii.,_ 3km � I 2mi i.mai II Large scale terrain nston-Salem 0 • . Durham Rocky Mount f Greensboro • Raleigh • RTH C ARC L INA •Greenville 0 -'- •Charlotte Fayetteville I •Jac + W._ C A - _ - -_- - 100km - ._Wilmington On,TW • BdV . 60mi Large scale map m instonS lem Greensboro o D rham Rocky Mount n Raleigh North Greenville Carolina ' arl offs .• flayettevi Ile \ o Qac + le 100km Wilmington Isdui 60mi Large scale aerial 9 Winston-Salem Greensboro Durham . Rocky Mount Raleigh • Greenville North • Carolina Charlotte • Fayetteville • Jack fie 100km Wi lmi n°t' du 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer 10 2.2 Web Soil Survey Map 11 Custom Soil Resource Report ' Soil Map M 697700 698000 698.300 698690 698900 699200 699600 699800 700100 700400 35°19'14"N ` i 35°19'14"N ,4I I Agaidr ® BnB / Ro P1/4„,14000 GaB BnBJ ►- NoB / L 1 BnB 7; CaB Bb x , . J. Pd / Bb 1 GaB` GaB BnB Ro .,.>,,, Y W j § ,. / T. .' B b EaB GoA . . ` 542,0 , ,,,;. \N o B ,;. Bb mIt§ r 'ti �� '1NaB r fG�� t.x ,y, ilk ii ,-/ / BnB i/T 41 Ailltsididt i HwYr2u3o !._, \--- 4" }i • GoA 4 +� ��" Gay " � "�,f' 4' NoA GaD 4 3 ogc�. — S BnB B b !`; > �d _ �. GaB44 GaB GaB• GaB Bb good Gasp maw Tmon bc.ea11o01 a1(1-ab�of-raOQ° 35°18'14"N I I „. 35°18'14"N 697700 698000 698300 698600 698900 699200 (89 00 699800 700100 700400 Map Scale:1:13,100ifpnntedonAlandscape(11"xs.s")sheet. NOTE: RED OUTLINE INDICATES APPROXIMATE F N o 150 ao 6o0 9000eters LOCATION OF THE ENTIRE PROJECT, RED A t SHADED REGION INDICATES APPROXIMATE 0 500 1000 2000 3000 Mapprojedion:Web Mercator Corner coordinates:WGS84 Edge tics:UTT4Zone17N WGS84 PHASE 1 LOCATION 12 Custom Soil Resource Report MAP LEGEND MAP INFORMATION Area of Interest(AOI) 14 Spoil Area The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. Q Stony Spot Soilsit Very Stony Spot Soil Map Unit Polygons Warning:Soil Map may not be valid at this scale. Wet Spot ,..,. Soil Map Unit Lines Enlargement of maps beyond the scale of mapping can cause p Other misunderstandingof the detail of mapping and accuracyof soil p Soil Map Unit Points pp 9 .• Special Line Features line placement.The maps do not show the small areas of Special Point Features contrasting soils that could have been shown at a more detailed Blowout Water Features scale. -_- Streams and Canals kg Borrow Pit Transportation Please rely on the bar scale on each map sheet for map * clay Spot 1.44 Rails measurements. 0 Closed Depression o,/ Interstate Highways Gravel Pit Source of Map: Natural Resources Conservation Service .r US Routes Web Soil Survey URL: Gravelly Spot Major Roads Coordinate System: Web Mercator(EPSG:3857) ® Landfill Local Roads Maps from the Web Soil Survey are based on the Web Mercator • Lava Flow Background projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the 46 Marsh or swamp Aerial Photography Albers equal-area conic projection,should be used if more It Mine or Quarry accurate calculations of distance or area are required. 4 Miscellaneous Water This product is generated from the USDA-NRCS certified data as O Perennial Water of the version date(s)listed below. v Rock Outcrop Soil Survey Area: Harnett County,North Carolina + Saline Spot Survey Area Data: Version 20,Sep 8,2022 Sandy Spot Soil map units are labeled(as space allows)for map scales Severely Eroded Spot 1:50,000 or larger. • Sinkhole Date(s)aerial images were photographed: Apr 24,2022—May 31 Slide or Slip 9,2022 oa Sodic Spot The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. 13 2.3 Harnett County Soil Map 14 C9 // 0 1 �— Duncan 1 4 • 2 C•OU e, , Cr N SOIL LEGEND* \ / G �® / 1 GILEAD-BLANEY-CANDOR / t�¢r9 1403 2 1 / Q° / \ 2 DOTHAN-FUQUAY-GILEAD 2 I` Vents 1/�t •• i gier 2 �� 3 NORFOLK-WAGRAM-RAINS / P 1iiY • ,`�' 35 30 / S — 4 CECIL-PACOLET-NASON / Cr 4 4 p114- � —� 1?Pii41111, 1‘ 5 BIBB-WEHADKEE 5 4,`_ � e- , • � 81 I 6 ROANOKE-WICKHAM-ALTAVISTA co / Ls Gt �� Fear Qo. Dante I 2 \ 7 EXUM-AYCOCK-NAHUNTA r 0 (yi —lira: 44 .. c, 'The units on this legend are described in the / 4 I 4sBu'es text under the heading"General Soil Map Units" Riuer/ CID5C Compiled 1992 / • • 5II' Creek C'./ 4orn0n �Vill Th ,„ 0/ 2 tsLillip Alitt livia• \ 2 1,� //( ��/ 8� 4 * ctk , � �� S4. P 1 2 , ti T NlIFAIIIAile.,,_ 0 a 35°20' 7 �// `- 1 �,� • 1 T I / 1117 \ 1 \ 7 27 P6 / M<tni . 2030elt • Bu nlevel da P Dunn • .t ,--it /� �Q^rs / 1 :4) f 7 Spa y t� 3 / Johnsonville 1 11 �� �• 5 \14, . 471PlitEll gihir. O \ ��e 1121 �6f BOUNTY v �0� 71 UNITED STATES DEPARTMENT OF AGRICULTURE ), _) 7 _t = I 4 SOIL CONSERVATION SERVICE — ' G / NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH,AND NATURAL RESOURCES ei \ tiitttie 7s°5o a ao NORTH CAROLINA AGRICULTURAL RESEARCH SERVICE 1 1111 1117 \ e410APPROXIMATE SITE ci, NORTH CAROLINA COOPERATIVE EXTENSION SERVICE29°10' \ o 1 LOCATION HARNETT COUNTY BOARD OF COMMISSIONERS � b °y� 1 _ GENERAL SOIL MAP i ' _ 7s�oo' CUMBERLAND N HARNETT COUNTY, NORTH CAROLINA CotN� / Scale 1:190,080 f0 1 2 3 Miles 1111 I I 1 1 0 3 6 Km Each area outlined on this map consists of I I I more than one kind of soil. The map is thus meant for general planning rather than a basis for decisions on the use of specific tracts. 15 1 2 G , Duncan �� /,` CO0:411, `� .,,,i.. 4<<e Cr/ G _`a \ 55 - /Cr 1403 •'L / / / eats c 'el' 4/3 Angler ®�1 Inset, sheet 7 t° --• 1 / au f} ` \ O0 Fear 0eetd�Kipling • 1.94 I / 1s 0 D / \ Ge C� a 1403 ` 0` O \� ti5 �,� r� AO I 4y415 D \ 6� 'V w e es �j�l ill-F-7-7____ Gd �` � y>, O River r V 49 421\ 4?� y�5 \ V 1229 c \ / Mamers \/l, it GL / upperes II:uies Creek Coats Lr/ / 1229lir •Lillington �Q Thdr"ton �`:a m/ 1 ®� \ 1215 Q 8 � ss 3 �,c�, / ;Olivia '0 ` y 6 amp . �iiiY // 6dt�e y ® CrP l_.,-As'i S`La35°2 / : S�d�Q JQ r tidef'`O/ •� / Mrzea,,s / 1117 (� !"\/.• O� `�/J� ® '\� McLeod 2030 BunnlevE a'koa ` pg r�nn , � �t \\ , _�® / Dot. A �`� se .� °o� -Os( r w°fs / Johnso vile ? c, 0 < o` I ? 2045 I ss Re er 0 11 1 CCLINTY -- 'a-.., i \ El I11�I tte 78I50' 78I' i nsetC, Inset, sheet 2 1111 1 Po, ( sss Inset A, sheet 13 Inset 8, sheet13 sheet 1379°10' ' ti14 C - - - Inset, �3,_ hset 14 CEO INDEX TO MAP SHEETS �Q' e`°` �� 7' �o' CUMBERLAND .`� GO QV ��, n�,, k5 N �O ��� HARNETT COUNTY, NORTH CAROLINA dcap✓1V — rJ� G� Scale 1:190,080 O 1 0 1 2 3 Miles �Q� SITE LOCATED ON 1 101 , I 1 1 i MAP SHEET 11 1 0 3 6 Km 1 [ 1 1 1 1 1 1 1 16 NORTH CAROLINA DEPARTMENT OF ENVIRONMENT,HEALTH,AND NATURAL RESOURCES NORTH CAROLINA AGRICULTURAL RESEARCH SERVICE UNITED STATES DEPARTMENT OF AGRICULTURE NORTH CAROLINA COOPERATIVE EXTENSTION SERVICE SOIL CONSERVATION SERVICE HARNETT COUNTY,NORTH CAROLINA HARNETT COUNTY BOARD OF COMMISSIONERS SOIL LEGEND CONVENTIONAL AND SPECIAL The first letter,always a capital,is the initial letter of the soil name.The second letter is SYMBOLS LEGEND a small letter.The third letter,if used,is always a capital and shows the slope. Symbols without slope letters are those of nearly level soils or miscellaneous areas. SPECIAL SYMBOLS FOR CULTURAL FEATURES SOIL SURVEY SYMBOL NAME BOUNDARIES MISCELLANEOUS CULTURAL FEATURES SOIL DELINEATIONS AND SYMBOLS cce Pal' AnB Alpin sand,0 to 6 percent slopes National,state,or province —— Farmstead,house(omit in urban area) E ESCARPMENTS AtA Altavista fine sandy loam,0 to 3 percent slopes,rarely flooded Au Augusta fine sandy loam,rarely flooded AyA Aycock silt loam,0 to 2 percent slopes County or parish — Church t Bedrock(points down slope) V V V V V V V AyB Aycock silt loam.2 to 6 percent slopes ■ Minor civil division — — — — Other than bedrock(points down slope) Bb Bibb loam,frequently flooded School BnB Blaney loamy sand,2 to 8 percent slopes Reservation(national forest or park,state SHORT STEEP SLOPE BnD Blaney loamy sand,8 to 15 percent slopes forest or park,and large airport) Indian mound(label) n. GULLY •wwwv' CaB Candor sand,0 to 8 percent slopes Land grant —••— Located O Tower CaD Candor sand,8 to 15 percent slopes object(label)) CeB Cecil fine sandy loam,2 to 8 percent slopes Limit of soil survey(label) DEPRESSION OR SINK 0 CeD Cecill fine sandy loam,8 to 15 percent slopes Tank(label) .Gas Ch Chewacla and Congaree loamy,frequently flooded Field sheet matchline and neatline SOIL SAMPLE Cl Co Coxville loam Wells,oil or gas A AD HOC BOUNDARY(label) io....,v�,1'�] A MISCELLANEOUS DoA Dothan loamy sand,0 to 2 percent slopes i�___ DoB Dothan loamy sand,2 to 6 percent slopes Windmill DtB Dothan gravelly loamy sand.0 to 6 percent slopes Small airport,airfield,park,oilfield, Blowout v DyF Dystrochrepts,steep cemetery,or flood pool Kitchen midden I-1 Clay spot X EnB Enon fine sandy loam,2 to 8 percent slopes STATE COORDINATE TICK I EnD Enon fine sandy loam,8 to 15 percent slopes 1 890 000 FEET Gravelly ExA Exum very fine sandy loam.0 to 2 percent slopes spot o 0 LAND DIVISION CORNER L FaB Fuquay loamy sand,0 to 6 percent slopes (sections and land grants) + WATER FEATURES Gumbo,slick or scabby spot(sodic) 0 FuB Fuquay gravelly loamy sand.0 to 6 percent slopes ROADS DRAINAGE Dumps and other similar non soil areas — GaA Gilead loamy sand,0 to 2 percent slopes GaB Gilead loamy sand,2 to 8 percent slopes Divided(median shown if scale permits) -- GaD Gilead loamy sand,8 to 15 percent slopes Perennial,double line Prominent hill or peak •„ GoA Goldsboro loamy sand,0 to 2 percent slopes Gr Grantham loam Other roads Perennial,single line — `_ � Rock outcrop(includes sandstone and shale) V HaB Helena fine sandy loam.2 to 8 percent slopes Trail Intermittent ' Saline spot + LaB Lakeland sand,0 to 8 percent slopes ROAD EMBLEM&DESIGNATIONS Drainage end N ,' LnB Lillington gravelly sandy loam,2 to 8 percent slopes Sandy spot LnD Lillington very gravelly sandy loam,8 to 15 percent slopes LnE Lillington very gravelly sandy loam,15 to 25 percent slopes Interstate ® Canals or ditches LoF Louisa fine sandy loam.25 to 45 percent slopes Severely eroded spot Ly Lynchburg sandy loam Federal US ay Double-line(label) CANAL ) Slide or slip(tips point upslope) ) MaA Marlboro sandy loam,0 to 2 percent slopes Draina a and/or irri anon — MaB Marlboro sandy loam,2 to 6 percent slopes State NC se 9 9 Stony spot,very stony spot 0 Q0 Na Nahunta loam Secondary SR am LAKES,PONDS AND RESERVOIRS NeD Nason silt loam,8 to 15 percent slopes NeE Nason silt loam,15 to 25 percent slopes RAILROAD Name only t r Perennial NoA Norfolk loamy sand,0 to 2 percent slopes NoB Norfolk loamy sand,2 to 6 percent slopes POWER TRANSMISSION LINE Intermittent *• • ___ _NoC Norfolk loamy sand,6 to 10 percent slopes (normally not shown) -• - NuB Norfolk-Urban land complex,0 to 6 percent slopes MISCELLANEOUS WATER FEATURES OrB Orangeburg loamy sand,2 to 6 percent slopes PIPE LINE(normally not shown) i--11 Marsh or swamp 416 PaE Pacolet fine sandy loam,15 to 25 percent slopes FENCE(normally not shown) - Pc Pactolus loamy sand,rarely flooded Spring o. Pd Pits-Dumps complex LEVEES Pf Pocalla loamy sand,0 to 6 percent slopes Pn Polawana loamy sand,frequently flooded Well,artesian t Ps Portsmouth loam,rarely flooded Without road —„—,.,,,—,,,„„„ Well,irrigation o Ra Rains sandy loam With road Rb Rains-Urban land complex Wet spot Ro Roanoke loam,occasionally flooded With railroad ;;;;;;;;,;;;i;;;;;;;;;;;;i; NY StA State fine sandy loam.0 to 3 percent slopes,rarely flooded DAMS To Toisnot loam Large(to scale) < VaB Vaucluse loamy sand,2 to 8 percent slopes VaD Vaucluse loamy sand,8 to 15 percent slopes Medium or Small 11.11011 VeB Vaucluse gravelly loamy sand,2 to 8 percent slopes �r VeD Vaucluse gravelly loamy sand,8 to 15 percent slopes PITS / u f VeE Vaucluse gravelly loamy sand,15 to 25 percent slopes ��—I WaB Wagram loamy sand,0 to 6 percent slopes Gravel pit r , WaC Wagram loamy sand,6 to 10 percent slopes We Wahee fine sandy loam,occasionally flooded Mine or quarry 'X WfB Wakulla sand,0 to 8 percent slopes Wh Wehadkee loam,frequently flooded WkB Wickham fine sandy loam,0 to 6 percent slopes,rarely flooded WkD Wickham fine sandy loam,6 to 15 percent slopes,rarely flooded 17 U.S.DEPARTMENT OF AGRICULTURE SHEET NUMBER 11 SOIL CONSERVATION SERVICE HARNETT COUNTY, NORTH CAROLINA Au 2 040 000 if f i N•0 „0 puns shoor 5) ' "% :22 30" - CPI "14 " iE. kiiik „ ,_,.,:f „, - r2,, „AR'. • _ .11P A of ) Not GoA t Ao 00A NV 11( -.------ IA . . '%am,A r:'-loVG 1 W'S i . ' -1 „,,,. - V / '''' ' N -„Y i' / " - ,S , .‘• . _ \ a 't' ....... . roarer , I 14L \* 1 ,.,, ,, *, '''21 r'''' LA% V '-'7A.-; ''' * e./ '-'1--• .1 k ,4/ ..,.4 Noe t. /illkor'nett .. 4.1 4 ill , ...„, f',.:: ..SAil '4 r 1 4,4 \woiti_... ;4;4 10.- rill.2-1' „,,,,, ' Pi: I___ , ___, N, qt. _ ,liftly , „. ', _LA_ „,.\--,-- .411L----Az_' '' " \ 1.1,( 17 / II-'' „,„ Notwir W. 1!.., , 1.' A, .. \, e i,'1 ' , -/ r-7 ) / /- ir- ik4Hflo-,Ak: NT. N X ''''''P."' ,,.,„ MItt t Y -- _.- 1 74.". ' 13161r.. 1.4 ,,) .k,, t:i'xtitii / 7 4 ; , f . .,, C ..\w,,i;, ;.;„•°_, ,,,....," litic..., 4747107 ...„,-;„ • A f, P I Zb ,, p.Tr4ritg,,,,L„. "1)7-4,343 .. „,...40..\ e--.( NJ,. , fit vf.014,, ,,,#.4 GA . i . ), ',„ \... 4FibmWessiliwo.._,,,4..,0A/- 2. ir 7, ler,i..., Li, L+ Alt: at, ... A ,,..„,.. ,,, , `‘' 4 • ._ /-or..,,,A.,„\ ; d. • 1,-, ' :I 13144:14k . e ( 7:4 41 : , 4 ..4 i • ".'ens,* ' rAt . .*\ I .f. .-Apppe, *lid 0,4 41,0 Elunnlevelp." yortri ,-, -'N ' - ' •-•.%--1 .Lep.v• 4111P ''''1441,,„ ..4.• /1. %IP 0, .101$04N4. ii„, ‘-iiii , ..,-,,Al ,, i 4,trii_,:-:-.. ,r, :, _ ; -,-;'r' ,,,,-"— • > . .41111ffir it 11,40 l'17.:Of_ , II ,. '',,_. '''''F"'l ,. f*._.,„4". jiltrallilliPeill Affe—k-'41N, 0,7„), ""1"A Niii‘dgritb, APPROXIMATE SITE L., / f - 9 • .„,;„,/ 46/4 d'el. III s• , .1.4 „i3i ' wtitikAr 47 t de _ ,01P1 ,_,.....,,, like 612 * PI IV r - lor lii, R. lipt,,W,wtifikisiik::‘ C2H„ o _ rU.' • 1:61h, • i: 'ii:', mliiis,vtity,-, ' \ - t.- % , 1 / ' grurP4.0. .‘l __,---- ----.__ -- \ ( •.:•,7 AO 1.?21 41,...., SteM ' S• A, - 1 1 r..,,..1' Po"',, .-.;-,:' `-- ,_ ^'^/,/),•,_'" ,..,. ' i' r ,,-' Amilaille .....0,;- •- --1 40I „ sir OP,- 1411r6- 0.10. A. iltark-J-I W1.0 r , 41:0.7i 3 I i i Itap WA -Aiiiinisiik . 14 7 W4720,44164:14.....,4' '7:777:-""4/4/1“..1"41114lagilliP-°. '',....; ‘,' - -Lr\ P:-------7;n- ''',.. --''' -----1"'T'lw.11/;" um.,. ' ''''.----/ NC"'. '1,4-1,"''''•%''' ) ' _ 4.41 r:11,,, ‘11. -; Gd1:' •' - rr ..20.1111”ii1E9 rir,,,Arir"-.13 -i . '. It arisitw , .--...„ ,, ,, .. ti - • '' r--- - rip ,..f a. .a.--.- ,COGIYAG .. .. , , so, , t ill, All, - 3515 001 (Joins hsetA,sh.13) Au Wk21 05 78°57 30' N sou.V.00 3 000 2 000 1 000 0 5 000 10 000 keel This map was compiled by U.S.Department of Agriculture, y Soil Conservation Service and cooperating agencies on 1973 Scale 1 24000' and 1976 photography obtained from U.S.Department of Interior,Geological Survey HARNETT COUNTY,NORTH CAROLINA NO 11 SHEET NO. 11 OF 14 18 2.4 USGS Topographic Map 19 USG$ U.S.DEPARTMENT OF THE INTERIOR The National Map BUNNLEVEL QUADRANGLE NORTH U.S-GEOLOGICAL SURVEY US Topo 7.5-MINUTE SERIESSLINA eel Pera changing world -78.8750' PV QV .78.7500° 35.3750° 694°0°"'E 95 96 97 98 99 00 01 02 03 04 35.3750' �®_I d pD R916mD„N A., - - "...� 16 CIID � ® � �R®aanF�mx�`� �n ® �� 05 1 % 5 �am e [A 15 .78304 0' \ Ea.r. m M 14 8 `�� 4' e 14 / yf3stt. 9 �e 1 af 1313 4 0 tII @ Ttraniilftak�P N a 12 8 R SITE LOCATION 1 4,-,,, t 44 q 12 y`fiS �aaaT/ •m 0 RECEIVING 11 ei ee WATERS (NOT A * CONSIDERED 11 HQW OR ORW) , ° Bsnleyel C-- I2thO5 . 10 b j / ; J sP ° E r 10 : ir ..