Loading...
HomeMy WebLinkAboutWQ0029945_More Information Received_20240709Initial Review Reviewer nathaniel.thornburg Is this submittal an application? (Excluding additional information.) * Yes No If not an application what is the submittal type?* Annual Report Residual Annual Report Additional Information Other Permit Number (IR) * WQ0029945 Applicant/Permittee Onslow Water and Sewer Authority Email Notifications Does this need review by the hydrogeologist? * Yes No Regional Office CO Reviewer Admin Reviewer Submittal Form Project Contact Information Please provide information on the person to be contacted by NDB Staff regarding electronic submittal, confirmation of receipt, and other correspondence. ...................................................................................................................................................................................................................................................................................... ... ... ... ... ... .. ... ... ... ... .. Name* Genevieve B. Versteeg Email Address* gversteeg@thewootencompany.com Project Information ......................... Application/Document Type* New (Fee Required) Modification - Major (Fee Required) Renewal with Major Modification (Fee Required) Annual Report Additional Information Other Phone Number* 919-828-0531 Modification - Minor Renewal GW-59, NDMR, NDMLR, NDAR-1, N DAR-2 Residual Annual Report Change of Ownership We no longer accept these monitoring reports through this portal. Please click on the link below and it will take you to the correct form. https://edoes.deq.nc.gov/Forms/NonDischarge_Monitoring_Report Permit Type:* Wastewater Irrigation High -Rate Infiltration Other Wastewater Reclaimed Water Closed -Loop Recycle Residuals Single -Family Residence Wastewater Other Irrigation Permit Number:* WQ0029945 Has Current Existing permit number Applicant/Permittee Address* 228 Georgetown Road, Jacksonville, NC 28540-4146 Facility Name* Summerhouse Wastewater Reclamation WWTP Please provide comments/notes on your current submittal below. This is a major permit modification for the Summerhouse Wastewater Reclamation Facility in Onslow County. This modification is required for the "SE Area WW Capacity Improvements, Contract 1 — Transmission System (SRP-W-ARP-0189)" project, which is ARPA-funded. At this time, paper copies are no longer required. If you have any questions about what is required, please contact Nathaniel Thornburg at nathaniel.thornburg@ncdenr.gov. Please attach all information required or requested for this submittal to be reviewed here. (Application Form, Engineering Plans, Specifications, Calculations, Etc.) 240624_SH ND Major Modification_ONWASA_FULL.pdf 69.89MB Upload only 1 PDF document (less than 250 MB). Multiple documents must be combined into one PDF file unless file is larger than upload limit. * By checking this box, I acknowledge that I understand the application will not be accepted for pre -review until the fee (if required) has been received by the Non -Discharge Branch. Application fees must be submitted by check or money order and made payable to the North Carolina Department of Environmental Quality (NCDEQ). I also confirm that the uploaded document is a single PDF with all parts of the application in correct order (as specified by the application). Mail payment to: NCDEQ — Division of Water Resources Attn: Non -Discharge Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Signature Submission Date 7/8/2024 \1 ooten June 24, 2024 Mr. Erick Saunders Environmental Engineer III NC DEQ/Division of Water Resources/Permitting 512 N. Salisbury Street Raleigh, NC 27604 120 N. Boylan Avenue Raleigh, NC 27603 (919)828-0531 Re: Response to Additional Information Request Summerhouse WRF Major Modification to Non -Discharge Permit No. WQ0029945 Onslow Water and Sewer Authority (ONWASA) Dear Mr. Saunders: We received your request for additional information (dated June 6, 2024) on the Major Modification application to the Non -Discharge Permit for the Summerhouse Water Reclamation Facility (WQ0029945), which we submitted on March 27, 2024, for SE Area WW Capacity Improvements, Contract 1 — Transmission System (SRP-W-ARP-0189). Please find attached the following: • Signature Authority Designation (NDSDAL) Letter. • Updated HRIS 06-16 Form. • Updated Engineering Plans showing the reclaimed water pump station and its 8-inch treated effluent force main. • Relevant Specifications for the reclaimed water pump station and its 8-inch treated effluent force main. Responses to your additional information request are provided below: A. Overall: 1. The 8-inch effluent force main on parcel 747-13.75 which contains the storage lagoon and spray fields associated with the Holly Ridge WWTP (Permit No. WQ0019907) permit shall be permitted in that application because it is adding flow and a new source to that facility. The 8-inch line permitted in this application shall terminate at the property line for this parcel. A response to this item is not needed. Noted. B. Cover Letter: 1. No comments. Noted. C. Application Fee: 1. No comments. Noted. TheWootenCompany.com rj �"'v 4 DESIGNING THE FUTURE ► Page 2 of 5 D. Application (Form: WWIS 06-16): 1. The signature authority in Item I.3. Mr. Jeffrey T. Lohr is not listed in our system as an authorized signature authority to sign on behalf ofthe Permittee. In accordance with 15A NCAC 02T .0I06(a), permit applications shall be signed by a principal executive officer of at least the level of vice president or other authorized employee. To meet permit application submission requirements, one of the following actions shall be taken: a. Provide an updated application form signed by an authorized permission pursuant to 02T .0106(b). b. Mr. Lohr shall be provided authority to sign permit applications in accordance with 15A NCAC 02T .0106(c). This delegation of authority shall be provided in writing to the Division by an authorized person, in this case a principal executive officer of at least the level of vice president pursuant to 02T .0106(b). A copy of a signature authority delegation letter is provided with this letter. See the attached Signature Authority Designation Letter, delegating authority to Jeffrey Lohr for signing and certifying the Holly Ridge WWTF and Summerhouse WRF non -discharge permit modification applications. 2. The pump mechanical equipment information in Item V.1 Le was not completed for the new reclaimed water pumps. Please provide this information in an updated HRIS form. Part V.I Le was updated to include the information for the new reclaimed water pumps, which will replace the existing pumps at the reclaimed water pump station located at the Summerhouse WRF. The revised HRIS form is included with this submittal. E. Property Ownership Documentation: 1. No comments. Noted. F. Setback Waivers: 1. N/A. Noted. G. Soil Evaluation: 1. N/A. H. Auronomist Evaluation: 1. N/A. \'')!,'Ij I. Hvdroeeoloi!ic Report: 1. N/A. Noted. Page 3 of 5 J. Water Balance: 1. N/A. Noted. K. Engineering Plans: The engineering plans provided are the full Contract 1 bid plans which include certain items not covered in this modification, such as the two new raw wastewater influent pump stations at this facility and the Holly Ridge WWTP (WQ0019907), and the new 12-inch and 18-inch force mains for raw wastewater transmission. As the Non -Discharge Branch will approve a certain plan set for construction, the final engineering plans shall only contain the items that are being modified in the application. Please update the plans to include only relevant information to this application, including the changes at the existing reclaimed water pump station and the 8-inch treated effluent line up to parcel 747-13.75. Please note that this plan set shall be different than the one submitted to the Division of Water Infrastructure, and any changes in this plan set may not change the plan set submitted to their group. The plan drawings submitted with this application only include the relevant pages for the 8-inch treated effluent line. For those drawings that include relevant and non -relevant information, red boxes were used to distinguish the relevant information from the non -relevant information. The relevant 8-inch effluent line drawings only include the segments of the force main that lie outside the property boundary of the Holly Ridge sprayfields. The relevant drawings for the segments of the force main that lie within the property were submitted with the revised drawings for the Holly Ridge WWTF non -discharge permit application. There are several 90-degree bends braced by restrained joint piping depicted on Sheets C-2.03, C- 2.04 and C-2.09. Please provide an explanation demonstrating that restrained joint pipe is satisfactory in lieu of thrust blocking. See Note 14 on Sheet C-0.02. While not specifically called out on those sheets, thrust blocking is required to be used at the fittings of the restrained joint segments. Sheet C-2.09 was removed (see response to Item K.1). L. Specifications: 1. See Item A. 1. Only relevant sections of the technical specifications (i.e., those that apply to the reclaimed water pump station and its 8-inch treated effluent force main) are included in this revised application. On pages which include relevant information and non -relevant information, the relevant information was highlighted in yellow to distinguish it from non -relevant information. 2. See Item K.2. Any equipment specifications for the raw wastewater pump stations and force main shall be removed. See response to Item L.1. M. Engineerine Calculations: 1. No comments. Noted. N. Site Map: 1. No comments. Noted. Page 4 of 5 O. Power Reliabilitv Plan: 1. No comments. Noted. P. ODeration & Maintenance (O&M) Plan: 1. No comments. Noted. Q. Residuals Mana6ement Plan: 1. N/A. Noted. R. Additional Documentation: ➢ Certificate of Public Convenience and Necessity: 1. N/A. Noted. ➢ Existing Permit: 1. No comments. Noted. ➢ Final Environmental Document: 1. N/A. Noted. ➢ Floodway Regulation Compliance: 1. No comments. Noted. ➢ Operational Agreement: 1. N/A. Noted. ➢ Threatened or Endangered Aquatic Species Documentation: 1. No comments. Noted. ➢ Wastewater Chemical Analysis: 1. N/A. Noted. Please let me know if you have any questions or would like to discuss this matter. Page 5 of 5 Sincerely, THE WOOTEN COMPANY i Carl Scharfe, PE. Senior Process Engineer/Project Manager cc: Jeffrey Lohr, Onslow County Water and Sewer Authority (ON WASA) Chief of Engineering June 17, 2024 NC Department of Environmental Quality Division of Water Resources Non -Discharge Permitting Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Subject: Permits No. WQ0019907 and WQ0029945 Signature Authority Designation Holly Ridge WWTF and Summerhouse WRF Other Non -Discharge Wastewater System Onslow County To Whom It May Concern: N c• O N WASA onwasa.com 228 Georgetown Rd Jacksonville, NC 28540 (910) 455-0722 As an appropriate signing official for Onslow Water and Sewer Authoritv (ONWASA), as designated by 15A NCAC 02T .0106, I hereby delegate authority to sign and certify all permit applications, reports or other permit -related documents to the following staff for the following permit numbers. Position Person Currently in Position Permit Tvae or Permit N..... hn.- Chief of Engineering Jeffrey T. Lohr, PE W00019907 WQ0029945 The Onslow Water and Sewer Authority appreciates your consideration of this request. If you have any questions, please feel free to contact: Perm iee/Applicant Name: Frankv J. Howard Title: Chief Executive Officer Complete Mailing Address: 228 Georgetown Road City: Jacksonville State: NC Zip: 28540 Telephone Number: (910) 937-7532 Facsimile Number: (910) 347-0793 Sincerely, State of North Carolina Department of Environmental Quality DWR Division of Water Resources 15A NCAC 02T .0700 — HIGH -RATE INFILTRATION SYSTEMS Division of Water Resources INSTRUCTIONS FOR FORM: HRIS 06-16 & SUPPORTING DOCUMENTATION Plans, specifications and supporting documents shall be prepared in accordance with 15A NCAC 02H .0400 (if necessary), 15A NCAC 02L .0100, 15A NCAC 02T .0100, 15A NCAC 02T .0700, Division Policies and good engineering practices. Failure to submit all required items will necessitate additional processing and review time. For more information, visit the Water Quality Permitting Section's Non -Discharge Permittiine Unit website General — When submitting an application to the Water Quality Permitting Section's Non -Discharge Permitting Unit, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Unless otherwise noted, the Applicant shall submit one original and two copies of the application and supporting documentation. A. Cover Letter (All Application Packages): ® List all items included in the application package, as well as a brief description of the requested permitting action. B. Application Fee (All New and Major Modification Application Packages): ® Submit a check, money order or electronic funds transfer made payable to: North Carolina Department of Environmental Quality (NCDEQ). The appropriate fee amount for new and major modification applications may be found at: Standard Review Proiect Fees. C. High -Rate Infiltration Systems (FORM: HRIS 06-16) Application (All Application Packages): ® Submit the completed and appropriately executed High -Rate Infiltration Systems (FORM: HRIS 06-16) application. Any unauthorized content changes to this form shall result in the application package being returned. If necessary for clarity or due to space restrictions, attachments to the application may be made, as long as the attachments are numbered to correspond to the section and item to which they refer. ❑ If the Applicant Type in Item L2. is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item I.2. is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ❑ The facility name in Item IL 1. shall be consistent with the facility name on the plans, specifications, agreements, etc. ® The Professional Engineer's Certification on Page 13 of the application shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 13 of the application shall be signed in accordance with 15A NCAC 02T .0106(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). ❑ If this project is for a renewal without modification, use the Non -Discharge Svstem Renewal (FORM: NDSR) application. D. Property Ownership Documentation (All Application Packages): ➢ Per 15A NCAC 02T .0704(f), the Applicant shall demonstrate they are the owner of all property containing the wastewater treatment and high -rate infiltration facilities: ® Legal documentation of ownership (i.e., GIS, deed or article of incorporation), or ❑ Written notarized intent to purchase agreement signed by both parties with a plat or survey map, or ® Written notarized lease agreement that specifically indicates the intended use of the property and has been signed by both parties, as well as a plat or survey map. Lease agreements shall adhere to the requirements of 15A NCAC 02L .0107. ❑ Provide all agreements, easements, setback waivers, etc. that have a direct impact on the wastewater treatment, conveyance, storage and high -rate infiltration facilities. INSTRUCTIONS FOR FORM: HRIS 06-16 & SUPPORTING DOCUMENTATION Page 1 of 6 E. Soil Evaluation (All Application Packages that include new high -rate infiltration sites): ❑ Per 15A NCAC 02T .0704(b) and the Soil Scientist Evaluation Policv. submit a detailed soil evaluation that has been signed, sealed and dated by a North Carolina Licensed Soil Scientist and includes at a minimum: ❑ The report shall identify all the basins/fields with project name, location, and include a statement that the basins/fields were recommended for the proposed land application activity. ❑ Field delineated detailed soils map meeting all of the requirements of the Soil Scientist Evaluation Policv. ❑ Soil profile descriptions meeting all of the requirements of the Soil Scientist Evaluation Policv. ❑ Provide all soil boring logs performed at the site. ❑ For non -basins, a standard soil fertility analysis conducted no more than one year prior to permit application for each map unit in the soil map legend for the following parameters: ❑ Acidity ❑ Exchangeable sodium percentage (by calculation) ❑ Phosphorus ❑ Base saturation (by calculation) ❑ Magnesium ❑ Potassium ❑ Calcium ❑ Manganese ❑ Sodium ❑ Cation exchange capacity ❑ Percent humic matter ❑ Zinc ❑ Copper ❑ pH ➢ Saturated hydraulic conductivity (KSAT) data that shall include at a minimum: ❑ A minimum of three KsAT tests shall be conducted in the most restrictive horizon for each soil series in the soil map. ❑ All KsAT tests shall be conducted in areas representative of the site. ❑ All KsAT tests shall be run until steady-state equilibrium has been achieved. ❑ All collected KsAT data shall be submitted, including copies of field worksheets showing all collected readings. ❑ Submit a soil profile description for each KsAT data point that shall extend at least one foot below the tested horizon. ➢ Soil evaluation recommendations shall include at a minimum: ❑ A brief summary of each map unit and its composition and identification of minor contrasting soils. ❑ For non -basins, maximum precipitation rate (in/hr) for each soil/map unit within the proposed infiltration areas. ❑ Seasonal infiltration restrictions, if appropriate. ❑ Identification of areas not suitable for high -rate infiltration. ❑ Recommended geometric mean KsAT rate to be used in the water balance for each soil/map unit based upon in -situ measurement of the saturated hydraulic conductivity from the most restrictive horizon. ❑ Recommended drainage coefficient to be used in the water balance based upon comprehensive site evaluation, review of collected onsite data, minor amounts of contrasting soils and the nature of the wastewater to be applied. ❑ For non -basins, recommended annual hydraulic loading rate (in/yr) for each soil/map unit within the proposed infiltration areas based upon in -situ KsAT measurements form the most restrictive soil horizon. ❑ For basins, recommended hydraulic loading rate (GPD/ft2) for each soil/map unit within the proposed infiltration areas based upon in -situ KsAT measurements form the most restrictive soil horizon. NOTE — If the soil evaluation was performed more than one year prior to the submittal of this application package, a statement shall be included indicating that the site has not changed since the original investigation. F. Agronomist Evaluation (All Application Packages that include new infiltration sites with cover crops or new crops for existing infiltration sites): ❑ Per 15A NCAC 02T .0704(i). submit an agronomist evaluation that has been signed, sealed and dated by a qualified professional and includes at a minimum: ❑ Proposed nutrient uptake values for each cover crop based upon each field's dominant soil series and percent slope. ❑ Plant available nitrogen calculations for each cover crop using the designed effluent concentrations in Application Item V.1. and proposed mineralization and volatilization rates. ❑ Historical site consideration, soil binding and plant uptake of phosphorus. ❑ Seasonal infiltration restrictions, if appropriate. ❑ A clear and reproducible map showing all areas investigated and their relation to proposed fields and crops. ❑ Maintenance and management plan for all specified crops. INSTRUCTIONS FOR FORM: HRIS 06-16 & SUPPORTING DOCUMENTATION Page 2 of 6 G. Hydrogeologic Report (All Application Packages treating industrial waste or having a design flow over 25,000 GPD): ❑ Per 15A NCAC 02T .0704(e). the Hvdro2eolo2ic Investigation and RenortinR Policv, the Groundwater Modeling Policv and the Performance and Analvsis of Aauifer Slue Tests and Pumninz Tests Policv, submit a detailed hydrogeologic description that has been signed, sealed and dated by a qualified professional and includes at a minimum: ❑ A hydrogeologic description to a depth of 20 feet below land surface or bedrock, whichever is less. A greater depth of investigation is required if the respective depth is used in predictive calculations. ❑ Representative borings within the infiltration areas and all proposed earthen impoundments. ❑ A description of the regional and local geology and hydrogeology. ❑ A description, based on field observations of the site, of the site topographic setting, streams, springs and other groundwater discharge features, drainage features, existing and abandoned wells, rock outcrops, and other features that may affect the movement of the contaminant plume and treated wastewater. ❑ Changes in lithology underlying the site. ❑ Depth to bedrock and occurrence of any rock outcrops. ❑ The hydraulic conductivity and transmissivity of the affected aquifer(s). ❑ Depth to the seasonal high water table (SHWT). ❑ A discussion of the relationship between the affected aquifers of the site to local and regional geologic and hydrogeologic features. ❑ A discussion of the groundwater flow regime of the site prior to operation of the proposed facility and post operation of the proposed facility focusing on the relationship of the system to groundwater receptors, groundwater discharge features, and groundwater flow media. ❑ If the SHWT is within six feet of the surface, a mounding analysis to predict the level of the SHWT after wastewater application. H. Water Balance (All Application Packages that include new or modified infiltration sites, changes in flow or changes in storage): ❑ Per the Water Balance Calculation Policv. submit information clearly demonstrating that the effluent can be assimilated regardless of precipitation events or temperature, and there are no crop or equipment maintenance issues that would necessitate storage. OR ❑ Per 15A NCAC 02T .0704(k) and the Water Balance Calculation Policv. submit a water balance that has been signed, sealed and dated by a qualified professional and includes at a minimum: ❑ At least a two-year iteration of data computation that considers precipitation into and evaporation from all open