HomeMy WebLinkAbout670047_Compliance Evaluation Inspection_20240627 Division of Water Resources
Facility Number U - 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: &Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: (Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: Departure Time: County: ()W Region: t 1kb
Farm Name: V0Y'" b`jx6n -FW W"\ Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative: 2.V�k Integrator:
Certified Operator: �Qr1/1Q j yo r-\ Certification Number: �2 O
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity 1'op.
Wean to Finish Layer Dairy Cow
Wean to Feeder Non-Layer Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other urkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? [:] Yes 0 No ❑ NA ❑NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes [:] No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes 42(No ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Cattrnued
Facilit Number: - Date of Inspection:
Waste Collection &Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes 0 No ❑ NA ❑ NE
a. If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in): _
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE
(i.e.,large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes &[No ❑ NA ❑NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR
7.Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes No ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes 10 No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes ,}� No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.))
❑ PAN ❑ PAN > 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12.Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ([M No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes /a No ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes tEq No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes �No ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes tEkNo ❑ NA ❑ N F,
Required Records& Documents
19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes "No ❑ NA ❑ NI:
20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes NNo ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists [—]Design ❑Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes &%No ❑ NA ❑NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis [:]Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes [�No ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes �j No ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facilit Number: - Date of Inspection:k12 7. 2
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes No ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes 0 No ❑ NA NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes [—] No UPNA NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 5LNo ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes 45�No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 6,No 0 NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes M No ❑ NA NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes EkNo ❑ NA ❑ NE
Comments(refer to question ft Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
5o i r-e_+0r1- d,v e, ZoZH
V b'�W- t
Reviewer/Inspector Name: "'QV) �r( � �Q�!(-f(� Phone: g1b �6g z�S-z
Reviewer/Inspector Signature: Date: 2�Z
Page 3 of 3 511212020