Loading...
HomeMy WebLinkAboutWQ0045595_Application (FTSE)_20240710State of North Carolina JUL 1, 0 2 0`2 4 Department of Environmental Quality Division of Water Resources NCD.EQ/DWR/NPDE8ow Tracking for Sewer Extension Applications (FTSE 10-23) Entity Requesting Allocation: J&S Land Development, LLC Project Name for which flow is being requested: The Enclave More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: M'Kean Maffit (Southside) WWTP b. WWTP Facility Permit #: NPDES NC 0023973 All flows are in MGD c. WWTP facility's permitted flow 12.000 d. Estimated obligated flow not yet tributary to the WWTP 3.737 e. WWTP facility's actual avg. flow 8.044 f. Total flow for this specific request 0.002250 g. Total actual and obligated flows to the facility 11.783 h. Percent of permitted flow used 98.2 Il. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)�(A-D) Design Approx. Obligated, Total Pump Pump Average Current Not Yet Current Flow Station Station Firm Daily Flow** Avg. Daily Tributary Plus (Name or Permit Capacity, * (Firm / pfl, Flow, Daily Flow, Obligated Available Number) No. MGD MGD MGD MGD Flow Capacity*** 69 WQ0013555 6.134 2.454 0.900 0.849 1.749 0.705 51 WQ0041831 0.256 0.103 0.048 0.019 0.067 0.036 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Cape Fear Public Utili<< Authori Downstream Permit Number: Page 1 of 6 FTSE 10-23 III. Certification Statement: I Jeff Theberge, CFPUA Eng. Mgr. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible parry. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. ,,7e#-1hebetVe ^FFTQerge (Jun 28, 202. 08:57 EDT) Signing Official Signature Engineering Manager Title of Signing Official 06/28/2024 Date Page 2 of 6 FTSE 10-23