Loading...
HomeMy WebLinkAbout670025_Compliance Evaluation Inspection_20240627 ivision of Water Resources Facility Number - O Division of Soil and Water Conservation 0 Other Agency Type of Visit: Von] lance Inspection Operation Review Q Structure Evaluation 0 Technical Assistance Reason for Visit: G"Routine O Complaint 0 Follow-up O Referral O Emergency 0 Other 0 Denied Access Date of Visit: 1�Arrival Time: .VO Departure Time: gvNunty:�� Region: Farm Name: N a-1' bV �(� H/\� 1 Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: �(� Integrator: Certified Operator: Certification Number: 2G796—T Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish I.a er I I Dairy Cow Wean to Feeder I INon-Layer I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dury Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other —Turkey Poults Other 1 7- Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes 6jNo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes allo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes (5QNo ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 511212020 Cor inued Facility Number: - Date of Inspection: Waste Collection &Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes allo ❑ NA ❑ NE a. if yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: I Spillway?: Designed Freeboard(in): 2 d Observed Freeboard(in): 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes tA No ❑ NA ❑ N F: (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes Ca No ❑ NA ❑ N k waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes C&No ❑ NA ❑ N l: 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes allo ❑ NA ❑ N I (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 0 No ❑ NA ❑ NF. maintenance or improvement? Waste Aaalication 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes 64_No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes a No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE VNI 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NF 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records& Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes VV V1 No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes,check the appropriate box below. 4,Yes ❑ No ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard -Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes &4 No ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes (K'No ❑ NA ❑ NF. Page 2 of 3 511212020 Continued Facility Number: - Date of Inspection:Co 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes K No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? if yes,check ❑ Yes c-71 No ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? Yes ❑ No JQ'NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document 0 Yes 4 No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? 0 Yes (RNo ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes K No ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes �No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes FNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes Za_No ❑ NA ❑ NE Comments(refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). W LILske (a b S W4 C-O C�0 s 'sac'. C Q.\ib rC k-h a n s 2-0SC-1 51 udc�t. fie. 202�1 Reviewer/Inspector Name: I'honr: q[6 __ S &SZ Reviewer/Inspector Signature: �—�4 i Page 3 of 3 511212020