Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
820138_Application - Irrigation Modification_20190214
Animal Waste Management Plan Certifcation (Please type or print all information that does not require a sienature) existing) or New or ExpuWerl fptease circle one) I�►t�ornysttnm Permit No: AWI820138 Marne of farm: EasoqFArm5.jnc Facility No: 82-138 Owner(s) Name: Eason Farms,Inc Phone No:9I0-23 7-1254 Mailing Address:32 Eason -Elmore Rd. Dutifl. NC 28334 Farm Location: County Farm is located in: Sampson Latitude and Longitude: 35.241541 / 78.533916 Integrator: Smtthficid Please attach acopy of a county road map with location identified and describe below (Be specific: road names, directions, milepost, etc.): From I-95 at Dunn take US 421South ariproxiMately 5 3 miles to Lee's ChMI Rd Turn left travel 6 miles to Easo Elmore Rd turn right Farm at end of road Operation Diaription_ Type of Swine Nn. of Atritnals n Wean to Feeder * Feeder to Finish Dt50 * Farrow to wean * Farrow to Feeder D Farrow to Finish D Gilts * Boars P-rpandIn8 OpErtrrion Only Type of Poultry No. of Aodmols O Layer O Non -Layer Type of Beef No. of Anintals 0 Brood ❑ Feeders Q Stockers ©titer Type of Livestock: Acreage Available for Application: 31 Required Type of Dairy No. of Anhnols Q Milking Cl Dry G Heifers G Calves Number of Animals: Total Number of waste. structures: 5 Total Capacity: 1227,176 Cubic Feet (fts) Are subsurface drains present on the farm: YES or NO (please circle one) If YES: are subsurface drains present in the area of the waste structures (please circle one or both as appticablr: Owner / Manager Agreement t (we) verify that all the above information is correct and will be updated upon changing. t (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any expansion to the existing design capacity.of the waste treatment and storage system or construction of new facilities will require a permit application and a new certification to be submitted to the Division of Water Quality (DWQ) and permit approval received before the new animals are stocked. I (we) understand that there must be no discharge of animal waste from the storage system to surface waters of the state unless specifically allowed under a permit from DWQ and there must not be run-off from the application of animal waste. I (we) understand that run-off of pollutants from lounging and heavy use areas must be minimized using technical standards developed by tht: USDA -Natural Resources Conservation Service (NRCS). The approved plan will be Fled at the farm and at the DWQ Regional Office and the office of the local Soil and Water Conservation District (SWCD), I (we) know that any modification must be approved by a technical specialist and submitted to the DWQ Regional Office and local SWCD and required approvals received from DWQ prior to implementation. A change in farm ownership requires a permit application to be sent to DWQ along with a new certification (if the approved plan is changed). Name of Land Oeyner: Farms. Inc RFCEIVEt alullaeure: Gam` Date: 12/14/2018 Name of Manager (if different from owner): FEB I d 3n to A WC . September 18, 2006 R891onaI O Peradoft SCANNEr) D). Application and HUdling Eauiorrtent Cheek the approprfare box O Existing or e&9aWjng facility with existing &Azle g9plicafign cogi_nmgnt (WUP or I; Animal waste application equipment specified in the plan has been either field calibrated or evaluated in accordance with existing design charts and tables and is able to apply waste as necessary to accommodate the waste ,tnagement plan: (existing application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates, a schedule for timing of applications has been established; required buffers can be maintained and calibration and adjustment guidance are contained as part of the plan). *3 New. exoanded. or existing facility without existing =tc ggplicat(gn cquigment for s2mv irrigigipn (0 Animal waste application equipment specified in the plan has been designed to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance are contained as part of the plan). New, CxDanded._or existin¢ faCilit.V Without existinir waste application enuinment fnr lAnd snre_atl;na nm i,einu an-o ur,gation. (WUPorI) -- Animal waste application equipment specified in the plan has been selected to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance are contained as part of the plan). Name of Technical Specie➢istt Please klg'liation 1 t Address (Age cy): o Lay 4 Signature: bui l ev\ M 5fia l is wate Work Completed: