Loading...
HomeMy WebLinkAboutNCC242078_Site Plan or Location Map_20240710 r� i��'�kirr AI�� PROJECT NARRATIVE4101461041.11110x115040.041/14414\) ��� � �O�N� J THE PURPOSE OF THE PROJECT IS TO UPGRADE THE CURRENT SWITCHING CAPABILIITES OF THE �.� PROJECT E REQUIRE THE 230KVGDINLIN DUE O THE ISTI ON THE CAMP GEIFROM A 1 230KV TAP.THIS ��� �� , a PROJECT WILL REQUIRE THE UPGRADING SW 285-2(EXISTING SW 285-1)FROM A 1600 AMP MANUALi if DUKE S&C LINERUPTER TO A 2000 AMP MOTOR-OPERATED REMOTE S&C LINERUPTER.PT 285-1 ��� �7 PROJECT ATTACHED TO THE C PHASE WILL BE INSTALLED NEAR EXISTING STR 285.SW 291-1,THE NEW 2000 �� �, N AMP MOTOR-OPERATED REMOTE S&C LINERUPTER,WILL BE INSTALLED AHEAD OF STR 291.PT 291-2 ATTACHED TO THE C PHASE WILL BE INSTALLED NEAR STR 292.DUE TO THE REQUIRED fr- 291CLEARANCESWILL R FROM THE 30KV C TO MEET D DESIGN SW AND STR 290 WILL BE REWILL BE D AAL STR ‘ki, ENERGY® vitiod, 0 WILL BE STR 2 1IAN ORDER MEETO STANDARDS.NEW DPGW WILL BE INSTALLED BETWEEN NEW STR 291 AND STR 293(NEW SPLICE LOCATION). THE ENTIRETY OF THE PROJECT IS IN ONSLOW COUNTY,NORTH CAROLINA.WETLANDS AND JURISDICTIONAL STREAMS HAVE BEEN MAPPED OUT FOR THE PROJECT.THE MOST IMMEDIATE SURFACE WATERS ARE TANK CREEK(19-17-5;C;NSW)AND BRINSON CREEK(19-12;SC;NSW)OF THE WHITE OAK RIVER BASIN. NO STATE RIVER BUFFERS APPLY TO THE PROJECT,BUT AS A NORTH & SOUTH CAROLINA STATE MAP PRECAUTION,DEP UTILIZES A 30'BUFFER ON ALL STREAMS AND A 20'BUFFER ON ALL WETLANDS, TRIBUTARIES,AND OTHER SURFACE WATERS. THE TOTAL LIMITS OF DISTURBANCE(LOD)FOR THE PROJECT ARE LISTED AS 11.50 ACRES; HOWEVER,MUCH OF THE AREA ENCOMPASSES ACCESS TO THE TRANSMISSION LINE STRUCTURES. GROUND DISTURBANCE WILL BE LIMITED TO THE CONSTRUCTION ENTRANCE AREAS,ACCESS PATHS,AND WORK AROUND STRUCTURES. NO DESIGNATED STOCKPILE OR LAYDOWN AREAS ARE ANTICIPATED ON THE SITE. FOLKSTON E- JACKSONVILLE 230KV CONSTRUCTION ACCESS WILL BE OBTAINED AT FOUR LOCATIONS. A TEMPORARY CONSTRUCTION ENTRANCE WILL BE UTILIZED AT WILLIAMS BE DR.AND ON THE EAST SIDE O EDIT DR.A .PERMANENT UPGRADE S W 2 8 5 1 A N D ALL-WEATHER ACCESS ROAD WILL BE INSTALLED ON THE EAST SIDE OF ONSLOW PINES DR.AND ON THE WEST SIDE OF EDITH DR. THE PROJECT IS LOCATED WITHIN DUKE ENERGY'S MOWED AND MAINTAINED RIGHT-OF-WAY.THE INSTALL NEW S W I T C I--I PRIOR USE OF THE SITE IS TRANSMISSION INFRASTRUCTURE AND THE PROJECT WILL NOT CHANGE THE EXISTING LAND USE. PRIOR TO CONSTRUCTION,A DUKE ENERGY CONSTRUCTION CONTRACTOR WILL INSTALL EROSION CONTROL MEASURES TO ENCOMPASS THE ANTICIPATED CONSTRUCTION LIMITS. PREDEVELOPMENT CONDITIONS WILL BE RESTORED AND THE AREA WILL LATITUDE: 34.730078 r. BE STABILIZED PRIOR TO COMPLETION OF CONSTRUCTION. LONGITUDE: -77.493083 AN AVOIDANCE AND MINIMIZATION OF DISTURBANCE APPROACH