atmosphere storage impoundments, and uses a variable number of days per month. ❑ Precipitation based on the 801 percentile and a minimum of 30 years of observed data. ❑ Potential Evapotranspiration (PET) using the Thornthwaite method, or another approved methodology, using a minimum of 30 years of observed temperature data. ❑ Soil drainage based on the geometric mean of the in -situ KSAT tests in the most restrictive horizon and a drainage coefficient ranging from 4 to 10% (unless otherwise technically documented). ➢ Other factors that may restrict the hydraulic loading rate when determining a water balance include: ❑ Depth to the SHWT and groundwater lateral movement that may result in groundwater mounding. ❑ Nutrient limitations and seasonal application times to ensure high -rate infiltration does not exceed agronomic rates. ❑ Crop management activities resulting in cessation of infiltration for crop removal. NOTE — High -Rate Infiltration Systems serving residential facilities shall have a minimum of 14 days of wet weather storage. L Engineering Plans (All Application Packages): ® Per 15A NCAC 02T .0704(c)(1), submit standard size and 11 x 17-inch plan sets that have been signed, sealed and dated by a North Carolina licensed Professional Engineer, and shall include at a minimum: ® Table of contents with each sheet numbered. ® A general location map with at least two geographic references and a vicinity map. ❑ A process and instrumentation diagram showing all flow, recycle/return, aeration, chemical, electrical and wasting paths. ® Plan and profile views of all treatment and storage units, including their piping, valves, and equipment (i.e., pumps, blowers, mixers, diffusers, flow meters, etc.), as well as their dimensions and elevations. ® Details of all piping, valves, pumps, blowers, mixers, diffusers, recording devices, fencing, auxiliary power, etc. ❑ A hydraulic profile from the treatment plant headworks to the highest infiltration point. ❑ The high -rate infiltration area with an overlay of the suitable infiltration areas depicted in the Soil Evaluation. ❑ For non -basins, each nozzle/emitter and its wetted area influence and each infiltration zone labeled as it will be operated. ❑ For non -basins, locations within the infiltration system of air releases, drains, control valves, highest infiltration nozzle/emitter, etc. ❑ For non -basin automated infiltration systems, provide the location and details of the precipitation/soil moisture sensor. ® Plans shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final specifications. However, the plans may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. INSTRUCTIONS FOR FORM: HRIS 06-16 & SUPPORTING DOCUMENTATION Page 3 of 6 Specifications (All Application Packages): ® Per 15A NCAC 02T .0704(c)(2), submit specifications that have been signed, sealed and dated by a North Carolina licensed Professional Engineer, and shall include at a minimum: ® Table of contents with each section/page numbered. ® Detailed specifications for each treatment/storage/infiltration unit, as well as all piping, valves, equipment (i.e., pumps, blowers, mixers, diffusers, flow meters, etc.), nozzles/emitters, precipitation/soil moisture sensor (if applicable), audible/visual high water alarms, liner material, etc. ® Site Work (i.e., earthwork, clearing, grubbing, excavation, trenching, backfilling, compacting, fencing, seeding, etc.) ® Materials (i.e., concrete, masonry, steel, painting, method of construction, etc.) ® Electrical (i.e., control panels, transfer switches, automatically activated standby power source, etc.) ® Means for ensuring quality and integrity of the finished product, including leakage, pressure and liner testing. ® Specifications shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final specifications. However, the specifications may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. K. Engineering Calculations (All Application Packages): ® Per 15A NCAC 02T .0704(c)(3), submit engineering calculations that have been signed, sealed and dated by a North Carolina licensed Professional Engineer, and shall include at a minimum: ❑ Hydraulic and pollutant loading calculations for each treatment unit demonstrating how the designed effluent concentrations in Application Item V.I. were determined. ❑ Sizing criteria for each treatment unit and associated equipment (i.e., blowers, mixers, flow meters, pumps, etc.). ❑ Total and effective storage calculations for each storage unit. ® Friction/total dynamic head calculations and system curve analysis for each pump used. ® Manufacturer's information for all treatment units, pumps, blowers, mixers, diffusers, flow meters, etc. ❑ Flotation calculations for all treatment and storage units constructed partially or entirely below grade. ❑ For non -basins, a demonstration that the designed maximum precipitation and annual loading rates do not exceed the recommended rates. ❑ For basins, a demonstration that the designed loading rate (GPD/fl2) does not exceed the recommended rate. ❑ A demonstration that the specified auxiliary power source is capable of powering all essential treatment units. L. Site Map (All Application Packages): ® Per 15A NCAC 02T .0704(d), submit standard size and 11 x 17-inch site maps that have been signed, sealed and dated by a North Carolina licensed Professional Engineer and/or Professional Land Survevor, and shall include at a minimum: ® A scaled map of the site with topographic contour intervals not exceeding 10 feet or 25 percent of total site relief and showing all facility -related structures and fences within the wastewater treatment, storage and infiltration areas. ® Soil mapping units shown on all infiltration sites. ® The location of all wells (including usage and construction details if available), streams (ephemeral, intermittent, and perennial), springs, lakes, ponds, and other surface drainage features within 500 feet of all wastewater treatment, storage and infiltration sites. ® Delineation of the compliance and review boundaries per 15A NCAC 02L .0107 and .0108. ® Setbacks as required by 15A NCAC 02T .0706. ® Site property boundaries within 500 feet of all wastewater treatment, storage and infiltration sites. ® All habitable residences or places of public assembly within 500 feet of all treatment, storage and infiltration sites. NOTE — For clarity, multiple site maps of the facility with cut sheet annotations may be submitted. M. Power Reliability Plan (All Application Packages): ® Per 15A NCAC 02T .0705(k), submit documentation of power reliability that shall consist of at a minimum: ® An automatically activated standby power supply onsite that is capable of powering all essential treatment units under design conditions, OR ➢ Approval from the Director that the facility: ❑ Serves a private water distribution system that has automatic shut-off during power failures and has no elevated water storage tanks, ® Has sufficient storage capacity that no potential for overflow exists, and ❑ Can tolerate septic wastewater due to prolonged detention. INSTRUCTIONS FOR FORM: HRIS 06-16 & SUPPORTING DOCUMENTATION Page 4 of 6 N. Operation and Maintenance Plan (All Application Packages): ❑ Per 15A NCAC 02T .0707, submit an operation and maintenance (O&M) plan encompassing all wastewater treatment, storage and infiltration systems that shall include at a minimum a description of: ❑ Operation of the wastewater treatment, storage and infiltration systems in sufficient detail to show what operations are necessary for the system to function and by whom the functions are to be conducted. ❑ Anticipated maintenance of the wastewater treatment, storage and infiltration systems. ❑ Safety measures, including restriction of access to the site and equipment. ❑ Spill prevention provisions such as response to upsets and bypasses, including how to control, contain and remediate. ❑ Contact information for plant personnel, emergency responders and regulatory agencies. NOTE — A final O&M Plan shall be submitted with the partial and/or final Engineering Certification required under 15A NCAC 02T .0116, however, a preliminary O&M Plan shall be submitted with each application package. O. Residuals Management Plan (All Application Packages with new, expanding or replacement wastewater treatment systems): ❑ Per 15A NCAC 02T .0704(i) and .0708, submit a Residuals Management Plan that shall include at a minimum: ❑ A detailed explanation of how generated residuals (including trash, sediment and grit) will be collected, handled, processed, stored, treated, and disposed. ❑ An evaluation of the treatment facility's residuals storage requirements based upon the maximum anticipated residuals production rate and ability to remove residuals. ❑ A permit for residuals utilization or a written commitment to the Applicant from a Permittee of a Department approved residuals disposal/utilization program that has adequate permitted capacity to accept the residuals or has submitted a residuals/utilization program application. ❑ If oil/grease removal and collection are a designed unit process, submit an oil/grease disposal plan detailing how the oil/grease will be collected, handled, processed, stored and disposed. NOTE — Per 15A NCAC 02T .0705(n), a minimum of 30 days of residual storage shall be provided. NOTE — Per 15A NCAC 02T .0704(i). a written commitment to the Applicant from a Permittee of a Department approved residuals disposal/utilization program is not required at the time of this application, however, it shall be provided prior to operation of any permitted facilities herein. NOTE — If an on -site restaurant or other business with food preparation is contributing wastewater to this system, an oil/grease disposal plan shall be submitted. P. Additional Documentation: ➢ Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) and .0704(g), provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the wastewater treatment and high -rate infiltration system, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. ➢ Existing Permit (All Modification Packages): E Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., compliance schedules, permit description, monitoring, permit conditions, etc.). ➢ Final Environmental Document (All Application Packages using public monies or lands subject to the North Carolina Environmental Policy Act under 15A NCAC 01 C .0100 to .0400): ❑ Per 15A NCAC 02T .0105(c)(4), submit one copy of the environmental assessment and three copies of the final environmental document (i.e., Finding of No Significant Impact or Record of Decision). ❑ Include information on any mitigating factors from the Environmental Assessment that impact the design and/or construction of the wastewater treatment and high -rate infiltration system. ➢ Floodway Regulation Compliance (All Application Packages where any portion of the wastewater treatment, storage and infiltration system is located within the 100-year floodplain): ❑ Per 15A NCAC 02T .0105(c)(8), provide written documentation from all local governing entities that the facility is in compliance with all local ordinances regarding construction or operation of wastewater treatment and/or disposal facilities within the floodplain. INSTRUCTIONS FOR FORM: HRIS 06-16 & SUPPORTING DOCUMENTATION Page 5 of 6 P. Additional Documentation (continued): ➢ Operational Agreements (All Application Packages for Home/Property Owners' Associations and Developers of lots to be sold): ➢ Home/Proberty Owners' Associations ❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Ap-reement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit the proposed or approved Articles of Incorporation, Declarations and By-laws. ➢ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b). submit the properly executed Operational Aereement (FORM: DEV). ➢ Threatened or Endangered Aquatic Species Documentation (All Application Packages): ® Per 15A NCAC 02T .0105(c)(10). submit documentation from the Department's Natural Heritage Program demonstrating the presence or absence of threatened or endangered aquatic species within the boundary of the wastewater treatment, storage and infiltration facilities. ❑ If the facility directly impacts such species, this documentation shall provide information on the need for permit conditions pursuant to 15A NCAC 02B .0110. ➢ Wastewater Chemical Analysis (All Application Packages treating Industrial Waste): ❑ Per 15A NCAC 02T .0704(h). provide a complete Division certified laboratory chemical analysis of the effluent to be infiltrated for the following parameters (For new facilities, an analysis from a similar facility's effluent is acceptable): ❑ Ammonia Nitrogen (NHs-N) ❑ Nitrate Nitrogen (NOs-N) ❑ Total Organic Carbon ❑ Calcium ❑ pH ❑ Total Phosphorus ❑ Chemical Oxygen Demand (COD) ❑ Phenol ❑ Total Trihalomethanes ❑ Chloride ❑ Sodium ❑ Total Volatile Organic Compounds ❑ Fecal Coliform ❑ Sodium Adsorption Ratio (SAR) ❑ Toxicity Test Parameters ❑ 5-day Biochemical Oxygen Demand (BOD5) ❑ Total Dissolved Solids ❑ Magnesium ❑ Total Kjeldahl Nitrogen (TKN) THE COMPLETED APPLICATION AND SUPPORTING DOCUMENTATION SHALL BE SUBMITTED TO: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES WATER QUALITY PERMITTING SECTION NON -DISCHARGE PERMITTING UNIT By U.S. Postal Service: 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1617 TELEPHONE NUMBER: (919) 807-6464 By Courier/Special Deliverv: 512 N. SALISBURY ST. RALEIGH. NORTH CAROLINA 27604 FAX NUMBER: (919) 807-6496 INSTRUCTIONS FOR FORM: HRIS 06-16 & SUPPORTING DOCUMENTATION Page 6 of 6 State of North Carolina Department of Environmental Quality DWR Division of Water Resources 15A NCAC 02T .0700 — HIGH -RATE INFILTRATION SYSTEMS Division of Water Resources FORM: HRIS 06-16 L APPLICANT INFORMATION: 1. Applicant's name: Onslow County Water and Sewer Authoritv (ONWASA) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State ® Municipal ❑ County 3. Signature authority's name: Jeffrev T. Lohr. PE per 15A NCAC 02T .0106(b) Title: Chief of Enaineerina 4. Applicant's mailing address: 228 Georaetown Road City: Jacksonville State: NC Zip: 28540-4146 5. Applicant's contact information: Phone number: (910) 937-7509 Email Address: jlohr(&onwasa.com IL FACILITY INFORMATION: 1. Facility name: Summerhouse Wastewater Reclamation Facilitv 2. Facility status: Existing 3. Facility type: Major (> 10.000 GPD or> 300 disposal acres) 4. Facility's physical address: 351 Holly Ridae Road City: Hollv Ridae State: NC Zip: 28445- County: Onslow 5. Wastewater Treatment Facility Coordinates (Decimal Degrees): Latitude: 34.495803' Longitude:-77.23725' Datum: Unknown Level of accuracy: Unknown Method of measurement: Address matching 6. USGS Map Name: USGS Tonoaranhic Man III. CONSULTANT INFORMATION: 1. Professional Engineer: Carl Scharfe.PE License Number: 040525 Firm: The Wooten Comnanv Mailing address: 120 N. Bovlan Avenue City: Raleigh State: NC Zip: 27603-1423 Phone number: (919) 828-0531 Email Address: cscharfe(athewootencomnanv.com 2. Soil Scientist: N/A License Number: Firm: Mailing address: City: State: Zip: - Phone number: (_) = Email Address: 3. Geologist: NA License Number: Firm: Mailing address: City: State: Zip: - Phone number: (_) = Email Address: 4. Agronomist: NA Firm: Mailing address: City: State: Zip: - Phone number: (_) = Email Address: FORM: HRIS 06-16 Page 1 of 13 IV. GENERAL REQUIREMENTS — 15A NCAC 02T .0100: 1. Application type: ❑ New ® Major Modification ❑ Minor Modification If a modification, provide the existing permit number: WQ0029945 and most recent issuance date: March 1.2024 2. Application fee: $395 - Standard - Major Facilitv - Major Mod 3. Does this project utilize public monies or lands? ® Yes or ❑ No If yes, was an Environmental Assessment required under 15A NCAC 01C? ❑ Yes or ® No If yes, which final environmental document is submitted? ❑ Finding of No Significant Impact or ❑ Record of Decision Briefly describe any mitigating factors from the Environmental Assessment that may impact this facility: 4. What is the status of the following permits/certifications applicable to the subject facility? Permit/Certification Date Date Permit/Certification Agency Reviewer Submitted Approved Number Collection Svstem (O > 200.000 GPD) See Attachment Dam Safetv Erosion & Sedimentation Control Plan Nationwide 12 / Section 404 Pretreatment Sewer Svstem Stormwater Management Plan Wetlands 401 Other: 5. What is the wastewater type? ❑ Domestic or ] Industrial (See 15A NCAC 02T .0103(20)) Is there a Pretreatment Program in effect? ❑ Yes or ❑ No Has a wastewater chemical analysis been submitted'? ❑ Yes or ❑ No 6. Wastewater flow: N/A GPD Limited by: ❑ Treatment, ❑ Storage, ❑ Field/Basin Hydraulics, ❑ Field Agronomics or ❑ Groundwater Mounding 7. Explain how the wastewater flow was determined: ❑ 15A NCAC 02T .0114 or ❑ Representative Data Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes or ❑ No Establishment Type Daily Design Flow a No. of Units Flow N/A N/A gal/ N/A N/A GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total N/A GPD a See 15A NCAC 02T .0114(b). (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). FORM: HRIS 06-16 Page 2 of 13 IV. GENERAL REQUIREMENTS — 15A NCAC 02T .0100 (continued): 8. What is the nearest 100-year flood elevation to the facility? 11 feet mean sea level. Source: DFIRM NC 3720425700K Are any treatment, storage or infiltration facilities located within the 100-year flood plain? ❑ Yes or ® No I� If yes, which facilities are affected and what measures are being taken to protect them against flooding? If yes, has the Applicant submitted written documentation of compliance with & 143 Article 21 Part 6? ❑ Yes or ❑ No 9. Has the Applicant provided documentation of the presence or absence of threatened or endangered aquatic species utilizing information provided by the Department's Natural Heritage Pro P-ram? ❑ Yes or ® No 10. Does the facility have a proposed or existing groundwater monitoring well network? ® Yes or ❑ No If no, provide an explanation as to why a groundwater monitoring well network is not proposed: If yes, complete the following table (NOTE — This table may be expanded for additional wells): Well Name Status Latitude a Longitude a Gradient Location MW-1 Active 34.5160000-77.5010000 UD Gradient Inside ComDliance Bound MW-2 Active 34.5110000-77.4960000 Cross Gradient On Review Boundary MW-3 Active 34.5060000-77.4970000 Down Gradient Inside Review Boundary MW-4 Active 34.5060000-77.5020000 Cross Gradient Inside Review Boundary Select 0- 0Select Select Select 0- 0Select Select Select 0- 0Select Select Select 0- 0Select Select Select 0- 0Select Select Select 0- 0Select Select a Provide the following latitude and longitude coordinate determination information: Datum: NAD83 Level of accuracy: Nearest 10 minutes Method of measurement: Conversion from state coordinate Dlane 11. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been submitted? ❑ Yes, ❑No or ®N/A 12. If the Applicant is a Developer of lots to be sold, has a DOVeIODer's ODerational Agreement (FORM: DEV) been submitted? ❑ Yes, ❑No or ®N/A 13. If the Applicant is a Home/Property Owners' Association, has an Association Operational Agreement (FORM: HOA) been submitted? ❑ Yes, ❑No or ®N/A 14. Demonstration of historical consideration for permit approval — 15A NCAC 02T .0120: Has the Applicant or any parent, subsidiary or other affiliate exhibited the following? a. Has been convicted of environmental crimes under Federal law or G.S. 143-215.6B? ❑ Yes or ® No b. Has previously abandoned a wastewater treatment facility without properly closing that facility? ❑ Yes or ® No c. Has unpaid civil penalty where all appeals have been abandoned or exhausted? ❑ Yes or ® No d. Is non -compliant with an existing non -discharge permit, settlement agreement or order? ❑ Yes or ® No e. Has unpaid annual fees in accordance with 15A NCAC 02T .0105(e)(2)? ❑ Yes or ® No FORM: HRIS 06-16 Page 3 of 13 V. WASTEWATER TREATMENT FACILITY DESIGN CRITERIA —15A NCAC 02T .0705: 1. For the following parameters, provide the estimated influent concentrations and designed effluent concentrations as determined in the Engineering Calculations, and utilized in the Agronomic Evaluation and Groundwater Modeling (if applicable): Parameter Ammonia Nitrogen (NH3-N) Biochemical Oxygen Demand (BOD5) Fecal Coliforms Nitrate Nitrogen (NO3-N) Nitrite Nitrogen (NO2-N) Total Kjeldahl Nitrogen Total Nitrogen Total Phosphorus Total Suspended Solids (TSS) Estimated Influent Concentration mg/L mg/L mg/L mg/L mg/L mg/L mg/L Designed Effluent Concentration (monthly average) mg/L mg/L per 100 mL mg/L mg/L mg/L mg/L mg/L mg/L 2. Is flow equalization of at least 25% of the average daily flow provided? ❑ Yes or ❑ No 3. Does the treatment facility include any bypass or overflow lines? ❑ Yes or ❑ No If yes, describe what treatment units are bypassed, why this is necessary, and where the bypass discharges: 4. Are multiple pumps provided wherever pumps are used? ❑ Yes or ❑ No If no, how does the Applicant intend on complying with 15A NCAC 02T .0705(i)? 5. Check the appropriate box describing how power reliability will be provided in accordance with 15A NCAC 02T .0705(k): ❑ Automatically activated standby power supply onsite capable of powering all essential treatment units; or ❑ Approval from the Director that the facility: ➢ Has a private water supply that automatically shuts off during power failures and does not contain elevated water storage tanks; ➢ Has sufficient storage capacity that no potential for overflow exists; and ➢ Can tolerate septic wastewater due to prolonged detention. 6. If the wastewater treatment system is located within the 100-year flood plain, are there water -tight seals on all treatment units or a minimum of two feet protection from the 100-year flood plain elevation? ❑ Yes, ❑ No or ❑ N/A 7. In accordance with 15A NCAC 02T .0705(n). how many days of residuals storage are provided? 8. How does the Applicant propose to prohibit public access to the wastewater treatment and storage facilities? 