ryitj c^u f%t. r Phone No. E) Odor Control, t Control Mortality Management and EmeMency Action Plan JSD, SILWUP. RC or I i The waste management plan for this facility includes a Waste Management Odor Control Checklist, an Insect Control Checklist, a Mortality Management Checklist and an Emergency Action Plan. Sources of both odors and insects have been evaluated with respect to this site and Rest Management Practices to Minimize Odors and Hest Management Practices to Control Insects have been selected and included in the waste management plan. Both the Mortality Management Plan and the Emergency Action Plan are complete and can be implemented by this facility. Name of Technical Specialist (Please Print): Curtis Barwick Affiliation— Barwicki e C Date Work Completed: 12/14/18 Address (Agency):_,..,.-10033 CPO - Club Circle. !'lilttton C 28329 Phone No.:910-385-1000 F) Written Notice of New or Expandlne SwineFaern The following signature block is only to be used for new or expanding swine form that begin construction [after Jane 21,1996. If the facility was built before June 21,19%, when was it constructed or last expanded I (we) certify that I (we) have attempted to contact by certified mail all adjoining property owners and all property owners who own property located across a public road, street, or highway from this new or expanding swine farm. The notice was in compliance with the requirements of NCGS 106-805. A copy of the. notice kind a list of the property owners notified are attached. Name of Land Signature:_2 Name of Manager (i€ different front owner): Signature: Date. AWC - September 18.2006 Technical Specialist Certification L As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to ISA NCAC 6H .0104, 1 certify that the animal waste management system for the farm named above has an animal waste management plan that meets or exceeds standards and specifications of the Division of Water Quality as specified in 15A NCAC 2T .1300 (formerly 2H .0217) and the USDA -Natural Resources Conservation Service and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2T .1300 (formerly 2H .0217) and 15A NCAC 68.0101-.0105, The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, SI, WUP, RC.1), the technical specialist should only certify pans for which they are technically competent, A Certification ication of Design A) Collectiom Storage, Treatment System Check the appropriate box Existing faciab without retrofit (SD or WUP) Storage volume is adequate for operation capacity; storage capability consistent with waste utilization requirements. ❑ New, expanded --or retrofitted facility (SD) Animal waste storage and treatment structures, such as but not limited to collection systems, lagootes and ponds, have been designed to meet or exceed the minimum standards and specifications. Name of Technical Specialist (Please Print): Designed by BionRgy Campbell et al 1998 Affiliation Date Work Completed: — Address (Agency):_ Phone No.: Signature: Date: B) Land Aool'tcation S,^ite (WUP) The plan provides for minimum separations (buffers); adequate amount of land for waste utilization; chosen crop is suitable for waste management; and the hydraulic and nutrient loading rates are appropriate for the site and receiving crop, dame of Technical Specialist (Please Print): Curtis Barwick Affiliation: Barwick Ag Services Li _f Date Work Completed: 12/14J2018 Address Phone No.:91Q-385-1000 12/14/2018 C) runoff Controls from Exkdor Lets Check thz appropriate box Facility without exterior to (SD or WUP or RC) This facility does not contain any exterior iots. ❑ Facility with exterior tots (RC) Methods to minimize the run off of pollutants from lounging and heavy use arras have been designed in accordance with technical standards developed by NRCS. Name of Technical Specialist (Please Print):Curtis 8arw Affiliation__ Barwick As Services LLC Date Work Completed: 12/14/18 Address (Agency): 103 Country Clu tjCirc /te, Clinton N 2832 Phone No.:910-M-1000 Signature: / -A-/'6Z J! r%-.