HomeMy WebLinkAbout20071934 Ver 1_Approval Letter_20071211This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act.
If you have any questions, please telephone Alan Johnson in the Mooresville Regional Office at 704-663-1099 or
Cyndi Karoly in the Central Office in Raleigh at 919-733-9721.
Sincerely,
'r~
for Coleen H. Sullins
Attachments
cc: Corps of Engineers Asheville Regulatory Field Office
Wetlands Unit- Ian McMillan
Central Files
Triage Check List
Date: 12/04/07
Project Name: Gary Murray
DWQ#: 07-1934
County: Cleveland
To: Alan Johnson, Mooresville Regional Office
60-day Processing Time: 12/03/2007 - 2/01/08
From: Ian McMillan
Telephone: (919) 715-4631
The file attached is being forwarded to you for your evaluation.
Please call if you need assistance.
^ Stream length impacted
^ Stream determination
^ Wetland determination and distance to blue-line surface waters on USFW topo maps
^ Minimization/avoidance issues
^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
^ Pond fill
^ Mitigation Ratios
^ Ditching
^ Are the stream and or wetland mitigation sites available and viable?
^ Check drawings for accuracy
^ Is the application consistent with pre-application meetings?
^ Cumulative impact concern
Comments: As per our discussion regarding revision of the triage and delegation processes,
please review the attached file. Note that you are the first reviewer, so this file will need to be
reviewed for administrative as well as technical details. If you elect to place this project on hold,
please ask the applicant to provide your requested information to both the Central Office in
Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim
procedure as we slowly transition to electronic applications. Please apprise me of any
complications you encounter, whether related to workload, processing times, or lack of a "second
reviewer" as the triage process in Central had previously provided. Also, if you think of ways to
improve this process, especially so that we can plan for the electronic applications, let me know.
Thanks!