9. If an influent pump station is part of the proposed facility (i.e., within the wastewater treatment plant boundary), does the influent pump station meet the design criteria in 15A NCAC 02T .0305(h)? ❑ Yes, ❑ No, ❑ N/A — To be permitted separately, or ❑ N/A — Gravity fed 10. If septic tanks are part of the wastewater treatment facility, do the septic tanks adhere to the standards in 15A NCAC 18A .1900? ❑ Yes, ❑ No or ❑ N/A FORM: HRIS 06-16 Page 4 of 13 V. WASTEWATER TREATMENT FACILITY DESIGN CRITERIA —15A NCAC 02T .0705 (continued): 11. Provide the requested treatment unit and mechanical equipment information: a. PRELIMINARY / PRIMARY TREATMENT (i.e., physical removal operations and flow equalization): Treatment Unit No. of Manufacturer or Dimensions (ft) / Volume Plan Sheet Specification Units Material Spacings (in) (gallons) Reference Reference Select Select Select Select Select b. SECONDARY / TERTIARY TREATMENT (i.e., biological and chemical processes to remove organics and nutrients) Treatment Unit No. of Manufacturer or Dimensions (ft) Volume Plan Sheet Specification Units Material (gallons) Reference Reference Select Select Select Select Select Select Select Select c. DISINFECTION Treatment Unit No. of Manufacturer or Dimensions (ft) Volume Plan Sheet Specification Units Material (gallons) Reference Reference Select Select ➢ If chlorination is the proposed method of disinfection, specify detention time provided: minutes (NOTE — 30 minutes minimum required), and indicate what treatment unit chlorine contact occurs: ➢ If ultraviolet (UV) light is the proposed method of disinfection, specify the number of banks: number of lamps per bank: and maximum disinfection capacity: GPM. d. RESIDUAL TREATMENT Treatment Unit No. of Manufacturer or Dimensions (ft) Volume Plan Sheet Specification Units Material (gallons) Reference Reference Select Select FORM: HRIS 06-16 Page 5 of 13 V. WASTEWATER TREATMENT FACILITY DESIGN CRITERIA —15A NCAC 02T .0705 (continued): e. PUMPS Location No. of purpose Manufacturer / Capacity Plan Sheet Specification Pumps Type GPM TDH Reference Reference Pump treated effluent Reclaimed Water from the Pump Station 2 Summerhouse WRF Wilo / Submersible 400 56 PS-2.6 11307 to the Holly Ridge sprayfields f. BLOWERS Location No. of Blowers Units Served Manufacturer / Type g. MIXERS Location No. of Units Served Manufacturer / Mixers Type h. RECORDING DEVICES & RELIABILITY Device No. of Location Manufacturer Units Select Select Select Select i. EFFLUENT PUMP / DOSING TANK (IF APPLICABLE): Capacity Plan Sheet Specification (CFM) Reference Reference Power Plan Sheet Specification (hp) Reference Reference Maximum Plan Sheet Specification Capacity Reference Reference FORM: HRIS 06-16 Page 6 of 13 Internal dimensions (L x W x H or (p x H) Total volume Dosing volume Audible & visual alarms Equipment to prevent infiltration during rain events (if applicable) ft I ft ft ft3 gallons ft3 gallons Plan Sheet Specification Reference Reference FORM: HRIS 06-16 Page 7 of 13 VI. EARTHEN STORAGE IMPOUNDMENT DESIGN CRITERIA — 15A NCAC 02T .0705: IF MORE THAN ONE IMPOUNDMENT. PROVIDE ADDITIONAL COPIES OF THIS PAGE AS NECESSARY. 1. What is the earthen impoundment type? Select 2. Storage Impoundment Coordinates (Decimal Degrees): Latitude: 0Longitude: - ° Datum: Select Level of accuracy: Select Method of measurement: Select 3. Do any impoundments include a discharge point (pipe, spillway, etc)? ❑ Yes or ❑ No 4. Are subsurface drains present beneath or around the impoundment to control groundwater elevation? ❑ Yes or ❑ No 5. Is the impoundment designed to receive surface runoff? ❑ Yes or ❑ No If yes, what is the drainage area? ft2, and was this runoff incorporated into the water balance? ❑ Yes or ❑ No 6. If a liner is present, how will it be protected from wind driven wave action?: 7. Will the earthen impoundment water be placed directly into or in contact with GA classified groundwater? ❑ Yes or ❑ No If yes, has the Applicant provided predictive calculations or modeling demonstrating that such placement will not result in a contravention of GA groundwater standards? ❑ Yes or ❑ No 8. What is the depth to bedrock from the earthen impoundment bottom elevation? ft If the depth to bedrock is less than four feet, has the Applicant provided a liner with a hydraulic conductivity no greater than 1 x 10-' cm/s? ❑ Yes, or ❑ N/A Has the Applicant provided predictive calculations or modeling demonstrating that surface water or groundwater standards will not be contravened? ❑ Yes or ❑ No If the earthen impoundment is excavated into bedrock, has the Applicant provided predictive calculations or modeling demonstrating that surface water or groundwater standards will not be contravened? ❑ Yes, ❑ No or ❑ N/A 9. If the earthen impoundment is lined and the mean seasonal high water table is higher than the impoundment bottom elevation, how will the liner be protected (e.g., bubbling, groundwater infiltration, etc.)? 10. If applicable, provide the specification page references for the liner installation and testing requirements: 11. If the earthen impoundment is located within the 100-year flood plain, has a minimum of two feet of protection (i.e., top of embankment elevation to 100-year flood plain elevation) been provided? ❑ Yes or ❑ No 12. Provide the requested earthen impoundment design elements and dimensions: Earthen Impoundment Design Elements Earthen Impoundment Dimensions Liner type: ❑ Clay ❑ Synthetic ❑ Other ❑ Unlined Top of embankment elevation: ft Liner hydraulic conductivity: x - cm/s Freeboard elevation: ft Hazard class: Select Toe of slope elevation: ft Designed freeboard: ft Impoundment bottom elevation: ft Total volume: ft,gallons Mean seasonal high water table depth: ft Effective volume: ft, gallons Embankment slope: Effective storage time: days Top of dam water surface area: ft2 The storage pond at the Holly Plan Sheet Reference: Ridge Sprayfields already exists. There are no proposed Freeboard elevation water surface area: ft, changes to this storage pond. Specification Section: Bottom of impoundment surface area: ft, NOTE — The effective volume shall be the volume between the two foot freeboard elevation and the: (1) pump intake pipe elevation; (2) impoundment bottom elevation or (3) mean seasonal high water table, whichever is closest to the two foot freeboard elevation. FORM: HRIS 06-16 Page 8 of 13 VIL INFILTRATION SYSTEM DESIGN CRITERIA — 15A NCAC 02T .0705: 1. Provide the minimum depth to the seasonal high water table within the infiltration area: 1 foot NOTE — The vertical separation between the seasonal high water table and the ground surface shall be at least one foot. 2. Are there any artificial drainage or water movement structures (e.g., surface water or groundwater) within 200 feet of the infiltration area? ❑ Yes or ® No If yes, were these structures addressed in the Soil Evaluation and/or Hydrogeologic Report, and are these structures to be maintained or modified? 3. Soil Evaluation recommended loading rates (NOTE — This table may be expanded for additional soil series): Basins/Fields Recommended Recommended Recommended Annual / If Seasonal, list Soil Series within Soil Loading Rate Loading Rate Loading Rate Seasonal appropriate Series (in/hr) (in/yr) (GPD/ft2) Loading months Goldsboro fine sandy loam, 0 to Field 2B N/A N/A N/A Annual N/A 2% slopes (GoA Leon fine Field 1 N/A N/A N/A Annual N/A sand (Ln) Pactolus Fields 2A & fine sand 3 N/A N/A N/A Annual N/A (Pa) Select Select Select 4. Are the designed loading rates less than or equal to Soil Evaluation recommended loading rates? ® Yes or ❑ No If no, how does the Applicant intend on complying with 15A NCAC 02T .0705(m)? 5. How does the Applicant propose to prohibit public access to the infiltration facilities? The annlicant nronoses leaving the access to the irritation sysstem as currently is. 6. Has the infiltration system been equipped with a flow meter to accurately determine the volume of effluent applied to each basin/field as listed in VII.8.? ® Yes or ❑ No If no, how does the Applicant intend on determining the amount of effluent applied to each basin/field? 7. For non -basins, provide the required cover crop information and demonstrate the effluent will be applied at or below agronomic rates: Cover Crop Soil Series % Slope Nitrogen Uptake Rate Phosphorus Uptake (lbs/ac•yr) Rate (lbs/ac•yr) Grass GoA, Ln, Pa 0 to 2% N/A N/A FORM: HRIS 06-16 Page 9 of 13 a. Specify where the nitrogen and phosphorus uptake rates for each cover crop were obtained: N/A b. Proposed nitrogen mineralization rate: N/A c. Proposed nitrogen volatilization rate: N/A d. Minimum infiltration area from the Agronomist Evaluation's nitrogen balance: N/A ft' e. Minimum infiltration area from the Agronomist Evaluation's phosphorus balance: N/A ft2 f. Minimum infiltration area from the water balance: N/A ft2 FORM: HRIS 06-16 Page 10 of 13 VIL INFILTRATION SYSTEM DESIGN CRITERIA - 15A NCAC 02T .0705 (continued): 8. Basin/Field Information (NOTE - This table may be expanded for additional fields): Designed Designed Designed Basin/ Area Dominant Loading Loading Loading Wat erbody Field (acres) Soil Series Rate Rate Rate Latitude a Longitude a Strreameam Classification (in/hr) (in/yr) (GPD/ft2) Index No. n 1/IA 9.82 Leon 0.12 36.92 N/A 34.515240 _77 5023990 18-87-4 SC;Sw;HQW 1/1B 9.62 Leon 0.12 36.92 N/A 34.513864 -77 5014860 18-87-4 SC;Sw;HQW VIC 8.07 Leon 0.12 36.92 N/A 34.513117 -77 5015470 18-87-4 SC;Sw;HQW VID 3.74 Leon 0.12 36.92 N/A 34.512088 -77 5009950 18-87-4 SC;Sw;HQW 2/2A-1 8.78 Pactolus 0.12 36.92 N/A 34.508936 _77 5007750 18-87-4 SC;Sw;HQW 2/2A-2 12.20 Pactolus 0.12 36.92 N/A 34.508358 _77 5006870 18-87-4 SC;Sw;HQW 2/2A-3 11.66 Pactolus 0.12 36.92 N/A 34.507327 _77 4990240 18-87-4 SC;Sw;HQW 2/2B-1 8.63 Goldsboro 0.12 21.84 N/A 34.506634 _77 4991760 18-87-4 SC;Sw;HQW 2/2B-2 5.84 Goldsboro 0.12 21.84 N/A 34.506567 _77 4973220 18-87-4 SC;Sw;HQW 3/3A 9.44 Pactolus 0.12 36.92 N/A 34.511579 _77 4966610 18-87-4 SC;Sw;HQW 3/3B 11.79 Pactolus 0.12 36.92 N/A 34.509802 0 0 0 0 0 -77 4966840 0 0 0 0 0 18-87-4 SC;Sw;HQW a Provide the following latitude and longitude coordinate determination information: Datum: NAD83 Level of accuracy: Nearest 10 minutes Method of measurement: Conversion from state coordinate Dlane b For assistance determining the waterbody stream index number and its associated classification, instructions may be downloaded at: httD:Hdea.nc.Lov/about/divisions/water-resources/Polamina/classification-standards/classifications 9. High -Rate Infiltration System design criteria: a. Infiltration Fields: FORM: HRIS 06-16 Page 11 of 13 Spray Infiltration Design Elements Drip Infiltration Design Elements There are no proposed changes to the existing Nozzle wetted diameter: nozzle sizes, capacity, Emitter wetted area: ft2 elevations, or manufacturer that is currently in place ft Nozzle wetted area: - ft2 Distance between laterals: ft Nozzle capacity: - GPM Distance between emitters: ft Nozzle manufacturer/model: - / - Emitter capacity: GPH Elevation of highest nozzle: - ft Emitter manufacturer/model: / Specification Section: N/A Elevation of highest emitter: ft Specification Section: FORM: HRIS 06-16 Page 12 of 13 VIL INFILTRATION SYSTEM DESIGN CRITERIA — 15A NCAC 02T .0705 (continued): b. Infiltration Basins: IF MORE THAN TWO BASINS. PROVIDE ADDITIONAL COPIES OF THIS PAGE AS NECESSARY. Infiltration Basin Design Elements Basin Name: Hazard class: Select Designed freeboard: It Total volume: ft3 Infiltrative surface area: ftz Daily infiltrative capacity: GPD Plan Sheet Reference: Infiltration Basin Dimensions Top of embankment elevation: ft Freeboard elevation: ft Toe of slope elevation: ft Impoundment bottom elevation: ft Mean seasonal high water table depth: ft Embankment slope: Top of dam water surface area: ft, Specification Section: Freeboard elevation water surface area: ft, Bottom of impoundment surface area: ft, i. Does this basin include a discharge point (pipe, spillway, etc)? ❑ Yes or ❑ No ii. Are subsurface drains present around the impoundment to control groundwater elevation? ❑ Yes or ❑ No iii. Is the basin designed to receive surface runoff? ❑ Yes or ❑ No If yes, what is the drainage area? ftz, and was this runoff incorporated into the loading rate? ❑ Yes or ❑ No iv. Will the effluent be placed directly into or in contact with GA classified groundwater? ❑ Yes or ❑ No If yes, has the Applicant provided predictive calculations or modeling demonstrating that such placement will not result in a contravention of GA groundwater standards? ❑ Yes or ❑ No v. If the infiltration basin is located within the 100-year flood plain, has a minimum of two feet of protection (i.e., top of embankment elevation to 100-year flood plain elevation) been provided? ❑ Yes or ❑ No Infiltration Basin Design Elements Basin Name: Hazard class: Select Designed freeboard: It Total volume: ft, Infiltrative surface area: ft2 Daily infiltrative capacity: GPD Plan Sheet Reference: Infiltration Basin Dimensions Top of embankment elevation: ft Freeboard elevation: ft Toe of slope elevation: ft Impoundment bottom elevation: ft Mean seasonal high water table depth: ft Embankment slope: Top of dam water surface area: ft, Specification Section: Freeboard elevation water surface area: ftz Bottom of impoundment surface area: ftz i. Does this basin include a discharge point (pipe, spillway, etc)? ❑ Yes or ❑ No ii. Are subsurface drains present around the impoundment to control groundwater elevation? ❑ Yes or ❑ No iii. Is the basin designed to receive surface runoff? ❑ Yes or ❑ No If yes, what is the drainage area? ftz, and was this runoff incorporated into the loading rate? ❑ Yes or ❑ No iv. Will the effluent be placed directly into or in contact with GA classified groundwater? ❑ Yes or ❑ No If yes, has the Applicant provided predictive calculations or modeling demonstrating that such placement will not result in a contravention of GA groundwater standards? ❑ Yes or ❑ No v. If the infiltration basin is located within the 100-year flood plain, has a minimum of two feet of protection (i.e., top of embankment elevation to 100-year flood plain elevation) been provided? ❑ Yes or ❑ No FORM: HRIS 06-16 Page 13 of 13 VIIL SETBACKS —15A NCAC 02T .0706: 1. Does the project comply with all setbacks found in the river basin rules (15A NCAC 02B .0200)? ® Yes or ❑ No If no, list non -compliant setbacks: 2. Have any setback waivers been obtained in order to comply with 15A NCAC 02T .706(a) and .0706(d)? ❑ Yes or ® No If yes, have these waivers been written, notarized and signed by all parties involved and recorded with the County Register of Deeds? ❑ Yes or ❑ No 3. Provide the minimum field observed distances (ft) for each setback parameter to the infiltration system and treatment/storage units (NOTE — Distances greater than 500 feet may be marked N/A): Setback Parameter Any habitable residence or place of assembly under separate ownership or not to be maintained as part of the project site Any habitable residence or place of assembly owned by the Permittee to be maintained as part of the project site Any private or public water supply source Surface waters (streams — intermittent and perennial, perennial waterbodies, and wetlands) Groundwater lowering ditches (where the bottom of the ditch intersects the SHWT) Subsurface groundwater lowering drainage systems Surface water diversions (ephemeral streams, waterways, ditches) Any well with exception of monitoring wells Any property line Top of slope of embankments or cuts of two feet or more in vertical height Any water line from a disposal system Any swimming pool Public right of way Nitrification field Any building foundation or basement Impounded public water supplies Public shallow groundwater supply (less than 50 feet deep) Infiltration Treatment /I System Storage Unitsl 430 - N/A 330 104 N/A N/A 100 330 165 55 N/A N/A N/A N/A 340 N/A N/A 4. Does the Applicant intend on complying with either 15A NCAC 02T .0706(b) or (c)? ❑ Yes or ® No If yes, what are the designed Total Nitrogen and Total Phosphorus effluent concentrations? TN: _ mg/L TP: _ mg/L 5. Does the Applicant intend on complying with the High -Rate Policv issued October 27, 2006? ❑ Yes or ® No If yes, verify the following information: ✓ Are the most stringent effluent standards in both 15A NCAC 02T .0705(b) and 15A NCAC 02U .0301(b) met? ❑Yes or❑No ✓ Is duality provided for all treatment units per 15A NCAC 02U .0402(c)? ❑ Yes or ❑ No ✓ Continuous online monitoring and recording of effluent for turbidity? ❑ Yes or ❑ No ✓ A lined 5-day upset pond is provided? ❑ Yes or ❑ No ✓ The 5-day upset pond has restricted access? ❑ Yes or ❑ No ✓ A certified operator of a grade equal or greater than the facility classification is on call 24 hrs/day? ❑ Yes or ❑ No FORM: HRIS 06-16 Page 14 of 13 IX. COASTAL WASTE TREATMENT DISPOSAL REQUIREMENTS —15A NCAC 0211.0400: 1. Is this facility located in a Coastal Area as defined per 15A NCAC 02H .0403? ® Yes or ❑ No For assistance determining if the facility is located within the Coastal Area, a reference map may be downloaded at: Coastal Areas Boundary. 2. Is this an Interim Treatment and Disposal Facility per 15A NCAC 02H .0404(2)? ❑ Yes or ® No NOTE — Interim facilities do not include County and Municipal area -wide collection and treatment systems. IF ANSWERED YES TO ITEMS IX.1. AND IX.2., THEN COMPLETE ITEMS IX.3. THROUGH IX.16. 3. Is equalization of at least 25% of the average daily flow provided? ❑ Yes or ❑ No 4. How will noise and odor be controlled? 5. Is an automatically activated standby power source provided? ❑ Yes or ❑ No 6. Are all essential treatment units provided in duplicate? ❑ Yes or ❑ No NOTE — Per 15A NCAC 02T .010306). essential treatment units are defined as any unit associated with the wastewater treatment process whose loss would likely render the facility incapable of meeting the required performance criteria, including aeration units or other main treatment units, clarification equipment, filters, disinfection equipment, pumps and blowers. 7. Are the disposal units (i.e., infiltration basins/fields) provided in duplicate? ❑ Yes or ❑ No 8. Is there an impounded public surface water supply within 500 feet of the infiltration area? ❑ Yes or ❑ No 9. Is there a public shallow groundwater supply (less than 50 feet deep) within 500 feet of the infiltration area? ❑ Yes or ❑ No 10. Is there a private groundwater supply within 100 feet of the infiltration area? ❑ Yes or ❑ No 11. Are there any SA classified waters within 100 feet of the infiltration area? ❑ Yes or ❑ No 12. Are there any non -SA classified waters within 50 feet of the infiltration area? ❑ Yes or ❑ No 13. Are there any surface water diversions (i.e., drainage ditches) within 25 feet of the infiltration area? ❑ Yes or ❑ No 14. Per the requirements in 15A NCAC 02H .0404(2)(7). how much green area is provided? ft2 15. Is the green area clearly delineated on the plans? ❑ Yes or ❑ No 16. Is the snrav infiltration wetted area within 200 feet of any adjoining properties? ❑ Yes, ❑ No or ❑ N/A X. GROUNDWATER LOWERING SYSTEM DESIGN: 1. Does this project utilize a groundwater lowering system? ❑ Yes or ® No (If yes, complete Items X.2. through X.4.) 2. Is the groundwater lowering system: ❑ mechanically lowered (i.e., pumped) or ❑ gravity fed? 3. Where does the groundwater lowering drainage system discharge? If the system mechanically lowers groundwater and discharges directly or indirectly (i.e., pond overflow) to surface waters, wetlands and/or stormwater structures, provide the date the Applicant obtained written confirmation from the Water Quality Regional Operations Section that operation of the groundwater lowering drainage system will not adversely affect surface waters of the State. Submitted: & Received: 4. Groundwater lowering system design criteria: Groundwater Lowering System Design Pipe diameter: in Discharge rate: Pipe material: Method to measure discharge rate: Pipe depth: ft Number of pumps: Pipe length: ft Pump capacity: Pipe slope (gravity -fed): % Plan Sheet Reference: Trench backfill material: Specification Section: GPD GPM TDH FORM: HRIS 06-16 Page 15 of 13 Professional Engineer's Certification: 56,6( fr attest that this application for (Professional Engineer's name from Application Item111.1.) 5✓ M e r k ov5 e- klz IwGIiie-l- 1,edal,m 1l `i a ri Fac i /; �-y (Facility name from Application Item If.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with this application package and its instructions, as well as all applicable regulations and statutes. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: Applicant's Certification per 1 5A NCAC 02T .0106tb): J'e►t' eY T Lour, attest that this application for (Signature Authority's name & title from Application Item 1.3.) 5C/M rlerhdv5e- Vm+e wort - R.P-daii,-Lce-i o rl F-a.c i 1, -/-y (Facility name from Application Item If.1.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land willl result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. I further certify that the Applicant or any affiliate has not been convicted of an environmental crime, has not abandoned a wastewater facility without proper closure, does not have an outstanding civil penalty where all appeals have been exhausted or abandoned, are compliant with any active compliance schedule, and do not have any overdue annual fees per 15A NCAC 02T .0105(ej. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well civil penalties up to 5,000 per violation. Signature: /` �'` Date: FORM: HRIS 06-16 Page 16 of 13 ISSUED FOR: DATE REVISIONS 0 r mft ,W 0%,9 Ri aw s," ONWASA Project No. CIP- 028 NORTH CAROLINA SOUTHEAST SERVICE AREA WASTEWATER CAPACITY IMPROVEMENTS CONTRACT 1 -TRANSMISSION SYSTEM } CROAUN p� vor$ #., 41441 ar VICINITY MAP 1 MARCH 2O24 CHIEF EXECUTIVE OFFICER Frankyj. Howard BOARD OF DIRECTORS Royce Bennett, Chairman Paul Conner, Vice -Chairman Pat Turner, Secretary /Treasurer Timothy Foster Jerry Bittner Joann McDermon Jeff Wenzel Robert Warden 120 North Boylan Avenue • Raleigh, NC 27603-1423 (919) 828-0531 • thewootencompany.com License Number: F-0115 18" FORCE MAID .PROJECT AREA MAP `I 8" FORCE MAIN z O vJU zzZ) —O� Ln wz Q00 oc�� oCL o 3:o Jww Q�W za:�W U.