-. f w It n AWC - September 18, 2006 III. Certi, ,nation of Installation A) Collection, Storage Treatrnent Installation New, expanded X fetrofitted faciUty (SD Animal waste storage and treatment structures, such as but not limited to lagossns and ponds, have beets installed accordance with the approved plan to meet or exceed the minimum standards and specifications. For existing futilities without retrofts, no cerdficrnion is necessary. Name of Technical Specialist (Please Print): Affiliation Date Work Completed: Address (Agency): Phon, Signature: Date: B) Land Applicat_ ton Site (WUP) No.: The cropping system is in place on all land as specified in the animal waste management plan. Nance of Technical Specialist (Please Print): Curtis Barwi k Affiliation: Barwick AR Services L C Date Work Completed: IV14f2018 _ Address (Agency): Signature: _51rr- i r4rt.j-1 f►, �.l 1��y C) Runoff tCw Rots from Exterior Lots (RC) Facility with exterior lots ?Methods to minimize the run off of poilutants from lounging and -heavy use areas have been iinstalled as specified in the plan. For facilities without exterior lots, no certification is necessary. Nanx of Technical Specialist (Please Print): Affiliation Date Work Completed: Address (Agency): Signature: _ _ .—Phone No.: M Application and Handiin uipment Installation (WLT or r # Animal waste application and handling equipment specified in the plan is on site and ready for use; calibration and adjustment materials have been provided to the owners and are contained as pan of the plan. Animal waste application and handling equipment specified in the plan has not been installed but the owner has proposed leasing or third party application and has provided a signed contract; equipment specified in the contract agrees with the requirements of the plan; required buffers can be maintained. calibration and adjustment guidance have been Provided to the owners and are contained as part of the plan. Narne of Technical S alist (Please Pri .t): fl,iJ s 1 Affiliation: -ve t t i tacl r �r Date Work Completed: Address (A7-1 ncy): bD8'• �ttr •, /VC Phone hfia..2����� . Signature._. Date: --� AWC • September 18, 2006 E) Odor Control, Insect Control and Mortality Management (SD SI WUP RC or I) Methods to control odors and insects as specified in the Plan have been installed and are operational. The mortality management system as specified in the Plan has also been installed and is operational. Name of Technical Specialist (Please Print): w i Affiliation__ B rwick Ag S vices LC Date Work Completed: 2/14/18 Address (A Signat,jre:_ No.: 4 i 0-385 1000 Please return the completed form to the Division of Water Quality at the following address: Department of Environment and Natural Resources Division of Water Quality Animal Feeding Operations Unit 1636 Mall Service Center Raleigh, NC 276".1636 Please also remember to submit a copy of this form along with the complete Animal Waste Management Plan to the DWQ Regional Office and the local Soil and Water Conservation District Office and to keep a copy in your files with your Animal Waste Management Plan. AWC - September 18, 2006 WASTE UTILIZATION PLAN Friday, November 18, 2016 � P U I t Producer : Eason Farms, Inc Farm Name: Eason Farms, Inc. 82-138 32 Eason -Elmore Rd Dunn,NC 28334 Telephone # : (910) 237-1254 Type of Operation : Feeder to Finish Swine Number of Animals: 3960 hogs design capacity Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient contents of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and avaialable water holding capacities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special pre -cautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on waste application through irrigation for this is the manner in which you have chosen to apply your waste. If you choose to inject the waste in the future, you need to revise this plan. Nutrient levels for injecting waste and irrigating waste are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for ananlysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. Page 1 of 9 AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 3960 hogs X 1.9 tons waste/hogs/year = 7524 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 3960 hogs X .6124 Ibs PAN/hogs/year = 2425.104 PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and suface application. TABLE I: ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE &CLASS- CROP YIELD LBS AW COMM ACRES LBS AW APPLIC. DETERMINING PHASE CODE N/ACRE N/ACRE USED TIME 10645 1A AUTRYVILLE ALL BH 5.5 270.05 0 2; 540.1 MAR-SEP 10645 - 1A AUTRYVILLE ALL SG 1 100 0 2200 SEP-MAY 10645 - 1P AUTRYVILLE ALL SA 1 270 0 17.6; 4752 APR-AUG 10645 - 1P AUTRYVILLE ALL WA 1 100 0 17.61 1760 SEP-ARP TOTALS: 7252.1 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirments. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of NC to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. Page 2 of 9 TABLE 2: ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specifications 2.) TRACT FIELD SOIL TYPE &CLASS- CROP YIELD LBS AW COMM ACRES LBS AW APPLIC. DETERMINING PHASE CODE N/ACRE N/ACRE USED TIME 1243 1 iAUTRYVILLE ALL BH 5.5 270.05 0 10.3I 2781.52 MAR-SEP 1243 - 1 iAUTRYVILLE ALL SG 1 100 0 10.31 1030 SEP-MAY TOTALS: 3811.52 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation * Acreage figures may exceed total acreage in field due to overseeding. **Lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in TABLES 1 and 2 above: CROP CODE CROP ,BH HYBRID_ BERMUDAGRASS-HAY SG_ SMALL GRAIN OVERSEEDED 'SA SUMMER ANNUALS WA WINTER ANNUALS UNITS LBS N/UNIT TONS 50 AC 50 AC 110 AC 100 Page 3 of 9 TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED 'TABLE 1 19.6 7,252 TABLE 2 - - - — -- -� 10.33,812 TOTALS: 29.9 11,064 AMOUNT OF N PRODUCED: 2,425 ' BALANCE .8,639 *** This number must be less than or equal to 0 in order to fully utilize the animal waste N produced. Acres show in each of the preceeding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nurturient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1465.2 pounds of plant available nitrogen (PAN) per year in the sludge that will need to be removed on a periodic basis. This figure is PAN when broadcasting the sludge. Please be aware that additional acres of land, as well special equipment, may be needed when you remove this sludge. See the attached map showing the fields to be used for the utilization of waste water. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. Your facility is designed for 150 days of temporary storage and the temporary storage must be removed on the average of once every 4.93 months. In no instance should the volume of waste being stored in your structure be within 1.58 feet of the top of the dike. If surface irrigation is the method of land application for this plan, it is the responsiblity of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of Nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. a�IFR%W9" RATION TRACT FIELD SOIL TYPE CROP RATE (in/hr) AMT (inches) FE15. 4 110645 -lA AUTR VILLE ALL ' 2019 I SG *� 110645 -iP AUTRVILLE ALL j SA wpQua!' *1 10645 lA AUTRVILLE ALL ! BMRe9l0nal(90tio sSectio�l 1243 -1 AUTRYVILLE ALL i SG 0.60 1 .1243 i +AUTRVILLE ALL I BH 0.60 *1 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Page 4 of 9 NARRATIVE OF OPERATION This WUP is written for both pivot and aerway application. Aerway acreages were determined after conservative buffers were measured. RYE's are based on the latest charts. The amount of nitrogen produced for the farm, 2,425 Ibs/year, is based off the initial design completed by Bion engineers in 2002. Supporting documents are attached. SA is millet cut for hay Page 5 of 9 PLANS & SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application, Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to assessment of civil penalties of $10,000 per day by the Division of Water Quality for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land to properly dispose of waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System (ACS). If an ACS is used the soil loss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field. These filter strips will be in addition to "Buffers" required by DEM. (See FOTG Stantard 393 - Filter Strips and Standard 390 Interim Riparian Forest Buffers). 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" in the NRCS Technical Reference - Environment file for guidance.) *7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and to provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. 10, Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop on bare soil. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: the outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from anv perennial stream or river (other that an irriaation ditch or canal. Animal waste Page 6 of 9 other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal Waste shall not be applied closer than 200 feet of dwellings other than those owned by the landownwer. 