HAS BEEN INCORPORATED INTO THE DESIGN OF THE EROSION CONTROL MEASURES BY UTILIZING EXISTING ACCESS POINTS AND STABILIZED RIGHT-OF-WAY ACCESS ROUTES,WHENEVER POSSIBLE. EROSION CONTROL MEASURES ARE INDICATED HEREIN FOR PERMITTING USE ONLY BY NCDEQ. THE INITIAL PROJECT iy SHEET LIST: DURATION IS ANTICIPATED TO START IN JANUARY,2025 AND BE COMPLETED JUNE,2025. ,,e TITLE SHEET SHEET PTL EROSION&SEDIMENT CONTROL NOTES SHEET PEN1 EROSION&SEDIMENT CONTROL NOTES SHEET PEN2 EROSION&SEDIMENT CONTROL NOTES SHEET PEN3 GENERAL NOTES EROSION&SEDIMENT CONTROL PLAN SHEET P1 1. APPROXIMATE STRUCTURE LOCATIONS WERE PROVIDED BY DUKE ENERGY LINE ENGINEER AND ARE EROSION&SEDIMENT CONTROL PLAN SHEET P2 FOR REFERENCE ONLY.THESE DRAWINGS SHALL NOT BE USED FOR LINE CONSTRUCTION. . - EROSION&SEDIMENT CONTROL PLAN SHEET P3 = 2. BASE DRAWINGS WERE CREATED BY GIS DATA OBTAINED FROM VARIOUS SOURCES.TOPOGRAPHIC EROSION&SEDIMENT CONTROL PLAN SHEET P4 0 AERIAL PHOTOGRAPHY WAS OBTAINED FROM STATE AGENCIES. EROSION&SEDIMENT CONTROL PLAN SHEET P5 3. NOT ALL EXISTING UTILITIES ARE SHOWN. LOCATIONS SHOWN ARE APPROXIMATE. IT IS THE E R EROSION&SEDIMENT CONTROL PLAN SHEET P6 CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE,BOTH VERTICAL AND HORIZONTAL, EROSION&SEDIMENT CONTROL DETAILS SHEET PED1 EROSION&SEDIMENT CONTROL DETAILS SHEET PED2 EXISTING UTILITIES PRIOR TO THE START OF CONSTRUCTION.THE CONTRACTOR SHALL NOTIFY NC EROSION&SEDIMENT CONTROL DETAILS SHEET PED3 811 PRIOR TO EXCAVATION. CONTRACTOR SHALL NOTIFY DUKE ENERGY IMMEDIATELY IN THE EVENT EROSION&SEDIMENT CONTROL DETAILS SHEET PED4 W OF ENCOUNTERING ANY UNDERGROUND OBSTACLE REQUIRING DEVIATION FROM THE PLAN. COST TO EROSION&SEDIMENT CONTROL DETAILS SHEET PEDS Z REPAIR DAMAGED UTILITIES SHALL BE BORNE BY THE CONTRACTOR. J 4. ALL UTILITIES SHALL BE PROTECTED AND REMAIN ACTIVE UNLESS OTHERWISE NOTED. CONTRACTOR P1 P2 P3 P4 P5 P6 SHALL NOT DISTURB UTILITY POLES,GUYS WIRES,OR ANCHORS WITHOUT PERMISSION FROM DUKE - _ MIGRATORY BIRD HOTLINE Q ENERGY. r STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY I- 5. PROJECT IS LOCATED IN THE WHITE OAK RIVER BASIN.THE PROJECT IS NOT SUBJECT TO _ ! SERVICE AREA.INTERACTIONS OF BIRDS WITH GENERATING FACILITIES,TRANSMISSION AND DISTRIBUTIONS, Z STATE-REGULATED BUFFER REQUIREMENTS. THE MOST IMMEDIATE SURFACE WATERS ARE - - SUBSTATIONS,OTHER STRUCTURES AND EQUIPMENT,AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO — TANK CREEK(19-17-5;C;NSW)AND BRINSON CREEK(19-12;SC;NSW). ' .- BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND 0 6. SEE SHEET PEN1 FOR EROSION AND SEDIMENTATION CONTROL SEQUENCE AND SEEDING SCHEDULE. CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. Z 7. STREAMS EXTEND BEYOND THE RIGHT-OF-WAY. APPROPRIATE BRIDGING AND MATTING OF THESE Q FEATURES IS REQUIRED SHOULD THE CONTRACTOR USE ANY ACCESS ROUTES LOCATED OUTSIDE OF CAROLINAS:800.573.3853 FLORIDA:727.386.3084 MIDWEST:317.430.4497 x— THE RIGHT-OF-WAY. I 8. ANY ALTERNATE ACCESS PLANNED BY THE CONTRACTOR SHALL BE APPROVED BY DUKE ENERGY $ SPILL REPORTING HOTLINE CO PERMITTING PRIOR TO USE. TO IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT,FEDERAL AND STATE LAWS 9. CONSTRUCTION ENTRANCES ARE SHOWN FOR REFERENCE ONLY. HEAVY MATS MAY BE USED IN LIEU ✓40 REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER OF ROCK 10. WETLANDCONSTRUCTION ENTRANCES IF MATTING SHALL BE COMPOSITE MATtS.D SUFFICIENT BY A DUKE NO LATTICE OR TWO-PLY MATTING SHAGY LL BE USED E KSO�V/(�F o SUPEREGURVISORY AGENCIES AS AND THE FIELDSENOVNRONMENT AS IBLE AL EHS PROFING ESSIDENTIFICATION.IONAL WHEN A SPILhL OR UNPERMITTEDEDIATELY NOTIFY YOUR U) RELEASE IS LJ,J IN JURISDICTIONAL WETLANDS AND/OR STREAMS. DISCOVERED.IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL,CONTACT ONE OF 0 11. NO OIL/FUEL-FILLED EQUIPMENT SHALL BE STORED OVERNIGHT WITHIN 100 FEET OF WETLANDS OR THE DUKE ENERGY SPILL REPORTING HOTLINES AT: Q SURFACE WATER WITHOUT CONTAINMENT. - CAROLINAS&MIDWEST:800.527.3853 12. SITE SHOULD BE"STORM READY"AT THE END OF EACH WORK DAY/WEEK. - - _ FLORIDA:866.769.1266 13. SECURE WRITTEN ACCESS AGREEMENT IS REQUIRED FOR ALL 3RD PARTY ACCESS AND PRIVATE - 0- DRIVES NOT INCLUDED IN ROW DOCUMENTATION PRIOR TO BEGINNING CONSTRUCTION. D 14. ALL DISTURBED AREAS SHALL BE RESTORED TO SAME OR BETTER CONDITION.PERMANENT GROUND VICINITY MAP CONTACTS COVER SHALL BE USED FOR STABILIZATION. PERMITTING SPECIALIST HDR Engineering Inc. RESPONSIBLE FOR MAINTENANCE: SCALE: NTS Duke Energy Progress of the Carolinas NAME CO Laura Kirby David R.Wagner II,PE PH: CV 411 S.Wilmington Street 555 Fayetteville St.,Suite 900 FAX: W Raleigh,NC 27601 Raleigh,NC 27601 EMAIL@EMAIL.COM J P:(276)613-3776 PH:(919)232-6600 J CONTRACTOR SHALL NOTIFY "NORTH CAROLINA ONE CALL" (811) aura.kirby@duke-energy.com david.wagner@hdrinc.com OR (1-800-632-4949) AT LEAST 48 HOURS PRIOR TO Z BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL Y UTILITIES THAT PROVIDED THEIR OWN LOCATOR SERVICES 0 INDEPENDENT OR "NORTH CAROLINA ONE CALL". REPORT ANY Q DISCREPANCIES TO THE ENGINEER IMMEDIATELY. nnE FOLKSTONE-JACKSONVILLE 230KV t DUKE UPGRADE SW285-1 AND INSTALL W ENERGY NEW SWITCH Z 11 HDR Engineering,Inc.of the Carolinas I— �J l 555 Fayetteville St,Suite 900 Raleigh,N.C.27601 PROGRESS ® EROSION CONTROL AND ACCESS PLAN Y N.C.B.E.L.S. License Number:F-0116 J 510 S.WILMINGTON ST. O RALEIGH,NC 27601 LINE INDEX- DRAWING SHEET REV FILE NO. DATE REVISION DRAWN CHECKED APPROVED TELEPHONE NO.(91W __546-2090 _ __ E21026901 PTL LL