°� O z NOT TO SCALE NOT TO SCALE C-0.01 GENERAL NOTES: EROSION CONTROL NOTES: ADHERE TO THE FOLLOWING ITEMS IN THE CONSTRUCTION OF THE UTILITY AND APPURTENANCES UNLESS OTHERWISE NOTED: 1. EXISTING UTILITIES ARE LOCATED ON PLANS APPROXIMATELY. NOTIFY UTILITY LOCATING SERVICE TO MARK LOCATION OF EXISTING UTILITIES A MINIMUM OF THREE FULL WORKING DAYS PRIOR TO COMMENCING CONSTRUCTION ACTIVITY. CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXACT LOCATION OF THESE EXISTING UTILITIES. THE COST AND TIME TO REPAIR THESE FACILITIES, IF DAMAGED, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. COORDINATE WITH UTILITY OWNERS AS NECESSARY. COSTS AND TIME ASSOCIATED ARE INCIDENTAL. 2. CONTRACTOR SHALL CONTACT THE NC DEPARTMENT OF TRANSPORTATION PRIOR TO ANY WORK WITHIN NCDOT RIGHT-OF-WAY. THE NCDOT DISTRICT ENGINEER FOR THIS PROJECT IS NAME, (XXX) XXX-XXXX. 3. CONTRACTOR SHALL TAKE PRECAUTIONS TO PROTECT EXISTING PROPERTY CORNER MARKERS. PROPERTY CORNERS, RIGHTS -OF -WAY, AND EASEMENTS SHALL BE CLEARLY MARKED BY THE CONTRACTOR FOR CONSTRUCTION LIMITS. ALL DISTURBED PROPERTY CORNERS SHALL BE REPLACED BY A REGISTERED NORTH CAROLINA PROFESSIONAL LAND SURVEYOR. 4. TEMPORARILY REMOVE MINOR ITEMS AS REQUIRED FOR THE INSTALLATION OF THE UTILITY. MINOR ITEMS SHALL INCLUDE, BUT NOT BE LIMITED TO, EXISTING SIGNS, MAILBOXES, STORM SEWER PIPES, SHRUBS (UNDER 6 FT IN HEIGHT), AND TREES (UNDER 3 INCH IN DIA.). REINSTALL ITEMS TO THEIR ORIGINAL CONDITION. INCLUDE COST IN THE PER FOOT COST OF THE UTILITY BEING INSTALLED. 5. SUPPORT, RELOCATE, ADJUST, OR REMOVE AND REPLACE EXISTING UTILITY POLES, FENCES, CULVERTS, PAVEMENT, UTILITIES, CURBING AND OTHER STRUCTURES DURING CONSTRUCTION. REPAIR DAMAGED ITEMS TO THEIR ORIGINAL CONDITION AT NO ADDITIONAL COST, NOTE, NCDOT ENCROACHMENT AGREEMENT, NOR ANY OF THE OTHER PERMITS IN THE PROJECT MANUAL, PROVIDE PERMISSION TO MOVE EXISTING UTILITIES. CONTRACTOR TO COORDINATE WITH UTILITY OWNERS TO TEMPORARILY, OR PERMANENTLY, RELOCATE AS NECESSARY. CONTRACTOR MAY BE REQUIRED TO PAY UTILITY OWNER OR THEIR AGENT TO MOVE, SUPPORT, OR TEMPORARILY/PERMANENTLY RELOCATE IN ORDER TO MAKE THE PROPOSED IMPROVEMENTS. THESE ACTIONS/REQUIREMENTS SHALL BE FULFILLED AT NO ADDITIONAL COST TO THE OWNER. 6. 6 INCH DEPTH OF NCDOT ABC AGGREGATE SHALL BE PROVIDED FOR THE FULL WIDTH OF UNPAVED DRIVEWAYS AND OTHER DISTURBED GRAVEL AREAS. CONTRACTOR SHALL MINIMIZE DISTURBANCE. SEE UNIT PRICE SECTION OF SPECIFICATION FOR PAYMENT. 7. OPEN CUT PAVED DRIVEWAYS, SIDEWALKS, AND CURB AND GUTTER. REPLACE CURB, GUTTERS, AND SIDEWALKS WITH NEW TO MATCH THE EXISTING CROSS SECTION TO THE NEAREST EXISTING JOINT. PROVIDE PAVEMENT CUTTING AND PATCHING PER DETAIL(S). ALL DRIVEWAY AND PAVEMENT/SIDEWALK/CURB & GUTTER TO BE REPLACED WITHIN THREE (3) DAYS. 8. CONTRACTOR TO PROVIDE VALVE MARKERS FOR ALL VALVES, AIR RELEASE VALVES. VALVE SHALL BE MARKED MV AND AV TO CORRESPOND WITH THE TYPE OF EQUIPMENT. VALVE MARKERS SHALL ALSO INCLUDE A PHONE NUMBER TO REPORT PROBLEMS OR REQUEST FORCE MAIN LOCATIONS. COSTS FOR MARKERS ARE TO BE INCLUDED WITH THE VALVE INSTALLATION. MARKERS LOCATED WITHIN C/A PORTIONS OF NCDOT ROADS SHALL BE INSTALLED AT R/W LINES. 9. CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL LOCATION AND SIZE OF EXISTING UTILITIES A MINIMUM OF 300 FEET IN ADVANCE OF LAYING ACTIVITIES. NOTIFY THE ENGINEER IMMEDIATELY IF A POTENTIAL CONFLICT ARISES BETWEEN THE EXISTING AND PROPOSED UTILITIES. 10. WHEN TRENCHING INSIDE NCDOT RIGHT-OF-WAY AND WITHIN THEORETICAL 1:1 SLOPE FROM THE EDGE OF PAVEMENT TO THE BOTTOM OF THE NEAREST EXCAVATION, SHORING CALCULATIONS AND PLAN CONFORMING TO NCDOT REQUIREMENTS MUST BE SUBMITTED TO NCDOT. NO WORK ALLOWED UNTIL WRITTEN APPROVAL IS GRANTED. 11. WHEN REMOVAL OF CROSSPIPE IS NECESSARY FOR FORCE MAIN INSTALLATION, REMOVE CROSSPIPE AND REINSTALL IF UNDAMAGED. IF DAMAGED, PROVIDE NEW PIPE OF SAME TYPE AND CLASS MATERIAL AT NO ADDITIONAL COST, DRAINAGE CROSSPIPE REPLACEMENT MUST MEET CURRENT NCDOT SPECIFICATIONS. 12. PROVIDE POSITIVE UNIFORM GRADE FOR THE FORCE MAIN TOWARDS AIR RELEASE VALVES IN ALL CASES. 13. AIR RELEASE VALVE LOCATIONS MUST BE AT HIGH POINTS OF THE MAIN. THE LOCATIONS INDICATED ON THE DRAWINGS MAY BE FIELD ADJUSTED TO MEET THIS REQUIREMENT UPON APPROVAL OF THE ENGINEER. 14. PROVIDE CONCRETE THRUST BLOCKS AT FITTING LOCATIONS IN ADDITION TO RESTRAINED JOINTS, UNLESS OTHERWISE NOTED. 15. FORCE MAIN SHALL BE C900 PVC UNLESS OTHERWISE NOTED. UNLESS OTHERWISE INDICATED, ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE EROSION CONTROL LAWS OF THE STATE OF NORTH CAROLINA, SPECIFICALLY THE SEDIMENT POLLUTION CONTROL ACT OF 1973, AS AMENDED, AND THE LOCAL EROSION AND SEDIMENT CONTROL ORDINANCES. 1. CONTRACTOR SHALL COORDINATE WITH OWNER THE SUBMITTAL OF THE ELECTRONIC NOTICE OF INTENT (E-NOI) AND ELECTRONIC NOTICE OF TERMINATION (E-NOT) FORMS. THE E-NOI AND E-NOT FORMS CAN BE FOUND ONLINE AT HTTPS: //DEQ. NC.GOV/NCG01. 2. A COPY OF THE EROSION AND SEDIMENT CONTROL PERMIT, A HARD COPY OF THE PLAN, THE CERTIFICATE OF COVERAGE, AND ALL SELF -INSPECTION RECORDS MUST BE KEPT ON -SITE AND SHALL BE ACCESSIBLE AT ALL TIMES FOR INSPECTION. 3. ALL LAND DISTURBING ACTIVITIES SHALL BE CONFINED TO THE LIMITS OF DISTURBANCE, AS SHOWN ON THE PLANS. CONTRACTOR STAGING, TEMPORARY STORAGE, LAY DOWN AREAS, AND DIRT PILES SHALL BE WITHIN THE LIMITS OF DISTURBANCE. 4. CONTRACTOR SHALL OBTAIN AND PAY FOR EROSION CONTROL PERMITS FOR OFF -SITE STORAGE YARD, BORROW AREA, AND DISPOSAL AREAS AS REQUIRED. 5. PROVIDE DEWATERING FAG (SILT BAG) WITH FLOATING INTAKE OR OTHER APPROVED DEVICE FOR DEWATERING TRENCH EXCAVATION AS NEEDED 6. ALL STOCKPILES SHALL HAVE A MAXIMUM SIDE SLOPE OF 2:1 AND SHALL NOT EXCEED A MAXIMUM HEIGHT OF 10 FEET. STOCKPILES MUST BE LOCATED A MINIMUM OF 50 FEET FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVE IS AVAIL.A3LE. PROVIDE SILT FENCE WITH OUTLET AROUND STOCK PILE AREA. 7. ALL DISTURBED SURFAC-S MUST RECEIVE TEMPORARY STABILIZATION AT THE END OF EACH WORK DAY. SOIL SUPPLEMENTS, SEED AND MULCH, IF APPLICABLE, SHOULD BE APPLIED WITHIN SEVEN DAYS AFTER THE PIPELINE/UTILITY IS CONSTRUCTED. 8. SPOIL OR DEBRIS SHALL NOT BE PLACED WITHIN 50 FEET OF STORM DRAINS OR STREAMS. 9. CONTRACTOR SHALL CONDUCT SELF -INSPECTION OF THE EROSION AND SEDIMENTATION CONTROL MEASURES AND COMPLETE THE COMBINED SELF -INSPECTION FORM. 10. CONSTRUCTION TIME THROUGH WETLANDS/BUFFERS SHALL BE MINIMIZED. 11. IF WORK IN STREAM AND BUFFER AREAS STOPS, CONTRACTOR MUST APPLY SEED AND/OR MATTING TO ALL DISTURBED AREAS AND ENSURE ADEQUATE STABILIZATION. 12. ALL DISTURBED DITCH LINES SHALL BE RESHAPED, RESEEDED, MULCHED AND TACK COAT APPLIED, TO PRE -CONSTRUCTION GRADE AND SHAPE UNLESS SHOWN OTHERWISE. 13. CONTRACTOR TO CHECK ALL AREAS WEEKLY TO ENSURE A GOOD STAND OF GRASS IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND/OR RESEEDED AS NEEDED. 14. INSTALL SILT FENCE OVER & AROUND TOP OF EXISTING PIPES AND INLETS AT DISTURBED AREAS, 15. INSTALL SILT FENCE AROUND SPOIL PILES AND ALONG TRENCHES TO MINIMIZE SEDIMENT FROM ENTERING ROADSIDE DITCHES AND EXISTING DRAINAGE OUTLETS. 16. PROVIDE EROSION CONTROL MEASURES AROUND STOCK / WASTE PILES AND STAGING AREAS AS NEEDED OR AS DIRECTED BY ENGINEER. 17. PROTECT STORM PIPE IN LETS FROM SEDIMENT RUNOFF FROM LAND DISTURBING ACTIVITIES WITH SILT FENCE, STONE CHECK DAM, OR ARC FILTER AS APPROPRIATE FOR SITE CONDITIONS. 18. REPLACE DISTURBED STORM PIPE OUTLET PROTECTION WITH EQUAL OR GREATER AMOUNT OF RIP -RAP WITHIN 5 DAYS OF DISTURBANCE. 19. WHERE AREA AROUND CUTLET IS DISTURBED AND NO OUTLET PROTECTION EXISTS, CLASS "1" RIP -RAP SHALL BE PLACED AROUND PIPE OUTLET AS DIRECTED BY ENGINEER. 20. PROVIDE EROSION CONTROL MATTING PER SPECIFICATIONS IN DITCHES AND SWALES WHERE DISTURBED AND/OR AS DIRECTED BY ENGINEER, UNLESS NOTED OTHERWISE. 21. CONTRACTOR SHALL REBUILD ALL DITCHES AND BANKS DISTURBED DURING CONSTRUCTION. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT (MATTING) ON ALL REBUILT DITCHES AND BANKS TO PREVENT EROSION UNTIL PERMANENT GROUND COVER IS ESTABLISHED, SEE DETAIL SHEET. 16. INSTALLATION OF THE UTILITY WILL BE BY OPEN CUT UNLESS OTHERWISE NOTED ON PLANS. EROSION CONTROL CONSTRUCTION SEQUENCE: 17. AT ALL LOCATIONS WHERE THE PROPOSED FORCE MAIN CROSSES UNDER AN EXISTING WATER MAIN, CONTRACTOR SHALL CENTER FORCE MAIN PIPE SEGMENT OVER THE WATER PIPE SO THAT BOTH JOINTS WILL BE AS FAR FROM THE WATER AS POSSIBLE AND MAINTAIN A MINIMUM VERTICAL SEPARATION OF 18" 1. SUBMIT E-NOI FORM AND OBTAIN AND POST A COPY OF PROJECT SPECIFIC CERTIFICATE OF COVERAGE. CERTIFICATE OF FROM OUTSIDE THE PROPOSED SEWER MAIN TO THE OUTSIDE OF THE EXISTING WATER MAIN. COVERAGE MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES OCCUR. 2. CALL NCDEMLR WILMINGTON OFFICE AT (910) 796-7215 AT LEAST 48 HOURS PRIOR TO START OF PROJECT, INCLUDING 18. MINIMUM VERTICAL SEPARATION BETWEEN NATURAL GAS MAINS, GAS SERVICE LINES, AND WATER MAINS SHALL BE 2 -0" . CONTRACTOR SHALL EXPOSE ALL INSTALLATION OF EROS30N CONTROL MEASURES, TO SCHEDULE A PRE -CONSTRUCTION CONFERENCE. NATURAL GAS MAINS AND GAS SERVICE LINES TO A DEPTH OF 2'-0" BELOW EXISTING GAS LINES PRIOR TO INSTALLATION OF NEW FORCE MAIN. 4. NOTIFY ENGINEER AND OWNER FOR SITE INSPECTION AND APPROVAL PRIOR TO COMMENCING MAIN CONSTRUCTION 19. CONTRACTOR TO NOTIFY APPROPRIATE GAS COMPANY AT LEAST 48 HOURS TO BEGINNING WORK IN THE VICINITY OF EXISTING GAS MAINS TO COORDINATE OPERATIONS. BEGIN CONSTRUCTION OPERATIONS ONCE EROSION CONTROL DEVICES HAVE BEEN INSTALLED AND APPROVED. INSPECTION. 5. CLEAR SITE ONLY AS NECESSARY TO INSTALL EROSION CONTROL DEVICES AS INDICATED ON THE DRAWINGS. INSTALL TEMPORARY EROSION CONTROL DEVICES AS SHOWN ON DRAWINGS: 20. WHEN THE PROPOSED FORCE MAIN ALIGNMENT REQUIRES THE FORCE MAIN BE INSTALLED IN THE BOTTOM OR SLOPES OF AN EXISTING DITCH, THE MAIN SHALL BE INSTALLED WITH A MINIMUM OF T-0" OF COVER IN ALL DIRECTIONS. THE NATURAL GROUND PROFILE SHOWN IN THE PLANS DOES NOT 5.a. INSTALL TEMPORAF'.Y GRAVEL CONSTRUCTION ENTRANCE/EXIT AS SHOWN ON PLANS. NECESSARILY REFLECT ALL DITCHES OR DEPRESSIONS. VALVES SHALL NOT BE PLACED IN DITCH LINE OR FRONT SLOPE. 5.b. INSTALL SILT FENCE OVER AND AROUND TOP OF EXISTING PIPES AND INLETS AT DISTURBED AREAS. INSTALL SILT FENCE OUTLETS AS SHOW ON THE PLANS AND ANY OTHER LOW LYING AREAS WHERE WATER WOULD POOL BEHIND THE FENCE. 21. REQUIREMENTS SET FORTH IN NCDOT ENCROACHMENT AGREEMENTS MUST BE MET AND SUPERSEDE ALL OTHER REQUIREMENTS. 5.c. INSTALL SILT FENC AROUND SPOIL PILES AND ALONG TRENCHES TO MINIMIZE SEDIMENT FROM ENTERING ROADSIDE 22. INSTALL ABOVE -GROUND UTILITY MARKERS AT HORIZONTAL BENDS, MAIN -LINE VALVE BOXES, EACH SIDE OF A ROADWAY CROSSING, AND ALONG THE PIPING DITCHES AND EXIS-ING DRAINAGE OUTLETS. ALIGNMENT. THE MAXIMUM SPACING FOR THE ABOVE -GROUND UTILITY MARKERS SHALL BE 500 LINEAR FEET. IN LOCATIONS WHERE THERE ARE MULTIPLE 5.d. PROVIDE EROSION CONTROL MEASURES AROUND STOCK/WASTE PILES AND STAGING AREAS AS NEEDED OR AS DIRECTED BY HORIZONTAL BENDS IN CLOSE PROXIMITY, ONE MARKER WILL BE SUFFICIENT TO DEMONSTRATE THE CHANGE IN DIRECTION. UTILITY MARKERS DESIGNED TO ENGINEER. PROVIDE ACCESS TO TRACER WIRE SHALL BE INSTALLED AT EVERY THIRD MARKER, OR EVERY 1000 FEET OF PIPE, WHICHEVER IS LESS. TRACER WIRE 5.e. PROTECT STORM PIPE INLETS FROM SEDIMENT RUNOFF FROM LAND DISTURBING ACTIVITIES WITH SILT FENCE, STONE CHECK DAM, OR INLET PIPE PROTECTION AS APPROPRIATE FOR SITE CONDITIONS. ACCESSIBLE ABOVE GROUND UTILITY MARKERS SHALL ALSO BE INSTALLED AT ENDS OF DIRECTIONAL BORES. 5.f. REPLACE DISTURBED STORM PIPE OUTLET PROTECTION WITH EQUAL OR GREATER AMOUNT OF RIPRAP WITHIN 5 DAYS OF 23. PROVIDE LOCATOR TAPE FOR ALL NEW FORCE MAINS. TAPE SHALL BE BRIGHTLY COLORED GREEN AND CONTINUOUSLY PRINTED WITH "SEWER FORCE MAIN" DISTURBANCE. IN LARGE LETTERS, MINIMUM OF 6-INCH WIDE BY 4 MILS THICK, WITH MAGNETIC CONDUCTOR MANUFACTURED FOR DIRECT BURIAL SERVICE. TAPE SHALL BE 5.g. WHERE AREA AROUND OUTLET IS DISTURBED AND NO OUTLET PROTECTION EXISTS, CLASS "1" RIPRAP SHALL BE PLACED BURIED CONTINUOUSLY DIRECTLY ABOVE THE FORCE MAIN BETWEEN 18-INCHES TO 24-INCHES FROM THE SURFACE GRADE. AROUND PIPE OUTLET AS DIRECTED BY ENGINEER. 24. PROVIDE TRACER WIRE FOR ALL NEW PLASTIC FORCE MAINS. WIRE SHALL BE TEN (10) GAUGE INSULATED WIRE COATED IN GREEN INSULATION. THE WIRE 5.h. PROVIDE EROSION CONTROL MATTING IN DITCHES AND SWALES WHERE DISTURBED AND/OR AS DIRECTED BY ENGINEER. SHALL BE CONTINUOUS AND UNINTERRUPTED AND BROUGHT TO SURFACE PER SPECIFICATIONS. 5J. CONTRACTOR SHALL REBUILD ALL DITCHES AND BANKS DISTURBED DURING CONSTRUCTION TO PRE -CONSTRUCTION CONDITION. CONTRACTOR SHALL INSTALL ROLLED EROSION CONTROL PRODUCT (MATTING) ON ALL REBUILT DITCHES AND 25. PRIOR TO START OF CONSTRUCTION: BANKS TO PREVENT EROSION UNTIL PERMANENT GROUND COVER IS ESTABLISHED. A. MATERIALS WILL BE CHECKED AT THE SITE OF CONSTRUCTION TO VERIFY CONFORMANCE WITH APPROVED MATERIALS. ANY MATERIALS, NOT IN 5.j. CONTRACTOR SHALL NOT CUT TREES AND VEGETATION BEYOND THE LIMITS OF OF DISTURBANCE. CONTRACTOR SHALL ACCORDANCE WITH ONWASA STANDARDS OR APPROVED BY THE ENGINEER AND ONWASA, AT THE JOB SITE WILL NOT BE ASSUMED FOR USE. REMOVE AND PROPERLY DISPOSE OF ALL VEGETATION, ROOTS, STUMPS, LIMBS, AND TIMBER REMAINING ON THE PROJECT SITE. CONTRACTOR WILL BE DIRECTED TO REMOVE THESE MATERIALS FROM THE AREA BEFORE WORK CAN PROCEED. CONTRACTOR MAY BE DIRECTED TO EXPOSE ANY WORK SUSPECTED OF CONTAINING INFERIOR MATERIALS. FAILURE, BY THE INSPECTOR, TO NOTICE FAULTY MATERIALS OR WORK DOES 6. MAINTAIN EROSION CONTROL DEVICES AS NECESSARY DURING CONSTRUCTION; INSPECT DEVICES AFTER EVERY RAINFALL EVENT AND CLEANOUT TRAPS M1D/OR CHECK DAMS WHEN HALF FULL. NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY TO PROVIDE A COMPLETED FINAL PRODUCT THAT MEETS THE REQUIREMENTS OF THE 7. AS CONSTRUCTION PROk3RESSES INSTALL ADDITIONAL EROSION CONTROL DEVICES AS INDICATED ON THE DRAWINGS, CALLED PLANS AND SPECIFICATIONS. ANY INFERIOR MATERIALS DISCOVERED WILL BE REPLACED WITHOUT CHARGE FOR REWORK TO THE OWNER. FOR IN SPECIFICATIONS, AS NEEDED, OR AS DIRECTED BY ENGINEER. AT THE END OF EACH WORKDAY, A CHECK DAM SHALL BE 26. SURVEYS, LINES AND GRADES: PLACED IMMEDIATELY DOWNSTREAM OF RECENTLY DISTURBED AREA. 8. SEED AND MULCH DENUDED AREAS WITHIN SEVEN (7) CALENDAR DAYS: A. THE CONTRACTOR SHALL ESTABLISH A PROJECT SURVEY CONTROL NETWORK, WITH BOTH HORIZONTAL (NAD 83 DATUM OR LATEST CORRECTION) AND VERTICAL (NAVD 88 DATUM OR LATEST CORRECTION) CONTROLS, AND DEVELOP AND MAKE ANY DETAILED SURVEYS HE DEEMS NECESSARY TO A. UPON COMPLETION OF ANY PHASE OF CONSTRUCTION. CONSTRUCT THE PROJECT IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS. THE CONTRACTOR SHALL CAREFULLY PRESERVE ALL REFERENCE B. WHEN WORK WILL NOT PROCEED IN AN AREA WITHIN THE ABOVE TIME FRAME. POINTS OR EXISTING SURVEY MARKERS AND IN THE CASE OF WILLFUL OR CARELESS DESTRUCTION THEREOF, THE CONTRACTOR SHALL BE CHARGED 9. AFTER SITE IS STABILIZED, REQUEST AN INSPECTION BY THE ENGINEER. UPON APPROVAL OF SITE STABILIZATION, REMOVE WITH THE RESULTING EXPENSE, AND SHALL BE RESPONSIBLE FOR ANY MISTAKES THAT MAY BE CAUSED BY THEIR UNNECESSARY LOSS OR TEMPORARY EROSION CONTROL DEVICES, DRESS OUT AREA AND SEED AND MULCH. PERMANENT EROSION CONTROL DEVICES SHALL BE INSTALLED AN D APPROVED BY ENGINEER. DISTURBANCE. 27. TRAFFIC FLOW AND SAFETY: A. THE CONTRACTOR SHALL MAINTAIN TRAFFIC FLOW AND CONTROL AT ALL TIMES. CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS, SUGGESTIONS AND/OR DIRECTIONS OF THE LOCAL POLICE DEPARTMENT, NORTH CAROLINA DEPARTMENT OF TRANSPORTATION, AND MAINTAIN OSHA COMPLIANCE CONCERNING TRAFFIC CONTROL AND SAFETY. ALL NECESSARY PRECAUTIONS SHALL BE TAKEN TO AFFECT THE FULL SAFETY OF THE PUBLIC AS WELL AS THE WORKMEN ON THE JOB. IN ANY SECTION OF THE WORK FOR WHICH ONWASA MUST OBTAIN AN ENCROACHMENT FROM THE N.C. DEPARTMENT OF TRANSPORTATION FOR CUTTING A PAVED STREET, OR WORKING IN THE DOT RIGHT-OF-WAY, THE CONTRACTOR SHALL FOLLOW THE REQUIREMENTS AS SET OUT IN THE APPROVED DOT ENCROACHMENT AGREEMENT. THE APPROVED TRAFFIC CONTROL PLAN SHALL SET FORTH THE METHOD AND MANNER BY WHICH THE CONTRACTOR SHALL PROVIDE FOR THE CONVENIENCE AND SAFETY OF THE TRAVELING PUBLIC. HOWEVER, IF DURING CONSTRUCTION, IT IS DETERMINED BY ONWASA, POLICE DEPARTMENT, DOT OR THE CONTRACTOR THAT ADDITIONAL MEASURE IS NEEDED; THE CONTRACTOR SHALL IMPLEMENT WHATEVER MEASURES ARE REQUIRED FOR THE SAFETY OF THE PUBLIC. B. ALL ENCROACHMENT BONDS REQUIRED BY THE DEPARTMENT OF TRANSPORTATION WILL BE SECURED BY THE CONTRACTOR AT HIS OWN EXPENSE. C. NO EXTRA PAYMENT WILL BE ALLOWED FOR SECURING THE REQUIRED BOND OR FOR THE IMPLEMENTATION OF A TRAFFIC CONTROL PLAN. THE COSTS OF THE BOND AND IMPLEMENTATION OF TRAFFIC CONTROL MEASURES SHALL BE INCLUDED IN THE BID PRICE FOR EACH ITEM IN THE PROPOSAL. FINAL DRAWING FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION 00 (V CD I d U O Z f- w_ 0 Z O Q V) z � J Z O w Q � U Lu O � z � � w N U � Q N Q Z U O N w Q Gn Z Q ~ �S I Lu r Q w U H _ Z >O w z F- O Q U W 'S = H O O Z N O 0 200 E N OU z c i>' a Ln Y E U 009 aU- • a, z � -0 a)E -6 = = z `- ce) y 0 co c a) L a) _j N J -a N O m co CDco M U c/) Lu O z J DC L1J z Lu V CAR Nql 9 SEAL �o�'���� ES W . /0/111111111�x 28-Aare-24- DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NO.: DATE: SCALE: CWD EBM KTP 2896-AM FEBRUARY 2023 AS NOTED 0 112 1 IF THIS BAR DOES NOT MEASURE 1"THEN DRAWING IS NOT TO FULL SCALE C-0.02 ABBREVIATIONS: A AREA ABND ABANDONED ABC AGGREGATE BASE COURSE AFF ABOVE FINISHED FLOOR APPRX APPROXIMATE ASPH ASPHALT ASSY ASSEMBLY AVG AVERAGE ARV AIR RELEASE VALVE AZ AZIMUTH AMERICAN WATER WORKS AWWA ASSOCIATION B-B BACK OF CURB TO BACK OF CURB BLDG BUILDING BM BENCHMARK BO BLOW -OFF BOA BLOW -OFF ASSEMBLY BOT BOTTOM BW BARBED WIRE C&G CURB AND GUTTER CB CATCH BASIN C CENTERLINE CIP CAST IRON PIPE CI CURB INLET CLR CLEARANCE CM CONCRETE MONUMENT CHIP CORRUGATED METAL PIPE CMU CONCRETE MASONRY UNIT CO CLEAN OUT COMM COMMUNICATIONS CONC CONCRETE CONT CONTINUOUS CSTR CONSTRUCTION CONTR CONTRACTOR COR CORNER CPED CABLE TV PEDESTAL CLVT CULVERT D DEPTH DI DROP INLET DIA DIAMETER DIP DUCTILE IRON PIPE DIM DIMENSION DITCH DISCHARGE DIST DISTANCE DNF DID NOT FIND DOT DEPARTMENT OF TRANSPORTATION DW DOMESTIC WATER DELTA E EAST EDGE OF PAVEMENT TO EDGE OF E-E PAVEMENT EACH EACH EFF EFFLUENT EIP EXISTING IRON PIPE EL ELEVATION ELEC ELECTRIC EPED ELECTRIC PEDESTAL EP EDGE OF PAVEMENT EW EACH WAY EWTR EDGE OF WATER Ex EXISTING EXPJT EXPANSION JOINT FDC FIRE DEPARTMENT CONNECTION FFE FINISHED FLOOR ELEVATION FG FINISHED GRADE FH FIRE HYDRANT FHA FIRE HYDRANT ASSEMBLY FHL FIRE HYDRANT LEG FHV FIRE HYDRANT VALVE FIN FINISH FLG FLAG FLNG FLANGE FM FORCE MAIN FOHH FIBER OPTIC HAND HOLE FOM FIBER OPTIC MARKER FOPD FIBER OPTIC PEDESTAL FP FIRE PROCECTION FPS FEET PER SECOND FT FEET FTG FOOTING G GAS GA GAUGE GALV GALVANIZED GM GAS METER GPM GALLONS PER MINUTE GR GRADE GTV GATE VALVE GV GAS VALVE GYP GYPSUM HCP HANDICAPPED HH HAND HOLE HORZ HORIZONTAL HP HORSE POWER HWA HIGH WATER ALARM HWL HIGH WATER LEVEL ID INSIDE DIAMETER IN INCH IN/HR INCHES PER HOUR INF INFLUENT INT INTERSECTION INV INVERT IPS IRON PIPE SET ISL ISLAND JB JUNCTION BOX KWY KEYWAY L LENGTH LF LINEAR FEET LP LIGHT POLE LT LEFT LWL LOW WATER LEVEL MAX MAXIMUM MATL MATERIAL MECH MECHANICAL MFR MANUFACTURER MH MANHOLE MIN MINMLJM MJ MECHANICAL JOINT MON MONUMENT N NORTH NAD 83 NORTH AMERICAN DATUM 83 NCWN NORMAL CROWN NC GRID NORTH CAROLINA GRID NCGS NORTH CAROLINA GEODETIC SURVEY No. NUMBER NOM NOMINAL NTS NOT TO SCALE NWL NORMAL WATER LEVEL N/A NOT AVAILABLE N/R NOT REQUIRED OC ON CENTER OD OUTSIDE DIAMETER OH OVERHEAD ORIG ORIGINAL P PROPERTY LINE PC POINT OF CURVATURE PE PLAIN END PED PEDESTAL PI POINT OF INTERSECTION PFV POST INDICATOR VALVE POB POINT OF BEGINNING POC POINT OF CONNECTION POE POINT OF ENDING PRV PRESSURE REDUCING VALVE PSI POUNDS PER SQUARE INCH PT POINT OR POINT OF TANGENCY PUE PERMANENT UTILITY EASEMENT PVC POLYVINYL CHLORIDE PVMT PAVEMENT R RADIUS RCP REINFORCED CONCRETE PIPE REF REFERENCE REQ'D REQUIRED REINF REINFORCED RET RETAINING REV REVISED RPM REVOLUTIONS PER MINUTE RPZ REDUCED PRESSURE ZONE RT RIGHT R/W RIGHT-OF-WAY S SOUTH SCH SCHEDULE SDMH STORM DRAINAGE MANHOLE SF SILT FENCE SHT SHEET SGNL SIGNAL POLE SPECS SPECIFICATIONS SQ SQUARE SS SANITARY SEWER SSMH SANITARY SEWER MANHOLE SSTL STAINLESS STEEL ST STREE STA. STATION STD STANDARD SYM SYMBOL S/W SIDEWALK T TANGENT TBM TEMPORARY BENCHMARK TCE TEMPORARY CONSTRUCTION EASEMENT TCP TERRA COTTA PIPE TDD TEMPORARY DIVERSION DITCH TEMP TEMPORARY THH TELEPHONE HAND HOLE THK THICK TOC TOP OF CURB TOP TOP OF SLOPE TOW TOP OF WALL TPED TELEPHONE PEDESTAL TPHN TELEPHONE TRANS TRANSFORMER TRFCBX TRAFFIC SIGNAL CONTROL BOX TRFCPL TRAFFIC SIGNAL POLE TYP TYPICAL UMKR UTILITY MARKER UP UTILITY POLE U/G UNDERGROUND VC VERTICAL CURVE VCP VITRIFIED CLAY PIPE VERT VERTICAL VOL VOLUME VPC VERTICAL POINT OF CURVATURE VPI VERTICAL POINT OF INTERSECTION VPT VERTICAL POINT OF TANGENCY WL WATER LINE WM WATER METER WT WEIGHT WV WATER VALVE WTP WATER TREATMENT PLANT WWF WELDED WIRE FABRIC WWTP WASTE WATER TREATMENT PLANT W/ WITH YH YARD HYDRANT YI YARD INLET Font style Indicates Existing Features SURVEY CODE Existing BENCHMARK BM e CONCRETE MONUMENT FOUND CMF CONCRETE MONUMENT SET CMS CONTROL POINT CP A GEOTECHNICAL BORE BORE IRON PIPE FOUND IPF Q IRON PIPE SET IPS Q IRON ROD FOUND IRF IRON ROD SET IRS Q MAG NAIL FOUND MNF tt�3j MAG NAIL SET MNS MILE MARKER (HWY) MM MILE MARKER (RR) MM NAIL FOUND NLF NAIL SET NLS PK NAIL FOUND PKF PK NAIL SET PKS PROPERTY LINE — — — — TEMPORARY BENCHMARK TBM WETLAND FLAG WLF EASEMENTS Existing ACCESS EASEMENT AE AE DRAINAGE EASEMENT SDE 5DE PUBLIC UTILITY EASEMENT UE/PUE uE RIGHT-OF-WAY RW - - SEWER EASEMENT SSE SSE TEMPORARY CONSTRUCTION TCE EASEMENT WATER EASEMENT WLE ME EROSION CONTROL CODE Existing CHECK DAM RCHK INLET PROTECTION RIP -RAP RPRP LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE @ ACCESS EASEMENT LIMITS OF DISTURBANCE @ EDGE OF PAVEMENT LOD/EP — LIMITS OF DISTURBANCE @ RIGHT-OF-WAY LOD/RW — LIMITS OF DISTURBANCE @ LOD/LIE — UTILITY EASEMENT LIMITS OF DISTURBANCE @ TEMPORARY CONSTRUCTION EASEMENT LIMITS OF DISTURBANCE @ TEMPORARY CONSTRUCTION ACCESS RIPARIAN BUFFER - ZONE I RBZ I RAZi — RIPARIAN BUFFER - ZONE 2 RBZ2 RBZ2 - SILT FENCE SF SF - SILT FENCE OUTLET SFOLT SILT FENCE / TREE PROTECTION SF/TPF FENCE SUPER SILT FENCE SSF TREE PROTECTION FENCE TPF WATTLE WTTL WATTLE BARRIER WB Know what's below. Call before you dig. NORTH CAROLINA ONE -CALL CENTER INC. DIAL 811 or 1-800-632-4949 3 BUSINESS DAYS BEFORE DIGGING www.ncocc.org LEGEND ROADWAY PROPOSED CODE Existing •' e ' emcp AE PDE PUE RW SSE TCE WLE PROPOSED 0 LOD — LOD/PAE — LOD/RW LOD/PUE LOD/TCE LOD/TCA -SF - SF/TPF -SSF- - TPF - WB ASPHALT DRIVEWAY ASPHALT OVERLAY BRICK DRIVEWAY BRICK SIDEWALK / WALKWAY BRIDGE BRDG CONCRETE DRIVEWAY CONCRETE DRIVEWAY (STAMPED) CONCRETE SIDEWALK / WALKWAY SWLK BACK OF CURB BC FACE OF CURB FC EDGE OF PAVEMENT EP FLOWLINE FLOW GUARDRAIL GDRL GRAVEL DRIVEWAY / PATH SOIL DRIVEWAY / PATH SITE CODE Existing AREA LIGHT / LIGHT POLE LP :C; BOLLARD BOL o BUFFER CURB FLOW LINE FONT STYLE INDICATES DESIGN FEATURES UTILITIES PROPOSED CODE Existing CABLE TV CABLE CTV cTv — CABLE TV HAND HOLE CHH PO CABLE TV PEDESTAL CPED UNDERGROUND ELECTRICAL UGE uGE— CABLE OVERHEAD ELECTRICAL WIRE ORE OHE— ELECTRICAL HAND HOLE EHH ELECTRICAL MANHOLE EMH ELECTRICAL METER EM ELECTRICAL PEDESTAL EPED E FIBER OPTIC CABLE FOC —FOC— FIBER OPTIC HAND HOLE FOHH 0 GAS LINE GL —G— GAS METER GM FG GAS VALVE GV GUY / ANCHOR WIRE GUY j LIGHT POLE / AREA LIGHT LP POWER POLE PP STEAM MANHOLE STM 4 PROPOSED TELECOMMUNICATIONS CABLE COM com— TELECOMMUNICATIONS MANHOLE TMH O TELEPHONE CABLE COM com— TELEPHONE HAND HOLE THH TELEPHONE PEDESTAL TPED �T FENCE INC — x x — — x x — TRAFFIC SIGNAL BOX TFCB FIRE HOSE HOSE HOSE TRAFFIC SIGNAL POLE TFCP b FIRE WATER LINE FWL FWL FWL TRANSFORMER TRNS HT SIGN SN "- UTILITY MARKER / WARNING WIT POST UTILITY POLE UP STORM DRAINAGE VEGETATION CODE Existing PROPOSED CATCH BASIN /COMBINATION CB Illu ® CODE Existing INLET CURB INLET CI ❑ CONIFEROUS TREE CTREE DROP INLET DI IIII ® DECIDUOUS TREE DTREE FLARED END SECTION FES ==IC HEDGE / SHRUB ROW HED JUNCTION BOX JB LANDSCAPING LSCP -�--- DRAINAGE MANHOLE SDMH STORM DRAINAGE PIPE C SHRUB SHB STUMP SEWER SHRUB (TO BE REMOVED) CODE Existing PROPOSED TREE (TO BE REMOVED) AIR RELEASE VALVE IN ARVMH / O) TREELINE / WOODS MANHOLE (FORCE MAIN) CLEAN OUT SSCO O O SEWER FORCE MAIN FM FM FM WATER SEWER LINE SS SS Ss CODE Existing SEWER MANHOLE SSMH AIR RELEASE VALVE IN ARVMH SEWER TEST PORT TPRT ® MANHOLE PLUG PLUG L_j BLOW OFF BO _&r BLOW OFF (TEMPORARY) BOA }p-- FIRE HYDRANT FH -6- FIRE HYDRANT VALVE FHV D4 PLUG PLUG MONITORING WELL MW REDUCER / INCREASER RDCR D WATER LINE WL WL WATER METER WM CD WATER VALVE WV m YARD HYDRANT YH 6 PROPOSED cTV UGE OHE FOC G 3 J� COM- O COM- X PROPOSED PROPOSED 7►4fr 0. WL N F� FINAL DRAWING FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION 0 (0-00 E N O0 z CL Ln O *1WU U _ C LL O L z � z E Z3 Z ` co O o') _ c Ln N L? U 'a N m co CD 00 M Z Ln � O z Cg� Q LU U Lj af O O Z a_ z 00 1— N LIJ CD W J 0L Q z U U -0 z O w N Z � I— LU Q N w —, w Q F- oG Q w QQccf a LU Z O U z LU m w U N m Q z I— O to w U O Ln ~ Ln Z O to O \\ \\\\\\1MIIIIJIIII/' /' \\\���,� N C A R pl ,/ EAL DESIGNED BY: CWD DRAWN BY: EBM CHECI(ED BY: KTP PROJECT NO.: 2 896-AM DATE: FEBRUARY 2023 SCALE: AS NOTED 0 112 IF THIS BAR DOES NOT MEASURE 1"THEN DRAWING IS NOT TO FULL SCALE C-0-03 INDEX OF DRAWINGS , 1 1 `1 1 11 1 1 KEY MAP 0 250' 500, 1,000, SCALE: 1 "=1,000' ; 1 1 I 1 1 1 1 1 1 1 1 1 - Sprayfield Storage Pond 1 1 1 l 1 C-2.09 1 1 r� i n 1 1 I I I I \ k / / 1 r r r / Do,ph Everett Rd. (SR 1535) \ 1 / 1 8" FORCE MAIN 1 I) 1 \ C- Ol I C t d(SR 1 gel 181FORCE MAIN H o11y &.,- \ Jr_' c IN It it SUMMERHOUSE r- `,C ` PUMP STATION It ?TrT �Ic<C F °\\ 1 l / t l i` r .� / 1\ \ 1 `\ t /It--LLJ� �. c•r.: ` ia�` \ %�1 -e-\\\\\/y J\"�j 10'.� ,-{� /-', / / ,y I,Y,-- 1 �L.-� Ir � \\\ ---., -ii 1 III \III 1 I -i� \ \ 1 ♦ \ >%-� II I I 41-- �\�1 \ \ \ -'`.�- sue- /�i �, , y,� I I !(%'LLL1_6•�L c' y� <�i C-0.01 COVERSHEET C-0.02 GENERAL NOTES C-0.03 ABBREVIATIONS KEY AND LEGEND C-0.04 SHEET KEY AND INDEX OF DRAWINGS C-1.01 12" FORCE MAIN PUMP STATION AND CROSS COUNTRY STA. 10+00 to 21+80 C-1.02 12" FORCE MAIN CROSS COUNTRY / HOMESTEAD LN. STA. 21+80 to 29+00 C-1.03 12" FORCE MAIN HOMESTEAD LN. / STUMP SOUND CHURCH RD. STA. 29+00 to 38+00 C-1.04 12" FORCE MAIN STUMP SOUND CHURCH RD. / MORRIS LANDING RD. STA. 38+00 to 45+00 C-1.05 12" FORCE MAIN STUMP SOUND CHURCH RD. / MORRIS LANDING RD. STA. 45+00 to 55+00 C-1.06 12" FORCE MAIN MORRIS LANDING RD. STA. 55+00 to 65+00 C-1.07 12" FORCE MAIN MORRIS LANDING RD. STA. 65+00 to 76+00 C-1.08 12" FORCE MAIN MORRIS LANDING RD. STA. 76+00 to 87+00 C-1.09 12" FORCE MAIN MORRIS LANDING RD. / HOLLY RIDGE RD. STA. 87+00 to 97+23 C-2.01 18" FORCE MAIN HOLLY RIDGE RD. STA. 10+00 to 22+00 0 c E N O C-2.02 18" FORCE MAIN HOLLY RIDGE RD. STA. 21+50 to 33+36+/- z c>3 C-2.03 8" FORCE MAIN HOLLY RIDGE RD. STA. 10+00 to 21+50 LO Y o O C-2.04 8" FORCE MAIN HOLLY RIDGE RD. / DOLPH EVERETT RD. STA. 21+50 to 33+50 = F- li C-2.05 8" FORCE MAIN DOLPH EVERETT RD. STA. 33+50 to 45+00 0 Z N E C-2.06 8" FORCE MAIN DOLPH EVERETT RD. STA. 45+00 to 56+50 -a = :3 Z C-2.07 8" FORCE MAIN DOLPH EVERETT RD. STA. 56+50 to 66+00 o M c c LO a) C-2.08 8" FORCE MAIN DOLPH EVERETT RD. STA. 66+00 to 75+00 -1 cal 1D C-2.09 8" FORCE MAIN DOLPH EVERETT RD. STA. 75+00 to 80+20+/- t 0 m N O00- ao m EC-001 HOLLY RIDGE PUMP STATION EROSION CONTROL SITE PLAN 00 EC-002 SUMMERHOUSE PUMP STATION EROSION CONTROL SITE PLAN C-4.10 HOLLY RIDGE PUMP STATION OVERALL SITE PLAN Z H C-4.11 HOLLY RIDGE PUMP STATION SITE PLAN ILU U w C-4.20 SUMMERHOUSE PUMP STATION OVERALL SITE PLAN C-4.21 SUMMERHOUSE PUMP STATION SITE PLAN O W V Z C-4.22 SUMMERHOUSE PUMP STATION EFFLUENT FORCE MAIN PROFILE z C-4.23 SUMMERHOUSE PUMP STATION CONNECTIONS TO EXISTING PIPING N Q u QC d N r) PS-1.0 HOLLY RIDGE PUMP STATION TOP PLAN u Q Z O L.L PS-1.1 HOLLY RIDGE PUMP STATION SECTIONS AND DETAIL O W cNn Z PS-1.2 HOLLY RIDGE PUMP STATION SECTIONS Q N W PS-1.3 HOLLY RIDGE PUMP STATION METER VAULT � w < z PS-2.0 SUMMERHOUSE PUMP STATION BOTTOM PLAN Q I r) a 3:^ z PS-2.1 SUMMERHOUSE PUMP STATION TOP PLAN Q w F- Q PS-2.2 SUMMERHOUSE PUMP STATION SECTION < Q < }- w W PS-2.3 SUMMERHOUSE PUMP STATION SECTION z Uz � O O PS-2.4 SUMMERHOUSE PUMP STATION SECTION W w In W PS-2.5 SUMMERHOUSE PUMP STATION METER VAULT = PS-2.6 EXISTING RECLAIMED WATER PUMP STATION PLAN AND SECTION O Q U = PS-2.7 NEW FLOW CONTROL VAULT AND VALVE VAULT PLANS AND SECTIONS 0 I- O un O Z N O SD-1 STANDARD DETAILS SD-2 STANDARD DETAILS \N ICIAIR/ SD-3 STANDARD DETAILS SD-4 STANDARD DETAILS Q = EAL SD-5 STANDARD DETAILS = _ SD-6 STANDARD DETAILS ',may GINEE� sy�pp �P \\�,• ES W • \\°` '''rrr//llllllllll\\\�` E-0.01 ELECTRICAL LEGEND E-1.01 ELECTRICAL PUMP STATION PLAN HOLLY RIDGE E-1.02 ELECTRICAL DISTRIBUTION SYSTEM DIAGRAM HOLLY RIDGE E-2.01 ELECTRICAL PUMP STATION PLAN SUMMERHOUSE E-2.02 ELECTRICAL DISTRIBUTION SYSTEM DIAGRAM SUMMERHOUSE E-3.01 ELECTRICAL DETAILS E-3.02 ELECTRICAL DETAILS E-4.01 CONTROL SCHEMATIC DESIGNED BY: S100 HOLLY RIDGE PUMP STATION FOUNDATION PLAN AND TOP PLAN CWD S101 HOLLY RIDGE PUMP STATION SECTIONS AND DETAILS DRAWN BY: EBM S200 SUMMERHOUSE PUMP STATION FOUNDATION PLAN CHECKED BY: S201 SUMMERHOUSE PUMP STATION TOP PLAN KTP S202 SUMMERHOUSE PUMP STATION SECTIONS AND DETAILS PROJECT NO.: 2896-AM S203 SUMMERHOUSE PUMP STATION SECTIONS AND DETAILS DATE: STRUCTURAL STANDARD SECTIONS, GENERAL FEBRUARY 2023 S300 NOTES AND APPENDIX B SCALE: AS NOTED 0 112 1 IF THIS BAR DOES NOT MEASURE 1"THEN DRAWING IS FINAL DRAWING NOT TO FULL SCALE FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION C-0.04 ti O N Q Property of FOSTER DAMES DANIEL PIN.•425700059550 DB: 3416 / PC:75 (358HOLLYRIDGERD) 14 fi `oHE / / I Wooden Post 4'5,4" C u 1 t ; v 0 0 I Wooden Post aced Fie 1 d AYI Inv.: 23.59 0 _ 15" CPP �� _ Inv.:23.95 151,CPPoft O �� 11'ater _ line X �2 41 OXE 11011 3' Ridge R -__ -�w�,. - ----_- 24— ----- = 25 71� 211( d. 4) Tom_ — — — — — — — — — — — — — — — — — — —26 CONNECT 8" FORCE MAIN AT PUMP STATION, SEE / ry�i ' X-- z v -26` e 12+ - _ �.��_ -2718" FORCE MAIN -, M SHEET C-4.20 / �' ,z9 44 _ --- - - N 10p'�=� - - (SEE SHEET C-2.01) ' g I -rz �• ' / l �� / / 1 pQ� 55c4'Fiber0piicBox \ 'I / -,2v --27-- rvj WltPost - FOC C. LOD/-CE 14+06o =_ nil 36 32 w 24 20 16 �AI X Property of ONSLOWWATER &SEWERAUTHORITY PIN.•429700049898 7 (RWINGROSELN) I I I i ff�) 0 20' 40' 80' I I I I SCALE: 1 "=40' Property of CANADY5AAMA E PIN 425700156965 DB.-2002/ PG- (null) (HOLLYRIDGERD) OI3E OYIE Properly of Summerhouse on Everett Bay PIN:425700334529 DB:3473/ PC:629 (291 Spicer Lake Dr) OBE „26. 00 ted / Cv lu' Inv.: 21.11 15"RCP!' -• -"`mac~ �-� � Woods �. - 22.50 BEND I 22 0 C OE / 11 0 W� -8 - 5 BEND tt � 7171 TYP. PAVEMENT CUT AND PATCH Q' (SEE DETAIL 3, SHEET SD-1)7-6 b ogle V�A 1. MEASUREMENTS HAVE BEEN LOCALIZED AT NC STATE PLANE NAD 83 (2011) COORDINATES NORTH 355,000 SFT AND EAST 2,522,000 SIFT AND NAVD 88 ELEVATION 35 SFT YIELDING A COMBINED FACTOR OF 0.9999206724. I I I _ - — - ---- -- - - 2" COMBINATION AIR RELEASE' I C---- ' VALVE IN 5 LD. MANHOLE �v STA. 15+80 +/- — zz w Ln _-_ - - Ex. C'rrade --- 8" - 22.50 BEND HORZ. /VERT. - STA. 16+86 ( " 0 8 22.5 BEND HORZ. / VERT. .; STA. 17+13 +/-- _�_ _ - _ _ -- 5' MIN. --- � ..� �- - - - - I 8" - 900 BEND _._ HORZ. ---- STA. 10+14 + - _ COVER �•- - � 3' MIN — COVER - M �� . -- - - --- ---- - — I„,-� - / / ���� ---_ �- — - - 8" C900 VC FORCE M --._..------ � --- - C9uv PVC FC)RCf —_ o co CD co __ - - — 1 t; - - 68 LF OF 8" C900 PVC W/ JOINT RESTRAINT - FORCE MAIN --- + _+ .. vi i _- 48 LF OF 18" C900 JOINT RESTRAINT FORCE I I + C) — - _ _ U) PVC W/- MAIN I _ -L06 LF OF 8" RJDIP ' — -- - - I -- ( - r m 0-1 32 24 20 Q v, z � O Z LLJ U W 0 O CL 00 >- w N F- N o QNI Cz U Q U 0 O w Ln z ~ Q Z LLJ w < Q Q H Lr Lu I— Q W Z U z O >0 W z H 0 Q U W i, _ I- O O= Z N O M N 0 0 CO U N G Z a tn ECO �0� E z � � Z > U) Q LO c o U 00 J m N � _rn O m z 0 N Q ce LLj QO J N J 0 Oo = O I + Z O Q w ce O LL .., 'C' A'�,llll S/� SEA %, FH INV h. ES„W1�r�P���� 16 DESIGNED BY: CWD DRAWN BY: EBM CHECKED BY: 12 KTP PROJECT NO.: 2896-AM DATE: MARCH 2O24 8 SCALE: HORZ.: 1 "=40' VERT.: 1 "=4' 0 1/2 1 4 IF THIS BAR DOES NOT MEASURE 1"THEN DRAWING IS NOT TO FULL SCALE o C-2.03 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 CANADY erly oDRA E PIN.•425700156965 C u l t i v a t e d F i e l d DB•2002/PG (null) WOLLYRIDGERD) Property of CanadySandraE PIN:429700156965 DB:2002/ PG: (Null) (Hotly Ridge Rd) BORE PIT (APPRX. SIZE, 40'x10', & LOCATION) Cultivated Feld w U, PUE-204 \ T -n Cultivated Field TCE-204 CP722.IRF0.25 o n N:275829.99 3 m E.• 2452658.79 n 3 ?s.� ELEV.:25.71' ' y \ I I InK:21.71 \• z is I I I I r 15"RCP 2S� OHE OHE OHE OHE �" OHE OHE OHE OHE d1 I l OHE OHE ~' OHE OHL OHS OHE —_--__— — — — — — — — —_ _— -- — — — — — — — — — — — — — — — — — — — _----------_—_----------24-----------------------�/" ILL ——------------_—_—__--=-- 24-- _ — — — — — — — -- — — — — — — — -- — _ — — _ ------ ---__ y - - _ - __ -- — — — — — — — . _ 24-----"��''------2 _-----'- '----------��-----------�w----------24 r.�w-------------------------I------ �---- 11'---- ��13y�_-� =_--- YJW---------- ww R/W_ -------_�- - - - - - - -25- -� ----------- ..rr vP-----�--------�L- WL WL -WL WL -- _ - aterline WL - - f" - WL _ Waterline -�,.,- WL - - - - - L I •R/W i - - - - - - _ I — — _ _ _ _ 25 _ _A[ta��.J I ----------- 18" FORCE MAIN O .-25" / __ _ _ _ c� o — -` - Holly Ridge Rd. (SR-1534) -( )- M _ SEE SHEET C-2.02 *�z z' -� � --� - (Asphalt Pavement) - -" -' -- 1 PRO ORCF_ 27- H \ 24 --- ------ P30" STEEL- ._LA.:/iL" �.�l:'Y �,-i�f� — — - _lrG�-:.;.r1f ►J,�l! — — — — U l.4y/ — 0 —... ' � I ►7.�N ►�.Dr— 1C — — — — — — — — '^ _3�y'SI ✓Sc,17: — —24 � — — _. — ..__ — — 25 --- _------------------------------- - - - - _ -- - - 25- - - - - ------------------------ _ -- ENCASEMENTPIPEBY BORE & JACKCoo _ F-�+ �L ,�- FJA4.,. ._.., - - -„_. F 1 fM.�.. - _ , - - �.; - - - -- -' .Er I- - - - - - - - - - -- - - FM FM FM - - - - - - - - -- _ r,a F�'S� - - - - +�M - - _ _ r, i:. - _ I 21-fe.- FM I ' fhl I -----� FR. ,�+ �- - -- g - __ - + M Z: �D 00 `'��� vs(22+00-(-`V foo ce ✓���-23+00 '24��ia�24+00 'M„ X - FM Y �, 25+00 n� 1f'�-- Y � 26+0� . -,� 27+00 R -,�i✓v , - _ - - - . .. Y - s orrre " Y �rry ry Y - Y �ir�_ i 24--i�28+QQE Y "�„�� �� Lod/ram a 29 QQ - - U H L L Y R I D G ROAD 8" FORCE MAIN wood �'15 22.12 � 3o+Q S. R. 1534 I of 6 O n / rA T O 02 Summerhouse on Everett Bay © ° ° Q PUE I` V V I n-n PIN.• 42570034529 ° -n O DB. 3473/ PG- 629 1 I m 1 ^ N O C7 (291 Spicer Lake Dr) ° \\ \ ) NM4wj �" I M PUE-202a i w o wgaw � �8°'� �o�.'`' �v^w TCE-202a �� rp wha�96 ��w aw tiN N Woods C1N"��N^��!4 , w v a °� Q o ~ti p ��M ti� b RECEIVING PIT (APPRX. y 4 � ro qrqy �� � O�"a� W� `v y#� � g0.� ryq� icy oyq� �wq� o�q ,y � �q � o ,�, g � � �w SIZE, 10x10,&LOCATION) 1 , x o ` ��� N ��� h� OOtiy00 c` 4� M 36 32 20 16 12 0 20' 40' 80' SCALE: 1 "=40' MATCH LINE STA. 33+50 SEE SHEET C-2.05 z 11 Illli a I I � I Jilly w I III I I �i I � � III jlj•� I I �I �II III�II III `c+nljI-8" - 450 BEND I>� l�IIII n I W II e-8" y - 45' BEND iy~ Nam• ` I. 8" - 11.250 BEND I h \Off Q I I I CP-720.' NF w PIN. PIN. Pu 1 MI6 N. 275830.91 E. 2452780.34 • r o ELEV.:25.76' M ` ` --Ri QO ++ WL-.R1t� M - _ 8" - 450 BEND D --8" - 450 BEND---_ wL _ 8" - 900 BEND- 1. MEASUREMENTS HAVE BEEN LOCALIZED AT NC STATE PLANE NAD 83 (2011) COORDINATES NORTH 355,000 SFT AND EAST 2,522,000 SFT AND NAVD 88 ELEVATION 35 SFT YIELDING A COMBINED FACTOR OF 0.9999206714. - _ i -- - -- -- I 3 MIN. COVER 'Ex. Grad -- i — I Q 3 q 2 O ° O NO— LU cn ____ N _ a cn _ .n I.r oo a o — "- ` ; PROPOSED 18" SSFM � ,�� a � -j W (MIN. 18" SEPARATION) RECEIVING PIT (APPROX. SIZE m '-' O 8' - 450 BEND 10x10, & LOCATION) HORZ STA. 32+56 +/-- 8" - 900 BEND 8" - 450 BE VD •'-- --�- -- -i 32 HORS, HORZ. t� r._, STA. + + - - STA. 32+71 +/- -- 8" - 22.50 BEND_ 90° BEND ��°� __ ° i � , - _. _. _ HORZ. 8 - 45 BEND tZ. VERT. HORZ. / VERT. STA. 30+03 +%- c� I S I A. 30+31 +/ z I ', 1 STA. 31+26 +/- Ln j I I I I 8" - 11.250 BEND STA. 32+28 +/- 8" - 22.50 BEND - {{ HORZ. / VERT.t �- 8" - 450 BEND - STA. 30+25 +/- / I HORZ. / VERT.- ---- - STA. 31+18 +/- 1 8"- 900 BEND - __ _ � l -.. �.._._ HORZ. /VERT. _ -- — + .�I_ __-- + __+__— + + Ln In � ST . 30+32 +/ � O - M , — --- -- -- M - M Cn Q Q d s _._ _ 100 LF OF 16" C900 PVCin �n 100 LF OF 8" RJDIP W/ JOINT RESTRAINT --�- - 46 LF OF 8" RJDIP _ 81 LF OF 16" STEEL - - - FORCE MAIN -_ ENCASEMENT PIPE (0.312" WALL THICKNESS) W/ 8" RJDIP FORCE MAIN BY DRY BORE & ..ACK s - ____ i 8 C900 PVC FORCE MAIN I - - -- -- - - -- _ - - - - - __ I - - 40 36 32 24 20 16 12 • 6V 0 117, Q r) z O W U w O O 00 >- w f V L L Q V) I d U °- z Q U - O or_ V) z U �z LLJ w Q N Q Q IQ E— Vn � U Ldw � Z U z O >O U z I- o Q u w o :D O z V) O (y) CV co 5= m o N04 > � U z Q 'o 1_ T s o 0 O 6 E z � a) Q C a 00 -j O N CYi 00 O rn z 0 N Q LU 0 Ln O M }- M O J }, 00 Lfl I + Z N � Q w U O U- ..� DESIGNED BY: CWD DRAWN BY: EBM CHECKED BY: UP PROJECT NO.: 2 896-AM DATE: MARCH 2O24 SCALE: HOR;Z.: 1 "=40' VERT.- 1 "=4' 0 ,/2 IF THIS BAR DOES NOT MEASURE 1"THEN DRAWING IS NOT TO FULL SCALE C - 2.0 4 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 0 24 K1] 16 wj 0 U -12 3 t?o 7 7 7 i J 7 Cultivated Field Property )' Canady Sand E PIN.•4257001_ 65 DR, 2002 / PG' Null) (Holly Ridge. Rd) Properl/ of State ofNorth Carolina do Director State Prop Office G PIN.,424904920596 DR:2836 / PC:15 (275 Old Folkstone Rd) — r Brush Inv.:6.17 / 84"CWF7 I - LOD/RL.�ODjRW i \ �- - - - - - - - .,., - - - - - _ _ _ _ "- i /' . ., LODIRW LOD/RW OD/RW �J ` ~ \ ` , I I LOD/RW - tlm _ - "� _ - _ _ L W _ - - M/x — — — — — — — — — — — �- - - - - - - _ - -_ _ _/ - \ LODfRN� ` iOD/RW _ _ LOD/RV^.)/ �I - _ WL — — —-�N7- - -Ty O \ A_ -' _.. _. �JI 79.- - - _ AL- M z Gravel Road \--_— — N Gravel Road --- - - - - - 25 z - / - - Tajo VE'Pe R- I - - 22 �. Dolph E N a-ss� - __--------== _ ------- ------ _ - _�---�a{e_--- - ----- -- ` as ' �,tDao — _ _ — _ — — _ ---------- _ — — _ --_ - l ----- ----- - — r- 2 - 7 _Lf •T -ems - _ - - - - - - - W-- FM �- _3- / f 3 unr, .y�38+0_ 34__-- ._ 3Y+/0_--i4 01/oal 7JJJ10I 3J1/ 10/L / 40+0 DC'-01/Ol :n-000l101 7RL00I aoi3Jl/qODl/OOl 301IO01 Q�QJ c / °' 2" COMBINATION AIR VALVE . . o -n 8" - PLUG f U W 'BEND i� -nj 0 IN 5' I.D. MANHOLE � � VALVE & BOX` o 0 U 70A 3m = rn m Ln D Z J WoodsU+ 3 � > Z < U m M z U O ce, w C) LL O Cultivated Field 00 N Property of Hines Hazel E PIN.-429700269427 PIN., 548 / PC:345 (258HolIVRidge Rd) TCE-205 - 0 _ 20' 40' $0' SCAI P 1 "=40' - CP-23 Woods Rod w/Cap Set N : 276789.99 ---------E: 2452252.39 _- - - - ELEV.: 21.56 0p - LODRI� LOD/RW _ L•9B RLG ✓ I RV (. / \ aOD RW _ LOD/R W \ t OD ' / 19 Gravel Road 25 u$l03! - - \ • �`� ti _ ' I--- _ / / 2 L6B/Ei' -61,-m T —fie ty` Fk / 1�41±00 / 4-./00 43 - 44+00 _-4+, MixH' OHE ORE _ 2 d013:21/ac' I 1� m 3J1/00l wi/001 DJ1/dOl / \ o (� 9 - - - - - - J Inv.: / - __26 _ N 15"RCP— Inv.:6.80 C) 00 84"CMP — Z — I � Duo -8" -PLUG p + J 4'k4"Lscp Timber + z r, VALVE & BOX ¢ p w 2: U O Inv.: 18.51 UO 15"RCP O LL LL O Woods 00 N Property Of Mi* Theodore L &Margaret PIN:425700264947 DR-2561 / PC:240 (132 Dolph Eaerett Rd) TCE-206 1. MEASUREMENTS HAVE BEEN LOCALIZED AT NC STATE PLANE NAD 83 (2011) COORDINATES NORTH 355,000 SFT AND EAST 2,522,000 SIFT AND NAVD 88 ELEVATION 35 SFT YIELDING A COMBINED FACTOR OF 0.9999206724. 5' MI1 .- COVER 2" COMBINATION VALVE IN 5' I.D. STA. 34+27 — AIR MANHOLE +/- RELEASE-Q- --. 3' MIN. COVER I -� �'VC �— ` E MAN �- .Grad --- --- - `` - --- _ _ 8 - PLUG VALVE & BOX -I _ 00 60 LF OF 8" C900 W/ JOINT RESTRAINT FORCE MAIN F _ - - 8" -PLUG -VALVE &BOX STA. 42+00 +/- - - - i - -_ - — -- - --- ----- --- --- -- -- - - - - _ - -- - - _ _ - - I _--- - -- I + -'-I - — M a - -- -- --- + - _ . _ - - U+/- n - IITING TYP. At -__ — t. o - - + Ln `n 226 LF OF 8" FUSIBLE C900 PVC =ORCE MAIN BY HORIZONTAL DIRECTION DRILL PVC _ FITTING, TYP. -- _ 1 — + C) 00 _ _ - _ 60 LF OF 8" C900 W/ JOINT RESTRAINT FORCE MAIN + C) d PVC �- I 6o 7p�C F - -�- _-- - _ M + ¢ 20 LF 8" RJDIP - . OF - -- �_ -- I w• 24 Q to Z � O Z w Q U W O a Z � w F- lJ'1 U >- QN °- Z U O N LU QV) Z Uj Ln Q ~ I ce U Q � w U Z >O w Ln Z I- O W 3: _ H O � V% O Z N O c') N 'q CO U N > C U Q Ln Z E O LL co O • N E 7 � � � • Z N N Q � c co J O N c0 00 � rn O O Z O N f r) C) W O ca, O LU + W = O J O0 I rn Z rn W ce 0 20 \\\ \�\0\\Wnln//// CA R p /// E 9! 9 16 12 4 DESIGNED BY: CWD DRAWN BY: EBM CHECKED BY: O KTP PROJECT NO.: 2 896-AM DATE: MARCH 2O24 _4 SCALE: HORZ.: 1 "=40' VERT.: 1 "=4' �1L.__� -8 IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO FULL SCALE -,2 C-2.05 34+00 35+00 36+00 37+00 38+00 39+00 50-ITIES 41+00 42+00 43+00 44+00 45+00 ���0----------- LODtRW___ �►���� I LoorRW Woods __— LODfRW — _ -"' '^ - 2`7,__- I �� Property of 25.60 0 0 - / //ice -' LderRw _ _ -� 27- - = teef>z? State ofNorth Carolina clo 15"RCP-_ �_ = _ H Director State Prop Ofjice /� P- p 7 SiB / ! ��R7 _.-_"= �� �ptE �1R r-4 PIX,424904920596 - DB. 2836 / PG. 15/ l �� \ / Inv.: 25.72 / - _ : �� �-" _ - _ - _ - _ V ���1� 1 30�00, 1 26.50 G�� 1 l0•�R�—'` — I ! _--- -- LO 2-- Inv.:— _ SSyvHu (275OldFolkrtoneRd) 15„ CPP �� 15"RCP �_ _ _ _ _ _ . - _ - _ _ _ - - 5� _ , ry 3011a0, N 28 _ _ r _.� _ _ l� oil �'7"� Inv.: 26.51 _ _ f�W \ — ,. - - - --'.. - - - _ - - Df _ -r -!_ - ' F + aO�J / 15"RCP Inv.: 26.50% - _- - - -- _--_ 12I� 15"RCP -28- — — — _ — �t4 i M aOJ�oD� O — FENCE TO BE ' I _ Inv.: 26.41 �"�L � . F M� E REMOVED/REPLACED Woods d LoorRW -za- _ -15" CPP H LOD O \ L•6 tRW '�' `�- 15� �I) — — MOH S \ — Pr°perty°f E� O ' IRW y \ �� • `�j� L F - Argenbright William H6 Bethany _ _ l i, _ PlY 425700187142 LODtRW �- T` e'rett OHE 30�100� / I L DB., 2446 / PG.• 875 Q _ 1 --�+-'----' LOD/Ryt' " � - _ _ _- _ -""� V _ - - M Woods (160D°Iph Everett Rd) T' — G ' LOD/Ri" . LODIR�' _ _ —' Dolph p -----` �F LODtRW --� - _ _ _ 27- rn - Dt _ - F SU+UU millOHE a Q' N , _25 Inv.:25.19 = =___ _ y 15" CMP �Op +00 — — a��oO " Oo `2" COMBINATION AIR VALVE ,_LOD�ro / _ — ___a7___f Mt49 o -n IN 5' I.D. MANHOLE _ f [� -- 26 vcDt� _ _ - - -_ - FM _ OHE yDo� -n O Property of LeerE� - - - re Wrobel Thomas R £a SHARONA TRUSTEES --_- 27- �u-__�-- _ ) n PIN.425700189071 - 8+00 OHE �" ��am m DB.- 4693 / PG.• 406 45 00, _ FM — _ — — 3 3 (156DOLPHEi�ERETTRD) F -'FM . 11 MhI _ 27 — OHE 30IJ001 C) OHE M/X 46+QQ r1112I �4. ev i 1 r' Z w 01 Inv.: 26.51 15"CPP W IDIA00l _ _ 3DJA3 I 3Dll Property Of �1 _ _ 28 — Woods Martin Dante Inv.: 24.39— �� Inv.: 26.44 15" C11�7' 15" CPP PIN.' 5 / PC: 601 Inv.: 25.50 DB. 4765 ph / vere tR 15' RCP (152 Dolph EaerettRd) Inv.: 25.43 15"RCP roperty of Properly of Holowath Michael j Britt, Jason William & Lisa Marie PIN:425700275615 N.• 425700370743 / DB: 4014 / PG: 587 DB - 2873 / PC 6" ( 2Dolph Everett Rd) (144Dolph Everett Rd) Property of Padg tt, John E II & Jennifer M PIN.• 425700370743 / DB. 3124 / PG 287 (140 Dolph Everett Rd) 0 20' 40' 80' SCALE: 1 "=40' 36 32 24 20 16 MW :� I Property of Carswell Karol Trustee PIN. 425700277371 / DB: 5768 / PG: 880 (136Dolph Everett Rd) P-p-iyOf Clark HughM&Betsy W PIN 425700273714 DB:1912 / PC:501 (148 Dolph Everett Rd) 1 1. MEASUREMENTS HAVE BEEN LOCALIZED AT NC STATE PLANE NAD 83 (2011) COORDINATES NORTH 355,000 SFT AND EAST 2,522,000 SFT AND NAVD 88 ELEVATION 35 SFT YIELDING A COMBINED FACTOR OF 0.9999206724. t 2" COMBINATION AR RELEASE VALVE e I 5' MIN COVER _ mv[a i m In _.'�,. � � � Ln �, � �__._ ____ITS• ._- � ___.. '�.__—_ rt _� — _ ____- __� _�I��� � � __� ' � mo 36 32 24 W, 16 iW 0 • co N 0 0 CEO U N C U a� Z O LL °O • a) E D = z > N Q LO C ca O U 00 J ;t. O N M L rn O m Z O N Z Z N � O Z U W w Q �c O O 00 W O v} W O CL a N u, U U 0 W (.0 O � to � z Q O U LLn wQ O 00 0 0 Ln + � � I I Lr) w z V U, w z l_1 Z W O >0 U W U w } Ln z :D 1— I) O 2 00 � o = J 0 Z O N DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NO.: DATE: SCALE: CWD EBM KTP 2896-AM MARCH 2O24 HORZ.: 1 "=40' VERT.: 1 "=4' 0 112 1 4 IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE I C-2-06 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 J 0 20' 40' 80' SCALE: 1 "=40' Property Of StateofNorth Carolina clo Director State Prop Office PIN.