• ; • 09 AO's`>a bS 1/2gMILE p �m --\ RADIUS CIRCLE 09 gn 4O `.4 / l —1 .,, N. 07 zo VOc e< pua GTt9 t g q tl B 06 0 4� R? 4 05 ''aa e ftl of " P2R'D'' ".9' 1 0 _ t .9m O0OgyO - - 05 miaow II \ _ _ �. . .. cam / \./6 6 ? R c ` l N 1 4 • ��,SMmNxTiiCO �7 ® �% —� 'RC'NDD(o ,1 i� 8/ \ �°,y�q�, / , —I L. 1s04awmN • / g ss0 1 N tic a 03 " 1 35.2500° 94 95 96 97 98 99 py 00 Qv 01 02 03 704.0.E -78.8750° .78.7500°35.2500° Produced by the United States Geological Survey MN SCALE 1:24 000 ROAD CLASSIFICATION Nor 83(NAD83) ExpresswaIf Local Connector World Geodetic System of 1984(wG584).Projection and 1 0.5 0 KILOMETERS 1 i ODD-meter gnd:Universal Transverse Mercator,Zane 17S -- CANNA— Secondarywy 1001RoadTM1ss map o not a legal document.Boundaries may be181MIS 1000 50D 0 S 0M OERS10002000Ramp 4WDgeneralized for Nis map scale.Private lands within government 1 1reservations OI be shown.Obtain permission before Ra MILg MILES •Inteate Route 0US Route O Slate Route entering private ro yWndz. .0__0 1000 2000 3000 .0 5000 8001 7000 8000 9000 10000 Cv^os°xcls t°c^n°" ==7:::r r,:c' Imagery NAIP,September 2020-September 2020 =ry ID Roads us. census Bureau, 2016 �� NOTE:RED OUTLINE INDICATES APPROXIMATE Names GNIS, 1980 2022 DECLINATION AT CENTER OF SHEET UTM GRID AND 2019 MAGNETIC NORTH 1Mamers 'n Nydrugraphy National Hydrography Dataseq 2005 - 2018 1 2 3 2 Lillington LOCATION OF THE ENTIRE PROJECT,RED Zonal Eleatwn oats: 0008 CONTOUR VERTICINTERVAL DATUM10 3 COO SHADED REGION INDICATES APPROXIMATE =�i NORTH AMERICAN VERTICAL DATUM OF 1988 Boundaries Multiple sources, see metadate file 2019�'- 2021 loon ,D 4 5 4Anderson Crok PHASE 1 LOCATION u_ o°q�sq 5 Erwin w Wetlands FWS National Wetlands Inventory Not Available I National This map was produced to calf°.with the 6Manchester = K PV OV onal Geospatial Program US Topo Product Standard. 6 ] 8 ]Slawmb Q 8Wade BUNNLEVEL, NC 22 w n� ADJOINING QUADRANGLES 2022 175 20 3. Peak Flow Analysis Hydrology and Hydraulics Modeling Curve Number and Time of Concentration Calculation 21 3. 1 Pre-Development 22 PROGRESS PLOT DATE:05/13/2024 K Y N ro // / / / / ) 11 \ ` \ \ / i I i \\\ M o 1 I I 1 I II \\\ (\ fi f / ,-_ ----_ I I III \ \ — \ \ \\ \\ \ / \ \ 1 I 11 f /I I11 I I \----- _'-- \\\\\\ \ r 1 f/1 / f 1 ( / /\J\ 7 \\\ \\ \ ( \ / I I I \ I ( z\ `--_____ --, x NV\ \ ,s., / /\ / / I 1 r -- N \ \\ `\ -- / ' 1 1 J' \ / - — --- — \ / I� / I\ \ / / ) I\\ \\ / \\\\ \ \ \\\ I \ \ � _ � � / / / / / \ \ \ \\ \ c ) / , � ,' V / / / ; -��\ \ \ \ \ \ ` \ \� - \`� \\ — --. ' '_r \ \ `\ . `\ `\ ; \ ; ( / I l /^ � \\ \\ \\ -- / / ,/ / o z° \ \\ \ \\ \ \QQ\l�\1\. _I \ r___ \ \ 1\ \ \ `\ l r j\ / I I / N\\ \ N. \___. r� r� rj/ / /\i - \\\\\\\\\\ \`N\\\`N \ --_ \ \�,\ N\\ /r J / rr/ v' / \ 1 \ `\ \\ \ \ \\\ \ \ l \ ,\ \\\\ `\ /' / i' / /��\ \\\ \\\`\\\-- \-, \ \ \- ---�--)Nv \R /-- --- r- - r r/ / / ` \ \ ` \ \ F' \ \ - \ \\\`\ - -� / / ! 1 -ice .45t..N,off, . `\\`\\ \\\-�\��.`�\\\ — ��\ 1\ - - rr r — _- / r i f , \ \ \ \I / \ \ :11 f\ I 1 ; \\\\ \\\�\\� //r / / Jl / / ���.Q+�SS%e;.y:,'% \ \ \- / o _ / I 1 1 \ I w nnnnu+ iii 1, \\\\ N ` __ " \\J\ \\` — / I I -- --- ////// --- \ / \\ \\\\ \ ;- — v\O �a / / \\\\\\\\ \\\ `\ \I I 1 \\\\ -- �_'- N..- \\\\ \ \ \\\N ` / / // // / / / 1 / I l l l l I l / / r -- \ N �'_,- U \ \ \ \ % \ \ I \N \ - 1824'SHALLOW / / / / / / / / / / • \ \ \ \ \ \ \ \ •\ ' / // r= --__ \ \ \ \ 1 \ \`\1 )` / /' r / / / / / / / / / / /�� / __ ,- \ --- Cr O aim \\`\\\\ \ \`\\\ \ `\`_�iri%/�i,----\ --- �\\ \ I l / /� \\\I1\J l \ / / / ---CONCENTRATED / / / / // // /// / / /// / / / / / / - -__-- - cc woi \ _ \ - FLOW / / / / / / / / / -- -_'' — - 4 \V A V A\A ` V A- /i i -----,'\ V 1 � �/ j 1 1V A / / / // /// / / / / / / j�l l l /r _ — — -' 'N` w i \ \ \-\ _ //// I 1 I I I I ( / / \I\ \ / __ / /// ' i / / / / / / / / f / / \ \\ dl-__ ¢\\\\ \\ � \ \ III \ I I I , I , I I I 11 l \I\\\\ / / / / // / f 1 \`\ \ \ a- \\ \ �\ \ I / \ \ \ g° \ \\ \ - //7//,.- / I I I I \ \ \ \ \ I 1 DA#2 / // / / / \ N. \ \ \/II — a N / / I / I I TOFF-SITE:817,942 SF(18.77 AC) \<. - / / / ( \ \ \ \ l / I 29 \\ \\ \ /i i / / / III \ \ \ \ I \ y / / / �� °z \ \\ \ — I I S \ \ \ \ \ I \ \ ON-SITE:128,314 SF(2.95 AC) r / / \ \ \ 1 - -- \ Z \\\\\\\-,.„--..,......„..1--------\ �r .-"\ \\ \\ 1 ( l l % I I \ 1 \ `\`\ \ \ 1 I — — TOTAL:946,256 SF(21.72 AC) ��y/ \r / / ,�l i I / S \\ ` \\ \ 1 II I \\ `---- \Il` h1 a \ \ 2 I 1 1 1 CLASS A SOIL:59,927 SF(1.37 AC) ti_--__ - •\ \ ' \ -- ter ^,..,\ \\\` \ 1 11 I1 / / �_ \\\\\\\ ---- \ " \ � I I CLASSCSOIL:886,329SF(20.35AC) \ / _ - \ ¢ �� \\\\ \ 1 III / / \a// 'CLASS CSOIL / / - ivorr- ,// / / / — \ w \0 \ \\ \\-----_ - `\\ `\\ 1 \ \ l 1 I1 / / ////// 4,/ )\+I\a'\ I / / 1 // / / / r CLASS ASOIL / l / / l l ( -- \-� wr \ \ \1 (I1 // )I I� / I \ r — z- `\\ \\ \ \ - -\ II 1 !! // //// z�/ 1 II a 100'SHEETFLOW // 1 \ w o \ \___ \\\11 jjrl/I 11 II //// / II �III i =_- _ \ zw \ -- - — ) f ' I11 ( // ` 11 I / / / \Ott I _ \ O Z ww N-.-----------------------. �//7 ,IIl1I/)\ / llI11II I 1 t +1'ei1\ `-2 _ ---- ' / / -- POI#1I -_ ~ \ �N \-- / / / / — - /1 II I 1 11 it / wil .: \ \ Ce \ \ J/ IJI I /I \ \a�� 3rr_ �\ \ _ - \ 'x II J 1 1 I 11 1/! ////, / / /i / /� 1 1/N \ \ \- \x20— -\ I� 1 `� _-- DA#1 / / \ `\ --`-�^ ----- ~`\t\ \ \\\, I- CLASS c SOIL w Z IIIV. �1111 I' OFF-SITE:4,297 SF(0.10 AC) / v v I. / / I I I I 1 ( \ \ -_- \ i \ ON-SITE:455,018 SF(10.44 AC) - \ --- \ \ - _ I I I x /N\ I \ I \ 1 I 11 1 1 I I 1 1 1 1 \ / 1 I I I I 1 \ ` II -�TOTAL:459,315SF(10.54AC) \ \ CLASS C SOIL 11 - -\ 75'SHEET FLOW \ \ \ \\ \ \ I 1 I I I 1 I 1 \ \ \ -\ 1,1\J 1 - CLASS A SOIL:241,677 SF(5.55 AC) CLASS A SOIL N I I \\\ (In i \ \\\\\\ \\\\\\\ \ \ I 1 I f 1 l \\\\ N\N\ \ \ -\JIp\\ --\ CLASS B SOIL:5,072 SF(0.11 AC) N \ V A A \ 1 1 1 1 V A v�\ -CLASS C SOIL:212,566 SF(4.88 AC) . \� Nv V 1\ \ \\\\\\ \ ` \\\\\\ \ \ \ \ �s \\A \ J / — — —11 - —.... I I I 1 w I \\\\\\\\\\\\\ \\ \ \\\ \\\\ \ \.-�\\\ \\\\--\ \\\\ \\ \ �4r' \J11 ^/II --_-_-' r i -- ` �\ \__ 1 l 1 I �\ \ " ° a m \ - _ 637'SHALLOWm / I ' \ \ \\\\\ \\ \\ \ \ \\ \ ` \ \ \ \\\-- \ \ \\\� -Nr --\I!\ /f / CONCENTRATED \ DA#3 N I -\ \ �- rc oy o m o I I \\\\\\\ \\\\\ \\\\\\\ \,` \ \\`\- \\\ \ `\ \\7 If \ FLOW --_ - o \ `\\\-- -�A\ H I I \\\\\\\\\\\\\`\\ \ \ \\\\\ \ \ \\\ \`\\\\ \ \ z4,' If\\/h-_ ---- — z '- - FLOW- ASOIL 8S ( 73 ) N w o 431'SHALLOW OFF SITE:0 SF(0.00 AC) 1 \\ `\ ` rc ° u -' CONCENTRATEDON SITE:49,151 SF(1.13 AC) \ \ o / \\ \ \ \ \\ \ \\ ` ` 1 _ ----- _ _ - W r TOTAL:49,151 SF(1.13AC) I I \ \\ \ \ V\ /r CLASS :31,52 F 0. AC \ ----—2/2" \ \\ \\ \ \\\ \ \' '- \ \ I\ CLASS C SOIL:17,623 SF(0.40 AC) — J z 1 l /_-'\ \ \ \ \ \ \\\\\ \� \ \ \ \ \ \ `2+1---- 1� --- \ \ \ \ \ \ \ \i I\ I _, \______,___,,,,_________ CLASS A SOIL ra.PIN I- •— U \\ \ \ it 0 = ~ Z Q \\\\\\ \\ \ \\ \ I \ \ \ \\ \ \- \ \ICLASSASOIL J^ CLASSASOIL / a--_ 1----' -_---- -- \ \ — _ /- - - r _-- -- \\ N\ J I- CL o ^2 cell' \\\\\\ \\ \ \ -- - \ \ \ ' \/ y .- ', POI#3 - - 11`\\\\II\I \ \\ \\\\\\\ -\ \ \ e I' \\ Nogo �' / ,.E \ �F_ Lr \ \ N ~ 2i Cl- Q 1 1 1 1 I I 11 1 1 1 \\ \ \ I \ �\I 111 / 1, I i_ \ ao / LJJ w 0 1111 \ \ \ \ \ a, lCLASSBSOIL 3g„,-,�ec----_ / -_- \ \ \ \ Z z I\ I 1 I 1 \+ I\ \ \ •\\\ \ I I l \ �11r/ 9' ,Y .,, sa ____-- \\ - -- ---- __- i -___--___-----\\\\\ \ \ U. $ W C� 1 ! , 1\. I I f / \ \ t\ , _ . \ . \ . \ \ \ III ``IL\ Ni rr / '-- - -- \-----\ �-- ----_ / _ -'�--� `\\\ \` \\ \ Q g > Q \ p II / I / - \- --__---- — — — — — — - �__ \ \` \ \ N. Q x W \I \ 1\ \I \ I\ \ I\ // 1\ --r' // / // V / \ ----- ii' \\\\ \\\ \ J O o Q I 1 , , \ \ \ \ ( . / / / / / / \ -- -------------- ,r �'i'r� — — \-\ \.`\\ \ \ \ \ \ - L1 C Ce p Y cm L a G U 3 w rn GRAPHIC SCALE DRAWING SHEET ,h dII E-1.0 ( IN FEET) 1 inch= 100 ft. THIS PLANSET AND ANY ASSOCIATED DOCUMENTS ARE PRELIMINARY AND NOT AUTHORIZED FOR CONSTRUCTION 01 OF 01 UNTIL SIGNED,DATED,AND OFFICIALLY RELEASED FOR CONSTRUCTION BY THE ENGINEER OF RECORD. 23 Project: Ambrosia Farm Location: Harnett County Date: 5/15/2024 PMEPre-Development Hydrology Input Summary Pre-Development On-Site Off-Site ALL-SITE Subcatchment Area Area Area sf ac sf ac sf ac Sub#1 455,018 10.45 4,297 0.10 459,315 10.54 Sub#2 128,314 2.95 817,942 18.78 946,256 21.72 Sub#3 49,151 1.13 0 0.00 49,151 1.13 All 632,483 14.52 822,239 18.88 1,454,722 33.40 On-Site Area(ac) Off-Site Area(ac) Subcatchment Total Area(ac) SCS CN Tc(min) Impervious Open Wooded Pond Impervious Open Wooded Pond Sub#1 0.00 10.45 0.00 0.00 0.00 0.10 0.00 0.00 10.55 55.4 13.6 Sub#2 0.00 2.95 0.00 0.00 0.57 8.53 6.73 0.00 18.78 70.5 26.3 Sub#3 0.00 1.13 0.00 0.00 0.00 0.00 0.00 0.00 1.13 51.5 14.0 Total 0.00 14.53 0.00 0.00 0.57 8.63 6.73 0.00 30.46 24 Pre-Development Hydrology Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#1 Date: 5/15/2024 Soil Type All SCS CN Sub#1 Land use A B C D sf ac sf ac sf ac sf ac sf ac % CN*Area CN Impervious 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Open 241677 5.55 5072 0.12 208269 4.78 0.00 455,018 10.45 100.0% 577.3 On-Site Wooded 0.00 0.00 0.00 I 0.00 0 0.00 0.0% 0.0 55.3 Pond 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 241,677 5.55 5,072 0.12 208,269 4.78 0.00 455,018 10.45 100.0% 577.3 Impervious 0.00 0.00 0.00 1 0.00 0 0.00 0.0% 0.0 Open 0.00 0.00 4297 0.10 0.00 4,297 0.10 100.0% 7.3 Off-Site Wooded 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 74.0 Pond 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 0.00 0.00 4,297 0.10 0.00 4,297 0.10 100.0% 7.3 Rational Runoff Coefficient,C ITotal CN 55.41 Curve Number Impervious 0.95 HOG A B C D Unimproved Areas 0.35 Total Area=10.54 ac Impervious 98 98 98 98 Lawn(sandy soil) 0.15 Composite SCS CN=55.4 Open 39 61 74 80 Lawn(heavy soil) 0.25 Wooded 30 55 70 77 Wooded areas 0.15 %Impervious=0.0% Pond 100 100 100 100 Wet pond 1 %Pervious=100.0% Pre-Development Hydrology Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#2 Date: 5/15/2024 Soil Type All SCS CN Sub#2 Land use A B C D sf ac sf ac sf ac sf ac sf ac % CN*Area CN Impervious 0.00 I 0.00 0.00 I 0.00 0 0.00 0.0% 0.0 Open 28801 0.66 0.00 99513 2.28 0.00 128,314 2.95 100.0% 194.8 On-Site Wooded mi 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 66.1 Pond 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 28,801 0.66 0.00 99,513 2.28 0.00 128,314 2.95 100.0% 194.8 Impervious 0.00 0.00 24,829 0.57 . 0.00 24,829 0.57 3.6% 55.9 Open 0.00 0.00 371567 8.53 0.00 371,567 8.53 53.9% 631.2 Off-Site Wooded 30,949 0.71 0.00 262,231 6.02 0.00 293,180 6.73 42.5% 442.7 71.4 Pond 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 30,949 0.71 0.00 658,627 15.12 0.00 689,576 15.83 100.0% 1129.8 Rational Runoff Coefficient,C ITotal CN 70.51 Curve Number Impervious 0.95 HSG A B C D Unimproved Areas 0.35 Total Area=18.78 ac Impervious 98 98 98 98 Lawn(sandy soil) 0.15 I. Composite SCS CN=70.5 Open 39 61 74 80 Lawn(heavy soil) 0.25 Wooded 30 55 70 77 Wooded areas 0.15 %Impervious=3.0% Pond 100 100 100 100 Wet pond 1 %Pervious=97.0% Pre-Development Hydrology Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#3 Date: 5/15/2024 Soil Type All SCS CN Sub#3 Land use A B C D sf ac sf ac sf ac sf ac sf ac % CN*Area CN Impervious 0.00 0.00 0.00 I 0.00 0 0.00 0.0% 0.0 Open 31528 0.72 0.00 17623 0.40 0.00 49,151 1.13 100.0% 58.2 On-Site Wooded 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 51.5 Pond 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 31,528 0.72 0.00 17,623 0.40 0.00 49,151 1.13 100.0% 58.2 Impervious 0.00 0.00 0.00 0.00 0 0.00 0.0 Open 0.00 0.00 0.00 0.00 0 0.00 0.0 Off-Site Wooded 0.00 0.00 0.00 0.00 0 0.00 0.0 Pond 0.00 0.00 0.00 0.00 0 0.00 0.0 Sum 0.00 0.00 0.00 0.00 0 0.00 0.0 Rational Runoff Coefficient,C ITotal CN 51.51 Curve Number Impervious 0.95 HSG _ A B C D Unimproved Areas 0.35 Total Area=1.13 ac Impervious 98 98 98 98 Lawn(sandy soil) 0.15 Composite SCS CN=51.5 Open 39 61 74 80 Lawn(heavy soil) 0.25 Wooded 30 55 70 77 Wooded areas 0.15 %Impervious=0.0% Pond 100 100 100 100 Wet pond 1 %Pervious=100.0% 25 sTRoNGRIp4 , 0( E r.t G ^J _ E R IN TIME OF CONCENTRATION INFORMATION Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#1 Date: 5/15/2024 Segment 1:Sheet Flow(Overland Flow) Segment 2:Shallow Concentrated Flow Length=100 ft Length=637 ft Top Elev=224.5 ft Top Elev=222.5 ft Bot Elev=222.5 ft Bot Elev=209 ft Height=2 ft Height=13.5 ft Slope=0.020 ft/ft Slope=0.021 ft/ft Surface Type= Short Grass Surface Type= Manning's n=0.15 Average Velocity=2.35 ft/s P(2-year/24-hour)=3.7 inch Tt= 0.15 hour Tt=0.08 hour Tt=9.11 minutes Tt=4.52 minutes aarr(n11°8 = i. Ti (Pa reoa T =3600V Segment 3:Channel Flow Time of Concentration(Tc) Length= ft Tc= 13.6 minutes Top Elev= ft Bot Elev= ft SCS lag Time=8.18 minutes Height= ft Time Increment=2.37 minutes Slope= ft/ft Surface Type= Weeds Discharge point: Manning's n=0.04 Reach to point: Flow Area= sf(5'w*3'h channel) Reach: Wetted Perimeter= ft(5'w*3'h channel) Distance=737 ft Hydraulic Radius= ft Velocity= ft/s Tt= hour Tt= minutes L 2 1 T` 1.49r 3600V V_ 3 s 2 26 STRONGRCK ENGINEERING GROUP TIME OF CONCENTRATION INFORMATION Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#2 Date: 5/15/2024 Segment 1:Sheet Flow(Overland Flow) Segment 2:Shallow Concentrated Flow Length=75 ft Length=1824 ft Top Elev=239 ft Top Elev=238.5 ft Bot Elev=238.5 ft Bot Elev=210 ft Height=0.5 ft Height=28.5 ft Slope=0.007 ft/ft Slope=0.016 ft/ft Surface Type= Short Grass Surface Type= Unpaved Manning's n=0.15 Average Velocity=2.02 ft/s P(2-year/24-hour)=3.7 inch Tt=0.19 hour Tt=0.25 hour Tt= 11.23 minutes Tt= 15.07 minutes 0.007611r L T,= T. (P_,rus u� aaK11.- Segment 3:Channel Flow ' Time of Concentration(Tc) _ Length= ft Tc= 26.3 minutes Top Elev= ft Bot Elev=L ft SCS lag Time= 15.78 minutes Height= ft Time Increment=4.58 minutes Slope= ft/ft Surface Type= Weeds Discharge point: Manning's n=0.04 Reach to point: Flow Area= sf(5'w*3'h channel) Reach: Wetted Perimeter= ft(5'w*3'h channel) Distance= ft Hydraulic Radius= ft Velocity= ft/s Tt= hour Tt= minutes 2 1 L Tt=3fi(10V V_ 1.49ras2 n 27 ENGINEERINGsTRoNG R ,k, c K GROUP MaTIME OF CONCENTRATION INFORMATION . Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#3 Date: 5/15/2024 Segment 1:Sheet Flow(Overland Flow) Segment 2:Shallow Concentrated Flow Length=75 ft Length=431 ft Top Elev=216 ft Top Elev=214.8 ft Bot Elev=214.8 ft Bot Elev=212.5 ft Height=1.2 ft Height=2.3 ft Slope=0.016 ft/ft Slope=0.005 ft/ft Surface Type=Short Grass Surface Type= Unpaved Manning's n=0.15 Average Velocity=1.18 ft/s P(2-year/24-hour)=3.7 Minch Tt=0.13 hour Tt=0.10 hour Tt=7.91 minutes Tt=6.09 minutes 0.007lnL)a" L T,= T = (P_'aeen� , 3600V d Segment 3:Channel Flow I Time of Concentration(Tc) Length= ft 'lc= 14.0 minutes Top Elev=I ft Bot Elev= ft SCS lag Time=8.41 minutes Height= ft Time Increment=2.44 minutes Slope= ft/ft Surface Type= II. Discharge point: Manning's n=0.04 Reach to point: Flow Area= sf(5'w*3'h channel) Reach: Wetted Perimeter= ft(5'w*3'h channel) Distance=506 ft Hydraulic Radius= ft Velocity= ft/s Tt= hour Tt= minutes L 2 1 Tit=3600V v =1.49r 3 s 2 n 28 3.2 Post-Development 29 PROGRESS PLOT DATE:05/13/2024 ��--_ -- - --- �'��'�� I////// ��\ vv ��I \\ \\ \\AA`AAA�VA\�������`�A�� /�- ��A�VA v���--- j �i_i'�/ n o ---- --i ---f-- ---<_- --, \\ / \ \ I — /- '--_____I--- - / \ --� � V p� AA \ . / � lv � ) 1- V A � I� �v V \ I � - I \--- 1- \ ,,,,!._ // , , / _---- __ ,-\\-\vifeo/;,, - ��� f'� 25 tie- - Ii „W °gy. � � --/-� / - ` \ \ \ �� � \�v� / r � w " 1n I3 \ A\ �a _- / ` v - \� � V \ A \ \\\\ ` �1 /` � / \\-- — // _ AAA A � VAAVA � / SZ v d VAL. \ V 1 y/ l /--- -/ I �. J U d_ / 1 , I' I I u 2T i— / / 1 I I\w \VA V Vvv _ - � -, , 1291'SHALLOW 3/ I I A, I \ 0.,,-\ - - w _ \ I 1 CONCENTRATED \ I _ co x a a /1 / 1 /41 , f I I- � C E i_ \ \ FLOW A A V � i / ©- ---% v A CLASS I / / 7, \ , / / I / -,,,Ax - / / / / / o11 A A ` VV /j- �A Citli , _ \ , , , \ ______„„______________ _, \\,,,, , \, _,,_, DA#2 \ V --%// /�---_-, v v v A / / ,---- \ OFF-SITE: SF(16.06AC) / / / / / // / / / _ 9 (� o� \, AV A A -�////i/�^ o� \ _-/ ON-SITE:276,387 SF(6.34 AC) /' I /\/ / / / 3a / / /4/,/ i r c\\,_—///i-/4. , , �d \ ) \\ \ TOTAL:975,851 SF(22.40AC) v // / ' / // / / — Za\ \ \ tee AO - at \ CLASS A SOIL:57,610 SF(1.32 AC) / /�, A / / / -,--- c� Z cc 6= V���-- // /// -- I f�� / / / AI IIA // 7 �' CLASSCSOIL:918,241SF(21.OSAC) // // j�r�/ // /1 / �'I //- o� - l 1 I ' , / 1 \\ tti c 1 7 / -- , - zz ''-7 / / '',/ ',/ / / , -'_ c r/ / \\ q.,, I \ \ \ \ I \ tag - __/ /1 1 , — ' I I \ \ \ \ \ l - / 29/ / I/ I , \ \ \ 0 z z, ��—;_�' _ —/1 J / / ,�l 1 SILVER QUEEN COURT \ \ Y� I 1 l I 1 / / / -' I 50'RIGHT OF WAY r — O F — A I / I 11 I �/ / T r v \ N o m e — 11 �v / 1 \I I I 1\I II I;I I / ,CLASS C SOIL *"11 v 75'SHEET FLOW I / / // / / 7 / I/ 1 1® / ) 'I 1 I Ce a z- - \ ,A V I 1 I I I i /// / //////,- 1 1�11 ' / �- �/ ,, - / CLASSASOIL / I / / / / / Z �� \///ill I/ I I;I/ ////�////- 1 , �''' I ti z �cv9 All // 01 Ii11; // / / / 1 I '\,hl',i / / - / �, //" `'vI ,f / lv �,X�� w \ODA#1 I I 1 1�= vi r--, rr--/-- r-- r——— a--,/ -,fl #1/ Cii) S � \/ � I III �� m // / / /// -/// CLASS C SOIL:37,493 SF(0.86 AC) p' i1 1 \ I \11 \ \' / / / / one _k it/' �I III I 1,.., �� �� w ' / / / / / / / / / / I A V v A —220 I �� 324'SHALLOW © III -i7J O O Q I Si - o / A 8 2 m \c/\ 89 10 1i / I I l I / / / / / / v vv 1 �n 111 I ) L v II� 76'SHALLOW a oI / / / v --, 1 CONCENTRATED /I 61 1 1 I v a3 I'II nI I I I I / I I I l ( \ v 0, 0 v 73T CHANNEL FLOW I , Q I I Q� CONCENTRATED 2 0I I 1 I / DA#3 n"I _1J-FLOW 1 / ' CLASS C SOIL FLOW ` mmI I V II 1 1 50'SHALLOW 1 I o\ I l IV \1 II \I V N218 IT I 71----� 1 1 - I � ,/ , 1 CONCENTRATED I A I V 1 , A z zo z z x OFF-SITE:0 SF(0 AC) Jit \ \ v �i y _ „ DA#7(BYPASS FLOW) 'r w 5 i 168'CHANNELFL r'-_,'---44,'tr-��',--- CLASS I N. E, 8 L ON-SITE:2,984 SF(0.07 AC) P •I' +L OW FLOW CLAS V A V A A \ \ V \ \ TOTAL:2,984 SF(0.07 AC) S o _ — ___- ---_ \ V\ \ 1 A �'- I_ -% 2,509 SF(0.06 AC) V A 1\ \\\\\V A \ V I\ \\ \\ICLASSCLASSI C SOIL SF(0.07 AC) s— � � - � z ! V CLASS A SOIL:45 SF 0.00 AC \ \A 1 A A A\ \ \ V A A \ �s-'" _ — lit®� 1- CLASS C SOIL:2,464 SF(0.06 AC) z VA\`AAA \\V A AAVV\`\` �\ \\V A� AAN vN. v 1d" ,D%I I' �I1 -`V 1 r r ) i; - , DA#5 o �64'CHANNEL FLOW '70'SHALLOW 1 100'S EET FLOWI + AMBROSIA W Y • I EL FLOW I OFF-SITE:0 SF(0 AC) Z W \ Q I, 382'CHANN \ s V, ,Av A \\\\`A Av\\� v.A v v-44 AVAA --_. ,,-- C, I 1, _ I I li '` 1 sorIGHTOFWAY 1 I ON-SITE:3,467 SF(0.08AC) (� o J�{ 1_ 1 11 1 I 1 1 11 I. /TOTAL:3,467 SF(0.08 AC) < z Z \`\\ \\`\\\` \\\ \ \\\`\\\\`\\\\�\ \ ' CONCENTRATED �I ,I -z'.3- 1 1 1 1 1 DA#6(BYPASS FLOW) / I / 1 /1 1 CLASS A SOIL:3,205 SF(0.07 AC) U = F W Q \vAA \ v VGA CLASS C SOIL FLOW L -�c 302'SHALLOW 1 0 307,128 SF 7.05 AC © CLASS C SOIL:262 SF 0.01 AC W \\\ a ( ) I s I , a5 as a� ( ) W \\ \ \\ \\ ., \\\\\ \\ \ \ \ N \ \ \ `-21,-- _ I I CONCENTRATED © ( ) — o \ \ \ \\\\\\ \ \\\ -----,\ \ \ \ \ \\•- ,\ \ `210_ 1 ----hi , FLOW CLASS B SOIL:5,072 SF(0.2 AC) CLASS A SOIL w o d Q \\\ \\ \ N \ I *I11 -_ L I I I OFF-SITE: 0 \ \ \ \ \ , ,\ ,N, -209- j CLASS C SOIL-:45,424I SF(1.04 AC) h 0 SF(0 AC) J Z z J W \\\\\\NN\\\\\\ \\\\\\\ \ \ \\ `\ \\� 2oa� II e 'll J,' ti 1---1,1' 71Ahhh: rL_- l 1 ON-SITE:7,344 SF(0.17AC) LL = W \ \ \ \` ` \ \`\\\ \ \ \ \ \ zm> `�\1` -1 L- 1-_ J .��� 1 1 1 �1- \-t ---1 --1 TOTAL:7,344 SF(0.17 AC) Q a < ' ` \\ \` \ \` \` \ \\\`` ` ` ` \ \\ ` /_N ''\ v - - —— 2 ��p���� __ ( ) ... _ = Z �o- CLASS A SOIL:5,758 SF 0.13 AC Q W \ \ \ \\ \\ \ \ \\\ \ \ `_ \ \ Ii _ ��` •�!- _ CLASS C SOIL:1,586 SF(0.04 AC) _I-' U) z 0 Q,4' q\ \ \ \\\ \\ \ \\\\' \ \\ � s\ NOW ISR FORMERLY ---20' i ----\\ _--- — -- - -i% -j% ---__ _ - - /�' v 1 A A 11 \ I A \A A V v A A v v AV`\V� I� JANIS N.LEWIS , ' / POI#3 -----zaa-' -- v _ �� J o I I 1 \\ `\\\\` \ ` \ 1 1 \CLASS A SOIL B:1217;P / NOW OR FORMERLY-2m-_ - OR FORMERLY _- _ __ W m O I \` \ \ ` \ \ PIN#:0556-:CLASS A SOIL ROY G.GREENE 20e \ CLASS A SOIL EL G.BETHUNE _- W \ \ V CLASS B SOIL I / t _ _ 6 a 1 I I \ \ �,444444...,\\ \ \ I I I I �- \ 1'� / DB:1011;PG:93 20A- _ �� \ DB:1868;PG:434 ___ _ - _ o J\ \1\ \ \ \ \ \ \ h I I 4 1 - - PIN#:0556-77-4494 - _U `� 1 \ ( PIN#:0556-87-1596 i -- -- Q 4-7'N J\ 1\ \\ \��\ \ \ \ \\\\ \ 1 I I 1 I I /cA / /' —203' --� � ` - —�f= i- — -- —'_—� Q \\\\\ \ \\\\` \\\ I 1 1 I I\ 1 1 \ \ \ \ \ , I I\ \---- /-' / / / 'J // /xo1- __ \\- I �i'- N Vvv \ 1 v \ v v / tis _ - / / // / __ -`� ` GRAPHIC SCALE DRAWING ` V ` 1V A v `\VA ` \\ ` v A I / /6 ,s A,0 T' / ` / / // ! \Vv c / \ I I v` IN FEET) �� v v v v\v v v \ r\ \-,_ ----i- / / // r -0 '.--.‘It:is / / \ ��-,, // l I \ f inch= 100 ft. _ I I \ 1 \ \ 1 1 / 1 / J�, I 1 f / \_ / / �/ / THIS PLANSET AND ANY ASSOCIATED DOCUMENTS ARE PRELIMINARY AND NOT AUTHORIZED FOR CONSTRUCTION UNTIL SIGNED,DATED,AND OFFICIALLY RELEASED FOR CONSTRUCTION BY THE ENGINEER OF RECORD. 30 Post-Development Hydrology Input Summary ■ On-Site Off-Site ALL-SITE Subcatchment Area Area Area Impervious Area sf ac sf ac sf ac sf ac Sub#1 32,015 0.73 5,478 0.13 37,493 0.86 3,635 0.08 11.35% Sub#2 276,387 6.34 699,464 16.06 975,851 22.40 41,803 0.96 15.12% Sub#3 2,984 0.07 0 0.00 2,984 0.07 1,370 0.03 45.91% Sub#4 7,344 0.17 0 0.00 7,344 0.17 2,861 0.07 38.96% Sub#5 3,467 0.08 0 0.00 3,467 0.08 1,318 0.03 38.02% Bypass#1 307,128 7.05 0 0.00 307,128 7.05 47,255 1.08 15.39% Bypass#2 2,509 m 0.06 0 0.00 2,509 0.06 1,774 0.04 70.71% All 631,834 14.50 704,942 16.18 1,336,776 30.69 I 100,016 2.30 15.83% Su t Description Total Area(ac) SCS CN Tc(min) Sub#1 DC 0.03 76.3 17.7 NDC 0.83 Sub#2 DC 0.30 73.1 34.3 NDC 22.10 Sub#3 DC 0.03 85.0 5.0 NDC 0.04 Sub#4 DC 0.07 64.9 8.9 NDC 0.10 Sub#5 DC 0.03 61.4 8.4 NDC 0.05 Bypass#1 DC 0.34 53.2 13.1 NDC 6.71 Bypass#2 DC 0.04 91.0 5.0 NDC 0.02 31 Post-Development Hydrology aMil Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#1 Date: 5/15/2024 Part 1:Land Use Breakdown Soil Type All SCS CN Sub Rl Land use A B C D sf ac sf ac sf ac sf ac sf ac % CN.Area CN Roadway I 0.00 M 0.00 • 0.00 0.00 0 0.00 0.0% 0.0 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Driveway 0 0.00 0 0.00 320 0.01 0 0.00 320 0.01 1.0% 0.7 Parking lot/Play ground/Pump station I 0.00 M 0.00 A 0.00 0.00 0 0.00 0.0% 0.0 Roof 0 0.00 0 0.00 3,315 0.08 0 0.00 3,315 0.08 10.4% 7.5 On-Site Sidewalk(Includes Patios) 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 76.7 Lawn 0.00 0.00 17,645 0.41 0 0.00 17,645 0.41 55.1% 30.0 Managed pervious(Open Space) 0 0.00 0 0.00 10,735 0.25 0 0.00 10,735 0.25 33.5% 18.2 Woods 0.00 0.00 0.00 1 0.00 0 0.00 0.0% 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 0.00 0.00 32,015 0.73 0.00 32,015 0.73 100.0% 56.4 Roadway 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Driveway 0.00 0.00 iii 0.00 0.00 0 0.00 0.0% 0.0 Parking lot/Play ground/Pump station 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Roof 0.00 N 0.00 0.00 0.00 0 0.00 0.0% 0.0 Off-Site Sidewalk(Includes Patios) 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 74.0 Lawn 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Managed pervious(Open Space) 0.00 0.00 5478 0.13 0.00 5,478 0.13 100.0% 9.3 Woods 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 0.00 0.00 0.00 0.00 5,478 0.13 100.0% 9.3 I 37,493 0.86 I I CN 76.3 I 32 Post-Development Hydrology Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#2 Date: 5/15/2024 Part 1:Land Use Breakdown Soil Type All SCS CN Sub#2 Land use A B C D sf ac sf ac sf ac sf ac sf ac % CN.Area CN Roadway 0.00 1 0.00 r ' 0.00 0.00 0 0.00 0.0% 0.0 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Driveway 320 0.01 0 0.00 3,360 0.08 0 0.00 3,680 0.08 1.3% 8.3 Parking lot/Play ground/Pump station 0.00 J 0.00 0.00 _AM 0.00 0 0.00 0.0% 0.0 Roof 3,315 0.08 0 0.00 34,808 0.80 0 0.00 38,123 0.88 13.8% 85.8 On-Site Sidewalk(Includes Patios) 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 74.4 Lawn 17,645 0.41 0 0.00 185,273 4.25 0 0.00 202,918 4.66 73.4% 330.5 Managed pervious(Open Space) 8,163 0.19 0 0.00 23,504 0.54 0 0.00 31,667 0.73 11.5% 47.2 Woods 0.00 0.00 0.00 1 0.00 0 0.00 0.0% 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 29,443 0.68 0.00 246944 5.67 0.00 276,387 6.34 100.0% 471.8 Roadway 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Driveway 0.00 0.00 j 0.00 0.00 0 0.00 0.0% 0.0 Parking lot/Play ground/Pump station 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Roof 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Off-Site Sidewalk(Includes Patios) 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 72.6 Lawn 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Managed pervious(Open Space) 28,167 0.65 0.00 671297 15.41 0.00 699,464 16.06 100.0% 1165.6 Woods 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 28,167 0.65 0.00 671297 15.41 0.00 699,464 16.06 100.0% 1165.6 I 875,851 22.40 I I CN 73.1 33 Post-Development Hydrology Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#3 Date: 5/15/2024 Part 1:Land Use Breakdown Soil Type All SC5 CN Sub Land use A B C D sf ac sf ac sf ac sf ac sf ac % CN.Area CN Roadway I 0.00 II■ 0.00 1,370 0.03 IIIIIIIIII■ 0.00 1,370 0.03 45.9% 3.1 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Driveway 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 Parking lot/Play ground/Pump station I 0.00 IIIII. 0.00 0.00 I, 0.00 0 0.00 0.0% 0.0 Roof 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 On-Site Sidewalk(Includes Patios) 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 85.0 Lawn 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 Managed pervious(Open Space) 0 0.00 0 0.00 1,614 0.04 0 0.00 1,614 0.04 54.1% 2.7 Woods 0.00 0.00 0.00 I 0.00 0 0.00 0.0% 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 0.00 0.00 2,984 0.07 0.00 2,984 0.07 100.0% 5.8 Roadway 0.00 0.00 0.00 0.00 0 0.00 0.0 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0 Driveway 0.00 0.00 0.00 0.00 0 0.00 0.0 Parking lot/Play ground/Pump station 0.00 0.00 0.00 0.00 0 0.00 0.0 Roof 0.00 N 0.00 0.00 0.00 0 0.00 0.0 Off-Site Sidewalk(Includes Patios) 0.00 0.00 0.00 0.00 0 0.00 0.0 Lawn 0.00 0.00 0.00 0.00 0 0.00 0.0 Managed pervious(Open Space) 0.00 0.00 0.00 0.00 0 0.00 0.0 Woods 0.00 0.00 0.00 0.00 0 0.00 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0 Sum 0.00 0.00 0.00 0.00 0 0.00 0.0 I 2,984 0.07 I I CN 85.0 I 34 Post-Development Hydrology aill Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#4 Date: 5/15/2024 Part 1:Land Use Breakdown Soil Type All SCS CN Sub#4 Land use A B C D sf ac sf ac sf ac sf ac sf ac % CN.Area CN Roadway 1,891 ' 0.04 II■ 0.00 970 0.02 IIIIIIIIII■ 0.00 2,861 0.07 39.0% 6.4 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Driveway 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 Parking lot/Play ground/Pump station I 0.00 IIIII. 0.00 J 0.00 I, 0.00 0 0.00 0.0% 0.0 Roof 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 On-Site Sidewalk(Includes Patios) 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 64.9 Lawn 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 Managed pervious(Open Space) 3,867 0.09 0 0.00 616 0.01 0 0.00 4,483 0.10 61.0% 4.5 Woods 0.00 0.00 1 0.00 I 0.00 0 0.00 0.0% 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 5,758 0.13 0.00 1,586 0.04 0.00 7,344 0.17 100.0% 10.9 Roadway 0.00 0.00 0.00 0.00 0 0.00 0.0 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0 Driveway 0.00 0.00 0.00 0.00 0 0.00 0.0 Parking lot/Play ground/Pump station 0.00 0.00 0.00 0.00 0 0.00 0.0 Roof 0.00 N 0.00 0.00 0.00 0 0.00 0.0 Off-Site Sidewalk(Includes Patios) 0.00 0.00 0.00 0.00 0 0.00 0.0 Lawn 0.00 0.00 0.00 0.00 0 0.00 0.0 Managed pervious(Open Space) 0.00 0.00 0.00 0.00 0 0.00 0.0 Woods 0.00 0.00 0.00 0.00 0 0.00 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0 Sum 0.00 0.00 0.00 0.00 0 0.00 0.0 I 7,344 0.17 I I CN 64.9 I 35 Post-Development Hydrology Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#5 Date: 5/15/2024 Part 1:Land Use Breakdown Soil Type All SCS CN Sub#5 Land use A B C D sf ac sf ac sf ac sf ac sf ac % CN.Area CN Roadway 1,056 ' 0.02 IIIIIII. 0.00 262 0.01 ■ 0.00 1,318 0.03 38.0% 3.0 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Driveway 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 Parking lot/Play ground/Pump station I 0.00 IIIIIII. 0.00 0.00 . 0.00 0 0.00 0.0% 0.0 Roof 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 On-Site Sidewalk(Includes Patios) 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 61.4 Lawn 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 Managed pervious(Open Space) 2,149 0.05 0 0.00 0 0.00 0 0.00 2,149 0.05 62.0% 1.9 Woods 0.00 0.00 0.00 I 0.00 0 0.00 0.0% 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 3,205 0.07 0.00 262 0.01 0.00 3,467 0.08 100.0% 4.9 Roadway 0.00 0.00 0.00 0.00 0 0.00 0.0 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0 Driveway 0.00 0.00 0.00 0.00 0 0.00 0.0 Parking lot/Play ground/Pump station 0.00 0.00 0.00 0.00 0 0.00 0.0 Roof 0.00 N 0.00 0.00 0.00 0 0.00 0.0 Off-Site Sidewalk(Includes Patios) 0.00 0.00 0.00 0.00 0 0.00 0.0 Lawn 0.00 0.00 0.00 0.00 0 0.00 0.0 Managed pervious(Open Space) 0.00 0.00 0.00 0.00 0 0.00 0.0 Woods 0.00 0.00 0.00 0.00 0 0.00 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0 Sum 0.00 0.00 0.00 0.00 0 0.00 0.0 I 3,467 0.08 I I CN 61.4 I 36 Post-Development Hydrology aMil Project: Ambrosia Farm Location: Harnett County Subcatchment: Bypass#1 M Date: 5/15/2024 Part 1:Land Use Breakdown Soil Type All SCS CN Bypass#1 Land use A B C D sf ac sf ac sf ac sf ac sf ac % CN.Area CN Roadway 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Driveway 3,840 0.09 64 0.00 256 0.01 0 0.00 4,160 0.10 1.4% 9.4 Parking lot/Play ground/Pump station 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Roof 39,780 0.91 663 0.02 2,652 0.06 0 0.00 43,095 0.99 14.0% 97.0 On-Site Sidewalk(Includes Patios) 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 53.2 Lawn 211,740 4.86 3,529 0.08 14,116 0.32 0 0.00 229,385 5.27 74.7% 218.5 Managed pervious(Open Space) 1,263 0.03 816 0.02 28,400 0.65 0.00 30,479 0.70 9.9% 50.5 Woods 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 256,623 5.89 5,072 0.12 45424 1.04 0.00 307,119 7.05 100.0% 375.3 Roadway 0.00 0.00 0.00 0.00 0 0.00 0.0 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0 Driveway 0.00 0.00 0.00 0.00 0 0.00 0.0 Parking lot/Play ground/Pump station 0.00 0.00 0.00 0.00 0 0.00 0.0 Roof 0.00 0.00 0.00 0.00 0 0.00 0.0 Off-Site Sidewalk(Includes Patios) 0.00 0.00 0.00 0.00 0 0.00 0.0 Lawn 0.00 MI 0.00 0.00 0.00 0 0.00 0.0 Managed pervious(Open Space) 0.00 0.00 0.00 0.00 0 0.00 0.0 Woods 0.00 0.00 0.00 0.00 0 0.00 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0 Sum 0.00 0.00 0.00 0.00 0 0.00 0.0 I 307,119 7.05 I I CN 53.2 37 Post-Development Hydrology aMil Project: Ambrosia Farm Location: Harnett County Subcatchment: Bypass#2 Date: 5/15/2024 Part 1:Land Use Breakdown Soil Type All SC5 CN Bypass#2 Land use A B C D sf ac sf ac sf ac sf ac sf ac % CN.Area CN Roadway 45 ' 0.00 M 0.00 1,729 0.04 0.00 1,774 0.04 70.7% 4.0 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Driveway 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 Parking lot/Play ground/Pump station I 0.00 M 0.00 0.00 . 