Loading...
HomeMy WebLinkAboutNCC242019_ESC Approval Submitted_20240710 `,c STATE q /". A � ROY COOPER ?4 Governor v',. - „' oP ELIZABETH S.BISER ;` s 't Secretary uwvm�"_�- WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality June 28, 2024 LETTER OF APPROVAL County of Currituck Attn: Ms. Rebecca L. Gay, Interim County Manager 153 Courthouse Road, Suite 800 Currituck, NC 27929 RE: Project Name: New Fuel Farm and Apron Acres Approved: 2.0 Project ID: Curri-2024-006 County: Currituck City: Maple Address: 264 Airport Road River Basin: Pasquotank Date Received by LQS: June 21, 2024 Submitted By: Talbert& Bright, Inc. Plan Type: Revision Dear Ms. Gay, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications.The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. . _ North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources NOR dj/� Washington Regional Office I943 Washington Square Mall I Washington,North Carolina 27889 ao ^m EnvironmentalO 252.946.6481 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC,once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Sincerely, / Samir Dumpor, PE Regional Engineer Land Quality Section cc w/o enc: William Nelson, Currituck County (email) John Massey, PE, Talbert& Bright, Inc. (email) WaRO Division of Water Resources (email) D - North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources v�fJ� Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889 4 V:4 CARQLNA D.P.tmeat of E.rYbm,mW twat, 252.946.6481 PROJECT INFORMATION SHEET APPROVAL DATE: October 24, 2023 RESPONSIBLE PARTY: County of Currituck PROJECT NAME: New Fuel Farm and Apron COUNTY: Currituck NO.: Curri-2024-006 OFF-SITE BORROW AND/OR DISPOSAL SITE: NO.: START-UP DATE: CONTRACTOR: ON-SITE CONTACT: ON-SITE PHONE NO.: OFFICE PHONE NO.: COMPLETE&RETURN THIS FORM PRIOR TO THE START OF CONSTRUCTION TO: N.C.D.E.Q. LAND QUALITY SECTION ATTN: Bradley West 943 WASHINGTON SQUARE MALL WASHINGTON, NORTH CAROLINA 27889 donald.west@deq.nc.gov .DE-' North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources ����//// Washington Regional Office I943 Washington Square Mall I Washington,North Carolina 27889 De9ibn•0 4.\/.'° 252.946.6481 = w=.1 %kg) A -a' ,Z sue, a� : Cd r,,,, .z E°� 17: 8 ...„, .= ....,, ,r i E 71 % S = SrElP 0.14 © Ci? 1= ,,,, r, cs „., ,.., ..., , L., w 4a' 1 a g %-il ci, Lit i 74,4 . . „:„ . , ,.., „.,, , ... : •1.1 = ."; PZ Cil A .6.1) C .,,© = ,.., at = $;iit 44 44 ,4162... .,mi �, .� ° 0 ago ,z1 4....at 4 ..., ._., • 4. 4 nc, L-, kr) CD . = i el ‘i) ,,,,,4 ,0,-, • .g.47.--,i4.-.. IT ' VIA F ` IA ! PP+gI t Jam, ��.10. CV 0 dI = ® .•.. va �� / L., ;4.ri = Alpo 11111ft.., . sue CI , p _ (N46. 2.: .s,$) . w„ a> © 4. *F = 4., t:,,,, . * Z'' = (...) 1p "� � Lr ,1_, i:4° psi Ei,..) c. = �, L., 4, c �i c� a)