HomeMy WebLinkAbout4405 Stoney Pointe Ct_Revised NCDWQ5. Describe the existing land
�,� /`use or condition of the site at the time of this application (residential,
undeveloped, etc.): Nt w I h v wl e
6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or
why it is necessary): /�,93 tG cross- a��� i/P(S. /�o+�J Div_/ is
A t r fu,S{ a�1n12. cif �P
7. Will work be conducted from land?,,� From water? ❑
8. Total amount of impacts below the normal pool lake level / Normal Water Level
Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet:
-3919 51, k
Temporary impacts in square feet:
9. Total amount of impacts above the normal pool lake level / Normal Water Level and 50 feet land-
ward
Permanent impacts (including back fill, excavation, rip rap, retaining walls, etc.) in square feet:
_�17 Z" -a.
Temporary impacts (temporary clearing, construction corridor) in square feet:
10. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet
landward to be impacted (number of trees, for instance):
/0
11. Signature
By signing below, I, as the project proponent, certify to the following:
• The project proponent hereby certifies that all information contained herein is true, accurate,
and complete to the best of my knowledge and belief
• The project proponent hereby requests that the certifying authority review and take action on
this CWA 401 certification request within the applicable reasonable period of time
Owner/Agent's Signature' [15A NCAC 02H .0502(f)] Date
'Agent's signature is valid only if an authorization letter from the owner is provided.
12. Please approximately sketch the following information on this plan and provide dimensions for
each item:
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
North Carolina Department ofEnvironmental Quality i Di\ision of Water Resources
Q ` 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617
/`� 919.707.9000
12. Please approximately sketch the following information on this plan and provide dimensions for
each item:
a. All proposed vegetation clearing
b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
d. Location of any proposed structures such as buildings, retaining walls, docks, etc.
i nrntinn of anv Pxravation or dredeing below the Full Pond/ Normal Water Level elevation
�Full Pond) 9MWater
Shoreline
133
CIec4-c
'4(,A
/C�6 /se.;p
Plan Mew
Lake
(At Full .Pondl Normal Water Level)
9 &"'ek
MOO
R � tie 9" 1/33
1
� V/ 39'9
/33
L'o'�G���
Lake
(AtRAPbft tHDM=TMT&MrLeV4 Existing Dock
/30fcx7ft
s. Lssafsss�ss t r sss,XWL
.r..r. r �iv�r�rrra.�r: rrrlw
s. rwsa��s.� rssss
i
M PL
•
FORM: SSGP 02-2017 Page 3 of 4
.s a
/ 3�
cc•�ss
-77
Lake
(At Full Pond/iNormal Water Level)
Side View
ry�
�
•
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 1 1617 Mail Sen ice Center i Raleigh, North Carolina 27699-1617
ixc ii t ; . mA ate\ r 919.707.9000
CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address: �S r �7 County:
. _ 1
Owner:
Print signature
Contractor/agent: . na
Print Signature
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC
02H .0506 and 15A NCAC 02B .0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)]
Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243
(6)]
Beaches, impervious patios, impervious walkways, etc, are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
Acknowledgement of Notification
I, L_ , hereby state that I have been informed of the Catawba
Riparian Buffer Rule. A work conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting
materials.
Signature (owner): Date: `� 2..