0.00 0 0.00 0.0% 0.0 Roof 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 On-Site Sidewalk(Includes Patios) 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 91.0 Lawn 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0.0% 0.0 Managed pervious(Open Space) 0 0.00 0 0.00 735 0.02 I 0.00 735 0.02 29.3% 1.2 Woods ' 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0% 0.0 Sum 45 0.00 0.00 2,464 0.06 0.00 2,509 0.06 100.0% 5.2 Roadway 0.00 0.00 0.00 0.00 0 0.00 0.0 Grassed Right-of-ways 0.00 0.00 0.00 0.00 0 0.00 0.0 Driveway 0.00 0.00 0.00 0.00 0 0.00 0.0 Parking lot/Play ground/Pump station 0.00 0.00 0.00 0.00 0 0.00 0.0 Roof 0.00 N 0.00 0.00 0.00 0 0.00 0.0 Off-Site Sidewalk(Includes Patios) 0.00 0.00 0.00 0.00 0 0.00 0.0 Lawn 0.00 0.00 0.00 0.00 0 0.00 0.0 Managed pervious(Open Space) 0.00 0.00 0.00 0.00 0 0.00 0.0 Woods 0.00 0.00 0.00 0.00 0 0.00 0.0 Land Taken up by BMP 0.00 0.00 0.00 0.00 0 0.00 0.0 Sum 0.00 0.00 0.00 0.00 0 0.00 0.0 I 2,509 0.06 I I CN 91.0 I 38 STRONGRCK ENGINEERING GROUP TIME OF CONCENTRATION INFORMATION Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#1 Date: 5/15/2024 Segment 1:Sheet Flow(Overland Flow) Segment 2:Shallow Concentrated Flow Length=75 ft Length=324 ft Top Elev=224.6 ft Top Elev=224 ft Bot Elev=224 Eft Bot Elev=217.5 ft Height=0.6 ft Height=6.5 ft Slope=0.008 ft/ft Slope=0.020 ft/ft Surface Type=Short Grass r Surface Type=iUnpaved Manning's n=0.15 Average Velocity=2.29 ft/s P(2-year/24-hour)=3.7 inch Tt=0.17 hour Tt=0.04 hour Tt= 10.44 minutes Tt=2.36 minutes 0.007htLl°" L T,_ _(p)oeso, Tt 3600V Segment 3:Channel Flow Time of Concentration(Tc) Length=168 ft Tc= 17.7 minutes Top Elev=217.5 ft Bot Elev=217.25 ft SCS lag Time= 10.59 minutes Height=0.25 ft Time Increment=3.07 minutes Slope=0.001 ft/ft Surface Type= Grass . Discharge point: Manning's n=0.035 Reach to point: Flow Area=0.74 I sf(36"pipe) Reach: Wetted Perimeter=3.55 ft(36"pipe) Distance=567 ft Hydraulic Radius=0.21 ft Velocity=0.58 ft/s Tt=0.08 hour Tt=4.85 minutes L 2 t T` 3600V V_1.4913s7 n 39 ENGINEERINGSTRONGRC4CK GROUP TIME OF CONCENTRATION INFORMATION Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#2 Date: 5/15/2024 Segment 1:Sheet Flow(Overland Flow) Segment 2:Shallow Concentrated Flow Length= 175 ft Length= 1291 ft Top Elev=238 ft Top Elev=236.5 ft Bot Elev=236.5 ft Bot Elev=215.5 ft Height= 1.5 ft Height=21 ft Slope=0.009 ft/ft Slope=0.016 ft/ft Surface Type=Short Grass Surface Type=Unpaved Manning's n= 0.15 Average Velocity=2.06 ft/s P(2-year/24-hour)=3.7 inch Tt=0.33 hour Tt=0.17 hour Tt=20.01 minutes Tt= 10.46 minutes 0.007(nL)o8 L Tt= (P )0.5s0.4 Tt=3600V z Segment 3:Channel Flow I Time of Concentration(Tc) Length=737 ft Tc= 34.3 minutes Top Elev=215.5 ml ft Bot Elev=210 ft SCS lag Time=20.58 minutes Height=5.5 ft Time Increment=5.97 minutes Slope=0.007 ft/ft Surface Type=Grass Discharge point: Manning's n=0.035 Reach to point: Flow Area=11.16 sf(36"pipe) Reach: Wetted Perimeter=13.77 ft(36"pipe) Distance=2203 ft Hydraulic Radius= 0.81 ft Velocity=3.20 ft/s Tt=0.06 hour Tt=3.84 minutes L 2 1 Tt=3600V V=1.49r 3 s 2 n 40 ENGINEERINGSTRONGRCK GROUP Mimi L. TIME OF CONCENTRATION INFORMATION j Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#3 Date: 5/15/2024 Segment 1:Sheet Flow(Overland Flow) Segment 2:Shallow Concentrated Flow Length= ft Length=70 ft Top Elev= ft Top Elev= 218.5 ft Bot Elev=` ft Bot Elev=217 ft Height= ft Height=1.5 ft Slope= ft/ft Slope= 0.021 ft/ft Surface Type= Short Grass Surface Type= Manning's n=0.15 Average Velocity=2.36 ft/s P(2-year/24-hour)=3.7 inch Tt= hour Tt= 0.01 hour Tt= minutes Tt= 0.49 minutes T,- o.ao;1nif L I e_1"s"1 Tt — :36(X)V Segment 3:Channel Flow Time of Concentration(Tc) Length=54 ft Tc= 5.0 minutes Top Elev= 217 ft Bot Elev=215.5 ft SCS lag Time=3.00 minutes Height=1.5 ft Time Increment=0.87 minutes Slope=0.028 ft/ft Surface Type= Grass Mil Discharge point: Manning's n=0.035 Reach to point: Flow Area=0.58 'IIsf(36"pipe) Reach: Wetted Perimeter=3.13 ft(36"pipe) Distance= 124 ft Hydraulic Radius=0.19 ft Velocity=2.31 ft/s Tt= 0.01 hour Tt= 0.39 minutes L 2 1 Ti = :3600V V= 1.49r s 2 n 41 ENGINEERINGSTRONGRCK GROUP TIME OF CONCENTRATION INFORMATION Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#4 Date: 5/15/2024 Concentrated Flow Length= ft Length=50 ft Top Elev=� ft Top Elev= 215.4 ft Bot Elev= ft Bot Elev=214 ft Height= ft Height=1.4 ft Slope= ft/ft Slope=0.028 ft/ft Surface Type= Short Grass Surface Type=mommr Manning's n=0.15 Average Velocity=2.70 ft/s P(2-year/24-hour)=3.7 inch Tt= hour Tt= 0.01 hour Tt= minutes Tt= 0.31 minutes 0.007(nL) L Tt_ (ps)°°e 4 Tc =:3600V Segment 3:Channel Flow Time of Concentration(Tc) Length=522 ft Tc= 8.9 minutes Top Elev= 214 ft Bot Elev=210 ft SCS lag Time=5.33 minutes Height=4 ft Time Increment=1.54 minutes Slope=0.008 ft/ft Surface Type= Grass Discharge point: Manning's n=0.035 Reach to point: Flow Area=0.34 sf(36"pipe) Reach: Wetted Perimeter=2.39 ft(36"pipe) Distance= Hydraulic Radius=0.14 ft Velocity= 1.02 ft/s Tt= 0.14 hour Tt= 8.57 minutes L z 1 T' = 3600V V_ 1.49r:�s'' 42 ENGINEERINGSTRONG RIC4iCK GROUP TIME OF CONCENTRATION INFORMATION i Project: Ambrosia Farm Location: Harnett County Subcatchment: Sub#5 Date: 5/15/2024 Segment 1:Sheet Flow(Overland Flow) Segment 2:Shallow Concentrated Flow Length= ft Length= ft Top Elev= ft Top Elev= ft Bot Elev= ft Bot Elev= ft Height= ft Height= ft Slope= ft/ft Slope= ft/ft Surface Type=Short Grass Surface Type=Unpaved Manning's n=0.15 Average Velocity= ft/s P(2-year/24-hour)=3.7 inch Tt= hour Tt= hour Tt= minutes Tt= minutes 0.0071rd.)°B L Tt- (Pz rngo.a Tt=3600V Segment 3:Channel Flow Time of Concentration(Tc) Length=382 ft Tc=8.4 minutes Top Elev=212.5 ft Bot Elev=210 ft SCS lag Time=5.01 minutes Height=2.5 ft Time Increment=1.45 minutes Slope=0.007 ft/ft Surface Type=Grass Discharge point: Manning's n=0.035 Reach to point: Flow Area=0.18 sf(36"pipe) Reach: Wetted Perimeter=1.73 ft(36"pipe) Distance= ft Hydraulic Radius=0.10 ft Velocity=0.76 ft/s Tt=0.14 hour Tt=8.36 minutes L 2 1 Tc=3600V V_1.49r 3 s 2 43 ENGINEERINGSTRONGRC4CK GROUP Milk TIME OF CONCENTRATION INFORMATION I Project: Ambrosia Farm Location: Harnett County Subcatchment: Bypass#1 Date: 5/15/2024 Segment 1:Sheet Flow(Overland Flow) Segment 2:Shallow Concentrated Flow Length=100 ft Length=302 ft Top Elev=218.5 ft Top Elev=215.25 ft Bot Elev=215.25 ft Bot Elev=209 ft Height=3.25 ft Height=6.25 ft Slope=0.033 ft/ft Slope=0.021 ft/ft Surface Type=Dense Grass Surface Type= Manning's n=0.24 Average Velocity=2.32 ft/s P(2-year/24-hour)=3.7 inch Tt=0.18 hour Tt=0.04 hour Tt=10.93 minutes Tt=2.17 minutes 0.007(nL)5d L Tt— (pz)Q5s°4 Tt=3600V di Segment 3:Channel Flow I Time of Concentration(Tc) Length= ft Tc= 13.1 minutes Top Elev= ft Bot Elev= ft SCS lag Time=7.86 minutes Height= ft Time Increment=2.28 minutes Slope= ft/ft Surface Type= 11. Discharge point: Manning's n=0.04 Reach to point: Flow Area= sf(5'w*3'h channel) Reach: Wetted Perimeter= ft(5'w*3'h channel) Distance= '- ft Hydraulic Radius= ft Velocity= ft/s Tt= hour Tt= minutes L 2 1 Tt=3600V V_1.49r3s2 n 44 STRONGRCK ENGINEERING GROUPTIME OF CONCENTRATION INFORMATION imi. AIM Project: Ambrosia Farm Location: Harnett County Subcatchment: Bypass#2 Date: 5/15/2024 Segment 1:Sheet Flow(Overland Flow) Segment 2:Shallow Concentrated Flow Length= ft Length=76 ft Top Elev= ft Top Elev=213.8 ft Bot Elev= ft Bot Elev=213.4 _ft Height= ft Height=0.4 ft Slope= ft/ft Slope=0.005 ft/ft Surface Type=Light Woods Surface Type=Unpaved Manning's n=0.4 Average Velocity=1.17 ft/s P(2-year/24-hour)=3.7 inch Tt= hour Tt=0.02 hour Tt= minutes Tt=1.08 minutes 0.007(nL)°a L Ti= Tt=3600V (p2)0.5.0.4 Segment 3:Channel Flow Time of Concentration(Tc) Length= ft Tc=5.0 minutes Top Elev=I ft Bot Elev= ft SCS lag Time=3.00 minutes Height= ft Time Increment=0.87 minutes Slope= ft/ft Surface Type=Weeds Discharge point:! Manning's n=0.04 Reach to point: Flow Area=15 ml sf(5'w*3'h channel) Reach: Wetted Perimeter=11 ft(5'w*3'h channel) Distance= ft Hydraulic Radius=1.36 ft Velocity= ft/s Tt= hour Tt= minutes L 2 1 Tt 3600V V=1.49r s s 2 n 45 4. Drainage Ditches and Piped Channels 46 4. 1 Drainage Ditch Drainage Area Map 47 PROGRESS PLOT DATE:05/13/2024 ��� \---- i//// I /// - ,\ __ = I�� \ \ \ \\\\\\\\\ \\� \ __--- ---` \�\ \ _ _ i �% i N w �`-__ -- --- --- - --/\ I/%//// 7N\ \\ \ '�I \\ \\ \\\\\\\\\\\\\\x�l��\�\\�� / — \��\�\, \���--- j �i�i'�/ n o \ I z Z= • =�� �� ; I \\\\ \ \\ \\ ` \ - % /\= ,/ � v / I �� I vvv - \ v _ _ _ v 1 .% \ v ,_ I /I Ili im__ � � � I� , ._�� � / � / 1 / pi , A — — � �v ., V - _ = I � l I�v \ 7, ____ > -7,.--,_ 7 / / ( , ‘,‘ -____-I--- 1 ` /vv � � // / / I ---� _—_ • CARO,,,vv v \.v \ / _vv / \�\ \ / - I \ \\ \ \ -~ ,� ,\ \\ \ N. vAv v v A — AV - - / �� — i //� l A 1 / _ \ \ V 1 _I V v v vvv' p v j V � - / I I // - V A� V I A A SZ q _ VAVA\ A AV % \V A\ __ III / / - - /// J.// I / I I I I J A v A d U ' z \ \A v„I- _ , v -/ / / 1 �\ ( / / \ w ci L— 7_ I \ \\ \\�\\\\ ti �\ \<\\ T ' 1 j�l ) \I \I I 136 I / // Cr No \ VA VA Vv vv-- -- v vA A vAvV A _ /000011. - / / / I AI I I I -V a� '' / / / /, \n, / ) , a a ,_,,,,, , , \\, ,,,,, . / . L ji-- v V �� �/� / / / / l l�/-_- / r>,__, (.i.., a� gE CqN- -�/ 'ii// 1 v v A o;,‘k, V DA#2(DITCH 2) // /' I /� / / / 33 r� \ \_ ///i/ �_ ��I \ 975,851 SF(22.40 AC) I / X) / // / / / / / 47/'/ -- Z / / @/ i / /'\i ly,' 9—._ tr., z i. El N //// � 1jj1II 1 I \ �/ V / — � � y ///// / / vv� 1 �\ Iv W z; '_// III 1� V 1 / ��� 7 // / i �� v aw I I 1 AV A A V / �/ i V ,� �v W zS cc �� / / l j III A VAv\v v\ \V I — — �// �/� , /'/ 29/��/ I/ SIL�VERQUEENCOURT v\ \ 0 Z Yw II I �' 50'RIGHT OF WAY \ r o' ---- V A\ V A I l 1 / / 1 I / // / / �/ 4 C7 w� _/ I I I I 1 1 / IAI zs' r I z_ p \\\1//il 11 I II /// / ti 11 1.1 4 \_ W z — I R) Ivy// ;;I �l ) 1 1 !- � r/_, ` T/ � T�M �i. i; ��� x / / \ \ ) I I IDA#1 DITCH 1 II vl r yrr I r-- I r--,yd- /I -, .. --,I --, / , / / I 1 - \ cc O �11 II I III J 1 / / / / I I Jam- z l 1 / / I — I / /'rl _ _ / / �� 1 / I I I 37,493 SF(0.86 AC) 3�I _x2 / / / f ! / - - \ --- o _� //// / ✓/ __ _i//J/ 1111�1 /II I I I 0, �� _1- -III ,k/�1 1/� dI ` 1 I I� \ r„� �\ / / / ////// / - /i/ J///l/III A i21 \ III \ ' \ -- --- I m I / 1 h / / / ///' /,i,i/ //l I 1 l V A �, f� J I' zip I v t v H �1, w j I / I // / / / / / / / / / / 1 I A�v \ v v A -2zo-- If I ©✓III ®/� © 1)- © 111 i7J-�I�I_® �9 CI �y I� v o c� III 1 1 4 1 /141 I I I I h as a3 1 1 1 I I I j 1 ( I/ 11 I ( \�v o p / 13_I II Q o s� y m I j I `vv 1,,,,, ,1 / III A V V A o i�I I. v L \ I I 1 1 I I 11 v A a �ri ITI I '�I H \ 1 I I it v �v i zi w IV A V\ 1 1 I ( I U r- 1€ h ' e� v I , N z o w x \\ \ \\ I I I I I \ \\ DA#3(DITCH 3) L__1/ -�-I�/ JI /r \�IL�_ JyL// �iL^JiJ`--JI --- -- \\ 1 �\\ y m o o v v` v v v v vv vv v vv Iv `v v 2 984 SF(o.o7 AC)�v x'I 4 � -• -� - t� _ _ ' - —_ �•—\-- --—v / \VAAAVAA \ A A\\VA \ V A\\v �A AV A \v_ N v A AV A N �2,5� 16 / '✓ -� � �.5 - -- �— = - I I o \ V v V A V \ vv 11 —I� � I 1 n'I' 1 AMBROSIA WAY - I I r I:ll' --- z o VAV\\\\\VA \A A vA A \ v v I I I 2 50'RIGHTOFWAY 11 1 I / z W 6 \ \ \ \ \ -13� III DA#5 DITCH 5 0 Q z\AAVAVA VAAA �� �I 41 z,s Tom_ II I� _JII I II I ( ) v v v v A v v V v 21z�/ l l _ �I 1 3,467 SF 0.08 AC 0 Z 0_ \\\\ \v� v A�v vvv V v�,v_�v� „--_ \ II It'll' 1a `© j-0 1 1 1s o 7 I 1 II @ .- 1 5 / a5 as/ a ( ) _ U \ \ \\\\\�\\ \\ \_ \ '''N\ \ \\\\\\\_�210— I III Ij III----— 212-- ---V�_ III +11 11 11 1 / a\ \\ \ \\ \ \ \ \ \ \ \ r t1 `I J11 _/ LLJ k 0 W \\\\\ \ \\ \\\ \\\ \ \\ \\\\ -2ss- \ I 11 -4L III -1 I , I Ifol f I / — — J z Z Vr \ \ \ \\�\ \ zoe I -F I Z--- _ �I i 1 / Lai.. = Q �_ • I-- --�L 1---I 1--1-' , DA#4 DITCH4 _ = — = Z Q q\ \\I \\\\� \\ \\\\\\\\\ y \ & 1� NOW OR FORMERLY _ zos / '7,344 SF(0.17 AC) -I v V A I I I A \A A\ \\ v\ \\ VA A.i.r. vw A\ -- IV A I' JANIS N.LEWIS // -zos- -- — -_� I O z I I \ \ \\ ■`\ \ \/ S I r DB:1217;PG:280 1-- / NOW OR FORMERLY-2U1 ; ——-_ _ NOW OR FORMERLY _-- - _ _ - — W Y I zos- i _ - I m w I I 1 1 \N-_ \\ \ 1 \ �I 1 11 PIN#:0556-67-8389 ROYG.GREENE \ DANIELG.BETHUNE -- I \ \\ N \ 1 .1 I ��' / -205 -- �— _ - K \\ \ _\ \ \\ \ II, `-- DB:1011;PG:93 p4— \ _ DB:1868;PG:434 i C� w J \ I I \ \ \ \\ \ \ h I \ B \ / PIN#:0556-77-4494 2 _- \\ _ _ _ _ _ _ _ i J, \ \\ \\ \`',...",\ \ \ \ \\\ 1 1 I I I \I/ 2 PIN#:0556-87-1596 / - ce a ce ,J��/J \\\\ \ \\\\\\\\\\ \ \\\ \\\\ \ ( 1 I I 1 � f — � — // / /_-/////Zo �_ �� - - - - _ / �- _ 3 \\\\\\ \\\\\\\\\\ \I \I 111\I\vl \1 \ 1\ I\ II\ // / // 'J // /201/ —I — __ - -- / / //' — -- N \\ \ \\\\ 1 I \ \ \ \ \ \ \ 1` \ / / / / _--- -- -t-- / / // /i Vvv v v 1 \ v v v v v v v I I v / / / tis ' -- / / // / yy--`7 GRAPHIC SCALE DRAWING SHEET 11 II\ -- - I I v ,N FEET) 11) \ � - � _ I 1 vA \ ` v�� � � /G � F _ �,/ // / ;I ;A) 1 1 VA , vV AA \ Vvv I 1 \ \ I \ \ / / THIS PLANSET AND ANY ASSOCIATED DOCUMENTS ARE PRELIMINARY AND NOT AUTHORIZED FOR CONSTRUCTION)cp., f / \_ _ / //�/ / UNTIL SIGNED,DATED,AND OFFICIALLY RELEASED FOR CONSTRUCTION BY THE ENGINEER OF RECORD. 