•424804920596 DB-2836 / PG.15 (27501dFo1kstoneRd) --29— Woods — — — — — — — -- -- — W —I Woods �\ Property of LODjRW LOD, W = Q , \ > LOD/R W LODtR W State ofNorth Carolina cloLOD/Rti Director State Pro O cejLODjRW LODjRW LODjR W LOD/RY\ PIN:424904920596 -------------------=—------27---==--- —X — — — —�a— _ _ \ ^� DB:2836/PG.15 I O _ -- -- — _* _ (275 01d Folkston Rd) N D01—zs--0- — _za —_— — --- —T 8" - 22.5° BEND Dolph Everett Rd. (SR-1535) p I E 'i—toD1Er— _ — — — ` .CEP — — Loo; ffr ►vD Gravel Road _ z � Z9 — _ ___-------- z7-- —---__--_----- tn— - -- 8------- °------ — — 3 Woods I ------- . ---- --- — — -----0 Q EF JBHtPt' _ �Z - �------ 18 ------ �-___�,..__ _---`-----28�-- _— _ yODfEP +.0�£7 H — ------ — _ _ _ w W +00 (�, 7 FR': FI I FM F[t I — — M M� 0 M/X 2 +00 ^^ the 58+ 0 ^" _..... 6 +00 — — — - ti l �\ �ht 59+00 1A h---I �Di/aol \ 1DL/aol W1/a01 �� = 3Dl/ — — — — — — — — -z - _ \ Y7L " r1T��, n9 : r' Uu 61+00. n� n- » \ 62+00 \\ 7J1J00� 9 X)VO01 � \ Y \ w Inv.: 26.03 J Di/ao� 2,11001 aD.L/a61 ( I \ _ (� 15"RCI' 3D1/401 Inv.:26.42 - TI ----- — 15"RCP O x '�> I / 3 M End NCDOT — n D Maintained R/W Property of r Z Argenbright William H& Bethany PIN:425700197142 DB:2446 / PG:875 (160 Dolph Everett Rd) 36 32 24 20 16 12 Property of Hickey Kathleen PIN.•425700184202 DR,2822 / PG. 353 (164Dolph Everett Rd) _ 1_N \� Woods w 1r4 �22 o' Property of Hickey Kathleen PIN:425700180387 DB:4116 / PG:582 (168 Dolph Everett Rd) Relevant Plan Drawings for the Summerhouse WRF Non -Discharge Permit Modification \ d60' O� Relevant Plan Drawings for the Holly Ridge WWTF Non -Discharge Permit Modification Woods 8"-11`250 BEND Inv.: 6 \ \ 24" 21 20 ' � \ \ 19— 0 � rail\ 00) xQQ � ✓� \ Inv.: 17.47 � \ 24"RCP 19 A� X COMBINED FACTOR OF 1. MEASUREMENTS HAVE BEEN LOCALIZED AT NC STATE PLANE NAD 83 (2011) COORDINATES NORTH 355,000 SFT AND EAST 2,522,000 SFT AND NAVD 88 ELEVATION 35 SFT YIELDING A 0.9999206724. k o. n- Ex. Grade -__F _�mo wcw axari �— MIN. ov sra. rs.o .. rrj W/ JOINT RESTRAINT FORCE MAIN r 36 32 16 12 0 L�J 00 fV O I u 0 W O a z O Z N J O Z w Q � U w O O a } w �I— Q N Q Z U �N w `" aV1 Z w Q QLLJ QQ w U z _z >O w V) Z �- oun U LU o ZD Ln O Z N O M N CO U r` >, N � U a Ln Z E LM O CU O� O (D 2 Z > 1 Q � c C U Nm J o 00 � a7 O 0) Z 0 N < re r WO >� LU �0 = o 4-, J O 1 (,0 z LU 01� LL CIA R 0� oFESS/p 25 'GIN tttnnnnll���� DESIGNED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NO.: DATE: SCALE: CWD EBM KTP 2 896-AM MARCH 2O24 HORZ.: 1 "=40' VERT.: 1 "=4' 112 IF THIS BAR DOES NOT MEASURE 1"THEN DRAWING IS NOT TO FULL SCALE C-2.07 JV TVV D'itUU bU+UU 61+00 62+00 63+00 64+00 65+00 66+00 36 32 16 12 0 L�J 00 fV O I u 0 W O a z O Z N J O Z w Q � U w O O a } w �I— Q N Q Z U �N w `" aV1 Z w Q QLLJ QQ w U z _z >O w V) Z �- oun U LU o ZD Ln O Z N O M N CO U r` >, N � U a Ln Z E LM O CU O� O (D 2 Z > 1 Q � c C U Nm J o 00 � a7 O 0) Z 0 N < re r WO >� LU �0 = o 4-, J O 1 (,0 z LU 01� LL CIA R 0� oFESS/p 25 'GIN tttnnnnll���� DESIGNED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NO.: DATE: SCALE: CWD EBM KTP 2 896-AM MARCH 2O24 HORZ.: 1 "=40' VERT.: 1 "=4' 112 IF THIS BAR DOES NOT MEASURE 1"THEN DRAWING IS NOT TO FULL SCALE C-2.07 JV TVV D'itUU bU+UU 61+00 62+00 63+00 64+00 65+00 66+00 Q fV 0 fV fV m w 0 w U In O J V; z O N a CL /-___-- _-----J.� _------- 26--------- 25= -25-- J - _ �_ _ ---__ _ OHE \ 9HE X- - X /) X X 1 YH - r _ l X \V / EX �, -j \ / ASPHALT PAVEMENT I / SURVEY CONTROL POINI No 1 REBAR WITH CAP EL 26.00 x ,/% LP x ONSLOW WATER & SEWER AUTHORITY ❑ ❑ PIN No 425700049858 DB:3177 PG:474 EX ASPHALT PAVEMENT I ,\ X I \ I \ / I \ / LP EX FENCE u EX CIP BLDG 0 J 0 J 0 J 0 J LOD i I � I I I I I I I I I I I I I I N rn I I I EXISTING I ELEVATED I SCREENS I I W IJ I I I J ❑ / I \- EXISTING EX I L HEADWORKS ASPHALT PAV MENT 1 \ \r p. Z� I EXISTING / INFLUENT / EQ TANK l __ / / / / / \� NEW 12" INFLUENT 26, FORCE MAIN o TO SUMMERHOUSE P.S. 0 LC Z, - LOD a EX OPERATIONS AND CHEMFEED 0�- GEN HOLY RIDGE ROAD - - - _ FM FM FAI." \ FM--------------------- � FA" FA,. - - ----------- 25 - — — OHE/ I \ I OHE \ / 26 \\�--------- / 18" FORCE MAIN TO CONTINUE DOWN HOLLY 0 I / // / , / — — — RIDGE ROAD, SEE SHEET C-2.00 FOR LINEWORK / I - I I I LL I I I M o I I I I I I I II 8" FORCE MAIN TO CONTINUE DOWN HOLLY I I I I I I RIDGE ROAD, SEE SHEET C-2.00 FOR LINEWORK I I I fl I I I I I I I j I I TEMPORARY CONSTRUCTION I i ENTRANCE, SEE DETAIL 8/SD-1 o J NEW 8" TREATED EFFLUENT 1 I I 1 / 1 I FORCE MAIN EX RECLAIMED WATER P.S. I I LP I NEW 18" EFFLUENT EXISTING 5- DAY HOLDING POND 1 I I 1 I / FORCE MAIN FROM _ o j II I I I II I I II j 1 I I II I 1 II SUMMERHOUSE P.S. I I I I I I II I I II I / / II I 1 I i I II I I I I l o I 1 \ I I I \ I \ \ \ I I I I 1 \ 100 YEAR FLOOD ELEVATION = 11.00 (PER FIRM MAP 3720424700K REVISED JUNE 19, 2020 SURVEY CONTROL POINT No 1 SURVEY CONTROL POINT No 2 REBAR WITH CAP REBAR WITH CAP EL 26.00 EL 25.92 LIMITS OF DISTURBANCE = 1.37 ACRES SANDRA EVERETT CANADY TRUSTEE PIN No 425700156965 DB:5111 PG:792 EROSION & SEDIMENT CONTROL NOTES 1.) CONTRACTOR SHALL COORDINATE WITH OWNER THE SUBMITTAL OF THE ELECTRONIC NOTICE OF INTENT (e-NOI) AND ELECTRONIC NOTICE OF TERMINATION (e-NOT) FORMS. THE e-NOI AND e-NOT FORMS CAN BE FOUND ONLINE AT https://deq.nc.gov/NCGO1. 2.) A COPY OF THE EROSION AND SEDIMENT CONTROL PERMIT, A HARD COPY OF THE PLAN, THE CERTIFICATE OF COVERAGE, AND ALL SELF -INSPECTION RECORDS MUST BE KEPT ON -SITE, PREFERABLY IN A PERMITS BOX LOCATED NEAR THE ENTRANCE, AND SHALL BE ACCESSIBLE AT ALL TIMES FOR INSPECTION. 3.) ALL LAND DISTURBING ACTIVITIES SHALL BE CONFINED TO THE LIMITS OF DISTURBANCE AS SHOWN ON THE PLANS. CONTRACTOR STAGING, TEMPORARY STORAGE, LAY DOWN AREAS, AND DIRT PILES SHALL BE WITHIN THE LIMITS OF DISTURBANCE. 4.) ANY SEEPAGE PUMPED OUT OF STRUCTURE EXCAVATIONS OR TRENCHES SHALL BE PUMPED THROUGH A DEWATERING BAG. 5.) ALL STOCKPILES SHALL HAVE A MAXIMUM SIDE SLOPE OF 2:1 AND SHALL NOT EXCEED A MAXIMUM HEIGHT OF 10 FEET. STOCKPILES MUST BE LOCATED A MINIMUM OF 50 FEET FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVE IS AVAILABLE. PROVIDE SILT FENCE WITH OUTLET AROUND STOCKPILE AREA. 6.) SPOIL OR DEBRIS SHALL NOT BE PLACED WITHIN 50' OF STORM DRAINS OR STREAMS. 7.) THE CONTRACTOR SHALL CONDUCT SELF -INSPECTION OF THE EROSION AND SEDIMENT CONTROL MEASURES AND COMPLETE THE FOLLOWING COMBINED SELF -INSPECTION FORM FOUND ONLINE AT https://deq.nc.gov/NCGO1. 8.) TO FACILITATE CLEANUP, CONTRACTOR SHALL PROVIDE A LAYER OF SAND, FINES, OR SCREENING FINES ON ROADS AND PAVED SURFACES PRIOR TO DEPOSITION OF ANY EXCAVATED MATERIAL. 9.) CONTRACTOR SHALL OBTAIN AND PAY FOR EROSION CONTROL PERMITS FOR OFF -SITE STORAGE YARD, BORROW AREA, AND DISPOSAL AREAS AS REQUIRED. CONTACT INFORMATION FOR RESPONSIBLE PARTY FOR MAINTENANCE ERIC OLSEN, THE WOOTEN COMPANY. EX CATCH BASIN 1 v v v1-1 "3 (TO BE REMOVED) \ \ \ \ NEW VALVE VAULT 30,------------- - - - - - - - 31------ - - - - - - — — — ------ -31 —30 SOD - --------------- - 29--------- \\//- - - - - - - - - 9 -------------------- 27-- _ 28----------�\/�' LOD - ---28 \.\ LOD LOD - _- LOD LOD ------ --27 EXRFC:LAIMBIL---------- -- \ \ EX UV FACILITY - - - - 26- - PUMP STATION „ i'P ElPM -x�26— Ti \\ F 26 - FM FM I NEW GENERATOR \ I LOD LOD /I \ 26 0 O EX PUMP STATION EX O ODOR CNTRL Is 26 \ NEW SUMMERHOUSE — \\ PUMP STATION, \ SEE SHEET C-4.21 I NEW t� o ELEC II BLDG EX CHEMICAL FEED LINE I (TO BE REMOVED) I I EX ASPHALT EXISTING PAVEMENT I AEROBIC DIGESTERS o I I 1 ODOR CONTROL TANK AND FEED, / SEE SHEET C-4.21 / °l D EX REUSE LINE (ABANDONED) SURVEY CONTROL POINT No 2 FM -m FM =M REBAR WITH CAP EX CONCRETE WASH OUT EL 25.92 ASPHALT PAVEMENT AREA, SEE DETAIL 9/SD-1 SUMMERHOUSE PUMP STATION EROSION CONTROL SITE PLAN SCALE: 1" = 20'-0" x o —xx—x�x i I IN SIDEWALK it W N,'�/ � 1 11 N Lj ---- -- I _ - —JL � �1 u u �j of / / I _ -25- LP SIDEWALK \� FMZito CONTRACTOR LAYDOWN/ EXFENCE STAGING AREA LOD LOD LOD I I o o NEW 18" DIA EFFLUENT I FORCE MAIN, I SEE PROFILE ON C-4.22 NEW METER VAULT i NOTES: 1.) INFORMATION SHOWN COMPILED FROM FIELD SURVEY AND PREVIOUS PLANS OF WWTP. CONTRACTOR SHALL FIELD VERIFY INFORMATION AS REQUIRED FOR BIDDING AND CONSTRUCTION OF CURRENT PROJECT. 2.) BYPASS PUMPING MAY BE REQUIRED FOR PERFORMING WORK WITHIN THIS PROJECT. COORDINATE ANY SHUTDOWN WITH OWNER. 3•) EXISTING WELL ON SITE SHALL BE ABANDONED ACCORDING TO NORTH z CAROLINA REGULATIONS. PUMP, WIRING AND CONTROL PANEL SHALL BE 0 REMOVED AND EQUIPMENT TURNED OVER TO THE OWNER. BURIED PIPE v) CAN BE ABANDONED IN PLACE, PROVIDE PLUG ON END. w 4.) THE SUMMERHOUSE WWTP IS TO REMAIN FUNCTIONAL AND IN SERVICE DURING THE CONSTRUCTION OF THE PUMP STATION. THE CONNECTION TO THE WWTP FORCE MAIN SHALL NOT BE MADE UNTIL JOB PHASES ARE COMPLETE AND APPROVAL BY THE ENGINEER GRANTED. LEGEND. EXISTING PROPOSED PROPERTY LINE —x— FENCE _x—x D4 YARD VALVE TREE LINE ASPHALT ACCESS DRIVE — GRAVEL — - - — ACCESS DRIVE - - —50— — CONTOUR LINE 110 SILT FENCE SF COMBINATION FENCE SF/TPF SILT FENCE OUTLET CONSTRUCTION ENTRANCE ES MATTING TEMPORARY DIVERSION DITCH SKIMMER BASIN RIP -RAP PROTECTION LIMITS OF DISTURBANCE LOD ES MATTING, SEE DETAIL 9/SD-1, TYP / Voo SILT FENCE, SEE DETAIL 10/SD 1 / P LIMITS OF DISTURBANCE EX WELL �I (TO BE ABANDONED) C2 ' v j ,25 SILT FENCE / OUTLET, SEE DETAIL 10/SD-1 moo / oe EX STORM DRAIN / (TO BE REMOVED) PLUG PIPE AT / / oo CATCH BASIN / / / EX CATCH BASIN / (TO REMAIN) lool / WATTLE AT CB, / SEE DETAIL 6/SD-1 / VOID / / NEW GRAVEL DRIVE, / sF / SEE DETAIL 2/SD-1 5 i� WATTLE AT CB, / ' FINAL DRAWING / SEE DETAIL 6/SD-1 FOR REVIEW PURPOSES ONLY EXSTORMDRAIN 22 12 2 22' NOT RELEASED FOR CONSTRUCTION (TO REMAIN) / � � � 1 20 0 % M N c; E O O (O U r N a U co Z E - U .0 LL O a a) co o L � O N E z � fn Q lM C aCo 0 U 00 J O N co°O � rn 00i O rn 0 Z 0 N Q N Z I-__ J z O Lu V w ce ^� z Lu Z V)O Q _ J U N Q CL a z Lu Q O V) U N CL V) w wLu Z N ~ V) Z 0 Q Z) C) r w 0 0 z ce Q U W 0 Lu U 0 Lu V)OU Lu O Q u = o V) O z N O ts V4 ��� /27/2024 DESIGNED BY: CWS DRAWN BY: PMD CHECKED BY: CWS PROJECT NO.: 2896-AM DATE: MARCH 2O24 SCALE: 0 1/2 1 IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO FULL SCALE EC-002 SUMMERHOUSE ON EVERITT BAY PIN No 425700334529 I DB:3473 PG:629 W W Of U r_zn ' v J SUMMERHOUSE ON EVERITT BAY r� PIN No 425700334529 �J ODB:3473 PG:629 z , U� LEGEND / EXISTING NEW / STRUCTURE PAVED ROAD / GRAVEL ROAD X FENCE X TREE/SHRUB LINE / PROPERTY LINE N, JAMES FOSTER PIN No 42570005550 DB:3416 PG:75 TEMPORARY CONSTRUCTION ENTRANCE, SEE DETAIL 8/SD-1 HOLLY RID I- —Oh a �— X YH X SURVEY CONTROL POINT No 1 / / L REBAR WITH CAP EL 26.00 X X LP X X LP EX FENCE I I 1 SURVEY CONTROL POINT No 2 N, REBAR WITH CAP EL 25.92 i N. NEIL THOMPSON PIN No 425700044538 DB:5663 PG:107 PHILLIP WEATHERSBEE \/ PIN No 425700044500 DB:5208 PG:37 / 9 EX 12"INFLUENT FORCE MAIN FROMHOLLYRIDGE 18" FORCE MAIN TO CONTINUE DOWN HOLLY RIDGE ROAD TO TOPSAIL WWTP, SEE SHEET C-2.00 FOR LINE WORK 8" FORCE MAIN TO CONTINUE DOWN HOLLY RIDGE ROAD TO SPRAY FIELD STORAGE POND, SEE SHEET C-2.00 FOR LINE WORK \ SUMMERHOUSE ON EVERITT BAY PIN No 425700334529 DB:3473 PG:629 X \ SEE DETAIL 3/SD-1 FOR TYPICAL a PAVEMENT CUT AND PATCH ONSLOW WATER & SEWER AUTHORITY NEW 8" TREATED EFFLUENT PIN No 425700049858 2 o ti FORCE MAIN DB: 3177 PG:474 P [� EXISTING 5- DAY HOLDING POND LEVAT. ;D REEN, SEE SHEET C-4.23 FOR DETAILS w w FOR CONNECTION TO EXISTING FORCE MAINS AND NOTE 3 EXISTING HEADWOR s SEE DETAIL 3/SD-1 FOR TYPICAL O PAVEMENT CUT AND PATCH � EX CATCH BASIN 00 NEW 18" EFFLUENT FORCE MAIN (TO BE REMOVED) EXISTING 1 FROM SUMMERHOUSE P.S. INFLUENT Ex EQTANK NEW SUMMERHOUSE NEW VALVE VAULT EX CIP CONTRACTOR LAYDOWN/ _ _ ' ` PUMP STATION, BLDG SEE SHEET C-4.21 EXRECLAIMED EXFENCE STAGING AREA �u PUMP STATION / ' LOD LP EXISTING • LOD / ' NEW 12" INFLUENT LP UV FACILITY NEW FLOW CONTROL VAULT N FORCE MAIN TO SUMMERHOUSE P.S. I — — NEW 18" DIA EFFLUENT FORCE MAIN, FLOD NEW GENERATOR SEE PROFILE ON C-4.22 / ❑ ~ ❑ � j, I NEW METER VAULT w _ S NEW O ELEC— EXPUMPSTATION BLDG EX WELL o (TO BE — `� ABANDONED EX EXISTING — ODOR ® AEROBIC 101 LP LJ U j CNTRL DIGESTERS o SILT FENCE SEE / DETAIL 10/SD-1 / DAVID & KIMBERLY GEN I EX OPERATIONS © 1 / / / KING ESTATE AND CHEMFEED � � /" / EX STORM DRAIN EDWARD GILLESPIE PIN No 425700143792 (TO BE REMOVED) PIN No 425700143720 DB: 5338 PG: 823 Q �j*/ moo / PLUG PIPE AT KENJNSTH & CONNIE DB: 5319 PG: 376 JAR_ _—J CATCH BASIN / PIN No 425700142750 EXREUSE LINE (ABANDONED) — �— / DB: 5709 PG: 299 LFM + `M * / EX CATCH BASIN CONCRETE WASH OUT ✓ / (OEMAIN) EXSTORMDRAIAr AREA, SEE DETAIL 9/SD-1 I i NEW GRAVEL DRIVE, MARK & CLAUDIA ANTONUCCI j EX CHEMICAL FEED LINE SEE DETAIL 2/SD-1 / PIN No 425700141674 / (TO BE REMOVED / DB: 5094 PG: 227 L A N E DALE & DEBRA CROSS T W � N � N G ROSE / PIN No 425700140546 EDUARDO & MAIDA DB:5607 PG:763 UTRILLA PIN No 425700141508 B:5648 PG:607 JULIA CONNOLLY & / \ CALEB LINNEHAN / PIN No 425700049574 DB:5316 PG:169 / JOHN & MARIBEL GREEN \ PIN No429500 DB:548486 PG: PG:57578 \ I I I \ om O J \ SUMMERHOUSE PUMP STATION SITE PLAN SCALE: 1" = 40'-0" FINAL DRAWING FOR REVIEW PURPOSES ONLY 40 20 0 40' NOT RELEASED FOR CONSTRUCTION 1' 40' 0" 100 YEAR FLOOD ELEVATION = 11.00 NOTES: (PER FIRM MAP 3720424700K REVISED JUNE 19, 2020 1.) INFORMATION SHOWN COMPILED FROM FIELD SURVEY AND PREVIOUS PLANS OF WWTP. CONTRACTOR SHALL FIELD VERIFY INFORMATION AS SURVEY CONTROL POINT No 1 SURVEY CONTROL POINT No 2 REQUIRED FOR BIDDING AND CONSTRUCTION OF CURRENT PROJECT. REBAR WITH CAP REBAR WITH CAP 2.) BYPASS PUMPING MAY BE REQUIRED FOR PERFORMING WORK WITHIN EL 26.00 EL 25.92 THIS PROJECT. COORDINATE ANY SHUTDOWN WITH OWNER. 3•) THE SUMMERHOUSE WWTP IS TO REMAIN FUNCTIONAL AND IN SERVICE z LIMITS OF DISTURBANCE - 1.37 ACRES DURING THE CONSTRUCTION OF THE PUMP STATION. THE CONNECTION O TO THE WWTP FORCE MAIN SHALL NOT BE MADE UNTIL JOB PHASES ARE v) COMPLETE AND APPROVAL BY THE ENGINEER GRANTED. 5; w SANDRA EVERETT CANADY TRUSTEE 4.) THE SUMMERHOUSE WWTP IS BEING UPGRADED WITH SOME NEW a-1 PIN No 425700156965 DB: 5111 PG: 792 PROCESS UNITS STARTING IN MAY 2024. THESE UNITS ARE SHOWN ON THESE PLANS AS EXISTING UNITS, AS REQUIRED, FOR CONSTRUCTION OF THIS PROJECT. / / / co N c; E O O co U r N U z E � U O CB O L O 0 0) E CD = = = z a� • > N Q c c co o a) 00 J O N m 00 L � O 0 z O N Q N Z � O z w u w ce O z Lu a z0 Z Q ce N w 2 2 w QQ z Z �! - V) Lu w O Q I ZD J Qr W z 0 L.L.I ce Q U W 0 Lu U_ z Z) NO V) Z � O < U Q O V% O z N O ts CAR SEAL INV p,, dd�1 =_ J w. S 3/27/2024 DESIGNED BY: CWS DRAWN BY: PMD CHECKED BY: CWS PROJECT NO.: 2896—AM DATE: MARCH 2O24 SCALE: 0 112 1 IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO FULL SCALE C-4.20 -RCW FM Lcw I SEE SHEET C-4.20 FOR EFFLUENT FORCE MAIN CONTINUATION 100 YEAR FLOOD ELEVATION = 11.00 NOTES: (PER FIRM MAP 3720424700K REVISED JUNE 19, 2020 SEE SHEET C-4.23 FOR DETAILS FOR CONNECTION 1.) INFORMATION SHOWN COMPILED FROM FIELD SURVEY AND PREVIOUS PLANS OF WWTP. CONTRACTOR SHALL TO EXISTING FORCE MAIN AND NOTE 4 EXISTING 5-DAY HOLDING POND FIELD VERIFY INFORMATION AS REQUIRED FOR BIDDING SURVEY CONTROL POINT No 1 SURVEY CONTROL POINT No 2 REBAR WITH CAP REBAR WITH CAP AND CONSTRUCTION OF CURRENT PROJECT. EL 26.00 EL 25.92 \\ _ 2.) BYPASS PUMPING MAY BE REQUIRED FOR PERFORMING WORK WITHIN THIS PROJECT. COORDINATE ANY SHUTDOWN WITH OWNER. \ \30 �29 - - - - - _ ___ 3.) EXISTING WELL ON SITE SHALL BE ABANDONED ------ _____ ,EXRECLAIMED-"ATER - - - -31 - - - ACCORDING TO NORTH CAROLINA REGULATIONS. Ib j'UNIPSTATION� - - - - - - - - - _ _ _ _ PUMP, WIRING AND CONTROL PANEL SHALL BE REMOVED _ _ _ _ - ---- AND EQUIPMENT TURNED OVER TO THE OWNER. BURIED _ _ ----- ------- 31 - - - - - - - 1 I PIPE CAN BE ABANDONED IN PLACE, PROVIDE PLUG ON -30- ------ -,� -- END. ---_-- li _ _ - - - -------------- - - - - - 30 _ SEE SHEET PS-2.6 FOR WORK \ 4.) THE SUMMERHOUSE WWTP IS TO REMAIN FUNCTIONAL \� _ ----29 ---- / ��� EXELECTRICAL ---- 0N-EXISTING-RECLAIMED PUMP - --- O AND IN SERVICE DURING THE CONSTRUCTION OF THE HAND HOLES -------------_-_ STATION PUMP REPLACEMENT \ i� EX REJECT WATER --29 �, PUMP STATION. THE CONNECTION TO THE WWTP FORCE ,TO 5-DA YHOLDING POND MAIN SHALL NOT BE MADE UNTIL JOB PHASES ARE -----___-- -.28- ---_ ----\ ------ COMPLETE AND APPROVAL BY THE ENGINEER GRANTED. ---------_28 ----------- - ---- - LOD LOD LOD LOD LOD LOD LOD LOD LOD LOC L JU LOD LUU -__---,7 -- , _ 5.) THE SUMMERHOUSE WWTP IS BEING UPGRADED WITH a /,---- ,�-____--_--- --- /--_, - -27 4 SOME NEW PROCESS UNITS STARTING IN MAY 2024. N 274855.77 THESE UNITS ARE SHOWN ON THESE PLANS AS EXISTING EXRECLAIMED - - - - E 2451030.47 N 274855.54 UNITS, AS REQUIRED, FOR CONSTRUCTION OF THIS PUMP STATION Rcw � _ _ - -' � � / - - - _ E 2451037.80 PROJECT. :,cw � Rcw � , - - - P�L���.4GII.ZT_Y_ _ , , - - - \ R _ WATEREXRECLAIMED ATER LP �� c -Rcl l C� _ _ - - ck TO INFIL TRA TION BASINS LP M _-- - -___ RCW- - - -26 � x J1.ClN � RCW Ex EXS1L-'WALK �w METER \ CD \ N 274848.21 \ i E 2451037.57 NEW 18" D.I. EFFLUENT BORE No CIB12 NEW 8" D�I_TREATED Ex CONTROL PANEL FORCE MAIN FROM EFFLUENT FORCE MAIN - - - N 274832.86 NEW VALVE VAULT, 8" DIA 450 SUMMERHOUSE P.S. FROM RECLAIMED -WATER P.S. 26 E 2450933.51 _ _ I SEE SHEET PS-2.7, EX DRAIN LINE BEND (RJ) TYP - f`c I TOP EL 26.75 TO PUMP STATION F_ I M rM FM % FM FM IPM 6U FM FM I I I I 1 1 /I : r, I Fg' Ti ri r11 ,J 1 I rM rM ^ M i �FM FM X 25.90 26 U�U v ° o � � I 18 DIA 45 BEND (RJ) TYP 25.84 12" DIA 450 BEND (RJ) TYP `� "�`-=s `•""""'` �� \ LOD \ LOD I WL sr EX PUMP STATION EX ODOR CNTRL -M NEW 12" D.I. � \ EXISTING N 274810.36 �' 1� INFLUENT FORCE MAIN ASPHALT E 2450989.99 \ TO SUMMERHOUSE P.S. DRIVE 25.76 N 274810.70 LOD � � N 274812.39 \ \ I I E 2450982.66 LOD LOD `� N 274813.22 E 2450960.49 N 274805.66 \ \ E 2450940.51� \ E 2451017.54 RCV' NEW METER VAULT, SEE SHEET PS-2.5, TOP EL 27.00 _N 274805.25 E 2451026.87 1\ .� 26 26.20 x I EX FENCE N 274807.22_ � NEW FLOW \ N 274803.70 ' E 2450947.22 NEW GENERATOR, CONTROL VAULT, I N 274795.93 SEE ELEC DWGS, E 245 100 1,04 \ SEE SHEET PS-2.7, SW EL 26.50 E 2451026.46 EXRETURNLINE o N 274806.21 SLAB EL 26.67 TOP EL 27.50 FROM5 DAY `� E 2450939.22 �� 12' I HOLDINGPOND 25.77 x NEW SIDEWALK 26.60 x BORE No C11311 = I cv �JJ .N 274781.88 6 30 x 2 I N 274796.32 N 27479577 N 274797.88 E 2450991.14 I I E 2450938.81 26.00 E 2450952.08 NEW 4" J BYPASS PUMP CONNECTION, s IA E 2450982.06 \ - I II PVC DRAIN I I SEE DETAIL 1/PS-2.4 III i--i N 274788.04 L7 II o I NEW ELEC BLDG, E 2450969.37�/ - - - I ill N 274786.79 o I SEE ELEC DWGS I I I E 2450998.23 16" FULL PORT PLUG VALVE (RJ) N 274788.11 I IEi E 2450938.47 SLAB EL 26.67 27.10 x I L J , h 27.10 % `��` �►'� 26.40 x x 25.83 l� - - - - - LEE INSET A 7F N 274783.09 1 Ell NEW SIDEWALK N SLAB EL 27.50 I I I I E 2450937.75-'*-► 1 -x SW 26.33 I ___ L II EX WELL I NEW `O 1- JI � L J j N x L I (TO BE ABANDONED), L J L L J I � SEE NOTE 3 u 0 I ELEC N NEW u I �I 26.50 x �I /25 XFMR DIESEL I ------I L- - ---J I NEW 16"D.IN - O BYPASS - B PUMP, FORCEMAIF� NEW YARD HYDRANT, Li PAD � FROM uL J rL J LJ LJ STATIONSEE 6/SD 2 EL 27.00 Ir❑rII i r-I NEW PUMP STATION, L J I NN os I SEE SHEET PS 2.0 I I - - 25 LL L-I--------- - -- 26.40x 4 Ilk o I '7 / / / \ I / / EXISTING J I I / AEROBIC I LP \ NEW SIDEWALK N 274760.96 DIGESTERS i SW 26.88 x SW 26.88 x/ E 2450997.10 / // SF I N 274757.56 N 274762.22 / 7 O VN 274755.78 E 2450968.25 25.83 E 2450950.50 E 2450994.91 ILT FENCE OUTLET, SW EL 26.33 rr" 26.30 x SEE DETAIL 11/SD- i a At- r1" o, / -qEA TO P. StII." / f NEW ODOR / 26.20 x'. CONTROL SYSTEM SLAB EL 25.90 NEW 16 D.I. FORCE MAIN � /" / / / / FROM BYPASS \\ /+ EX CONTROL PANEL v � `�� + / (TO BE REMOVED), PUMP �/ / SEE NOTE 3 o / r, '2 16" DIA 45° BEND (RJ) TYP / "1 vL N 274732.05_/ s` ss E 2450933.45 e SILT FENCE, o� sf SW EL 25.80 / 5 S C , \ S WL OE SEE DETAIL 10/SD-1 D 6 / // /� `25.90 x N 274731.03 // /+ EX YARD INLET / WL WL / E 2450953.10 / SW EL 25 90 ('D / / / o CONNECT NEW 2" SCH I I ° CUT AND REPAIR ASPHALT 1100, // 80 PVC WATER LINE FOR NEW 2" WATER LINE �ovwwwww TO EXISTING I I ������ NEW GRAVEL DRIVE, EXISTING 25.80 / SEE DETAIL 2/SD-1 ASPHALT DRIVE / / EX CHEMICAL FEED LINE (ABANDONED) I EX CHEMICAL FEEDMANHOLE - / +/ / EX STORMDRAIN - -� // (TO REMAIN) Epp / WA EX RECLAIMED TER LINE / 5F (ABANDONED) / / // / O / / FM +/ -M FM M _ / M r FM ^M � FM / � /5F/ CONCRETE WASHOUT AREA _ i // ./ / SUMMERHOUSE PUMP STA IT O1551 0N SITE PLAN OJ 0 5 0 %m � � SCALE: 1" = 10'-0" 10' EXISTING NEW 16" D.I. FORCE MAIN TO NORTH TOPSAIL WWTP I--- 16"x16" WYE (RJ) NEW 16" D.I. FORCE MAIN FROM PUMPS NEW 16" D.I. FORCE MAIN FROM DIESEL BYPASS PUMP INSET A SCALE: 1" = 4'-0" LEGEND 1► WA STRUCTURE PAVED ROAD GRAVEL ROAD FENCE TREE/SHRUB LINE PROPERTY LINE FINAL DRAWING � FOR REVIEW PURPOSES ONLY � NOT RELEASED FOR CONSTRUCTION V) 0 w co N E 0 0 co U r N U co Z C" `n E O0 O z � a� co 0 L 0 E z a� • > En Q L c Oco I U 00 J O N 00 00 m 0 rn 0 Z 0 N Q N z � J O zw V w ce o Z Lu N 0 Q a O Q U N CL w Z V)Q z ZQ w W Lu 0 Q I Z i�: 0 0 V) Q ZLu = Q u W Lu ZD N O V) Z � ow O =O z N O 2(4,°tiq� y S AL ScoP\\,,, 3/27/2024 DESIGNED BY: CWS DRAWN BY: PMD CHECKED BY: CWS PROJECT NO.: 2896-AM DATE: MARCH 2O24 SCALE: 0 112 1 IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO FULL SCALE C-4.21 EXISTING MANHOLE EXISTING 4'-0"x 6'-0"ACCESS F. EXISTING 10'-0"DIA WET WELL EXISTING 8" L UENT FROM F UV FACILITY PS-2.6 NOTES: 1. BYPASS PUMPING MAY BE REQUIRED FOR INSTALLATION OF NEW PUMPS INTO EXISTING WET WELL. THE EXISTING UPSTREAM MANHOLE CAN BE USED WITH THE BYPASS PUMP DISCHARGE GOING TO THE 5-DAY HOLDING POND OR USING THE EXISTING 3" QUICK CONNECT IN THE EXISTING VALVE VAULT. COORDINATE ANY BYPASS PUMPING TIMES AND DURATION WITH WASTE WATER TREATMENT PLANT SUPERVISOR BEFORE BEGINNING BYPASS PUMPING. i EXISTING 3" DRAIN FROM CHLORINE ANALYZER EXISTING 1/2"SAMPLE LINE EXISTING SUMP PUMP DISCHARGE EXISTING REJECT WATER TO 5-DAY HOLDING POND REMOVE EXISTING EFFLUENT PUMPS, I I BASE ELBOW, LIFTING RAIL, ELECTRICAL CABLES AND ASSOCIATED EQUIPMENT, EXISTING SUMP PUMP REPLACE WITH NEW EFFLUENT PUMPS, SEE SPECIFICTIONS EXISTING VALVE VAULT EXISTING REJECT WATER 6'-Y VAL VE BOX I I EXISTING 4'-0"x 6'-0"ACCESS HATCH EXISTING 8" CHECK VAL VE, TYP EXISTING PL UG VA VE, TYP EXISTING MOTORIZED ` I 0 _ _ — — _ _ _ r EXISTING 8 %3" TEE W/ EXISTING VALVE, TYP PLUG T AL VE — — — — 3" QUICK CONNECT CAP 3'-0" 1--_ CORE DRILL EXISTING BOX TO L t-1 F 1 Q1 r� PS-2.6 INSTALL NEW 3" PVC DRAIN TO SUMP, SEAL WITH NON -SHRINK GROUT 1, l vDONED NPW WELL TYPE PUMP � l EXISTING CHLORINE ANALYZER EXISTING SAMPLER PLAN- EXISTING RECLAIMED WATER PUMP STATION SCALE: 1/4" = V-0" EXISTING METER IN HOT BOX ABANDONED 4" NPW LINE fV EXISTING HOIST fV O fV fV M Z EXISTING 4'-0"x 6'-0"ACCESS HATCH V Q � EXISTING VENT Z 0 EXISTING 10'-0"DIA WET WELL 7 vi — a V) I � � fV V)Euj � I Q < EXISTING 8" v) INFL UENT FROM UVFACILITY NEW LIFTIPERFR G RAILS ( ) Li -) li) CL .