HomeMy WebLinkAbout310217_Compliance Evaluation Inspection_20240625 Division of Water Resources
Facility Number - Z f O Division of Soil and Water Conservation
O Other Agency
Type of Visit: C_o/mpliance Inspection Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: ((Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: ZS 2 Arrival Time: Departure Time: County:J)(.1p VI Region:
Farm Name: `� C � 1(�5 Owner Email:
Owner Name: c_1 /mil S Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative:►�� J `f�'1/1,Q Integrator:
Certified Operator: �6,5 �� �r Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
can to Finish Layer DairyCow
Wean to Feeder Q Non-Layer Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish La ers I 113eef Stocker
Gilts Non-Layers 113eef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? [:] Yes No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE
of the State other than from a discharge? dq
Page I of 3 511212020 Continued
Faeilit Number: 7 - 2 Date of Ins pection:
Waste Collection&Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes A No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in): 2,7
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes � No ❑ NA ❑ NE
(i.e., large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ER No ❑NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes �No ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 0 No ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes �No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes n No ❑ NA ❑ NE
maintenance or improvement?
1 1. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes ra No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ l allure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12.Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes 0 No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes 071 No ❑ NA ❑ NE
16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes B] No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE
Required Records& Documents
19. Did the facility fail to have the Certificate of Coverage& Permit readily available? ❑ Yes ] No ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes 14 No ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and I" Rainfall Inspections ❑Sludge Survey
22.Did the facility fail to install and maintain a rain gauge? ❑ Yes 1K] No ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes 0 No ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: - 2 Date of-inspection: t; Z
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes No ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes q No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No N NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document [:] Yes No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately. aq
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 21 No ❑ NA ❑ N1
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes E4 No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 4 No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes E3 No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes a No ❑ NA ❑ NE
Comments(refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
C aA%brab'oKS 2( 2c-t
LMibrc 6 0n� ) Sew bw CCA+C 0 S'8 m n ZQ z 4 - lid v�y
y�
Reviewer/Inspector Name: Phone: �1 D"'� "245 Z
Reviewer/Inspector Signature: �v^)J Date: (4125
G
Page 3 of 3 511212020