48 4.2 Drainage Ditch Calculations 49 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 Channel #1 10-year Storm Triangular Highlighted Side Slopes (z:1) = 4.00, 4.00 Depth (ft) = 0.42 Total Depth (ft) = 1.50 Q (cfs) = 1.970 Area (sqft) = 0.71 Invert Elev (ft) = 217.00 Velocity (ft/s) = 2.79 Slope (%) = 3.71 Wetted Perim (ft) = 3.46 N-Value = 0.035 Crit Depth, Yc (ft) = 0.44 Top Width (ft) = 3.36 Calculations EGL (ft) = 0.54 Compute by: Known Q Known Q (cfs) = 1.97 Elev (ft) Section Depth (ft) 219.00 - 2.00 218.50 1.50 218.00 1.00 217.50 0 0.50 217.00 0.00 216.50 -0.50 0 2 4 6 8 10 12 14 16 Reach (ft) 50 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 Channel #2 10-year Storm Triangular Highlighted Side Slopes (z:1) = 4.00, 4.00 Depth (ft) = 1.81 Total Depth (ft) = 2.00 Q (cfs) = 44.13 Area (sqft) = 13.10 Invert Elev (ft) = 218.20 Velocity (ft/s) = 3.37 Slope (%) = 0.75 Wetted Perim (ft) = 14.93 N-Value = 0.035 Crit Depth, Yc (ft) = 1.50 Top Width (ft) = 14.48 Calculations EGL (ft) = 1.99 Compute by: Known Q Known Q (cfs) = 44.13 Elev (ft) Section Depth (ft) 221.00 - 2.80 220.50 2.30 220.00 1.80 219.50 1.30 219.00 0.80 218.50 0.30 218.00 -0.20 217.50 -0.70 0 2 4 6 8 10 12 14 16 18 20 Reach (ft) 51 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 Channel #3 10-year Storm Triangular Highlighted Side Slopes (z:1) = 4.00, 4.00 Depth (ft) = 0.18 Total Depth (ft) = 1.50 Q (cfs) = 0.290 Area (sqft) = 0.13 Invert Elev (ft) = 217.00 Velocity (ft/s) = 2.24 Slope (%) = 8.37 Wetted Perim (ft) = 1.48 N-Value = 0.035 Crit Depth, Yc (ft) = 0.21 Top Width (ft) = 1.44 Calculations EGL (ft) = 0.26 Compute by: Known Q Known Q (cfs) = 0.29 Elev (ft) Section Depth (ft) 219.00 - 2.00 218.50 1.50 218.00 1.00 217.50 0.50 0 217.00 0.00 216.50 -0.50 0 2 4 6 8 10 12 14 16 Reach (ft) 52 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 Channel #4 10-year Storm Triangular Highlighted Side Slopes (z:1) = 4.00, 4.00 Depth (ft) = 0.34 Total Depth (ft) = 1.50 Q (cfs) = 0.620 Area (sqft) = 0.46 Invert Elev (ft) = 214.00 Velocity (ft/s) = 1.34 Slope (%) = 1.11 Wetted Perim (ft) = 2.80 N-Value = 0.035 Crit Depth, Yc (ft) = 0.28 Top Width (ft) = 2.72 Calculations EGL (ft) = 0.37 Compute by: Known Q Known Q (cfs) = 0.62 Elev (ft) Section Depth (ft) 216.00 2.00 215.50 - 1.50 215.00 1.00 214.50 0.50 0 214.00 0.00 213.50 -0.50 0 2 4 6 8 10 12 14 16 Reach (ft) 53 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 Channel #5 10-year Storm Triangular Highlighted Side Slopes (z:1) = 4.00, 4.00 Depth (ft) = 0.25 Total Depth (ft) = 1.50 Q (cfs) = 0.300 Area (sqft) = 0.25 Invert Elev (ft) = 213.00 Velocity (ft/s) = 1.20 Slope (%) = 1.63 Wetted Perim (ft) = 2.06 N-Value = 0.035 Crit Depth, Yc (ft) = 0.21 Top Width (ft) = 2.00 Calculations EGL (ft) = 0.27 Compute by: Known Q Known Q (cfs) = 0.30 Elev (ft) Section Depth (ft) 215.00 - 2.00 214.50 - 1.50 214.00 1.00 213.50 0.50 0 213.00 0.00 212.50 -0.50 0 2 4 6 8 10 12 14 16 Reach (ft) 54 Table of Summary-Permanent Ditch DRAINAGE AREA(AC) Rainfall(10 yr) Cvalue Flow FLOW DEPTH(FT) TOP WIDTH(FT) BOTTOM WIDTH(FT) DEPTH(FT) SIDE SLOPE(Z:1) FREEBOARD(FT) LENGTH(FT) BEGIN ELEVATION END ELEVATION SLOPE(FT/FT)VELOCITY(FT/S) VELOCITY(FT/S) On-Site _ Off-Site All-Site(A) (i) (C) (CO (actual) (ALLOWED) D1 0.73 0.13 0.86 7.88 0.29 1.97 0.42 12 0 1.5 4 1.08 62 217 214.7 3.71% 2.79 4.50 D2 6.34 16.06 22.4 7.88 0.25 44.13 1.81 16 0 2 4 0.19 960 218.2 211 0.75% 3.37 4.50 D3 0.07 0 0.07 7.88 0.52 0.29 0.18 12 0 1.5 4 1.32 41 217 213.57 8.37% 2.24 4.50 D4 0.17 0 0.17 7.88 0.46 0.62 0.34 12 0 1.5 4 1.16 270 214 211 1.11% 1.34 4.50 D5 0.08 0 0.08 7.88 0.48 0.30 0.25 12 0 1.5 4 1.25 123 213 211 1.63% 1.20 4.50 I Weighted C Values Percentage of Area Percentage of Area Percentage of Covered by Roofs Covered by Asphalt Pervious Area Weighted C (C=1.00) (C (C .20)�.95) Value � Di 0.06 0.06 0.88 0.29 D2 0.06 0.01 0.93 0.25 D3 0.00 0.43 0.57 0.52 D4 0.00 0.35 0.65 0.46 D5 0.00 0.38 0.63 0.48 55 4.3 Piped Channel Drainage Area Map 56 PROGRESS PLOT DATE 01/30/2024 >- LEGEND: IT 0 STORM DRAINAGE PROPOSED MAJOR CONTOUR / I PROPOSED MINOR CONTOUR / / / -- / ' r _ / _ _ / - -/ / / / -r - EXISTING MAJOR CONTOUR ,/ 1 / // - �- / /r - // // �/� / EXISTING MINOR CONTOUR / '/ // �' /' // / / / / IIMMME PHASE LINE 1 /// // -� / // /// /� / I/ I // /� / /// // / / / I O0 1,, �� A /-1- / / �/ // / / I ) UI _ / / - / 1 / -� '' '" �1 �I / / -'/� / �/ ' / T / \ \ \ / / NOW OR FORMERLY / '/ ' �- - / / / /I I r \ I I \ SILVER QUEEN COURT / / / \ I © \ ♦--- / GERALDINE BRADFORD SUBDIVISION -' - / / / I \ I \ / // / 50'RIGHT OF WAY // ( \ VI A % v 1 // DB:2000;PG:375 1 /' �/ / I z° / / / / � I / /vs,- \ / I �/ �" I "/ �ti6/ 1 tin' /// / / / CARQ�;'',,. I / / \ III 4 / / / PROPERTY LINE(TYP.) / -•i- - (0/ - _/ \ _ 1 // If I / `, titi� "F ' i 25 •,-, PHASE LINE PHASE II . 'YJpt4� k�` V I J / ( C-' q W��P . \ M Wf *W� . GRADING NOTES: w mm�111 \\ 11\ / II - � / � J r 1.CONTRACTOR SHALL CALL'NORTH CAROLINA ONE CALL" w O DIGGI O 1 11 I I I -f-- / rim / ( I //,/ I- ///-I' I ,' /I //, I L -, 1 / I / .\ - ELEV:2,1 . TINUT49)AT LEAST 48.HOURS PRIOR TI CREPAN IE HAVE / r / EXISTING UTILITIES LOCATED.REPORT ANY DISCREPANCIES TO 0 I II) / / THE ENGINEER. O I \ \ /I -_ 1 �i ' / / / ,-�// / 0,40 / SZ _ 2.CONTRACTOR TO COORDINATE ACTIVITIES WITH UTILITY O 3 • COMPANIES INVOLVED IN ANV RELATED RELOCATION(I.E. Z \ / \ 1 I / / / 1 / / I^ / POWER POLES,TELEPHONE PEDESTALS,WATER METERS,ETC.). 5 (� : / I 1 / I / IIF sr -1--- 3.EXISTING UTILITIES SHOWN ARE BASED ON FIELD SURVEYS AND w di I 1m P I _ /I / V / \ \ T THE BEST AVAILABLE RECORD DRAWINGS.THE CONTRACTOR Z MP 1 v a r _-+ _ --- -- / I,'' /� \ / I \ \ _ SHALL VERIFY CONDITIONS PRIOR TO BEGINNING U• c / ' - (--rt---- 1 CONSTRUCTION.ANV DISCREPANCIES BETWEEN ACTUAL FIELD Z I /I / / \ CONDITIONS AND THE PLANS SHALL BE REPORTED TO THE a Y / - 1" / / / \ I \ \ \ ALL INEERIMMEDIATELY.RO `� / / 4.ALL PROPOSED SIDE ROAD SWALES,DITCHES,CROSS PIPES N 0 \ `=` I I / // / I \ \ AND DRIVEWAY PIPES SHALL BE PROTECTED BY EROSION �L 85 ee r y / I 1 CONTROL MEASURES AS SHOWN AND SPECIFIED ON THE 0 Z \ E"0 (\ I --,-J--- -__ I -- / / I / I I \ EROSION CONTROL PLAN. 1 O w 0 1I __ 'I 5.A P.E.OR AN R.L.S.SEAL IS REQUIRED ON ALL AS-BUILT x U)H - 11\ N I. 1 1 CD 1I-�- �y ® ,Jr-' ® --r ® / © �---- --J 8�/ \® 10 I 0 \( \ IMPERVIOUS SURFACES. CC W N \_ -220- \ I 1 // \ \ 6.THE CONTRACTOR IS RESPONSIBLE FOR REPORTING ANY U I / /' - 1 \ 1 I1 1 I 1 \ I DISCREPANCIES IN THE CATCH BASIN ELEVATIONS OR THE LI i \ \ \ / 11y I 1 / 1 1 J/ y 1 \ / \ PROPOSED PIPE SLOPES TO THE ENGINEER.THE CONTRACTOR (5 Z O \ I r \ / Q \`n- IS ALSO RESPONSIBLE TO REPORT ANY CONFLICTS BETWEEN Q' e� z 1 J- \ �'/ - / \ ANY UTILITY,STORM DRAIN LINE,WATER LINE,SEWER LINE OR d- \\ \ _/ \ ,/ /' - \ ANY OTHER PROPOSED OR EXISTING STRUCTURE TO THE S m \ t)SI �- - '/ / \ 31 ENGINEER. O 55 \ \ II I CP#O3 -�_ ,- - \ 7.A LAND DISTURBING PERMIT ISSUED BY NORTH CAROLINA C. m 1 \\ 21g IOO 0I\' / // // - I /-- / \ / DEPARTMENT CO MMEO QUALITY D-WIDI TB REQUIREDG J Z \ \ I y 0.72 AC /' / / PRIOR TO THE COMMENCEMENT ENVIRONMENTAL ANY LAND-DISTURBING \ - __ 11 ACTIVITIES. Z d \ \ I ------ ------ 1" / - -1 ---- / \ INV OUT:210.82 8.ALL EXISTING VAULTS,MANHOLES,STORM DRAIN STRUCTURES, (0 o,CD \ \ \1 I 1 I PIPE-03 1 / rH VALVE BOXES,CLEANOUTS,ETC.SHALL BE ADJUSTED AS IINOU213.99 ' '' \� _ NEEDED TO MATCH FINISHED GRADE./-16 LF 18"CORRUGATED 050%I � I31 �� 9.ALL BACKFILL,COMPACTION,SOILS TESTING,ETC.SHALL BE \ INV IN:213.82 ) ZCD o \ - / - - \ PERFORMED BY THE OWNER'S INDEPENDENT TESTING l __ ' - 1 1 �I PIPE-02 LABORATORY. O'_ \ \ \/ ` '''''4.... ` \ - -- --__-_ # 44 LF 18 LA RCP Q 0.50%-- - 10.ALL SPOT ELEVATIONS INDICATED ARE AT EDGE OF PAVEMENT W d'w I - _ _ UNLESS NOTED OTHERWISE.ALL ELEVATIONS ARE BASED ON NC w I \\\ t \\ 1�-1 -- - --�- -- - -- -- ---- - -- - -- - y-- -- CLASS -- r / 11.G GRID NORTH(NAD 83) MEETING WITH NORTH CAROLINA W �U - \ I / \ DEPARTMENT OF ENVIRONMENTAL QUALITY MUST BE Q 7•IPE-04 - / - � - Woo- _p`" \11 - - \216 - - `215- - - / - SCHEDULED PRIOR TO ANV WORK,GRADING OR INSTALLATIONZ w w ib Li-TT GUKKUGA tU HIHt L U.'9% / 2�8 2 ` ` W 216-_ / �� / �/ \ OF EROSION CONTROL MEASURES. O 0' PIPE-0 218� __i % 12.ALL HANDICAP PARKING SPACES AND STRIPED ACCESSIBILITY 1 7 z77- � - AISLES ARE TO HAVE NO MORE THAN A 1:5020%SLOPE IN ALL 68 LF 16"CLASS IV RCP Q0.80% 4r_� _ \ _ __ _ _ _ �- ( ) Ky y- - - - 4--- w� -- - - -- -- �+ ------ -- --- - - - DIRECTIONS.ALL SIDEWALKS ARE TO HAVE NO MORE THAN A -215 .I 6• �- - - T # \ 1:20(5.0%)SLOPE FOR THE LENGTH OF THE SIDEWALK AND NO 20 \ 1 TINV IN:211.04 II ( -r - -- s � _ + \ MORETHANA1:50(2.0%)SLOPEFORTHEWIDTHOFTHE �,=I INV IN:213. C04 - I SIDEWALK.-_214- INV I13.08 1.':. - I / I -_1--- I\� \ Z UU Q.Q6 AC / \_ 13.IF CONTRACTOR NOTICES ANY DISCREPANCIES IN ANY OF N Q: ' 1 --- - --- 1 r 1 THESE SLOPE REQUIREMENTS,IT IS THE CONTRACTOR'S 0 i / \ INVOU:213.43---- - �\ -- I 1 r I- \ Z /I ' 1 f '' RESPONSIBILITY TO CONTACT THE OWNER PRIOR TO PLACING W H _ l� I' y/ AMBROS/A WAY ANY HARDSCAPE SO THAT A SOLUTION CAN BE FOUND.\ Q DISSIPATOR PAD(TYP.) I I 1 I 14.SPOT ELEVATIONS ARE GIVEN AT THE MAJORITY OF THE MAJOR \ ,IIII X I / I 50'RIGHT OF WAY,\ 1 I BREAK POINTS BUT IT SHOULD NOT BE ASSUMED THAT ALL 0 \ r I -_- NECESSARY SPOT ELEVATIONS ARE SHOWN.DUE TO SPACE Us 213 /\\-1 / I k I 1 --� / \ I LIMITATIONS,THERE MAV BE OTHER CRITICAL SPOTS NOT = \ /-I-T -- --- 1 1 I LABELED THAT SHOULD BE TAKING INTO CONSIDERATION.THE l) U t \ \ ljr k_ --- - _\ i'// I _ \\ \\ / CONTRACTOR SHALL REVIEW THE GRADING PLAN IN DETAIL AND Fs .-+ ----'' r -___ /- - / '1' 1 \ \ -1I r----\ 1 / SHALLENSURE THAT ALL IDECRITICAL IGRADEPOINTS ARE STAKED // \ f\ - / -' \ \--_-- //' AND FOLLOWED TO PROVIDE POSITIVE DRAINAGE. 15.FILL STORM DRAIN PIPES SHALL BE PROTECTED WITH STONE \\ -/ \ /I -� 1- I I '�" I I 1 / I FILTER PROTECTION AFTER STOPPAGE OF WORK EACH DAY w \ -212' \ \ 1 L(__ ' I 1 1 \--t-1- I I-I__` // (SEE DETAIL SHEET). 3 O m h \ _ __ %.EXISTING VEGETATION WITHIN TREE PROTECTIVE AREAS SHALL a y I Si , I \ II © --1 H - 1'-© 13 -L_- 19 © - -- © © -t '1 '© © I I REMAIN UNDISTURBED UNLESS NOTED OTHERWISE.ANY AND y LL ALL LANDSCAPING AND EXISTING TREES 8 SHRUBS TO REMAIN m tl \ �_--- 11 �� 1 T�� 1 �_ 1 WHICH ARE DAMAGED DURING DEMOLITION OR CONSTRUCTION py m \ \ �/\ ___ I 1 - 1 --- I ------ 1 1 / SHALL BE REPLACED BV THE CONTRACTOR USING A LICENSED O• Z Z y.l -(._ - '- T -1 \ r-'�',, \ / LANDSCAPE CONTRACTOR AT NO ADDITIONAL COST TO THE O ,..;1 3 210- \/ ' --_- OWNER. cQi \ \ I \ " ------ '/ 1 -- 1 17.THE GRADING CONTRACTOR SHALL COMPLY WITH ALL STATE y m o O \il--- 1I 1 -I-- i- 1 1- CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON \ ` -\' `-- 1 - I I 1 -- _ 1 - 11 / AND OFFSITE.THE GRADING CONTRACTOR SHALL MAINTAIN ALL -209--- 1 \ I ---+ .-` /L - -�. EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR Q \\ \ \ __ - TI'*-- ------ 1 AS DIRECTED BY THE EROSION CONTROL INSPECTOR OR THE z I ARCHITECT. 1 V / 1� 1� V -�L� ' 1 --- I �T 1 0 \ \ \ t \ -- - i 18.THE GRADING CONTRACTOR SHALL BE RESPONSIBLE FOR\\ \\24"EXISTING RCP \ - I \ 1 --1- 1- _ I - \ 1 ' OFF-SITE DISPOSAL OF ALL CLEARING AND GRADING WASTE U -208-- 1 __ 1 1 CC ERATED DURING CONSTRUCTION AND FOR --207_ \ I /�� I�1 J _T \\ OBTAINNG ALLNAPPLIC LE PERMITS FOR OFF-SITE STOCKPILES F\ / / �.. k �.-��-- 1 --\-<- J -�_` __ MATERIALS J� AND/OR WASTE AREAS U L _ _ - c ---- z D _ O \�� �\\\\ r NOW OR FORMERLY �4HE 1.1111111 -- � � � ���-WWII - / / •� Q 'o 22 w a\ \\ 111 I\ I JANIS N.LEWIS -\\ os- \ i ' / ~ O W - ' -- w W Z V A \\ �l \ / /'v D6:1217;PG280 1 / / ---------_2oa- _- +- -- _ PIN#:0556-67-8389 - - - - z - zz w Z \ \ p1 1 / I\ \ \ �/ ----NOW OR FORMERLY _�'-- --- \ NOW OR FORMERLY _ II U) = Q Q 1 ROY G.GREENE __-- - ----� 2 \ DANIEL G.BETHUNE __ Q a W UTILITY SEPARATION NOTES: I _--- DB:1011;PG:93 ---2p6- / DB:1868;PG:434 i _ C) u, MINIMUM VERTICAL SEPARATION BETWEEN UTILITIES: I PIN#:0556-77-4494 - / -- -- -- --- I m Z - - 2'STORM SEWER/OTHER UTILITIES NOT LISTED -zU5'- -- \ \ PIN#:0556-87-1596 _ - J 3 W - 2'WATER MAINS(POTABLE WATER OVER POTABLE WATER) \ \ _ - --' J HO d - 2'RECLAIMED WATER LINES(POTABLE WATER OVER RECLAIMED WATER) al-1 y QN fl 3'FINAL EARTH GRADE W IY 2'SANITARYSEWER STORM DRAINAGE NOTES: _ ce 0 CROSSING A WATER MAIN OVER A SEWER. 1.ALL STORM DRAINAGE PIPES SHOWN ARE TO BE CLASS III REINFORCED U U WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER,THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 24 INCHES CONCRETE(RCP)UNLESS NOTED OTHERWISE. N 71ef ABOVE THE TOP OF THE SEWER,UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 24 INCH VERTICAL SEPARATION-IN WHICH CASE BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED �_ OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. 2.ALL PIPE JOINTS SHALL BE MADE WITH PREFORMED JOINT SEALER,WHICH Q CROSS A WATER MAIN UNDER A SEWER. CONFORMS TO AASHTO SPECIFICATION M-198 FOR TYPE B FLEXIBLE PLASTIC 2 WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER,BOTH WATER AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO GASKETS UNLESS OTHERWISE NOTED. w WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING.A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING.THE DESIGN 3.ALL BACKFILL SHALL BE NON-PLASTIC IN NATURE,FREE FROM ROOTS, H VEGETATION MATTER,WASTE CONSTRUCTION MATERIAL OR OTHER V! SHALL MAINTAIN VERTICAL SEPARATIONS TO SATISFY STATE MINIMUM REQUIREMENTS WHERE THE DUCTILE IRON PIPE IS USED TO SATISFY THE HARNETT REGIONAL WATER REQUIREMENTS ABOVE. OBJECTIONABLE MATERIAL.SAID MATERIAL SHALL BE CAPABLE OF BEING MINIMUM HORIZONTAL SEPARATION BETWEEN UTILITIES: COMPACTED BY MECHANICAL MEANS AND SHALL HAVE NO TENDENCY TO - 3-5'EDGE OF PAVEMENT FLOW OR BEHAVE IN A PLASTIC MANNER UNDER THE TAMPING BLOWS OR GRAPHIC SC ALE DRAWING 5'STORM SEWER,POWER POLES AND OTHER UTILITIES NOT LISTED PROOF ROLLING. 10'SANITARY SEWER AND RECLAIMED WATER MAINS OR ASSOCIATED LINES 4.MATERIALS DEEMED BY THE OWNER'S REPRESENTATIVE AS UNSUITABLE - SHEET 10'ANY NON-PERMANENT STRUCTURES OR IMPROVEMENTS FOR BACKFILL PURPOSES SHALL BE REMOVED AND REPLACED WITH 25'ANY BUILDING FOUNDATION,BASEMENT,SUBSURFACE STRUCTURE h = 2II 30'ANY SWIMMING POOL SUITABLE MATERIAL. 11 LATERAL SEPARATION OF SEWERS AND WATER MAINS 5.BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER WATER MAINS SHALL BE LAID AT LEAST 10 FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS,UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 10 FOOT LATERAL SEPARATION,IN WHICH PIPE IS LAID.THE FILL AROUND THE PIPE SHALL BE THOROUGHLY ( IN FEET) CASE: COMPACTED TO 95%OF THE MAXIMUM DRY DENSITY OBTAINABLE WITH THE 1 inch= SO ft. - THE WATER MAIN IS LAID IN A SEPARATE TRENCH,WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 2 FEET ABOVE THE TOP OF SEWER STANDARD PROCTOR TEST.THE TOP EIGHT(6)INCHES SHALL BE - - THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH,AND WITH THE ELEVATION OF THE BOTTOM OF COMPACTED TO 100 PERCENT STANDARD PROCTOR. THE WATER MAIN AT LEAST 2'ABOVE THE TOP OF SEWER. 6.UNDER NO CIRCUMSTANCES SHALL WATER BE ALLOWED TO RISE IN - UNBACKFILLED TRENCHES AFTER PIPE HAS BEEN PLACED. THIS PLANSET AND ANY ASSOCIATED DOCUMENTS ARE PRELIMINARY AND NOT AUTHORIZED FOR CONSTRUCTION UNTIL SIGNED,DATED,AND OFFICIALLY RELEASED FOR CONSTRUCTION BY THE ENGINEER OF RECORD. 57 4.4 Piped Channel Calculations 58 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 Pipe 03 Circular Highlighted Diameter (ft) = 1.50 Depth (ft) = 0.80 Q (cfs) = 2.150 Area (sqft) = 0.96 Invert Elev (ft) = 214.07 Velocity (ft/s) = 2.24 Slope (%) = 0.50 Wetted Perim (ft) = 2.46 N-Value = 0.025 Crit Depth, Yc (ft) = 0.56 Top Width (ft) = 1.50 Calculations EGL (ft) = 0.88 Compute by: Known Q Known Q (cfs) = 2.15 Elev (ft) Section 216.00 • 215.50 • 215.00 • 214.50 214.00 • 213.50 0 1 2 3 Reach (ft) 59 Channel Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 Pipe 04 Circular Highlighted Diameter (ft) = 1.00 Depth (ft) = 0.28 Q (cfs) = 0.300 Area (sqft) = 0.18 Invert Elev (ft) = 213.57 Velocity (ft/s) = 1.65 Slope (%) = 0.90 Wetted Perim (ft) = 1.12 N-Value = 0.025 Crit Depth, Yc (ft) = 0.23 Top Width (ft) = 0.90 Calculations EGL (ft) = 0.32 Compute by: Known Q Known Q (cfs) = 0.30 Elev (ft) Section 215.00 214.50 214.00 v 213.50 213.00 0 1 2 Reach (ft) 60 Piped Channels-Table summary Drainage Area(AC) Channel Pipe Rainfall(25 year) C value Flow(Q) Size(in.) No.Barrel Length(ft.) Inv.In Inv.Out Slope Depth(ft.) Velocity(ft/s) On-Site Off-Site Total Pipe 03 0.72 0 0.72 8.77 0.34 2.15 18 1 16.0 214.07 213.99 0.5% 1.03 2.24 Pipe 04 0.06 0 0.06 8.77 0.57 0.30 12 1 16.0 213.57 213.43 0.9% 0.26 1.65 Weighted C Values Percentage of Area Percentage of Area Percentage of Covered by Roofs Covered by Asphalt Pervious Area Weighted C (C=1.00) (C .).95) (C�.20) Value Pipe 03 0.14 0.04 0.82 0.34 Pipe 04 0.00 0.50 0.50 0.57 61 5. Cross Pipes 62 5.1 Cross Pipe Drainage Area Map 63 PROGRESS PLOT DATE 01/30/2024 >- LEGEND: IT 0 STORM DRAINAGE PROPOSED MAJOR CONTOUR / 1 PROPOSED MINOR CONTOUR / / / / ' // _ / _ _ / - -/ / / / -// - EXISTING MAJOR CONTOUR ,/ 1 / // - �''� / /r - // // �/� / EXISTING MINOR CONTOUR / // // �' // // / / / / immmo PHASE LINE 1 /// // / // /// /� / 11 4/ II I I m // /� / / / �� /// // , / / I 0 / / / / II �� A /�/ LU �/ // / / I I ft I CIA - / / �� /'s1 I I \ I A\� 1 1 �'/� / -- ��/ T \ I \ / / NOW OR FORMERLY // / �- / / / 1 \ \ I I SILVER QUEEN COURT I I I 1 I I I © \ ♦--- / GERALDINE BRADFORD SUBDIVISION �� / / / / I \ I \ / // / 50'RIGHT OF WAY /I ( \ VI A % v I // DB:2000;PG:375 I /' - / z° / / / / / / / /' iv / / / / • I /' / / / 66DNn, // /TT0 \ ��IV I II �/ �// „e - �� /// �// / / CARQ��' I�1 ti^ •\ ,� ���€ �,;.,.. ., / I I I / / / PROPERTY LINE(TYP.) / -"!