14. Waste shall be applied in a manner not to reach other property and public right - of ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted croplands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses, except when applied at agronomic rates and the application causes no runoff or drift from the site. *16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. *17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. *18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. *19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied as a preemergence with no other applications of animal waste during the crop season. *21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume fpr waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production amd maintained. Soil and waste analysis records shall be kept for five (5) years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina Department of Agriculture regulations. * Liquid Systems Page 7 of 9 NAME OF FARM: Eason Farms, Inc. 82-138 OWNER / MANAGER AGREEMENT I (we) understand and will follow and implement the specifications and the operation and maintenance precedures estalished in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and/or storage system or construction of new facilities will require a new utilization plan and a new certification to be submitted to DEM before the new animals are stocked. I (we) understand that I must own or have acces to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-day storm event. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates that no runoff occurs. NAME OF FACILITY OWNER: Eason Farms, Inc t SIGNATURE:w—�-- DATE: .�-x � �� , NAME OF MANAGER (if different from owner): please print SIGNATURE: DATE: NAME OF TECHNICAL SPECIALIST: Curtis Barwick AFFILIATION: Barwick Ag Services ADDRESS (AGENCY): 103 Country Club Circle Clinton, NC 28328 (910) 385-10 SIGNATURE: DATE: Page 9 of 9 S rii h p(a- C, I c .S . `/ EA] )-) a A� � a I.) v S'l s O� r, a ,,,, 6 3 z 1 6) I o (o I�s e� 10) 16(Q. — Cja, 10(2)(•(., = C46 (aka) NAME OF FARM: Eason Farms, Inc. 82-138 OWNER / MANAGER AGREEMENT I (we) understand and will follow and implement the specifications and the operation and maintenance precedures estalished in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and/or storage system or construction of new facilities will require a new utilization plan and a new certification to be submitted to DEM before the new animals are stocked. I (we) understand that I must own or have acres to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-day storm event. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates that no runoff occurs. NAME OF FACILITY OWNER: Eason Farms, Inc SIGNATURE,-_16``'"'A cc +?wrr+�in�c � -DATE: I - '1-11 NAME OF MANAGER (if different from owner): SIGNATURE: please print DATE: NAME OF TECHNICAL SPECIALIST: Curtis Barwick AFFILIATION: Barwick Ag Services ADDRESS (AGENCY): 103 Country Club Circle Clinton, NC 28328 n 000 SIGNATURE: DATE: Z'/Y-X Page 9 of 9 Updated Crop Management Practices for Bermuda Winter Overseed This document, as approved by the Interagency Nutrient Management Committee on October 10, 2017, hereby modified the July 13, 1998 Memorandum "Crop Management Practices for Select Forages Used in Waste Management". This modification updates the application window protocol for the 100 lb Nitrogen PAN rate for both Cereal Rye and Annual Ryegrass, as well as winter small grains. • Farms utilizing the 100 lbs./ac PAN rate for the overseed are allowed to apply no more than 50 Ibs./ac PAN from October 1 through December 31 and no more than 50 Ibs./ac PAN from January 1 through March 31. • Applications made during the months of December and January cannot exceed the combined total of 25 Ibs./ac PAN for the two -month period. • The last application of animal waste is to be applied to the bermuda crop prior to September 30. • The PAN rate for grazed systems must be reduced by 25%. All other requirements of the July 13, 1998 Memorandum continue to apply. Those requirements include but are not limited to; • Cereal rye and annual ryegrass should be planted by October 15 to provide the best opportunity to get winter growth. • A harvest is required prior to heading or April 7, whichever comes first, for both cereal rye and annual ryegrass. This is necessary to minimize the potential for shading of emerging bermuda and reducing its yield. To favor the production of bermuda, additional harvest of annual ryegrass will be required when the ryegrass canopy reaches 12-15 inches height. These management requirements shall also apply to overseeded winter small grain. Nov 16, 2017 Page 1. of 1 (Yellow) res ,n Courtly rties Roads al Limits k40� fSY5j-�O http://sampson.connectgis.com/DownloadFile. ashx?i=_ags_mapc 7l 3 a4a2eOda45 5fa826e36... 9/9/2016 � � � cm E e LL @ C � e U � � 0 z � � � 0 � C 0 CL 2 � 6. m � E 2 O CL co O N § co d k w k 0 0 Im if � q �§ 2E F ' b \a. a q § e.S § k 5 kakOL /0 =g 2�$gs�:S 2§. �j kk\ � L 2 I 2i\LuG -0 §]}/ is r-®0 m®> §§ � � � C4 E e U. ■ 2 0 e � � t 0 z � c � 0 0 C 0 CL & � � k!