� REMOVE EXISTING EFFLUENT PUMPS, —\ BASE ELBOW, LIFTING RAIL, ELECTRICAL EXISTING DRAIN CABLES AND ASSOCIATED EQUIPMENT, REPLACE WITH NEW EFFLUENT PUMPS, SEE SPECIFICTIONS CUT EXISTING 6" DISCHARGE AS REQUIRED AND INSTALL ADAPTER FLANGE, TYP OF 2 \ NEW 4"x6" ECCENTRIC REDUCER (FL) NEW PUMP BASE DISCHARGE BEND (PER MFR) EXISTING VALVE VAULT NEW VALVE VAULT, SEE SHEET PS-2.7 EXISTING 8"FORCE MAIN TO EXISTING INFIL IRA TION BASINS EXISTING VALVE, TYP NEW TREATED EFFLUENT FORCE MAIN y TO SPRAY FIELD STORAGE POND, SEE C-4.21 FOR CONTINUATION EXISTING 4'-0"x 6'-0"ACCESS HATCH EXISTING 8" CHECK VALVE, TYP EXISTING PLUG VALVE TYP cF FINAL DRAWING 12" 0 1 3' FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION cn O V) W ce V) O co N M E 0 0 co U r N U Z E � U O a� co o L 0 0 E Z a� 0 > � cn Q L c Oco i U 00 J O N m co m 0 0 Z 0 N Q N Z � J O zww Q G V Lu w z N O_ ZD � �Q CLo �> w ce V)J w 2 Q Q z ZD i Lu W (/') Q r Z w z Z cro O ce Q U W U Lu � � z ZD0 V) Ov V) LL Z � O Q O V) 0 Z N O CARO Q SEAL �4winSiCP��\\� 3/27/2024 DESIGNED BY: CWS DRAWN BY: PMD CHECKED BY: CWS PROJECT NO.: 2896—AM DATE: MARCH 2O24 SCALE: 0 112 1 IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO FULL SCALE F SECTION- EXISTING RECLAIMED WATER PUMP STATION PS-2.6 SCALE: 1/2" = V-0" PS - 2.6 12'-10" 5'-0" 60"x72" DOUBLE DOOR ALUMINUM ACCESS HATCH, SEE SPECS - ALUMINUM 4" VENT WITH 8" 4" DIA 900 LADDER SS INSECT SCREEN BEND (FL) I� V 12"x10" DIA CONCENTRIC 00 °' REDUCER (RI), TYP \ 12" DI INFLUENT FORCE MAIN, INV 20.50 � I N I' I' T— I I - 21-411 - -811- -8"_ 10" DIA MAG METER, SEE SPECS 10" DIA DISMANTLING JOINT (FL) 2'-6" - 4_ 4" PVC DRAIN TO PUMP STATION 3'-3" ___________ - - - //-----------3 / / i� / / o 4" PVC DRAIN WITH BACKWATER VALVE, INV 19.50 I I CREATE 2'-0" SQ SUMP AT DRAIN f 10" WALL PIPE (FLxPE) TYP 80 8" T � 1 F 1 I PS-2.7 J 1 12" DI T0 PUMP P P STATION, INV 22.50 CONCRETE VAULT, SEE STRUCTURAL DWGS 10" DIA EQ FLOW \\ CONTROL VALVE W/ ELECTRIC ACTUATOR, SLOPED CONCRETE FILL 10" SPOOL (FL) SEE SPECS PLAN- INFLUENT FLOW CONTROL VALVE VAULT SCALE: 1/2" = V-0" 2 V Q z O 24" SQUARE ALUMINUM ACCESS HATCH, SEE SPECS vi 7'-4" 6'-0" 4" DIA 90° BEND (FL) ---� f 3" PVC DRAIN 1 N I I 60 L----J 1' o" iO 3" BACKWATER VALVE I N EXISTING 8" G q FORCE MAIN Ps-2.7 u I i PROVIDE DOGHOUSE STYLE I 4 N OPENINGS TO FIT OVER EXISTING 8" FORCE MAIN, J SEAL WITH NON-SHINK GROUT r I r / / 4 8" FLANGED ADAPTER (RJxFL) OVERCAST HOLE FOR NEW 8" FORCE MAIN NEW 8"x8" TEE (FL) AND SEAL WITH BOOT 4" DIA 90° BEND (FL) W/ PUNCHED FLANGE AND S.S. INSECT SCREEN PRECAST CONCRETE BOX, SEE SPECIFICATIONS PROVIDE DOGHOUSE STYLE OPENINGS TO FIT OVER EXISTING 8" FORCE MAIN, SEAL WITH NON-SHINK GROUT EXISTING 8"FORCE _AJAIN TO EXISTING INFILTRATION BASINS G PS-2.7 NEW 8" PLUG VALVE WITH EXTENDED STEM, STAND AND MOTORIZED OPERATOR, SEE SPECIFICATIONS, TYP OF 2 NEW 8" TREATED EFFLUENT FORCE MAIN 2'-0" TO SPRAY FIELD STORAGE POND, SEE SHEET C-4.21 PLAN- NEW TREATED EFFLUENT VALVE VAULT SCALE: 1/2" = V-0" 0 En 4" VENT WITH SS INSECT SCREEN TOP EL 27.50 °'_ GRADE EL 26.58+/- 8" 1 1'-6" 5'-0" 4" DIA 900 BEND (FL) 4" DIA WALL PIPE (FLxPE) - ALUMINUM LADDER I 3'-3" t 11 10" SPOOL (FL) _ I T 12"x10" DIA CONCENTRIC 10" DIA -- REDUCER (RI), TYP DISMANTLING rr 21-411 8„ 8„ JOINT (FL) r- i L J f 1 �G r 12" DI INFLUENT - 4� IIII 14 4 FORCE MAIN, INV 20.67 u Q BOT EL 19.17 f 10" DIA MAG METER, 10" DIA EQ FLOW CONTROL VALVE W/ SEE SPECS ELECTRIC ACTUATOR, _ 2'-0" _ SEE SPECS SLOPED CONCRETE FILL F SECTION- INFLUENT CONTROL VALVE VAULT PS-2.7 SCALE: 1/2" = V-0" 24" SQUARE ALUMINUM 4" DIA 90° BEND (FL ACCESS HATCH, SEE SPECS PRECAST CONCRETE BOX, 4" WALL PIPE SEE SPECIFICATIONS (FLxPE) TOP EL 26.75 GRADE EL 26.25+/- I III III NEW 8"x8" TEE (FL) 8" FLANGED ADAPTER EXISTING 8(RJxFL)" FORCE MAIN i0 Y r I BOT EL 21.75 3" PVC DRAIN OVERCAST HOLE AND SEAL WITH NON -SHRINK GROUT 3" BACKWATER VALVE INV EL 22.00 ` NEW 8" PLUG VALVE WITH EXTENDED STEM, STAND AND MOTORIZED OPERATOR, SEE SPECIFICATIONS, TYP OF 2 mR 4" DIA 90° BEND (FL) W/ PUNCHED FLANGE AND S.S. INSECT SCREEN II - - PROVIDE DOGHOUSE STYLE OPENINGS TO 8„ - FIT OVER EXISTING 8" FORCE MAIN, SEAL - WITH NON-SHINK GROUT Vol EXISTING 8"FORCE MAIN TO EXISTING INFILTRATION BASINS x �yl LL � 4 LL A- V-6" SLOPED GROUT FILL, FORM V-6" SQARE SUMP FOR BACKWATER VALVE G SECTION- NEW TREATED EFFLUENT VALVE VAULT PS-2.7 SCALE: 1/2" = V-0" 12" 0 1 1 1 1 1/2"= V-0" 60"x72" DOUBLE DOOR ALUMINUM ACCESS HATCH, SEE SPECS CONCRETE VAULT, SEE STRUCTURAL DWGS 1 1 1 1 12" DI TO PUMP STATION, INV 22.50 10" WALL PIPE (FLxPE) TYP CREATE 2'-0" SQ SUMP AT DRAIN 4" PVC DRAIN WITH BACKWATER VALVE, INV 19.50 FINAL DRAWING FOR REVIEW PURPOSES ONLY � NOT RELEASED FOR CONSTRUCTION V) Z O V) w co N c; E O O co U r- >, N U ICU z E 0,U O "u z N Q ' c c U cu O 00 J O N m c0 � rn O rn 0 z O N Q In z � J O zuJ Q � U w ce w z N oZD CLo �> w ce V)J w 2 Q V)Q z ZD > Lu W O Q ' � °� r w z z 0 Q U W U Lu � z ZD0 N Ov V) w Z � In O Q V W O V% O Z In O CARO ���1\111111111///�� Q _ �SR L 3/27/2024 DESIGNED BY: CWS DRAWN BY: PMD CHECKED BY: CWS PROJECT NO.: 2896-AM DATE: MARCH 2O24 SCALE: 0 112 1 IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO FULL SCALE PS-2.7 VARIES 4'-0" 12" 12'-0" 12" 4"-0" I VARIES 4'-0" 12" 12'-0" 12" 4"-0" SLOPE 1/4" PER FT s SLOPE 1/4" PER FT. Stope 1 S�OpE D� �• �IA OMPACTED 3" THICK ACCESS ROAD SIDE ASPHALT DRIV DITCH -SEE DETAILSTONENON-WOVEN GEOTEXTILE FABRIC S I❑N NOTES: 1. ASPHALT PAM HALL BE S9.5B SURFACE COURSE 2. COMPACT E TO CONFORM TO AASHTO STANDARD T-99 3. DIMEN AND ROADSIDE DITCH LOCATIONS MAY VARY DEPENDING ON SITE CO 4. NO OVEN GEOTEXTILE FABRIC SHALL BE NON -BIODEGRADABLE CONFORMING TO 6 OF THE NCDOT STANDARD SPECIFICATIONS FOR TYPE 1 ENGINEERING FABRIC i TYPICAL ASPHALT DRIVE i SD-1 NOT TO SCALE NEW ASPHALT PAVEMENT CUi BACK EXIST CUT BACK EXIST BASE SURFAc, CUURSE - - - - COURSE 12" MIN 6" MIN FROM BASE SLOPE ASPHALT ONCRETE SURF COURSE (S-9.513) EXIST SURFACE COURSE K COAT ASPHALT CONCRETE BASE TACK COAT \ (I-19.013) S J EXIST BASE COURSE -AGGREGAT ASE COURSE dSD-1 TYPICAL PAVEMENT JUNCTION NOT TO SCALE SEED AND MULCH PER EROSION CONTROL AND SEDIMENTATION PLANS AND SPECS I %//////xv //\ \/ %/'i/jj -\j SELECT COMPACTED �O V BACKFILL, SEE NOTE 5 °J° \ // MARKING TAPE z �xV �X\� UNDISTURBED EARTH UL u �A/� \ SELECT COMPACTED m �X//� BACKFILL, SEE NOTE 5 TOP OF PIPE XX PIPE BEDDING O///<�Oo °0�000 Oa0°°O�OOc WIDTH O.D. + 18" MIN O.D. + 24" MAX PIPE BEDDING, CLASS I #67 WASHED STONE WHEN ROCK IS ENCOUNTERED, SEE SPECS FOR THICKNESS PIPE GRADE NOTES: 1. ALL BACKFILL MATERIAL SHALL BE SUITABLE NATIVE MATERIAL. 2. FOR DEEP TRENCHES REQUIRING SHORING AND BRACING, DIMENSIONS SHALL BE TAKEN FROM THE INSIDE FACE OF THE SHORING AND BRACING. 3. BACKFILL SHALL BE COMPACTED IN 6" LIFTS IN TRAFFIC AREAS AND 12" LIFTS IN NON -TRAFFIC AREAS. 4. NO ROCKS OR BOULDERS 4" OR LARGER SHALL BE USED IN INITIAL BACKFILL. 5. SELECT BACKFILL MATERIAL SHALL BE USED IN ALL LOCATIONS WHERE EXCAVATED MATERIAL IS DETERMINED, BY THE ENGINEER/CONSTRUCTION OBSERVER, TO BE UNSUITABLE FOR BACKFILLING. ACHIEVE 80% COMPACTION IN NON -TRAFFIC AREAS, AND 95% COMPACTION IN TRAFFIC AREAS. 6. ALL TRENCHING AND EXCAVATION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE NORTH CAROLINA OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR THE CONSTRUCTION INDUSTRY MANUAL. 7. NO BOULDERS 8" IN DIAMETER OR LARGER SHALL BE USED. TYPICAL DUCTILE IRON PIPE 5 TRENCH AND BEDDING SD-1 NOT TO SCALE SLOPE 1/4" PER FT. SLOPE 1/4" PER FTC 3:J .N 3 1_S Ope 1 S�OP� S�Opf 3 5\-OPE ACCESS ROAD SIDE \- g COMPACTED ABC STONE DITCH - SEE DETAIL NON -WOVEN GEOTEXTILE FABRIC SECTI❑N NOTES: 1. COMPACT STONE TO CONFORM TO AASHTO STANDARD T-99 2. DIMENSIONS AND ROADSIDE DITCH LOCATIONS MAY VARY DEPENDING ON SITE CONDITIONS 3. NON -WOVEN GEOTEXTILE FABRIC SHALL BE NON -BIODEGRADABLE CONFORMING TO SECTION 1056 OF THE NCDOT STANDARD SPECIFICATIONS FOR TYPE 1 ENGINEERING FABRIC 2 TYPICAL GRAVEL DRIVE SD-1 NOT TO SCALE SIDEWALK NOTES: CURB AND GUTTER NOTESi CONSTRUCT STANDARD SIDEWALK 5' WIDE AND CONSTRUCT CURB AND GUTTER 2' - 6' TYPICAL. WHERE EXISTING %THICK TYPICAL. WHERE EXISTING CONDITIONS CONDITIONS ARE DIFFERENT MATCH EXISTING CURB AND GUTTER. A DIFFERENT MATCH EXISTING SIDEWALK, PLACE CONTRACTION JOINTS AT 10' INTERVALS, EXCEPT THAT PLA\CRETE INT 1' DEEP WITH b8' RADII A 15' SPACING MAY BE USED WHEN A MACHINE IS USED OR EN IN IDEWALK AT 5' INTERVALS. SATISFACTORY SUPPORT FOR THE FACE FORM CAN BE OBT ED WITHOUT THE USE OF TEMPLATES AT 10' INTERVALS. ONEJOINT WILL BE REQUIRED AT 50' INTERVALS. JOINT SPACING MAY BE ALTERED IF REQUIRED BY E INEER. A �INT WILL BE REQUIRED WHERE THE SIDEWALK CONTRACTION JOINTS MAY BE INSTALLED WITH TH USE OF JOITURE, TEMPLATES OR FORMED BY OTHER APPROVED M ODS. 1/8' RAD. SURFACE OF SIDEWALK JOINT SEALER T I2' JOINT WIDTH . JOINT FILLER T = SIDEWALK THICKNESS SIDEWALK EXPANSION JOINT DETAIL NOT TO SCALE CONSTRUCT NON -TEMPLATE FORMED JOINTS A N. OF 1 16' DEEP, FILL ALL CONSTRUCTION JOINTS WITH J FILLER AND SEALER, SPACE EXPANSION JOINTS AT 90' INT VALS AND ADJACENT TO ALL RIGID OBJECTS, JOINT 1/8' RAD. SEA SURFACE OF GUTTER ° + 12' JOINT WIDTH JOINT 4 II FILLER CURB AND GUTTER EXPANSION JOINT DETAIL NOT TO SCALE CONCRETE SIDEWALK Y2' EXPANSION JOINT 1/2' D• 6` WIDTH C B & GUTTER EXISTING 3" RAD, ° PAVEMENT ' T III III -II III °II 12" °. _ I I_II-1 I 1=1I1=111= ° I -I _ - ° - (UNDISTURBED EARTH °I I III 111-1°1-1 19.° '•, 1=1 1-111-1 11-1 1=1 �11=1 I I=111= 4 -i=I=1 I-III-I-1 1-1 111 11 11 11 ;III- ' RB AND GUTTER W/SIDEWALK 2'-6" CURB AN GUTTER NOT TO SCALE NOT TO SCALE STANDARD CURB AND GUTTER SD-1 NOT TO SCALE SEED AND MULCH PER EROSION CONTROL AND ION PLANS ANDSPECS � _/xxjxjxA� j v % � ' � ; //�/jv \A A ` Aj' \��\j�Aj�Aj�` SELECT COMPACTED FINAL IN TAMPED BACKFILL 12" LAYERS % �j� MARKING TAPE /� Lu j/�� UNDISTURBED EARTH Lu I / \ \\\ � % % #12 COPPER TRACER Lu BACKFILL %//� WIRE (REQUIRED FOR jTAMPED IN 6"V� - - 12" - - - / jV/PVC ONLY) LAYERS ��/� A�Ax PIPE BEDDING, CLASS I x/� / #57 OR #67 WASHED II TOP OF PIPE ;//� I ;/ / STONE COMPACTED oa 0 000 oa OoV/' TO 90% STANDARD ������ °00 °� 00 ��/�A�� PROCTOR DENSITY PIPE BEDDING �x//� D000 0 0 O 0 0 �OC �000 °OOOO O00o00 090O�/�/ )00 00000 0= 0C // PIPE GRADE SEE SPECS FOR THICKNESS _ WIDTH OF STONE UNDER PIPE O.D. + 24" MIN O.D. + 48" MAX NOTES: 1. TYPICAL FOR PIPE DEPTHS OF 3' TO 141. FOR DEPTHS GREATER THEN 14' THE INITIAL BACKFILL SHALL BE SAME MATERIAL AS PIPE BEDDING MATERIAL. ALL TRENCHS 20' OR GREATER SHALL BE DUCTILE IRON PIPE. 2. FOR DEEP TRENCHES REQUIRING SHORING AND BRACING, DIMENSIONS SHALL BE TAKEN FROM THE INSIDE FACE OF THE SHORING AND BRACING. 3. STONE BEDDING FOR PVC WATER MAINS SHALL BE REQUIRED WHERE UNSUITABLE SUBSURFACE CONDITIONS EXIST AS DIRECTED BY THE ENGINEER. 4. NO ROCKS OR BOULDERS 4" OR LARGER SHALL BE USED IN INITIAL BACKFILL. 5. SELECT BACKFILL MATERIAL SHALL BE USED IN ALL LOCATIONS WHERE EXCAVATED MATERIAL IS DETERMINED, BY THE ENGINEER/CONSTRUCTION OBSERVER, TO BE UNSUITABLE FOR BACKFILLING. 6. ALL TRENCHING AND EXCAVATION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE NORTH CAROLINA OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR THE CONSTRUCTION INDUSTRY MANUAL. TYPICAL PIPE TRENCH 6 AND PIPE BEDDING FOR PVC SD-1 NOT TO SCALE MAXIMUM PAYMENT WIDTH SAW CUT EXISTING ASPHALT 2' MIN. OR MATCH EXISTING S9,5 SURFACE COURSE MIN. 8' COMPACTED ABC AGGREGATE BASE 6• - COMPACTED BACKFILL VARIES J 12' 12' PIPE WIDTH NOTES: 1. THE PAVEMENT SHALL BE DEFINED BY A STRAIGHT EDGE, PREFERABLY A MACHINED SAW CUT. 2. THE TRENCH SUBGRADE MATERIAL SHALL BE BACKFILLED WITH DRY SOIL OR ABC STONE TO THE BOTTOM OF THE PROPOSED SUBGRADE. THE BACKFILL SHALL BE PLACED AND COMPACTED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. 3. WITHIN ROADS MAINTAINED BY NCDOT, THE TRENCH SHALL BE BACKFILLED AND COMPACTED IN ACCORDANCE WITH NCDOT STANDARDS. 4. THE ENTIRE THICKNESS/VERTICAL EDGE OF THE CUT SHALL BE TACKED. 5. THE SAME DEPTH OF PAVEMENT MATERIAL WHICH EXISTS SHALL BE REINSTALLED, BUT IN NO CASE SHALL THE ASPHALT BE LESS THAN 2" THICK. 6. THE ASPHALT PAVEMENT MATERIAL SHALL BE INSTALLED AND COMPACTED THOROUGHLY TO ACHIEVE A SMOOTH LEVEL PATCH. D TYPICAL PAVEMENT CUT AND PATCH NOT TO SCALE 2" X 2" DURABLE 2" X 2" DURABLE HARDWOOD STAKE _� HARDWOOD STAKE 1 WOOD MULCH OR 3" 3" COMPOST TO Y2 MIN. 16" DIA. HEIGHT OF WATTLE } MIN. 16" DIA. WATTLE WATTLE FLOW-��� FLOW �� ; AREA TO BE _ AREA TO BE - _ II -11-III-III=111J PROTECTED � 1110111=III PROTECTED =IIII_( I I -I I1=1I1= III I I I II I I II j I 11=1I ( I I I I II I I I I II I I I I1=1I1=1I1=1I1= I I I_I � I_I � 1=1I I I I1= � ! I I I I II I I I I1=1I1=1I1=1I1= I_I I1= -I I I_I I1=1I1=1I I- _ _III III -I IIIIOIIiI_li1=111= _II-III-III_I11_III_I11- 11-III- 12" MIN. 12" MIN. TRENCH INTO GROUND 4" MIN. ENTRENCHED INSTALLATION UNTRENCHED INSTALLATION NOTES: 1. PRIOR TO INSTALLATION, CLEAR ALL OBSTRUCTIONS AND DEBRIS GREATER THAN 1" THAT MAY INTERFERE WITH PROPER FUNCTION. 2. PLACE WATTLE BARRIER ON GENTLY SLOPING GROUND AND TURN ENDS OF WATTLE SLIGHTLY UPSLOPE TO PREVENT RUNOFF FROM GOING AROUND THE ENDS. 3. USE OAK OR OTHER DURABLE HARDWOOD STAKES DRIVEN VERTICALLY THROUGH THE CENTER OF THE WATTLE. INSTALL STAKES ALONG THE LENGTH OF THE WATTLE AT A MAXIMUM INTERVAL OF 4' BETWEEN STAKES FOR UNTRENCHED INSTALLATION AND A MAXIMUM INTERVAL OF 8' BETWEEN STAKES FOR ENTRENCHED INSTALLATION. STAKES SHOULD BE DRIVEN TO A MINIMUM DEPTH OF 12", WITH A MINIMUM OF 3" EXTENDING ABOVE THE TOP OF THE WATTLE. 4. INSPECT WATTLE BARRIERS WEEKLY AND AFTER RAINFALL EVENTS OF 0.5" OR GREATER AND REMOVE ACCUMULATED SEDIMENT AND/OR DEBRIS. 9 STANDARD WATTLE BARRIER SD-1 NOT TO SCALE FILTER OF 1 INCH DIAMETER # 57 WASHED STONE o�U u� o°o ° NOTE: o a'°0000 SILT FENCE FABRIC TO OVERLAP .0114 o ° HARDWARE CLOTH BY 12 INCHES o Soo 0 0 °0000 0 o°O O�o °6 O� off°°°o0 000o O ° l, STEEL FENCE POST WIRE FENCE SILT FENCE FABRIC HARDWARE CLOTH ON WIRE FENCE FILTER OF 1 INCH DIAMETER - # 57 WASHED STONE g� 0o O o oc oO°g�OC FLOW DIRECTION 60- 0 . 0o0 18" ­O°°COC�O°°U o`< o�qO o� oo ll GRADE ul r w II SIDE VIEW u SIL FAI GRP n 2"-3" COARSE AGGREGATE NOTE: 1. ENTRANCE APPLICABLE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED. 2. CONSTRUCTION ENTRANCE SHALL BE PLACED FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. 3. PERIODIC TOP DRESSING AND ROUTINE MAINTENANCE SHALL BE PROVIDED ON ENTRANCE AS REQUIRED. CONTRACTOR SHALL STOCKPILE FRESH STONE ON SITE. 4. ANY MATERIAL THAT MAKES IT TO EXISTING PUBLIC ROADWAY SHALL BE REMOVED AND CLEANED IMMEDIATELY. Q8 TEMPORARY CONSTRUCTION ENTRANCE SD-1 NOT TO SCALE = 8'-0" MAX. f_ SILT FILTERING FABRIC STONE FILTER OF 1" GRAVEL PLACED AGAINST FENCE WHERE REQUIRED 8'-0" MAX. 14 GAUGE APPROVED WIRE BACKING SILT FILTERING (6"x6" MAX. FABRIC OPENING) ® 1.33 LB/FT STEEL POSTS FRONT WIRE MESH o rn ° ,o<: ° r ° o80o� °p 1 00 o°O - 91, M � ANCHOR ch z DITCH Lu w SECTION NOTES: 1. POSTS SET AT DEPTHS OF 4' FOR EARTH BACKFILL. ANCHOR DITCH IS 9" x 9" AND FILL IS TO BE COMPACTED. 2. PROVIDE ADEQUATE EXCAVATION AHEAD OF SILT FENCE TO ACT AS A VELOCITY BREAK AND SILT TRAP. 3. CONTRACTOR MAY USE ALTERNATE MATERIAL OR METHOD UPON APPROVAL FROM ENGINEER. oD- SILT FENCE NOT TO SCALE oU 0 0 oo U O oU o O �Lg6 ��o= � U16Uz05ooV O0o lP )00° on�oO�o°() � nC)°O�o ()nC)°=n0.'�n n=n�nn0.'On°rinC)°=n0.'��° HARDWARE CLOTH STEEL FENCE POST ON WIRE FENCE PLAN VIEW NOTE: USE SILT FENCE OUTLETS ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND THERE IS A LOW AREA. USE AS A REPAIR OF SILT FENCE FAILURES. STEEL FENCE POST SET FRONT VIEW AND SILT THE TR NCHNCE FABRIC 6 INCHES INTO ii STANDARD SILT FENCE OUTLET SD-1 NOT TO SCALE FINAL DRAWING FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION V) O V) Lu co 04 c; E O O (O U r 04 U co z E 0) U 0 N co O L � O N E CD"_ z N � In Q co c 0 U �, 00 J O 00 m 00 L � O 0 z O 04 Q N z � O z Lu u w O O Lu V) a O J_ Uce N Q Q Lu V Lu V) Q z z Lu � oc O I Q 0 z Lu z Q Q u Lu V) z N O O Q O =O V) z N O Is a N9l 9 b,°,4 8Y w S ,,,,��, M7/2024 DESIGNED BY: CWS DRAWN BY: PMD CHECKED BY: CWS PROJECT NO.: 2896-AM DATE: MARCH 2O24 SCALE: 0 112 1 IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO FULL SCALE SD-1 CONCRETE COLLAR TO ROUND SURFACE M.H. RING AND COVER FOR H-20 LOADING FINISH GRADE, GROUT AROUND RING SEE NOT 1 \ TOP OF PAVEMENT BUTYL MASTIC ROPE GRADE RINGS 8" MAX. 2'-0" SEALANT, (TYP.) a ECCENT CONE SECTION BUTYL MASTIC ROPE SEALANT, (TYP.) \ a POLYOLEFIN BACKED EXTERIOR JOINT WRAP TO SEAL EXTERIOR JOINTS DIAMETER MAIN DEPTH OF SIZE INSTALL. Z / 8" TO 12" 0' TO 15' Z 5' - 0" 15" TO 30" 15' TO 30' 6' - 0" 36" & GREATER 30' & GREATER____ a SEE MONOLITHIC BASE a . NOTE #3 wor �. °. GROUT CHANNEL INV. ELEV. SEE NOTE #2 6" 8" MIN. #57 STONE ° AGGREGATE BASE OMPACTED SUBGRADE NOTES: 1. THE DISTANCE FROM THE OP OF M.H. RING AND COVER MAY VARY WIDELY. SEE GRADI PLAN, AND/OR MANHOLE SCH ULE 2. INVERT ELEV. SHOWN N THE PLANS OR MANHOLE SCHEDULE ARE AT THE INLET AND OUT L OF MANHOLE UNLESS ERWISE NOTED 3. CARRIER PIPE TO NHOLE CONNECTIONS SHALL BE RUBBER SLEEVE WITH DUAL S.S. BANDS 4. ALL MANHOLES E TO BE EXTENDED BASE 5. ALL INTERIOR INTS AND LIFTING POINTS SHALL BE SEALED WITH GROUT 6. MANHOLES S ILL NOT HAVE STEPS 1 STANDARD MANHOLE SD-2 NOT TO SCALE RE UIREMENTS FOR ABOVE GROUND INSTALLATIONS OF REDUCED PR SURE PRINCIPLE AND DOUBLE CHECK VALVE ASSEMBLIES 1. The b kflow preventer must be installed a Maximum distance of five (5) feet from t meter service or before any wyes, tees, or bypasses. Installation of backflow reventers within the DOT right-of-way will not be accepted, it must be install d on the customers property. 2. Reduced p assure principle assemblies must be installed in a horizontal position and s0 10c ed in which no portion of the assembly can become submerged un er any circur nces. 3. Double check valves can be installed in a vertical position provided the water lows in an upward dir tion. 4. All backflow pre enters must be installed above ground. Backflow preventers installed inside must be minimum of twelve (12) inches above the floor, and no igher than four (4) fee above the floor. Customer must maintain adequate cl rance around the assemb for testing, and/or repair of the assembly. Wherev a reduced pressure principle b kflow preventer is installed inside a building an air gap drain of adequate size must e installed. Below ground installations are prohib' ed for RP's. Surface or Sub-surfa obstacles which prohibit the installation of t e device in accordance with the sp cifications shall be subject to the review a approval of the Engineering Director for Iternative locations. 5. Backflow prevention asse blies installed outside must be protecte with a ASSE 1060 approved enclosure. The a sembly must maintain a minimum dis nce of twelve (12) inches and a maximum Cis nce of thirty (30) inches above th ground. Landscaping is allowed around any assem ly provided it does not interfere ith the testing and/or repairing of the assembly. 6. Protective enclosures must be sed to prevent freezing or v ndalism for backflow prevention assemblies installed utside above ground. Freez proof enclosures that meet of exceed North Carolina umbing Code Standards e acceptable provided that the insulation is at least 7.05 R ctor, and have the 10 0 ASSE approval plate. Adequate drainage shall be provide by a hinged door o drain ports along the bottom walls of the protective encI ure. The enclosur will require to be mounted to the ground or existing grade. If t e structure is n removable it must be accessible by doors large enough for ntrance and r air. 7. Backflow prevention assemblies two an one half (2 2) inches or larger must be supported to allow for the weight of th backflow revention assembly. Support construction can consist of concrete blo , brick r steel. Supports must have a proper footing to rest on. Supports should be sp ced s they do not cause interference with the testing and/or repair of the ass, blie . 8. All piping must be of ductile iron, pvc, co pp r or brass. 9. All backflow prevention assembly installations hall be inspected by the Onslow Water and Sewer Authority Technical Operations Set n or an authorized representative prior to initial connection to the potable water s Ste . 10. Before installation of any backflow prevent r, Co tact the Backflow Cross Connection ORC at 910-455-0722 to assist in prop selec n and installation. Note: Appendices within these regulations are subject to hange periodically or as required by the State of North Carolina. 