- - �� - _/ \ _ / �� // ) "� ti J _ � 25 jj PHASE LINE PHASE II ,° "'Ylt �n�:'` I 1 wq ;`P �,. I II / �"��� ..14 1.7 W..�"��. �"� . � •� �'.'W.7*. I I GRADING NOTES: tl° 1.CONTRACTOR SHALL CALL"NORTH CAROLINA ONE CALL" 1 J 1-800-632-4949 AT LEAST48 HOURS PRIOR TO DIGGING TO HAVE E % /I , I EXISTING UTILITIES LOCATED.REPORT ANY DISCREPANCIES TO 1 I II / / / // / / / I / / THE ENGINEER. O / �-I- ELEV:210.40 2.CONTRACTOR TO COORDINATE ACTIVITIES WITH UTILITYSZ I \\ I ) -. i' 'r / / / // _ / / / // - - - COMPANIES INVOLVED IN ANY RELATED RELOCATION(I.E. z � I 1 I /' 1 / // I^ / _ POWER POLES,TELEPHONE PEDESTALS,WATER METERS,ETC.). E / I 1 / I / a \ 3.EXISTING UTILITIES SHOWN ARE BASED ON FIELD SURVEYS AND W 1 w r _ / /I / / THE BEST AVAILABLE RECORD DRAWINGS.THE CONTRACTOR N Z 1 / I// /1 / /� / 1 \ I \�--- 1 _ SHALL VERIFY CONDITIONS PRIOR TO BEGINNING Z-O, m � I T 1 w a I I T / / \ \\ (-- CONSTRUCTION.ANV DISCREPANCIES BETWEEN ACTUAL FIELD Q. Z \ CONDITIONS AND THE PLANS SHALL BE REPORTED TO THE W = / / / / I 1 N. \ ALL INEER IMMEDIATELY. �0 4.ALL PROPOSED SIDE ROAD SWALES,DITCHES,CROSS PIPES N O \ m `Z' I I / // / I \ \ AND DRIVEWAY PIPES SHALL BE PROTECTED BY EROSION �L W \ or` I I / I / I / 1 \ I 1 \ "/ 1 \ CONTROL MEASURES AS SHOWN AND SPECIFIED ON THE Z 1\ g-0 J\ -r ----- I __-1' / ,// I / I // I / 1 \ 1 \ \1 EROSION CONTROL PLAN. 1 O W O RI - _ 'I " 5.AP.E.OR AN R.L.S.SEAL IS REQUIRED ON ALL AS-BUILT x CO W - II\ r I lit 0 �" �l ® ,I/ ® �r ® / © Oi'--1_---SY/' \® 10 I 0 \J \ IMPERVIOUS SURFACES. CC W N \- 22tr / / \ I \ I 6.THE CONTRACTOR IS RESPONSIBLE FOR REPORTING ANY O I q n / /' /- 1 \ 1 I1 1 1 1 \ DISCREPANCIES IN THE CATCH BASIN ELEVATIONS OR THE ._i \ 2/ II 1 / 1 1 J/ ,, 1 \ / \ PROPOSED PIPE SLOPES TO THE ENGINEER.THE CONTRACTOR 2 00 -----,, 1 \ i- \ / ,r /�- \ \ 1 1© \-1�3- IS ALSO RESPONSIBLE TO REPORT ANY CONFLICTS BETWEEN \ ' 0I \ i-// 1 - PROPOSED OR EXISTING STRUCTURE TO THE i \ \\ ANY UTILITY,STORM DRAIN LINE,WATER LINE,SEWER ORLINEd ANY OTHER P m -, I _/ _ ,/ 1/ 1 i I 1 ENGINEER. O -\ \ 'I A=I I � _ -I 1 i J \ 3:1 ].A LAND DISTURBING PERMIT ISSUED BY NORTH CAROLINA O N \ O A I / / DEPARTMENT OF ENVIRONMENTAL QUALITY WILL BE REQUIRED °Z \\ \,,, o Q I 11 __I - _ // �' / Imo'/// / \ PRIOR TO THE COMMENCEMENT OF ANY LAND-DISTURBING -218\ n I \-- i'� 1 ^y-I----� �I / \� ACTIVITIES. Z 0 - // i--_ 1 1 1 INV OUT:210.82 8.ALL EXISTING VAULTS,MANHOLES,STORM DRAIN STRUCTURES, Q.- TOTAL 0.94 AC NNV OU 213.99 INVIPE-03 ' - 1 - / I VALVED BOXES,CLEANOUTS,HE ETC.SHALL BE ADJUSTED AS 0 w\ I _ P L J NVI4lik J J _ J � .. \ j J NEEDED TO MATCH FINISHED GRADE. -18 LF IS"CORRUGATED• Qa 0.50%---- i -I ----J 1 ALL BACKFILL COMPACTION SOILS T a OFFSITE 0.22 AC ' .213 6. / \ 9. TESTING,ETC.SHALL BE D Wo�__I / i' --- -'� V ) PIPE / PERFORMED BY THE OWNER'S INDEPENDENT TESTING CDC INCLUDESDA ` �' -I14.oT-�- _ ---_ _3�/ _ ALL SPOTTELE 2w _I � p �_ \\ -� -___-_ / 44 LF 18"CLASS IV RCP Q 0.50%-- / 11.I \ N -' {} 1 LABORATORY. ELEVATIONS INDICATED ARE AT EDGE OF PAVEMENTZ W _- _ �_ __ __ _ ___ __ __ __ _ s__ __ �J UNLESS NOTED OTHERWISE.ALL ELEVATIONS ARE BASED ON NC W F a. I 1 - mo po _ FROM CP#03) \ \ `�� >- - - / - __ 1 \\ GRID NORTH(NAD 83). W Z O 11.A PRE-CONSTRUCTION MEETING WITH NORTH CAROLINA O \ '/ 1 DEPARTMENT OF ENVIRONMENTAL QUALITY MUST BE Z 1- PE-04 \ - e` �� _.4 - / - ' - O�c- _O o \1T - ` - _ /F}5 1 SCHEDULED PRIOR TO ANY WORK,GRADING OR INSTALLATION Z W w 218- C "9WO / 2�9 `< o j G \ OF EROSION CONTROL MEASURES. �' PIPE-0 A 218- -i / _ 12.ALL HANDICAP PARKING SPACES AND STRIPED ACCESSIBILITY oN 68 LF 16"CLASS IVRCP(�0.80% 7 z7j i _ __ ��_�- AISLES ARE TO HAVE NO MORE THAN A 1:50(2.0%)SLOPE IN ALL �� -215 . 1 �, 4�� \-L w.� - # C 02 /.� DIRECTIONS.ALL SIDEWALKS ARE TO HAVE NO MORE THAN A Uj / \ I - INV IN:211.04 1:20(5.0%)SLOPE FOR THE LENGTH OF THE SIDEWALK AND NO Z J ^�I1 1L- L I�'� i � --_ \\ \ MORE THAN A 1:50(2.0%)SLOPE FOR THE WIDTH OF THE a0,= I\ K INV IN.213.57- I I / I 1 _ 0.4 AC SIDEWALK. -_--I-- / _1� 1 1 I I I \ Cie Z FF -_214- INV OUT:213.08 �f'' 1 I I i- \ 13.IF CONTRACTOR NOTICES ANY DISCREPANCIES IN ANY OF fn(Y -- / '\, r -// / l 50'RIGWAWA , 1 r , 1 III THESE SLOPE REQUIREMENTS,IT IS THE CONTRACTOR'S 01 \ el INV OT:213.43----- ___ I I r \ , RESPONSIBILITYTOCONTACT THE OWNER PRIORTO PLACINGW Z HT CiF V/I \ 1 �/ ANY HARDSCAPE SO THAT A SOLUTION CAN BE FOUND.\ Q DISSIPATOR PAD(TYP.) I I " 1 // I AMBROSIA ! 1 I I 14.SPOT ELEVATIONS ARE GIVEN AT THE MAJORITY OF THE MAJOR = \ II ' k� I I 1 I /� BREAK POINTS BUT IT SHOULD NOT BE ASSUMED THAT ALL 0 \ f' ---- / NECESSARY SPOT ELEVATIONS ARE SHOWN.DUE TO SPACE U --v _/X /---�\ ,� I --- \ LIMITATIONS,THERE MAY BE OTHER CRITICAL SPOTS NOT _ / I I-y, \\ I / LABELED THAT SHOULD BE TAKING INTO CONSIDERATION.THEItin 0 1\ \ - --- ��- /+��- --�I\ I \ I /1 / CONTRACTOR SHALL REVIEW THE GRADING PLAN IN DETAIL AND k __ '// 4 / SHALL ENSURE THAT ALL CRITICAL GRADE POINTS ARE STAKED / II \ I\ ki -I- t �IAND FOLLOWED TO PROVIDE POSITIVE DRAINAGE- / ------IL ____ 15.ALL STORM DRAIN PIPES SHALL BE PROTECTED WITH STONE/ ---_ -, 1 1 -- r -I �.J 1 / FILTER PROTECTION AFTER STOPPAGE OF WORK EACH DAV w \ 212� \ \ {1 -�- I �' 1 1 - -�-1--I- I I-1--- // (SEE DETAIL SHEET). - O m\ %( _ IS EXISTING VEGETATION WITHIN TREE PROTECTIVE AREAS SHALL a \\ y I \ I - I1 1©---I ----la----"L// 1© - III 1$ L- 1y ©Q \�\\ © ©3 2�4 --t1''�© © REMAIN UNDISTURBED UNLESS NOTED OTHERWISE.ANV AND y, LL� Q ALL LANDSCAPING AND EXISTING TREES 8 SHRUBS TO REMAIN m --211----- 1 1 1 r-- 1 _ 1 - WHICH ARE DAMAGED DURING DEMOLITION OR CONSTRUCTION it O y w m 1 I \ II /'n -_- -� 1 --- I '----- I 1 / SHALL BE REPLACED BY THE CONTRACTOR USING A LICENSED [7 ZZ y.l }�._ _'- T -1 - r ',- - / LANDSCAPE CONTRACTOR AT NO ADDITIONAL COST TO THE O L.;,, 3 210- \1 --_ - \-- -\ - -�/ OWNER. 0 cQi w \ 00 III\ I \\i1--- -- -_-_- 1 I I - --- - - -_-_-_ ---' l-r 1 T.THE GRADING CONTRACTOR SHALL COMPLY WITH ALL STATE y o -- II-- 1 / CODES IN OBSERVING EROSION CONTROL MEASURES BOTH ON --- 209_-- \il ` \ AND OFFSITE.THE GRADING CONTRACTOR SHALL MAINTAIN ALL \ I I -- �.-- L - �. EROSION CONTROL DEVICES AFTER EACH RAINFALL EVENT OR S \ \ \ --- _'r ' r-- I-----_ 1 AS DIRECTED BY THE EROSION CONTROL INSPECTOR OR THE z II1 I ARCHITECT. I ,IA / 1,�=�1� \ I `HL-7- ' 1 --- I �T 1 0 \ -/ , I \ __ --- - 18.THE GRADING CONTRACTOR SHALL BE RESPONSIBLE FOR W \\ \\24"EXISTING RCP \ - I \ 1 --1- --- _ I -- - OFF-SITE DISPOSAL OF ALL CLEARING AND GRADING WASTE U -208-- 1 1 1 N S T R --202_' \ \ /�� I-I J 1-1 -t --- OBTAIN NG ALLNAPPLIC LE PERMITS FOR OFF-SITE SD TOCKPILES H \ / / J�.. k 1 �.���-- 1 --\-<- J -�_` -�T�._ 1. J� AND/OR WASTE AREASAB K Z. -------- .1 i__iti-il iii 0 I I I T. .-- - ' \ \�� �\\\\ K NOW OR FORMERLY 1.1111111 -- � 41 L________----,-"al ------4it..H1 ___-'' � � ��� - / / •� Q 'o �\ \ III 1 I JANISN.LEWIS ,\ os- _- ---- \ \ / ' / ~ Li_ O W -- -- --- w W V A \\ �( \ / I 1 / v D6:1217;PG 280 1 / / --2oa- - +-- _ - - Q z d PIN#:0556-67-8389 - - z p' \ p1 \ / I\ \ \ 1 �/ NOW OR FORMERLY__20T =--'-- ----_- \ NOW OR FORMERLY _--- ctoo = Q Ct ROY G.GREENE - v DANIELG.BETHUNE Q a W D UTILITY SEPARATION NOTES: I __--_ DB:1011;PG:93 --"2°6- / DB:1868;PG:434 _ _ / m C9 MINIMUM VERTICAL SEPARATION BETWEEN UTILITIES: PIN#:0556-77-4494 - - -- -- --- I m 2 Q 2'STORM SEWER/OTHER UTILITIES NOT LISTED _vs-- - - - \-- PIN#:0556-87-1596 __ - J 3 („) - ------- J Fo z -- 2'WATER MAINS(POTABLE WATER OVER POTABLE WATER) -, -_ -' - 2'RECLAIMED WATER LINES(POTABLE WATER OVER RECLAIMED WATER) IJJ Q I; Q - 3'FINAL EARTH GRADE W cc 2'SANITARYSEWER STORM DRAINAGE NOTES: _ ` 0 CROSSING A WATER MAIN OVER A SEWER. 1.ALL STORM DRAINAGE PIPES SHOWN ARE TO BE CLASS III REINFORCED U O WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER,THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 24 INCHES CONCRETE(RCP)UNLESS NOTED OTHERWISE. N ,lef ABOVE THE TOP OF THE SEWER,UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 24 INCH VERTICAL SEPARATION-IN WHICH CASE BOTH THE WATER MAIN AND SEWER SHALL BE CONSTRUCTED H OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. 2.ALL PIPE JOINTS SHALL BE MADE WITH PREFORMED JOINT SEALER,WHICH Q CROSS A WATER MAIN UNDER A SEWER. CONFORMS TO AASHTO SPECIFICATION M-198 FOR TYPE B FLEXIBLE PLASTIC WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER,BOTH WATER AND THE SEWER SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO GASKETS UNLESS OTHERWISE NOTED. W WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING.A SECTION OF WATER MAIN PIPE SHALL BE CENTERED AT THE POINT OF CROSSING.THE DESIGN 3.ALL BACKFILL SHALL BE WASTENON-LASTIC IN NATURE,FREE FROM ROOTS, I- VEGETATION MATTER, CONSTRUCTION MATERIAL OR OTHER m SHALL MAINTAIN VERTICAL SEPARATIONS TO SATISFY STATE MINIMUM REQUIREMENTS WHERE THE DUCTILE IRON PIPE IS USED TO SATISFY THE HARNETT REGIONAL WATER REQUIREMENTS ABOVE. OBJECTIONABLE MATERIAL.SAID MATERIAL SHALL BE CAPABLE OF BEING MINIMUM HORIZONTAL SEPARATION BETWEEN UTILITIES: COMPACTED BY MECHANICAL MEANS AND SHALL HAVE NO TENDENCY TO - 3-5'EDGE OF PAVEMENT FLOW OR BEHAVE IN A PLASTIC MANNER UNDER THE TAMPING BLOWS OR GRAPHIC SC ALE DRAWING 5'STORM SEWER,POWER POLES AND OTHER UTILITIES NOT LISTED PROOF ROLLING. 10'SANITARY SEWER AND RECLAIMED WATER MAINS OR ASSOCIATED LINES 4.MATERIALS DEEMED BY THE OWNER'S REPRESENTATIVE AS UNSUITABLE - SHEET 10'ANV NON-PERMANENT STRUCTURES OR IMPROVEMENTS FOR BACKFILL PURPOSES SHALL BE REMOVED AND REPLACED WITH 25'ANY BUILDING FOUNDATION,BASEMENT,SUBSURFACE STRUCTURE h = zII 30'ANY SWIMMING POOL SUITABLE MATERIAL. 11 LATERAL SEPARATION OF SEWERS AND WATER MAINS 5.BACKFILLING OF TRENCHES SHALL BE ACCOMPLISHED IMMEDIATELY AFTER WATER MAINS SHALL BE LAID AT LEAST 10 FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS,UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 10 FOOT LATERAL SEPARATION,IN WHICH PIPE IS LAID.THE FILL AROUND THE PIPE SHALL BE THOROUGHLY ( IN FEET) CASE: COMPACTED TO 95%OF THE MAXIMUM DRY DENSITY OBTAINABLE WITH THE 1 inch= SO ft. - THE WATER MAIN IS LAID IN A SEPARATE TRENCH,WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 2 FEET ABOVE THE TOP OF SEWER STANDARD PROCTOR TEST.THE TOP EIGHT(6)INCHES SHALL BE - - THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH,AND WITH THE ELEVATION OF THE BOTTOM OF COMPACTED TO 100 PERCENT STANDARD PROCTOR. THE WATER MAIN AT LEAST 2'ABOVE THE TOP OF SEWER. 6.UNDER NO CIRCUMSTANCES SHALL WATER BE ALLOWED TO RISE IN - UNBACKFILLED TRENCHES AFTER PIPE HAS BEEN PLACED. THIS PLANSET AND ANY ASSOCIATED DOCUMENTS ARE PRELIMINARY AND NOT AUTHORIZED FOR CONSTRUCTION UNTIL SIGNED,DATED,AND OFFICIALLY RELEASED FOR CONSTRUCTION BY THE ENGINEER OF RECORD. 64 5.2 Cross Pipe Calculations 65 Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 CP#1 5 year Invert Elev Dn (ft) = 213.08 Calculations Pipe Length (ft) = 68.00 Qmin (cfs) = 2.27 Slope (%) = 0.79 Qmax (cfs) = 2.27 Invert Elev Up (ft) = 213.62 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 2.27 No. Barrels = 1 Qpipe (cfs) = 2.27 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 1.75 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.69 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 214.11 HGL Up (ft) = 214.19 Embankment Hw Elev (ft) = 214.41 Top Elevation (ft) = 216.20 Hw/D (ft) = 0.53 Top Width (ft) = 47.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(It) CP#1 5 year Hw Depth(ft) 217.00 3.38 216.00 - 2.38 215.00 1.38 thieFeentret 214.00 0.38 /11 213.00 -0.62 212.00 -1.62 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 9D Circular Culvert HGL Embank Reach(It) 66 Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 CP#1 10 year Invert Elev Dn (ft) = 213.08 Calculations Pipe Length (ft) = 68.00 Qmin (cfs) = 2.52 Slope (%) = 0.79 Qmax (cfs) = 2.52 Invert Elev Up (ft) = 213.62 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 2.52 No. Barrels = 1 Qpipe (cfs) = 2.52 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 1.91 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.81 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 214.13 HGL Up (ft) = 214.22 Embankment Hw Elev (ft) = 214.46 Top Elevation (ft) = 216.20 Hw/D (ft) = 0.56 Top Width (ft) = 47.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(It) CP#1 10 year Hw Depth(ft) 217.00 3.38 216.00 - 2.36 215.00 1.36 214.00 0.36 213.00 -0.62 212.00 -1.62 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 9D Circular Culvert HGL Embank Reach(It) 67 Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 CP#1 25 year Invert Elev Dn (ft) = 213.08 Calculations Pipe Length (ft) = 68.00 Qmin (cfs) = 2.80 Slope (%) = 0.79 Qmax (cfs) = 2.80 Invert Elev Up (ft) = 213.62 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 2.80 No. Barrels = 1 Qpipe (cfs) = 2.80 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 2.08 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.94 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 214.15 HGL Up (ft) = 214.25 Embankment Hw Elev (ft) = 214.51 Top Elevation (ft) = 216.20 Hw/D (ft) = 0.60 Top Width (ft) = 47.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(It) CP#1 25 year Hw Depth(ft) 217.00 3.38 216.00 - 2.38 215.00 1.38 Inletcontrol 214.00 0.38 213.00 -0.62 212.00 -1.62 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 9D Circular Culvert HGL Embank Reach(It) 68 Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 CP#2 5 year Invert Elev Dn (ft) = 210.82 Calculations Pipe Length (ft) = 44.00 Qmin (cfs) = 1.39 Slope (%) = 0.50 Qmax (cfs) = 1.39 Invert Elev Up (ft) = 211.04 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 1.39 No. Barrels = 1 Qpipe (cfs) = 1.39 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 1.15 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.20 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 211.79 HGL Up (ft) = 211.48 Embankment Hw Elev (ft) = 211.64 Top Elevation (ft) = 214.00 Hw/D (ft) = 0.40 Top Width (ft) = 20.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(It) CP#2 5 year Hw Depth(ft) 215.00 3.96 214.00 2.96 le il 213.00 Pr' , 1.36 212.00 --..1.1111111.11111 I 0.96 I el control 211.00 -0.04 210.00 -1.04 209.00 -2.04 0 5 10 15 20 25 30 35 40 45 50 55 60 65 GrWarCulvert HGL Embank Reach(It) 69 Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 CP#2 10 year Invert Elev Dn (ft) = 210.82 Calculations Pipe Length (ft) = 44.00 Qmin (cfs) = 1.54 Slope (%) = 0.50 Qmax (cfs) = 1.54 Invert Elev Up (ft) = 211.04 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 1.54 No. Barrels = 1 Qpipe (cfs) = 1.54 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 1.26 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.30 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 211.80 HGL Up (ft) = 211.51 Embankment Hw Elev (ft) = 211.68 Top Elevation (ft) = 214.00 Hw/D (ft) = 0.43 Top Width (ft) = 20.