® L §a-C 0 O VM V � � � � � § 2 cm 2 (L (D O N k m Cp k e k 0 Q CD a CD \ k CL % I @ � � § , � ] � 0qroc z § § z e ■ 0 J �B eE k§ /§ (k |§. 6aG ) ||m k�§ �kk {}§ ;!# 2m !�2 � 7 CL ENT l CL fj f! k�9 kkk 20B @2 §§k a§\ i[( !I° §�\ �)§ �o{ R)a §21 E in x =7. !|# §7 \ s/0 V �!! §k ! ciI §§§ 0 �o N n UOC� 000 0 O C) C G N N s- M c N p O a E H W b C a £ W U w ry' � � w "• .. R .r 00 N W =en W N y M H O .- E`r•+ N .p o e ci a v�i a � r00 a m a U y a o J 4 C a� O a w N 41 CR N ji O •Oi 0 � m y O1 L °p a w Y) a W x a° H n a � V w r e e •r°r m M s cn d C C C mtom — -- v L co cc 2 fl. 9 u Cr C co �C r M} ci z z �A N N r C -� wwww c i LLITTT= F- J i0 Nn CO L. o`Ao co i. v � p � "� v I— � o tri o 0 -� a a'T v a m C V O z C N CL co E O N Le a. 'S O Co CA C a) LL 126 O O W Fi O O O n OE JE= a u ,AVmWa re z�a Z $OV c aUZ 1= rw_j �ca 0 03oD �y$ CTy w0 T C p� r '- iv �t0otu I,a_ jg y 7C � R '•1• I I y y �_yO •C IU j 7 OC A p a'a iS � ih rn �Fd iLuvw t {p y a 5 E y C to Y �j8 N � O •O C W R N 7 L L _ U ui Q 3 � m 1° a) E m mcv rn $ o z�P- mo � w 6 RE m ao 0 �o 0 d m a m ECL r y ry U U C C II y yO N E w N to 'tZi E La) � y A 9 E ll y mto12 y � W g d � S y to LL y � O °• Page 1 of 1 Parcels (Yellov,,) CerLerlir•es Sampson Cocrty NC Courties Primary Roads �I — us er W uricipal Limits - AA r--rent 410 70 6 �f http://sampson.connectgis.corn/DownloadFile.ashx?i= ags mapeOd31ccf3ad64e148cd86... 11/18/2016 SWINE LAGOON APPLICATION WAIVER I hereby give I ( p authorization to apply swine manure/lagoon effluent within 200' of my dwelling/residence. I realize that the current state setback is 200' from my dwelling. In no case shall swine manure/ lagoon effluent be applied within 100' of my well. Term of Agreement: From: To: I"y n Location of property: City7� State C , „ Zip Code �a193 3 Landowner sig ature \ -��-1 _ Date STATE OF NORTH CAROLINA COUNTY OF I hereby certify that . a Notary Public of said county, do personally appeared before me this day and acknowledge the due execution of the foregoing instrument. WITNESS my hand and official seal this My commission expires Notary Public (SEAL) day of WASTE APPLICATION WAIVER hereby give authorization to apply animal waste closer to my dwelling than the current state setback of 200' from my dwelling. Under no circumstances may waste be applied closer than 100' from my well. This waiver will be in effect from to 'S©— Date SWINE LAGOONAPPLICATION WAIVER hereby give L 1 n w L1son authorization to apply swine manure/lagoon effluent within 200' of my dwelling/residence. f realize that the current state setback is 200' from my dwelling. In no case shall swine manure/ lagoon effluent be applied within 100' of my well. Term of Agreement: From: __ To:_ FO f2 Y-E R- Location of property:��n` City "). State_ _ bj C_ ZipCode _-a833q Landowner signature ► u G • _ ral STATE OF NORTH CAROLINA COUNTY OF-5AMR-SnN I hereby certify that . a Notary Public of said county, do personally appeared before me this day and acknowledge the due execution of the foregoing instrument. WITNESS my hand and official seal this My commission expires Notary Public (SEAL) day of WASTE APPLICATION WAIVER I —M a ri I'* r) E. 44m Y d e,r hereby give (— i r, Us o o d Ca s o r, authorization to apply animal waste closer to my dwelling than the current state setback of 200' from my dwelling. Under no circumstances may waste be applied closer than 100' from my well. This waiver will be in effect from d to de-�( h%�-e, n �� (51 IVAre-k,1j Landowner 1113 6 /% G Date ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased, etc,) (4a(4e<- , hereby give �inwood Eason permission to apply animal waste from his Waste Utilization System on 3.'7 __ _ acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer Adjacent Landowner: 7W gE, ^ Waste Producer: Technical Representative: SWCD Representative: Term of Agreement: to (Minimu,n of Ten Years on Cost Shared Items) (See Required Specification No. 2) Date: Ira°/1 6 Date: Date: Date: WASTE APPLICATION WAIVER I Ie hereby give authorization to apply animal waste closer to my dwelling than the current state setback of 200' from my dwelling. Under no circumstances may waste be applied closer than 100' from my well, This waiver will be in effect from `..�� to zo .