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(1t) CP#2 10 year Hw Depth(ft) 215.00 3.96 214.00 2.96 213.00 - 1.96 212.00 ...o In 2tcontrol 211.00 4 210.00 7 -1.04 209.00 I -2.04 0 5 10 15 20 25 30 35 40 45 50 55 60 65 CirWarCWvert HOL Embank Reach(It) 70 Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 CP#2 25 year Invert Elev Dn (ft) = 210.82 Calculations Pipe Length (ft) = 44.00 Qmin (cfs) = 1.72 Slope (%) = 0.50 Qmax (cfs) = 1.72 Invert Elev Up (ft) = 211.04 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 18.0 Shape = Circular Highlighted Span (in) = 18.0 Qtotal (cfs) = 1.72 No. Barrels = 1 Qpipe (cfs) = 1.72 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 1.38 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 3.40 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 211.82 HGL Up (ft) = 211.53 Embankment Hw Elev (ft) = 211.72 Top Elevation (ft) = 214.00 Hw/D (ft) = 0.45 Top Width (ft) = 20.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(It) CP#2 25 year Hw Depth(ft) 215.00 3.96 214.00 2.96 213.00 212.00 ...o In ctcontrol 211.00 4 210.00 7 -1.04 209.00 I -2.04 0 5 10 15 20 25 30 35 40 45 50 55 60 65 CirWarCWvert HOL Embank Reach(It) 71 Cross Pipes-Table summary Storm DRAINAGE AREA(AC) Cross Pipe (in/hr)in/hr' (C value Flow Q' Size(in.) No.Barrel Length(ft.) Inv In Inv Out Slope HGL(Dn) Hw/D Velocity(Dn) (TOP Elev ft' Freeboard Event On-Site Off-Site All-Site _ Pipe 01 0.72 0.22 0.94 7.1 0.34 2.27 18 1 68.0 213.62 213.08 0.8% 214.11 0.53 1.75 216.20 0.47 5 year - - - Pipe 02 0.4 0 0.4 7.1 0.49 1.39 18 1 44.0 211.04 210.82 0.5% 211.79 I 0.4 1.15 214.00 0.53 10 ear Pipe01 0.72 0.22 0.94 7.88 0.34 2.52 18 1 68.0 213.62 213.08 0.8% 214.13 0.56 1.91 216.20 0.45 y • Pipe 02 0.4 0 0.4 7.88 _ 0.49 1.54 18 1 44.0 211.04 210.82 0.5% 211.8 0.43 1.26 214.00 0.52 Pipe 01 0.72 0.22 0.94 8.77 0.34 J 2.80 18 1 68.0 213.62 213.08 0.8% 214.15 0.6 2.08 216.20 0.43 25 year - - - - - - - Pipe 02 0.4 0 0.4 8.77 0.49 1.72 18 1 44.0 211.04 210.82 0.5% 211.82 0.45 1.38 214.00 0.50 Weighted C Values Percentage of Area Percentage of Area Percentage of Covered by Roofs Covered by Asphalt Pervious Area Weighted C (C=1.00) (C4i.95) (Cg).20) Value Pipe 01 0.11 _ 0.07 0.82 0.34 Pipe 02 0.00 0.38 0.63 0.49 72 5.3 Existing Cross Pipe Calculations 73 Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 Off-Site Existing Cross Pipe 5 year Invert Elev Dn (ft) = 206.78 Calculations Pipe Length (ft) = 35.60 Qmin (cfs) = 4.53 Slope (%) = 0.62 Qmax (cfs) = 4.53 Invert Elev Up (ft) = 207.00 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 4.53 No. Barrels = 1 Qpipe (cfs) = 4.53 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 1.97 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 4.23 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 208.15 HGL Up (ft) = 207.75 Embankment Hw Elev (ft) = 208.04 Top Elevation (ft) = 209.59 Hw/D (ft) = 0.52 Top Width (ft) = 20.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(x) Off-Site Existing Cross Pipe 5 year H„Depth an, 210.00 3.00 209.00 2.00 205.00 1.00 207.00 0.00 205.00 -1.00 205.00 4.00 0 5 10 15 20 25 30 35 40 45 50 55 60 C(rculerCulvert t1OL Embank Reach(It) 74 Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 Off-Site Existing Cross Pipe 10 year Invert Elev Dn (ft) = 206.78 Calculations Pipe Length (ft) = 35.60 Qmin (cfs) = 5.03 Slope (%) = 0.62 Qmax (cfs) = 5.03 Invert Elev Up (ft) = 207.00 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 5.03 No. Barrels = 1 Qpipe (cfs) = 5.03 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 2.15 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 4.36 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 208.17 HGL Up (ft) = 207.79 Embankment Hw Elev (ft) = 208.10 Top Elevation (ft) = 209.59 Hw/D (ft) = 0.55 Top Width (ft) = 20.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(x) Off-Site Existing Cross Pipe 10 year H„Depth an, 210.00 3.00 209.00 2.00 20300 Inletcontrol 1 00 207.00 0.00 205.00 -1.00 205.00 -2.00 0 5 10 15 20 25 30 35 40 45 50 55 60 C(rcelerCulvert HOL Embank Reed(It) 75 Culvert Report Hydraflow Express Extension for Autodesk®Civil 3D®by Autodesk, Inc. Wednesday,Jun 26 2024 Off-Site Existing Cross Pipe 25 year Invert Elev Dn (ft) = 206.78 Calculations Pipe Length (ft) = 35.60 Qmin (cfs) = 5.60 Slope (%) = 0.62 Qmax (cfs) = 5.60 Invert Elev Up (ft) = 207.00 Tailwater Elev (ft) = (dc+D)/2 Rise (in) = 24.0 Shape = Circular Highlighted Span (in) = 24.0 Qtotal (cfs) = 5.60 No. Barrels = 1 Qpipe (cfs) = 5.60 n-Value = 0.012 Qovertop (cfs) = 0.00 Culvert Type = Circular Concrete Veloc Dn (ft/s) = 2.35 Culvert Entrance = Square edge w/headwall (C) Veloc Up (ft/s) = 4.51 Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 HGL Dn (ft) = 208.20 HGL Up (ft) = 207.83 Embankment Hw Elev (ft) = 208.18 Top Elevation (ft) = 209.59 Hw/D (ft) = 0.59 Top Width (ft) = 20.00 Flow Regime = Inlet Control Crest Width (ft) = 0.00 Elev(x) Off-Site Existing Cross Pipe 25 year H„Depth an, 210.00 3.00 209.00 2.00 Inlet control 208.00 1.00 207.00 0.00 205.00 -1.00 205.00 -2.00 0 5 10 15 20 25 30 35 40 45 50 55 60 C(rcelerCulvert HOL Embank Reed(It) 76 Existing Cross Pipe-Table summary Storm Cross Pipe Drainage Area(AC) Rainfall(in/hr) C-Value Flow(Q) Size(in.) No.Barrel Length(ft.) Inv.In Inv.Out Slope HGL(Dn) Hw/D Velocity(Dn) TOP Elev(ft.) Freeboard Event 5 year Existing Off-Site 1.12 7.1 0.57 4.53 24.00 1 35.6 207.0 206.78 0.62% 208.15 0.52 1.97 209.59 0.63 10 year Existing Off-Site 1.12 7.88 0.57 5.03 24.00 1 35.6 207.0 206.78 0.62% 208.17 0.55 2.15 209.59 0.61 25 year Existing Off-Site 1.12 8.77 0.57 5.60 24.00 1 35.6 207.0 206.78 0.62% 208.2 0.59 2.35 209.59 0.58 Weighted C Values Percentage of Area Percentage of Area Percentage of Covered by Roofs Covered by Asphalt Pervious Area Weighted C (C=1.00) (C40.95) (C4.20) Value Exisiting Off Site 0.00 0.50 0.50 0.57 77 6. Appendix A: Hydrograph Model Results 78 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 2 1 3 10 8 00 V 11 V 14.1 V 111 Legend Hyd. Origin Description 1 SCS Runoff PRE DA#2(PRE POI#1) 2 SCS Runoff PRE DA#1 (PRE POI#3) 3 SCS Runoff PRE DA#3(PRE POI#2) 4 SCS Runoff POST bypass#2(post POI#2) 5 SCS Runoff post Bypass#1 (post POI#3) 6 SCS Runoff post DA#5 7 SCS Runoff post DA#4 8 SCS Runoff post DA#3 Bypass 9 SCS Runoff Post DA#2 10 SCS Runoff POST DA#1 Bypass 11 Combine POST POI#1 12 Reservoir POI 1 -->Pond 13 Reservoir Bypass 2-->pond Project: Pre and Post Hydrograph.gpw Friday, 05/ 17/2024 79 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 1 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 38.41 2 730 145,060 PRE DA#2(PRE POI#1) 2 SCS Runoff 9.357 2 724 32,324 PRE DA#1 (PRE POI#3) 3 SCS Runoff 0.640 2 726 2,626 PRE DA#3(PRE POI#2) 4 SCS Runoff 0.352 2 716 758 POST bypass#2(post POI#2) 5 SCS Runoff 5.811 2 722 19,674 post Bypass#1 (post POI#3) 6 SCS Runoff 0.150 2 720 357 post DA#5 7 SCS Runoff 0.389 2 720 903 post DA#4 8 SCS Runoff 0.359 2 716 741 post DA#3 Bypass 9 SCS Runoff 36.06 2 736 166,488 Post DA#2 10 SCS Runoff 2.319 2 724 7,279 POST DA#1 Bypass 11 Combine 36.15 2 736 167,748 6,7,9, POST POI#1 12 Reservoir 1.630 2 1038 148,504 11 196.69 112,617 POI 1 -->Pond 13 Reservoir 0.002 2 1442 387 4 196.00 684 Bypass 2-->pond Pre and Post Hydrograph.gpw Return Period: 5 Year Wednesday, 05/ 15/2024 80 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 1 PRE DA#2 (PRE POI #1) Hydrograph type = SCS Runoff Peak discharge = 38.41 cfs Storm frequency = 5 yrs Time to peak = 730 min Time interval = 2 min Hyd. volume = 145,060 cuft Drainage area = 21.720 ac Curve number = 70.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 26.30 min Total precip. = 4.72 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA#2 (PRE POI #1) Q (cfs) Hyd. No. 1 -- 5 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 1 Time (min) 81 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 2 PRE DA#1 (PRE POI #3) Hydrograph type = SCS Runoff Peak discharge = 9.357 cfs Storm frequency = 5 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 32,324 cuft Drainage area = 10.540 ac Curve number = 55.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 13.60 min Total precip. = 4.72 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA#1 (PRE POI #3) Q (cfs) Hyd. No. 2 -- 5 Year Q (cfs) 10.00 - 10.00 8.00 I 8.00 6.00 - 6.00 4.00 - 4.00 2.00 2.00 1 . , 0.00 -. 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 82 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 3 PRE DA#3 (PRE POI#2) Hydrograph type = SCS Runoff Peak discharge = 0.640 cfs Storm frequency = 5 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 2,626 cuft Drainage area = 1.130 ac Curve number = 51.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.00 min Total precip. = 4.72 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA#3 (PRE POI#2) Q (cfs) Hyd. No. 3 -- 5 Year Q(cfs) 1.00 - 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 1L 0.10 0.10 0.00 1. - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 83 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 4 POST bypass#2 (post POI#2) Hydrograph type = SCS Runoff Peak discharge = 0.352 cfs Storm frequency = 5 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 758 cuft Drainage area = 0.060 ac Curve number = 91 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.72 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST bypass#2 (post POI#2) Q (cfs) Hyd. No. 4 -- 5 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 i 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 4 Time (min) 84 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 5 post Bypass #1 (post POI #3) Hydrograph type = SCS Runoff Peak discharge = 5.811 cfs Storm frequency = 5 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 19,674 cuft Drainage area = 7.050 ac Curve number = 53.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 13.10 min Total precip. = 4.72 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 post Bypass #1 (post POI #3) Q (cfs) Hyd. No. 5-- 5 Year Q(cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 85 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 6 post DA#5 Hydrograph type = SCS Runoff Peak discharge = 0.150 cfs Storm frequency = 5 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 357 cuft Drainage area = 0.080 ac Curve number = 61.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.40 min Total precip. = 4.72 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 post DA#5 Q (cfs) Hyd. No. 6 -- 5 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 J — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 86 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 7 post DA#4 Hydrograph type = SCS Runoff Peak discharge = 0.389 cfs Storm frequency = 5 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 903 cuft Drainage area = 0.170 ac Curve number = 64.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.90 min Total precip. = 4.72 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 post DA#4 Q (cfs) Hyd. No. 7 -- 5 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 /LIMN 0.00 ` — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 87 9 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 8 post DA#3 Bypass Hydrograph type = SCS Runoff Peak discharge = 0.359 cfs Storm frequency = 5 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 741 cuft Drainage area = 0.070 ac Curve number = 85 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.72 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 post DA#3 Bypass Q (cfs) Hyd. No. 8 -- 5 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 8 Time (min) 88 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 9 Post DA#2 Hydrograph type = SCS Runoff Peak discharge = 36.06 cfs Storm frequency = 5 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 166,488 cuft Drainage area = 22.400 ac Curve number = 73.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 34.30 min Total precip. = 4.72 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post DA#2 Q (cfs) Hyd. No. 9 -- 5 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 Time (min) 89 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 10 POST DA#1 Bypass Hydrograph type = SCS Runoff Peak discharge = 2.319 cfs Storm frequency = 5 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 7,279 cuft Drainage area = 0.860 ac Curve number = 76.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.70 min Total precip. = 4.72 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA#1 Bypass Q (cfs) Hyd. No. 10 -- 5 Year Q (cfs) 3.00 3.00 2.00 2.00 1.00 - 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) 90 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 11 POST POI#1 Hydrograph type = Combine Peak discharge = 36.15 cfs Storm frequency = 5 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 167,748 cuft Inflow hyds. = 6, 7, 9 Contrib. drain. area = 22.650 ac POST POI#1 Q (cfs) Hyd. No. 11 -- 5 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 11 — Hyd No. 6 Hyd No. 7 Hyd No. 9 91 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 12 POI 1 -->Pond Hydrograph type = Reservoir Peak discharge = 1 .630 cfs Storm frequency = 5 yrs Time to peak = 1038 min Time interval = 2 min Hyd. volume = 148,504 cuft Inflow hyd. No. = 11 - POST POI#1 Max. Elevation = 196.69 ft Reservoir name = Off site existing pond Max. Storage = 112,617 cuft Storage Indication method used. POI 1 -->Pond Q (cfs) Hyd. No. 12 -- 5 Year Q (cfs) 40.00 40.00 30.00 - 30.00 20.00 20.00 10.00 10.00 0.00 — 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) — Hyd No. 12 Hyd No. 11 MITI II Total storage used = 112,617 cuft 92 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 13 Bypass 2 --> pond Hydrograph type = Reservoir Peak discharge = 0.002 cfs Storm frequency = 5 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 387 cuft Inflow hyd. No. = 4 - POST bypass#2 (post POI#120x. Elevation = 196.00 ft Reservoir name = Off site existing pond Max. Storage = 684 cuft Storage Indication method used. Bypass 2 --> pond Q (cfs) Hyd. No. 13 -- 5 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) Hyd No. 13 Hyd No. 4 I1 1 1 1 1 1 II Total storage used = 684 cuft 93 15 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 1 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 51.52 2 728 191,953 PRE DA#2(PRE POI#1) 2 SCS Runoff 15.14 2 724 47,678 PRE DA#1 (PRE POI#3) 3 SCS Runoff 1.172 2 724 4,051 PRE DA#3(PRE POI#2) 4 SCS Runoff 0.420 2 716 916 POST bypass#2(post POI#2) 5 SCS Runoff 9.969 2 722 29,721 post Bypass#1 (post POI#3) 6 SCS Runoff 0.215 2 720 500 post DA#5 7 SCS Runoff 0.537 2 720 1,235 post DA#4 8 SCS Runoff 0.440 2 716 918 post DA#3 Bypass 9 SCS Runoff 47.56 2 736 217,373 Post DA#2 10 SCS Runoff 2.993 2 724 9,359 POST DA#1 Bypass 11 Combine 47.68 2 736 219,108 6,7,9, POST POI#1 12 Reservoir 2.347 2 976 198,902 11 196.88 144,573 POI 1 -->Pond 13 Reservoir 0.002 2 1442 505 4 196.01 827 Bypass 2-->pond Pre and Post Hydrograph.gpw Return Period: 10 Year Wednesday, 05/ 15/2024 94 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 1 PRE DA#2 (PRE POI #1) Hydrograph type = SCS Runoff Peak discharge = 51.52 cfs Storm frequency = 10 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 191,953 cuft Drainage area = 21.720 ac Curve number = 70.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 26.30 min Total precip. = 5.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA#2 (PRE POI #1) Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 60.00 60.00 50.00 — 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 ____ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 95 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 2 PRE DA#1 (PRE POI #3) Hydrograph type = SCS Runoff Peak discharge = 15.14 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 47,678 cuft Drainage area = 10.540 ac Curve number = 55.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 13.60 min Total precip. = 5.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA#1 (PRE POI #3) Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 96 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 3 PRE DA#3 (PRE POI#2) Hydrograph type = SCS Runoff Peak discharge = 1.172 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 4,051 cuft Drainage area = 1.130 ac Curve number = 51.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.00 min Total precip. = 5.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA#3 (PRE POI#2) Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 2.00 2.00 • 1.00 - • 1.00 • 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 97 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 4 POST bypass#2 (post POI#2) Hydrograph type = SCS Runoff Peak discharge = 0.420 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 916 cuft Drainage area = 0.060 ac Curve number = 91 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST bypass#2 (post POI#2) Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 4 Time (min) 98 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 5 post Bypass #1 (post POI #3) Hydrograph type = SCS Runoff Peak discharge = 9.969 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 29,721 cuft Drainage area = 7.050 ac Curve number = 53.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 13.10 min Total precip. = 5.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 post Bypass #1 (post POI #3) Q (cfs) Hyd. No. 5-- 10 Year Q (cfs) 10.00 - 10.00 8.00 1 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - 0 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 99 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 6 post DA#5 Hydrograph type = SCS Runoff Peak discharge = 0.215 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 500 cuft Drainage area = 0.080 ac Curve number = 61.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.40 min Total precip. = 5.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 post DA#5 Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 100 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 7 post DA#4 Hydrograph type = SCS Runoff Peak discharge = 0.537 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 1,235 cuft Drainage area = 0.170 ac Curve number = 64.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.90 min Total precip. = 5.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 post DA#4 Q (cfs) Hyd. No. 7 -- 10 Year Q(cfs) 1.00 - 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 i 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 101 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 8 post DA#3 Bypass Hydrograph type = SCS Runoff Peak discharge = 0.440 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 918 cuft Drainage area = 0.070 ac Curve number = 85 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 post DA#3 Bypass Q (cfs) Hyd. No. 8 -- 10 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 - ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 8 Time (min) 102 24 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 9 Post DA#2 Hydrograph type = SCS Runoff Peak discharge = 47.56 cfs Storm frequency = 10 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 217,373 cuft Drainage area = 22.400 ac Curve number = 73.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 34.30 min Total precip. = 5.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post DA#2 Q (cfs) Hyd. No. 9-- 10 Year Q (cfs) 50.00 50.00 -I 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - t.JL �- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 103 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 10 POST DA#1 Bypass Hydrograph type = SCS Runoff Peak discharge = 2.993 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 9,359 cuft Drainage area = 0.860 ac Curve number = 76.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.70 min Total precip. = 5.52 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA#1 Bypass Q (cfs) Hyd. No. 10 -- 10 Year Q (cfs) 3.00 I 3.00 2.00 2.00 1.00 - 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 10 Time (min) 104 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 11 POST POI#1 Hydrograph type = Combine Peak discharge = 47.68 cfs Storm frequency = 10 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 219,108 cuft Inflow hyds. = 6, 7, 9 Contrib. drain. area = 22.650 ac POST POI#1 Q (cfs) Hyd. No. 11 -- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - _ 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 11 Hyd No. 6 Hyd No. 7 Hyd No. 9 105 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 12 POI 1 -->Pond Hydrograph type = Reservoir Peak discharge = 2.347 cfs Storm frequency = 10 yrs Time to peak = 976 min Time interval = 2 min Hyd. volume = 198,902 cuft Inflow hyd. No. = 11 - POST POI#1 Max. Elevation = 196.88 ft Reservoir name = Off site existing pond Max. Storage = 144,573 cuft Storage Indication method used. POI 1 -->Pond Q (cfs) Hyd. No. 12 -- 10 Year Q (cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 12 Hyd No. 11 111111111 Total storage used = 144,573 cuft 106 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 13 Bypass 2 --> pond Hydrograph type = Reservoir Peak discharge = 0.002 cfs Storm frequency = 10 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 505 cuft Inflow hyd. No. = 4 - POST bypass#2 (post POI#1210x. Elevation = 196.01 ft Reservoir name = Off site existing pond Max. Storage = 827 cuft Storage Indication method used. Bypass 2 --> pond Q (cfs) Hyd. No. 13 -- 10 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 - 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 13 Hyd No. 4 I1 1 1 1 1 1 II Total storage used = 827 cuft 107 29 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 1 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 71.18 2 728 262,333 PRE DA#2(PRE POI#1) 2 SCS Runoff 24.31 2 724 72,384 PRE DA#1 (PRE POI#3) 3 SCS Runoff 2.058 2 724 6,406 PRE DA#3(PRE POI#2) 4 SCS Runoff 0.516 2 716 1,142 POST bypass#2(post POI#2) 5 SCS Runoff 16.65 2 722 46,117 post Bypass#1 (post POI#3) 6 SCS Runoff 0.315 2 720 723 post DA#5 7 SCS Runoff 0.762 2 720 1,743 post DA#4 8 SCS Runoff 0.554 2 716 1,172 post DA#3 Bypass 9 SCS Runoff 64.55 2 734 293,063 Post DA#2 10 SCS Runoff 3.970 2 724 12,421 POST DA#1 Bypass 11 Combine 64.73 2 734 295,530 6,7,9, POST POI#1 12 Reservoir 2.902 2 984 273,674 11 197.15 199,341 POI 1 -->Pond 13 Reservoir 0.003 2 1442 630 4 196.01 1,030 Bypass 2-->pond Pre and Post Hydrograph.gpw Return Period: 25 Year Wednesday, 05/ 15/2024 108 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 1 PRE DA#2 (PRE POI #1) Hydrograph type = SCS Runoff Peak discharge = 71.18 cfs Storm frequency = 25 yrs Time to peak = 728 min Time interval = 2 min Hyd. volume = 262,333 cuft Drainage area = 21.720 ac Curve number = 70.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 26.30 min Total precip. = 6.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA#2 (PRE POI #1) Q (cfs) Hyd. No. 1 -- 25 Year Q (cfs) 80.00 80.00 70.00 70.00 60.00 60.00 50.00 50.00 40.00 — 40.00 30.00 30.00 20.00 I 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 109 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 2 PRE DA#1 (PRE POI #3) Hydrograph type = SCS Runoff Peak discharge = 24.31 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 72,384 cuft Drainage area = 10.540 ac Curve number = 55.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 13.60 min Total precip. = 6.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA#1 (PRE POI #3) Q (cfs) Hyd. No. 2 -- 25 Year Q (cfs) 28.00 28.00 24.00 24.00 20.00 20.00 16.00 16.00 12.00 12.00 8.00 8.00 4.00 4.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 110 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 3 PRE DA#3 (PRE POI#2) Hydrograph type = SCS Runoff Peak discharge = 2.058 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 6,406 cuft Drainage area = 1.130 ac Curve number = 51.5 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 14.00 min Total precip. = 6.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 PRE DA#3 (PRE POI#2) Q (cfs) Hyd. No. 3 -- 25 Year Q (cfs) 3.00 3.00 2.00 I 2.00 1.00 - 1.00 0.00 _ «' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) 111 33 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 4 POST bypass#2 (post POI#2) Hydrograph type = SCS Runoff Peak discharge = 0.516 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,142 cuft Drainage area = 0.060 ac Curve number = 91 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST bypass#2 (post POI#2) Q (cfs) Hyd. No. 4 -- 25 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 - 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 4 Time (min) 112 34 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 5 post Bypass #1 (post POI #3) Hydrograph type = SCS Runoff Peak discharge = 16.65 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 46,117 cuft Drainage area = 7.050 ac Curve number = 53.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 13.10 min Total precip. = 6.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 post Bypass #1 (post POI #3) Q (cfs) Hyd. No. 5-- 25 Year Q (cfs) 18.00 - 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 5 Time (min) 113 35 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 6 post DA#5 Hydrograph type = SCS Runoff Peak discharge = 0.315 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 723 cuft Drainage area = 0.080 ac Curve number = 61.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.40 min Total precip. = 6.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 post DA#5 Q (cfs) Hyd. No. 6 -- 25 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 .- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) 114 36 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 7 post DA#4 Hydrograph type = SCS Runoff Peak discharge = 0.762 cfs Storm frequency = 25 yrs Time to peak = 720 min Time interval = 2 min Hyd. volume = 1,743 cuft Drainage area = 0.170 ac Curve number = 64.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 8.90 min Total precip. = 6.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 post DA#4 Q (cfs) Hyd. No. 7 -- 25 Year Q(cfs) 1.00 - 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 - J - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Time (min) 115 37 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 8 post DA#3 Bypass Hydrograph type = SCS Runoff Peak discharge = 0.554 cfs Storm frequency = 25 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 1,172 cuft Drainage area = 0.070 ac Curve number = 85 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 post DA#3 Bypass Q (cfs) Hyd. No. 8 -- 25 Year Q (cfs) 1.00 1 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50I 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 8 Time (min) 116 38 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 9 Post DA#2 Hydrograph type = SCS Runoff Peak discharge = 64.55 cfs Storm frequency = 25 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 293,063 cuft Drainage area = 22.400 ac Curve number = 73.1 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 34.30 min Total precip. = 6.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post DA#2 Q (cfs) Hyd. No. 9-- 25 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 i 50.00 40.00 - 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 9 Time (min) 117 39 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 10 POST DA#1 Bypass Hydrograph type = SCS Runoff Peak discharge = 3.970 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 12,421 cuft Drainage area = 0.860 ac Curve number = 76.3 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 17.70 min Total precip. = 6.65 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 POST DA#1 Bypass Q (cfs) Hyd. No. 10 --25 Year Q (cfs) 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 — L 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 10 Time (min) 118 40 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 11 POST POI#1 Hydrograph type = Combine Peak discharge = 64.73 cfs Storm frequency = 25 yrs Time to peak = 734 min Time interval = 2 min Hyd. volume = 295,530 cuft Inflow hyds. = 6, 7, 9 Contrib. drain. area = 22.650 ac POST POI#1 Q (cfs) Hyd. No. 11 --25 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 11 Hyd No. 6 Hyd No. 7 Hyd No. 9 119 41 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 12 POI 1 -->Pond Hydrograph type = Reservoir Peak discharge = 2.902 cfs Storm frequency = 25 yrs Time to peak = 984 min Time interval = 2 min Hyd. volume = 273,674 cuft Inflow hyd. No. = 11 - POST POI#1 Max. Elevation = 197.15 ft Reservoir name = Off site existing pond Max. Storage = 199,341 cuft Storage Indication method used. POI 1 -->Pond Q (cfs) Hyd. No. 12 --25 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 JOLII *8---1--- 0.00 -. 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 12 Hyd No. 11 111111111 Total storage used = 199,341 cuft 120 42 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Hyd. No. 13 Bypass 2 --> pond Hydrograph type = Reservoir Peak discharge = 0.003 cfs Storm frequency = 25 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 630 cuft Inflow hyd. No. = 4 - POST bypass#2 (post POI#1210x. Elevation = 196.01 ft Reservoir name = Off site existing pond Max. Storage = 1,030 cuft Storage Indication method used. Bypass 2 --> pond Q (cfs) Hyd. No. 13 --25 Year Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 13 Hyd No. 4 I1 1 1 1 1 1 II Total storage used = 1,030 cuft 121 43 Hydraflow Rainfall Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2024 Wednesday,05/15/2024 Return Intensity-Duration-Frequency Equation Coefficients(FHA) Period (Yrs) B D E (N/A) 1 0.0000 0.0000 0.0000 2 69.8703 13.1000 0.8658 3 0.0000 0.0000 0.0000 5 79.2597 14.6000 0.8369 10 88.2351 15.5000 0.8279 25 102.6072 16.5000 0.8217 50 114.8193 17.2000 0.8199 100 127.1596 17.8000 0.8186 File name:SampleFHA.idf Intensity= B/(Tc+ D)^E Return Intensity Values(in/hr) Period (Yrs) 5 min 10 15 20 25 30 35 40 45 50 55 60 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 5.69 4.61 3.89 3.38 2.99 2.69 2.44 2.24 2.07 1.93 1.81 1.70 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.57 5.43 4.65 4.08 3.65 3.30 3.02 2.79 2.59 2.42 2.27 2.15 10 7.24 6.04 5.21 4.59 4.12 3.74 3.43 3.17 2.95 2.77 2.60 2.46 25 8.25 6.95 6.03 5.34 4.80 4.38 4.02 3.73 3.48 3.26 3.07 2.91 50 9.04 7.65 6.66 5.92 5.34 4.87 4.49 4.16 3.88 3.65 3.44 3.25 100 9.83 8.36 7.30 6.50 5.87 5.36 4.94 4.59 4.29 4.03 3.80 3.60 Tc=time in minutes.Values may exceed 60. Precip.file name:Sample.pcp Rainfall Precipitation Table (in) Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.05 0.00 0.00 4.72 5.52 6.65 0.00 0.00 SCS 6-Hr 2.20 0.00 0.00 3.34 3.91 4.69 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 122