� Landowner Date ANIMAL WASTE UTILIZATION AGREEMENT (Needed only if additional land has to be leased, etc.) hereby give permission to apply animal waste from his Waste Utilization System on acres of my land for the duration of time shown below. The field(s) on which waste can be applied are shown on the attached map. I understand that this waste contains nitrogen, phosphorous, potassium, and other trace elements and when properly applied should not harm my land or crops. I also understand that the use of waste will reduce my need for commercial fertilizer. Adjacent Landowner R �,-, Waste Producer: Technical Representative: SWCD Representative. Term of Agreement: to (Minimum of Ten Years on Cost Shared Items) (See Required Specification No. 2.) Date: 1 - Z9 - Date: Date: Date: s: • L O 1s E d Y y i Oww p y RRi .7 6i L C y N .0 C 6.6. �,,,• C. O ° C O C R ° C G •� ea �' e.� C a m ,.. .�. � l3% C• y 7 cn 3 c° cn c= `° I E �•G O ° � E C � O O 0 � y Li O N u w CS _E N k C 6i G � Ci v i W C r .O ' V ^ •Li N� 7 ^+i G it i� O�❑❑ y nCA O C O � C O C 3G L •C 3 C � ,C L9 3 eo O C O ^ nD ^' Z 0 . L) — V _ _ la_ a ci L• 22 Q O V ° L U F:.1 •i ` Y Ci ^ D •LC O p � O 1 ED 9 • • • V it L V L A C w LM VA CJ a y I•n N� N a u Q .5 D • J • J • t7 fl N 7 :7 7 �n • N 0 L u 0 La �n Y� :E w w 0 G y p G H ea v o ¢ < C G'= t Lb U C U U U V U U U V U U zzzzzzzzz: V W Gwi cc N v V v ti O a r •r` 0 � L-A, O 0 7 C I.V. y 2 0 3D L w Ci O h.W- -W rd p• RG •Dn oy c ^ V OJ L) V •V rto = a •- E I1 a oo22-0 CO_ ..Q .? , LL 00 2 •- e4 Yr � E == �O< A �"'A no - ; k.v.L.va ^ r� y H Cd u � p.� p O V cceC ccP— O o O 0 Gam. r. G y y O n ea — 00. U O 4 N c : Le g � 0 � E � 3m 0 � N � u @ V i � 0 Q � g � c « \ § / � 2 \ § > } > t �\ \ \� � � \ _•§ u � \ / ■ S ) a e ( w = - � 5 2 = = e - £ 2 ■ § ■ 2 % �2L5 E3 7 2 E U5 6) NI r , •O .y •� ri � C V y A •N C � � .� •O— R .� � C p y. Gi � t4 e0 C O r O abU r s� L R o �a w 'C 3= y eo 40 � C •� � I R � � •• Q i N ^ y � .� v .y iC C a cit 3 :s U r`n , H 3 3 a a O eNa O 7 4 eOs in 4 � 3 1r y S� n u Mortaiit-: Management Nlethods (check which -^.ethod(s) Ire being implemented) �1 Burial three feet beneat the surface of the ground within 2-1 hours after knowledge of the death. The burial must be at ,east 300 feet from anv fling stream or public body of :eater. -T1 Rendering at a rendering giant licensed under G.S. 106-168.7 ,z1 Complete incineration ,1 In the case of dead poult.^i only: placing in a disposal Olt or a size and design approved by the Depar r,—=,c of Am -culture u knv method which in the professional opinion of the State Veterinarian would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval of. the Scate Veterinarian must be attached) December 13. 1996 EMERGENCY ACTION PLAN PHONE NUMBERS DWQ (919) 713-9081 E IERGENCY M.-�_ 1AGEI ENTT SYSTEM (910) -8996 SWCD - _(910) 522-7963 N-RCS 910 592-7963 This plan will be implemented in the event that wastes from your operation are leaking. overflowing, or running off site. You should not wait until wastes reach surface waters or leave Your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. L Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. C. Close valves to eliminate further discharge. d. Repair all leeks prior to restarting pumps. D: Leakage from flush systems. houses. solid separator_-ac:ion include: a. Stop recycle pump. b. Stop irriZation pump. C. Make cure n�� ail;hun occurs. u. Stop ail :low.. in bile !louse..iu?h systems- or :QIld separators. e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: V a. Dia a small sump or ditch away from the embankment to catch all seepap. put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals. trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Anv damage noted, such as employee injury, fish hills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f.. CouId a future rain event cause the spill to reach surface waters'? g. Are potable water wells in danger (either on or off of the property)? h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) reQionaI office: Phone - - After hours, emergency number: 919-t3-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. -The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number C. Instruct E VS to contact local Health Department. d. Contact CES, phone number - - , local SWCD office phone number and local MRCS office for advice/technical assistance phone number - - 4: If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site damage. a. Contractors Name: t� � b. Contractors .address: c. Contracrors Phone: ;CQ 6: Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: v w� b. Phone: ?: Implement procedures as advised by DW Q and technical assistance agencies to rectify' the damage. repair the system. and reassess the waste management plan to keep problems with release of wastes from happening again.