3 STRAND BARB WIRE TOP RAIL u X x x I y a I �'J n it YYYYYIlYYYYYY •� ���211�����!,�!,������������� �oV,A.3 CENTER STRETCH �i�i�i�i�i�i�i�i�i�i�i�i�i�i♦ _A 1. I- TENSION WIRE 0 -CONCRETE ENCASEMENT (TYPICAL)` 16'-0" (TYP.) I I LDOU GATE HINGES NOTES: 1. DOUBLE GATE SHALL HAVE A LOCKING MECHANISM, DROP ROD, AND TRUSS ROD. 2. ALL FENCE COMPONENT MATERIALS SHALL BE THERMALLY FUSED AND BONDED VINYL COATED (GREEN OR BLACK) WITH A 9 GAUGE CORE 0SD-2 STANDARD FENCING NOT TO SCALE 23 1/2' 2 1/8' SECTION "A" 7 1/2' / I_ LAGSHIELDS MAY ONLY BE USED IN ROADWA APPLICATIONS. COVER 120 LBS. MINIMUM 2 5' 33 1/4' 5/8" X 3" LAGSHIELD IN HOL /NHOLES DRILLED INTO CONE OR RING WI ANH FRAMES SHALL BE ANCHOR SUNK TO DESIGN DEPTH, TI LY CAST AND 5/8" X 3" HOT DIPPED HALL BE A MINIMUM WEIGHT OF GALVANIZED LAG BOLT AND WASHER. S. SHALL WEIGH A MIN. OF 120 LBS. LES WITHIN PAVED SURFACES BE CONSTRUCTED IN ACCORDANCE ETAIL.AL SHALL BE USED BETWEEN RING ONE 2 STANDARD MANHOLE COVER AND FRAME SD-2 NOT TO SCALE 6 L EX. SEW PIPE, TOP FREMOVED WI IN MANHOLE VERT KCHANNEL NEW SEWER MASONRY 811 LINE SEAL w MIN = 811 CONC. EX. SEWER D BE D '. PIPE riC� ii D D i 1 o Nc: SLAB % #4 @ 12" 12" MIN CONC. BENCH O.C.E.W. #67 STONE SEAL FOR OGHOUSE TYPICAL SECTION STYLE PIPE NING 3 DOGHOUSE MANHOLE SD-2 NOT TO SCALE = rn m� zC c O< z aH Dar m M ao o 70z F� >c �c cm c� m D co co o V) nl r �7 Cn z m O D m I F7 M ;;C o c 0 Cf) Z = p rn m m M 0 O Om �< vi =-9 c- z O c mT'700 (>W Cn DMD D Mo I r MD M OOZ D �0 Cf<�oO O y f£bd DW D -m OnC7-9 1S Z = -n���r 0M 0 lD p DD� -0O O K0 �z <<;U <oT<DCnd �dvC r rCD O r- < <0D�.ZOm m rrco 0 O �� Cn Z d0C *k Z D � D O MO* ro Z O D � �OO x Z x OM � Z)1 Z) D Z co 0 Do�WpW _Oa Cu c U) 7 = II0 I A �� 0 Z RELIEF y m W Cn I VALVE 0 M m II - - OUTLET O ►:I z X /0 m _ o ro z M 0 11 II I I II 4• :. •q, • r•S. �•rµ D- z o o hE3 n- oo � z;0 0 �110 o ANC � I Jjo' � in o ;0FLOW - F W yFLOW p--� J _ FROM ❑NWASA'S WATER MAIN / TO CUSTOMER o A MMd m REDUCED PRESSURE 5' ASSEMBLY NOTES: 1. THE INSTAL HAS THE OPTION TO INSTALL THE GATE OR BALL VALVES AND THE PRESSURE REDUCING VALVE INSIDE OF E ENCLOSURE. 2. IN ORD TO PREVENT OBSTRUCTION DURING THE TESTING OR REPAIR OF THE ASSEMBLY, IT IS RECOMMENDED THAT E GATE OR BALL VALVES AND THE PRESSURE REDUCING VALVE BE INSTALLED OUTSIDE THE ENCLOSURE. 5 STANDARD METER AND 211 RPZ SD-2 NOT TO SCALE DUCTILE IRON FLANGED TEE DUCTILE IRON BLIND FLANGE SIPHON BREAK NOTE: HOSE BIB SHALL ACCOMMODATE STANDARD 3/4" GARDEN HOSE. PRECAST C C. COLLAR STANDARD 1. 5' // SET 1" ABO VALVE VALVE BOX LID BOX TOP YP.) 1' TAMP BACKFILL CONCRETE PLAIN ENDxFLANGED END LLAR DUCTILE IRON PIPE GATE STANDAR VALVE VALVE BOX )E CONCRETE MJ TEE ON / I BLOCKING FORCE MAIN WITH THRUST BLOCKING RESTRAINED MJxMJ RESTRAINED CONCRETE DUCTILE IRON E 90 DEG BEND WITH JOINTS SUPPORT (RESTRAINED JOI CONCRETE THRUST IF MORE THAN ONE BLOCKING FULL SECTION) NOTES: 1. EMERGENCY BYPASS CONNECTION ASSEMBLIES SHALL BE MINIMUM 6-INCH DIAMETER (PIPING, FITTINGS, VALVES, ETC.). LARGER DIAMETER ASSEMBLIES MAY BE REQUIRED AS DIRECTED BY ONWASA. 2. ALL JOINTS SHALL BE RESTRAINED 9 STANDARD EMERGENCY BYPASS CONNECTION SD-2 NOT TO SCALE TOP OF SLAB ' t_ 12" � TYPE K, 1" DIAMETER COPPER WITH THREADED TO COMPRESSION FITTING AT HYDRANT. STANDARD YARD HYDRANT NOT TO SCALE STANDARD CONCRETE VALVE COLLAR (IF NOT IN ASPHALT) (IF IN ASPHALT, VALVE BOX TO MATCH ASPHALT GRADE) FINISHED GRADE 1' a V COVER < • \\ \\ \ i\ /X z TAMPED CAST IRON VALVE BOX Li D BACKFILL -CMo O CAST IRON GATE VALVE - STANDARD MJ GLANDS -- NOTE: RESTRAINT GLANDS -_ MAY BE USED AS OPTION IF NEEDED TAMPED BACKFILL CONCRETE SUPPORT (/'4 STANDARD INLINE VALVE SD-2 NOT TO SCALE .. _ Tr_, 1 - Rhino # TVF86UB - Rhino TriVlew Flex" ...66" The TriGHip Anchor Raps"" shall be extarded priorty to Blue with Black trap OR burial of the Rost. Soil shall be compacted :hiring 1 - Rhine # NiI66UW2 - Rhino TriViaw"' Test Station, placement of marker post. 86", 2 Inside Terminals, Blue with White Cap All materials shall be provided byRhino Markin & 1-Cap Lock -TS-LOCK for Test Stations Protection Syteans,Inc. g 3 - Decal # SD-B516K Custom Decals i 4'-0" (OR AS INDICATED) 1/8" RADIUS EXPANSION JOINTS 40'-0" OC MAX (BOTH SIDES)- DINT SEALER FINISH 1 /8" TO 1 /4" GRADE- N, CONTROL JOINTS 5'-0" OC MAX 1" - x x x- JOINT FILLER 1/� f 2" CLR W2.9 X W2.9 (6X6) WWF TRANSVERSE EXPANSION TY? �f JOINT IN SIDEWALK SECTION VIEW JOINT DETAIL AL CONTRACTION JOINT 40' MAX SPACING BETWE 1/2" EXPANSION JOINT , 5'-0" ---4" THICK CONCR WALK_---,,",, \ VARIES, SEE PLAN FOR WIDTH 1 /2" EXPA ION JOINT MATL HEN WIDTH OF SIDEWAL4 PAD, ETC REQUIRE WHEN WALK ABUTS EXCEEDS 6', LONGITUDINAL CONTRACTION RIGID RUCTURES JOINTS SHALL BE PLACED AS REQUIRED PLAN VIEW �o TYPICAL SIDEWALK SD- NOT TO SCALE Install above -ground utility markers at horizontal bends, nrairaline valve boxes (not within I D feet [sf a fire hydrant assembly branch), ends of directional bores, bank edge of all channels crossed by direeionl bores, each side of a roadway crossing, and along the piping alignment The maximum spacing for the above -ground udliity markers shall be 50C linear feet. In locations where them are multiple horizontal bends in dose proximity, one marker - Dili be suf'iiciant to +d : e..:,,:: the change in dirwdon. Utility markers designed to plrarli& nuumm bD trawr wire d-al be installed at every third u arker or every 10130 Peet of pipe, whdwv r is Lesser_ Trace' wire accersiF_ ahwe- grrx nd utility Rite hers shatl a%o fre installed at otitis of Ij directional bums. ll - AP Il EL �l j II RI AP A I I T E E E ¢l E L 31 RI E E P 48' -- .AP TE EL RI N E i GroffA IL Mlnlmum bury Lure ciepth 18" Anchor Dea 00 STANDARD VALVE BOX SD-2 NOT TO SCALE WIDTH AS SPECIFIED ON PLANS / -- NEW ASPHALT 4" CONCRETE PAVEMENT WWF 6X6-W1 . 4X1 . 4 - 6" OT #57 STONE (3" MIN. COVER. TYP.) BASEC RSE .� x 0 0 D0 0 0 0 0 0 /i0 7 / Oo oC � D �oO �o0�oa0o0\ I Zo oC)0 oaC� OOo O 00� 01 0 ' o COMPACTED SUBGRADE 0 n�0/1C ��U�000 - ( �� BEND #4@12 NOTES: 1. STANDARD SIDEWALK WI HIS SHALL BE AS SHOWN ON THE PLAN SHEETS D THICKNESS SHALL BE 4" UNLESS OTHERWIS ENOTED. 2. A GROOVE JOI 1" DEEP WITH 1/8 " RADIUS SHALL BE REQUIRED HE CONCRETE SIDEWALKS AT 5' INTERVALS. ONE 1/2 " XPANSION JOINT WILL BE REQUIRED AT 40' INTER S. A 1/2 " EXPANSION JOINT WILL BE REQUIRED WH E THE SIDEWALK JOINS ANY RIGID STRUCTURE. ii TURNDOWN SIDEWALK SD-2 NOT TO SCALE FINAL DRAWING FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION V) 0 V) LU IBC M N A O O (o 0 r- >, N a U ca Z Iz LO E �0o LL a� o L � O N E Z a� > � cn Q L-0 c CU o U 00 1D O N m °O � rn O rn 0 Z O N Q N Z � 0 Zw Q � U w � O 0 O w N a O J UNce Q N Q "' N W V) Q Z z w oc 0 I Q O Z w Z Q Q U w U_ Z °C wO V) U ow O =O Z In O �6F ES S/p a N9l 9 tW 52SY. 3/27/2024 DESIGNED BY: CWS DRAWN BY: PMD CHECKED BY: CWS PROJECT NO.: 2896-AM DATE: MARCH 2O24 SCALE: 0 112 1 IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO FULL SCALE SD-2 V) w A= CARRIER PIPE SEE SCHEDULE VARIES ACCORDI TO PIPE SIZE (APP X 4 1/2" TOTAL ADJUS ENT) �ADJUSTA E SADDLE WITH S PORT PIPE, MSS TYPE 8, SEE SCHEDULE A (M TYPE 37, AS REQD) XPANSION ANCHOR BOLT (D) (2 REQD EA SUPPORT - SEE SCHEDULE A ll u ll c.1 1= B = SINGLE PIPE ADJUSTABL ADDLE SCHEDUL A ADJUSTABLE SADDLE (DIM I NCHES) PIPE SIZE A B C D DIA x LG 3 2 1/2 7 1 1/ 5/8 x 5 4-12 3 7 1/2 2 1/2 5/8 x 5 1 16 4 9 3 5/8 x 5 /18-20 6 11 3 1/2 3/4 x 6 r 24-36 6 11 4 3/4 x 6 1 PIPE SUPPORTS SD-3 NO SCALE 0 6" PIPE DIA 6" O 2 1/2" x 5/16" STRAP(GALV O AFTER FAB) U- _ _ 5/8"0 GALV _ t- O BOLTS (12" LONG) w • \ • < 3 LAYERS OF >' GRADE FELT W/GRAPHILu O z • • • w - #5 DWL 12" w #3T S@12" \ w z U- � y = C° z A - A- A 0 fV Lu w O OI #5 BARS @12" EW y \11+(2xA) - NOTEV (BOTTOM MAT) /4D-3NO ION "A"=4" FOR HEIGHT UP TO 6'-0" ION "A"=8" FOR HEIGHT 6'-0" TO 12'-0" USE FOR HEIGHT OVER 12'-0", SEE STRUCTURAL DWGS. E SUPPORT - CONCRETE PIER E - FLOOR DRAIN, JO M 30000, JAY R FINI FLOOR -FORM 2'-0" 0 SMITH 2O05, Z N Z-415 OR EQUAL DISH ERE REQUIRED 450 WYE AND 450 BEND / FOR VENT LINE IF REQD / DEEP SEAL "P" TRAP NOTE: I INTERIOR FL00 DRAIN AND CLEANOUTS TO HA\THAVE EL BRONZE TOPS. EXTE R FLOOR DRAINS AND CLEANOU LACQUERE AST IRON TOPS. 5 FLOOR DRAIN SD-3 NOT TO SCALE - CONCRETE WALL 2 1/2" x 2 1/2" x 1/4" ANGLE , = 2'-0" M /I SEE PLANSNl"-2 1/2" x 1/4" SST STRAP PIPE 1/2" x 1 1/4" SST BOLTS (2 REQ) 1/2" SST BOLTS (2 REQ) 8 PIPE WALL SUPPORT BRA�ET -3 NO SCALE NOTES: STANDARD THRUST BLOCKING 1•) THRUST BLOCKING SHALL BE USED AT BENDS, TEES, OR WHERE DIRECTED BY ENGINEER. 2.) CONCRETE THRUST BLOCKS, ARCHES, ENCASEMENTS, FLOWABLE FILL, ETC. SHALL BE FORMED USING PLYWOOD OR SANDBAGS TO PROVIDE REQ'D SHAPE. 3.) CONCRETE SHALL BE 3000 PSI MINIMUM. 4.) CONCRETE SHALL NOT ENCASE OR CONTACT BOLTS OR OR ENDS OF MECHANICAL JOINT FITTINGS. WRAP PIPE WITH 4 ML POLYETHYLENE PLASTIC TO PREVENT BOND. CONCRETE THRUST BLOCK SCHEDULE* PIPE BEND DESIGN SIZE 90 7TEE 45 0 22 1/2 0 11 1/4 0 PLUG PRESSURE (IN) H L H L H L H L C D (PSI) <4 1.3 2.6 1.0 2.0 0.7 1.4 0.5 1.0 0.5 1.5 150 1 6 1.7 3.4 1.3 2.5 0.9 1.8 0.6 1.3 0.8 2.0 150 1 8 2.3 4.5 1.7 3.3 1.2 2.4 0.8 1.7 1.0 2.5 150 12 3.3 6.6 2.4 4.9 1.7 3.5 1.2 2.5 1.4 2.7 150 1 1 16 4.3 8.7 3.2 6.4 2.3 4.6 1.6 3.2 1.8 3.0 150 1 1 20 5.2 10.4 3.9 7.5 2.8 5.4 2.0 4.0 2.0 4.0 150 1 24 6.4 12.9 4.7 9.5 3.4 6.8 2.4 4.8 2.3 5.0 150 30 8.0 16.0 5.9 11.8 4.2 8.4 3.0 6.0 3.0 6.0 150 1 36 9.6 19.1 7.0 14.1 5.0 10.1 3.6 7.1 3.5 7.5 150 1 1 42 11.1 22.2 8.2 16.4 5.8 11.7 4.1 8.3 4.0 9.5 150 1 48 12.7 25.4 9.3 18.7 6.7 13.3 4.7 9.5 4.5 12.0 150 * BASED ON AVERAGE SOIL PASSIVE BEARING STRENGTH OF 2000 PSF USING SAFETY FACTOR OF 1.5 UNDISTURBED EARTH b AS REQUIRED 311 VARIES 3 11 ANC\SE OLTS, PER PER SIZE 3" MIN BAS 2" MIN I PUMP OR EQUIP 1" NON-METALLIC = I = BASE F NON -SHRINK 1200 I I GROUT (AS REQ'D) STANDARD ASE BEND ° 0Ln N i Lu. Lnn ASPHALT \ Q IMPREGNATED w CONC PIER a FILLER w o CONC BASE 0 0 0 0 O O I ce N I } I 6" MIN CL ANCHOR - I #4@1 W I I SEE MECH DWGS #3 @ 12" TIES #4 12" EF, TYP BOLTS REQUIRED REQUIRED COVER + 1" ONC FLOOR 8" MIN, COVER + 1" 8" MIN, PLAN VIEW SEE NOTE MAX /NR SEE NOTE MAX = � E VE #5 DOWELS @12" EF I #5 DOWELS @12" SEE NOTE DOWEL ADHESIVE/DE DO LS @12 L OUND, SEE NOTE ALL AROUND, /Ro TE HOOK 90° FROM SHOWN SO THAT SEE NOTE OK IS PARALLEL TO PIPE, TYP. STANDARD BASE BEND AY BE CAST IN WITH 90° HOOK OTE: DOWELS MAY BE CAST IN WITH 900 HOOK 0 H DOWEL ADHESIVE AT CONTRACTO OPTION. ANCHORED WITH DOWEL ADHESIVE AT CONTRACTO OPTION. IS 8" THICK OR LESS, USE #4 DOWELS BEDDED ANCHOR BOLTS, PER 3" VARIES 3" WHERE FLOOR IS 8" THICK OR LESS, USE #4 DOWELS BEDDED F BOTTOM OF FLOOR SLAB. BASE SIZE TYP TYPLu TO WITHIN 2" OF BOTTOM OF FLOOR SLAB.PICAL E UIPMENT BA E NON-HRINKLLIC wCRADLE PIPE SUPPORT Q`GROUT (AS REQ'D) SCALE �I SD-3 NOT TO SCALE i I _ 18" _ X MIN. TRENCH WIDTH X (O.D. + 18" MIN) 12" CLASS B 4S o CONCRETE u o, 0 z _ j� a N 11 TYPICAL SECTION TEE OR BEND 1/2 L 1/2 L CLASS B Q z_ CONCRETE U_ UNDISTURBED EARTHrNI \ TYPICAL PLUG UNDISTURBED WRAP PIPE WITH 4 ML \ \\ EARTH POLYETHYLENE PLASTIC TO PREVENT BOND PLAN - TEE PLAN - BEND 9 STANDARD THRUST BLOCKING SD-3 NOT TO SCALE TYPL PIPE (SEE PLANS FOR DIA) 2" X 3/16" SST STRAP 1/2" 0 SST ANCHOR (4" EMBED) TYP OF 2 1/2" 0 SST ANCHOR (4" EMBED) TYP OF 2 o - STAINL STEEL NUT AND W RS Ll> 2" X 3/16" SST STRAP o PIPE (SEE PLANS 0 FOR DIA) D 211 MIN o ' TOP OF WALL SEE PLANS \ ' SST WASHE P a D � D - m � - 2"x3/16" BACKING 3 1/4" THICK - - NEOPRENE PAD - PLATE TYP � N CONCRE ALL CONCRETE WALL ALL HARDWARE SHALL BE TYPE 304 STAINLESS S UNO. ALL WARE SHALL BE TYPE 304 STAINLESS STEEL UNO. CONTRACTOR HAS OPTION OF USING WE TYPE, ADHESIVE TYPE OR CONTRACTOR S OPTION OF USING WEDGE TYPE, ADHESIVE TYPE OR CAST -IN -PLACE BOLTS. CAST -IN -PLACE B S. TOP WALL SIDE WALL 6 DETAIL - TYPICAL PIPE STRAP SD-3 NO SCALE NOTE: NO ENCASEMENT REQUIRED FOR SPACE GREATER THAN 12" \%\% 6" PIPE 6" o Z O.D. Z FLOWABLE FILL FULL TRENCH WIDTH (SEE NOTE 1) ' EXIST PROPOSED Q PIPE � PIPELINE a �� o Qo 0 a 6- MIN ------------------ t6" MIN 12" MAX 12" MAX a D a oo D _ EXIST . PROPOSED PIPE PIPELINE 1" THICK COMPRESSIBLE JOINT FILLER 12" MATERIAL MIN PROPOSED PIPELINE PROPOSED PIPELINE OVER EXIST PIPE UNDER EXIST PIPE 10 TYPICAL PIPE CROSSING SD-3 NOT TO SCALE s #4 STIRRUPS 0 Lu @8" OC MAX I z Cu 0 W 0 w 2" CLR m z #4 STIRRUPS J ID @8" OC MAX s g = w G J O L 0 CONC PIER a a L W � J � COLD JOINT m s 0 A REQUI D COVER 1" 8" MIN, MAX DO L SEE NOTE ADH IVE r #5 D ELS @12" ALL AR LIND, SEE NO ELEVATION NOT . DOWELS MAY BE CAST IN WITH 900 HOOK OR AN CRIED WITH DOWEL ADHESIVE AT CONTRACTORS OPTIO W RE FLOOR IS 8" THICK OR LESS, USE #4 DOWELS EMBEDDE T WITHIN 2" OF BOTTOM OF FLOOR SLAB. CHOR BOLT SIZE SHALL BE /4" LESS THEN STANDARD BASE HOL SIZE 7 TYPICAL BASE BEND SUPPO T SD-3 NOT TO SCALE SLOPE TOP FOR POSITIVE WATER RUNOFF / 6" DIA SCH 40 STEEL PIPE FILLED WITH CONCRETE AND PAINTED PER SPE03 a IL O N -1 O 04 PAVEMENT N EDGE OF CONC SLAB STEM WALL o } co Z 2 LAYERS -1/2" OINT FILLE ATL 30# FELT ° PAPER CLASS -B C CRETE TOF \� \ ENCASEME o O En 1/2- NT FILL MATL p Z w o Y 8" IA SCH 40 STE PIPE o EEVE, PAINT PER s = SPECS, SECTION 9A ° o co NOTE: 6" / 6" UNLESS OTHERWISE 6" \TYl / NOTED ALL BOLLARDS SHALL BE TYPE 1 BOLURD TYPE 2 BOLLA 11 TYPICAL BOLLARD SD-3 NOT TO SCALE FINAL DRAWING FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION V) O w co N A E O O co 0 r N U z E � U 0 a� ca O E z a� • > Q L c Oco I U 00 J O N m 00 L � O 0 z 0 N Q N z � J O zw u w ce O w a O J_ Uce N Q Q "' V)W V) Q z z w oc o Q o z w z Q ce Q U w U � z N O z � O Q u w 0 D V^ O z N O CAR SEAL �`M4 l5: w S co, nnlnm� 3/27/2024 DESIGNED BY: CWS DRAWN BY: PMD CHECKED BY: CWS PROJECT NO.: 2896-AM DATE: MARCH 2O24 SCALE: 0 112 1 IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO FULL SCALE SD-3 ZW 0 J _j �Q U po > Z- J OZ ' U Q DO J o 3� _M U2 V g J W o > g Ua pZ a¢ J 0 oQ <o 0 Q U Z w Qn W V) W U a W a_ a (N W LJ M 0> nW n o� a U H L W C u) O w !n w Z O CJ U �S L1j Ld aWm 3 z � O O M j J Q Q WW=mow tY 0 Ld < Ln W W w ���tn5o U�Op0 ag a m a w_1 W 4 U ::)LJ W <C) �Ow z to Q_J[If 20- < W (n a ¢ (n d W = Lj 'to W>� LLjv" I=-Ld O,per Lr) N p LLI a- oQ�zp=wmW z O Wiz Lo D=Q.2 Jgv<0_cn oM- w z Z Z ZW�L'1 aZ o0m-J W z_ a Ja= WZ Q Ld V) =Zm�N x Ln oo� dW WJ W W Q W JO QJSQ V) wjp>U_>w Inwz : :2a WV)LjOpLJ�a S W (n O - D- O I- ~-�'SQ 0_QZ z�w�QZ\> = W W Q¢OwLL WO F J N J U W J 2 J n w Of i w z¢WO -xO =zzwm�0 3:O_z)aL,oam N NM 4 Ln ca r� Onslow Water & Sewer Authority USE WITH "ONWASA MANUAL OF SPECIFICATIONS, STANDARDS and DETAILS, latest revision" ON WAS µ gam° ° TMce,ry AIR RELEASE/VACUUM VALVE SCALE: DETAIL# Not To Scale SS ARV SEWER REVISION DATE: SHEET #: May, 2016 1 of 1 �P EQUAL �90° III- -SEE NOTE 1 1EE1I. 1LI- -I I 1 I LEI_ EQUAL o> .90. I I �TI It -I I I=I 1 1-I i L_ I I E I _ III=1TI -III-III- III_ II�II� !Q Qa M - rTa SEE NOTE 1 a EQUAL Ir 90' 90° 1-1 I G I _ Q I I -III -I la ` EQUAL Q a IhIII- -T -1 I II_j� =_1�lil ��L_I�I-ICI -ICI-I' FOR ALL BEND FITTINGS. FOR TEE FITTING WIDEN TRENCH TO ACCOMMODATE ANCHOR IF REQUIRED } Ili �_II _rl II lu I -I 1 I Y I I�Ir III- TRENCH WIDTH PHI 1SEE TRENCHING- DETAILS III -II I I III I � III ICI-li III- I -III-_ 42' MIN 1=TI- i EQUAL ° v 3' MIN 1= L v -III- EQUAL _ I=1I1- i -III=L I-1 I (- 3' MIN ��1-1�1 III IIII�IIII �IIIII�11111�11� 11=I11- } UNDISTURBED •T"�� EARTH SECTION A -A NOTES: 1. CONCRETE BLOCKING IS TO BE FORMED TO ENSURE ACCESSIBILITY TO FITTINGS AND POURED AGAINST UNDISTURBED EARTH. 2. ALL FITTINGS SHALL BE WRAPPED IN POLYETHYLENE TO PREVENT CONCRETE FROM CONTACTING FITTINGS, BOLTS, OR ENDS OF MECHANICAL JOINT BENDS. 3. CONCRETE TO BE MINIMUM 3,000 PSI ® 28 DAYS. 4. WHEN SACKRETE IS TO BE USED, IT SHALL BE PROPERLY MIXED PER MANUFACTURER SPECIFICATIONS. 5. FOR REQUIRED DIMENSIONS, SEE WS_TB2 Onslow Water & Sewer Authority N WAS USE WITH "ONWASA MANUAL OF SPECIFICATIONS, STANDARDS and DETAILS, latest revision" O rz... - ^" " A SCALE: DETAIL# `/~ THRUST BLOCKING Not To Scale WS_T REVISION DATE: SHEET #:#: May, 2016 1 of 4 TYPE 1 (NOTE 1) FLAT BOTTOM TRENCH WITH LOOSE DIRT (FLAT BOTTOM IS DEFINED - UNDIST... - EARTH) TYPE 2 FLAT BOTTOM TRENCH WITH BACKFILL LIGHTLY CONSOLIDATED TO CENTERLINE OF PIPE (FLAT BOTTOM IS DEFINED AS UNDISTURBED EARTH) YTPE3 PIPE BEDDED IN 4" MINIMUM LOOSE SOIL WITH BACKFILL LIGHTLY CONSOLIDATED TO TOP OF PIPE (LOOSE SOIL IS DEFINED AS NATIVE SOIL EXCAVATED FROM THE TRENCH, FREE OF ROCK, ORGANIC MATERIAL, FOREIGN MATERIALS ANT' FROZEN EARTH.) TYPE 4 PIPE BEDDED IN SAND, GRAVEL, OR CRUSHED STONE TO A DEPTH OF 1/8 PIPE DIAMETER, 4" MINIMUM WITH BACKFILL COMPACTED TO TOP OF PIPE. (APPROXIMATELY 80 PERCENT STANDARD PROCTOR, AASHTO T-99) TYPE PIPE BEDDED TO IT'S CENTERLINE IN COMPACTED GRANULAR MATERIAL, 4" MIN MUM UNDER PIPE. COMPACTED GRANULAR oR SELECT MATERIAL TO TOP OF PIPE. (APPROXIMATELY 90 PERCENT STANDAED PROCTOR, AASTO T-99) (SELECT MATERIAL IS DEFINED AS NATIVE SOIL EXCAVATED FROM THE TRENCH, FREE bF ROCKS, ORGANIC MATERIAL, FOREIGN MATERIALS AND FROZEN EARTH) NOTES: 1. FOR NORMAL PIPE SIZES 14 INCH AND LARGER, CONSIDERATION SHOULD BE GIVEN TO THE USE OF LAYING CONDITIONS OTHER THAN TYPE 1. 2. CONSIDERATION OF THE PIPE -ZONE EMBEDMENT CONDITIONS INCLUDED IN THIS FIGURE MAY BE INFLUENCE BY FACTORS OTHER THAN PIPE STRENGTH. FOR ADDITIONAL INFORMATION ON PIPE BEDDING AND BACKFILL, SEE ANSI/AWWA C600. N WASA Onslow Water & Sewer Authority USE WITH "ONWASA MANUAL OF SPECIFICATIONS, STANDARDS and DETAILS, Iale, I revision" SCALE: DETAIL# SEWER FORCE MAIN Not To Sc Ile SS_F M E D EMBEDMENT DETAIL REMay,216TE: SHEET#: May, 2016 1 1 of 1 TEST PRESSURE = 150 PSI TEST PRESSURE = 200 PSII PIPE TYPE DIMENSIONS (FT) VOLUMEI CONCRETE TYPE DIMENSIONS DIMENSIONS (FT) VOLUMECONCRETE SIZE FITTING CU. YD, SPIPE IZE FITTING CU. YD, I I 11 1/4' ---- ---- ---- ---- 11 1/4' 1.00 1.00 1.00 0.04 <4 122 1/2' 1.00 1,00 1.50 0.06 <4 22 1/2' 1.00 1.00 1.50 0.06 INCHES 45° 1.00 I 1,00 1,50 0.06 INCHES 45° 1,00 I 1.00 1.50 0.06 90• 1.00 I 1.00 2.50 0,09 I 900 1.50 I 1.50 2.50 0.15 TEE 1.00 I 1.00 2,00 0,07 1 TEE 1.50 ISO 2.00 0.12 I11 1/4' 1.00 1.00 2.50 0.09 11 1/4' 1.00 1.00 2.50 0.09 4 122 1/2• I 1.00 I 1.00 2.50 0.09 4 122 1/2' 1.00 1.00 I 2,50 0.09 INCHES I 45• I 1.00 I 1.00 2.50 0.09 INCHES I 45- I 1.50 1.50 I 2.50 0.15 I 90- I 1.50 1.50 2.50 I 0.15 0' I 1.50 1.50 I 2.50 0.15 TEE I 1,50 1.50 2,00 I 0.12 rTEE1 1.50 1.50 1 2.00 0.12 11 1/4' 1,50 1.50 2.50 0.15 1/, I 1.50 1.50 I 2.50 0.15 6 122 1/2-1 1.50 1.50 I 2.50 I 0.15 6 122 1/2-1 1.50 1.50 I 2.50 I 0,15 INCHES I 45- I 1,50 1.50 I 2.50 I 0.15 INCHES I 45' 1 1.50 1.50 I 2.50 1 0,15 1 90° 1 2.00 2.00 1 3.00 I 0.28 I 90- 1 2.50 2.00 I 3.00 I 0.33 TEE I 2.00 1 2.00 1 2.50 I 0.23 I I TEE 1 2.50 2.00 2.50 I 0.28 �11 1/4' 2.00 2.00 I 2,50 0.23 it 1/4• I 2.00 2.00 2.50 I 0.23 g 22 1/2' 2.00 I 2.00 1 2,50 0.23 I 8 122 1/2• I 2.00 I 2.0a 2.50 I 0.23 INCHES I 45• 2.00 I 2.00 I 2,75 0,25 I INCHES I 45- 2100 2.00 2.75 0.23 I 90, 3.00 I 2.00 I 3.00 I 0.39 I 90° 4,00 2.00 3.00 0.50 I TEE 3.00 I 2.00 2.50 0.32 1 1 TEE 4.00 i 2.00 2.50 0.42 11 1/4' 2100 2.00 3,00 0.26 Il 1/4' 2.00 ( 2.00 300 0,28 12 122 1/2' I 2,00 2,00 3.00 I 0.28 I 12 122 1/2' 3.00 1 2.00 I 3.00 0,39 INCHES I 45' I 3.00 2,50 3.00 I 0,47 I INCHES I 45' I 4.00 2.50 I 3.00 0.61 I 90• I 4.50 3.00 3.50 I 0.94 I I 90- 1 5.50 3.00 1 3.50 1.13 TEE I 4,50 3.00 I 3.00 I 0.81 I I TEE I 5,50 3.00 I 3.00 I 0.97 1 Il 1/4' 2.00 2.00 3.00 0.28 11 1/4' I 2.00 2.00 3.00 0.28 16 122 1/2'1 3.00 2.00 I3.00 I 0.39 I 22 1/2'1 4.00 I2.00 3.00 1 0.50 INCHES I 45- I 4.00 3.00 1 3.50 I 0.84 I INCHES I 45- 1 5.50 I 3.00 3.50 I 1.13 I 90• I 650 I 3.50 1 3.50 I 1.54 I 190' 1 7.50 I 4.00 3.50 I 2.01 �I TEE 1 6.50 _ 3.50 1 3.00 I 1.32 I I TEE 1 7.50 I 4.00 3.00 I 1.72 CHART NOTES_ 1. IF BLOCKING EXCAVATION IS IN LIGHTLY COMPACTED FILL AREAS, OR IN AREAS WHERE BOULDERS OR STUMPS HAVE BEEN REMOVED, BLOCKING SIZE MUST BE RE -SIZED FOR THE SPECIFIC LOCATION/CIRCUMSTANCE BY A NC LICENSED PROFESSIONAL ENGINEER. 2. BLOCKING SIZES SHOWN IN THESE TABLES ASSUME THE FOLLOWING: a. BLOCKING IS CONSTRUCTED IN RESIDUAL SOILS AS SHOWN IN DETAIL b. SOIL BEARING PRESSURE = 2000 PSF c. VELOCITY OF FLOW = 15 FPS 3. THIS DETAIL NOT APPLICABLE TO REDUCING BENDS. 4. NEITHER THE WEIGHT OF THE CONCRETE BLOCKING NOR FRICTION BETWEEN CONCRETE BLOCKING AND SOIL WAS ADDED INTO BLOCKING SIZES COMPUTATION. THEREFORE, BLOCKING SIZE IS CONSERVATIVE. Onslow Water & Sewer Authority USE WITH "ONWASA MANUAL OF SPECIFICATIONS, STANDARDS and DETAILS, latest revision" WASA Not SCALE: To Scar DETAIL # ws_TB2 THRUST BLOCKING REVISION DA rE: SHEET #: May, 2016 2 of 4 Parts LW . 1 - Rhino * T Flextu, W The TnGrip Anchor Flaly "I ';sttatt be exitlin" pdocty to Gram With Stack Cap OR burial of the post. Sall iEIali 5-e ctmpecillihd during 1- Rhino r TVT€ +Ea - Rhirm TdVOW10 Test Station. placmient of marker "_ +Ea6"', 2 Inside, Tennin s, &een wfth VVWbe, Cap Ail materiaLs shaft be provided by Rhino Mlladdrpq 1 - Loa - TS-Lt' m *or Vast Stabom Protectim S+ytetrws, lwe 3 - Decsit St 1 aK Guisla ra DoGalls IrrsWI above-+jroufid. unity markm at horilimnU berm. rroir-i ne voAve boxes (Trot vAll in 10 feet of a fro hydirant assembly bwnch� +Burls of ditechonal borw, edge a g) trX:l< d all drannels ctosqed by bows. each �Ade of a wig, and along the pong aligntTrarlL The inazirrium spamg for theabove-ground utiGiy markers shall to 50D 1 new feet. In lomations where ftra are rriWrlple horlzonkiill bends. In dose pro WEnity, one Marker - W" be SUMdOnt to LX� the Change in d& Ucti Ml. Utakty rriarkers designedpromdeaccess totracer wire shall be InstMed of every third trlarluer, of every 1000 feet olf pipe, whictrever Ls lesser. Tracer wire amble abuve- �t p ground utility markers stidl aLia txc Installed at errr€!s of .R ,.-a - ort;Wboesi 4V W s lvltirtirnuirn h try d8pih 0 ` S RR � V E WE. E M' RA I N' CaD dxore wus�. ONWASA Y� eas Andtar DeWl Onslow Water & Sewer Authority USE WITH "ONWASA MANUAL OF SPECIFICATIONS, STANDARDS and DETAILS, latest revision" ONWASSTANDARD ha UTILITY MARKER NoSCALE: DETAIL# t To Scale SS FMRK FOR SEWER FORCE MAIN REVISIONDATE: SHEET#: 1 May, 2016 1 of 1 0 p w I I z o o °' W ZZW V) paQ JwN Q5v),wZ, 'o W �j o ISL.ix Qa= a Of rW ZCD z¢x� x ¢rwL1j of 3 Li a m m Z I-¢w - o wx�a Wm -I i O r _J (j Zw �C5U_ ITI zZQ_xQWQNvJm) u O Wa J�Wm x2O Ci o ao Z)U waQo -- Z __ Lo aW m WU m 0ox I -p a =rp an p VQ Um 0 ZmUbo-0=w I N Oo a� �Ld w L`I o }oa 0>z too w o- ODUa Z of (S pane Sm 5- Ld a -�O w W\ Nth ..9i �__ v Z >w-JWxwJON5Q� _j wr DI-zw w O� ---^c= 0 On- OJ an azR-w�W�Z0 3 O m oz Z �w W KxtaM Du-w cn j mp C.O(n [L F NmN pWp Womwww3-Q O OQ Of Za Q H cq X 'r-N awx <,>_(zxz 3: m ~ dt �MlO10 <O0ZO�wLo, mo w _-- ¢ccnn H F.-O U1 2 W C7 In 3 YIL'.-.pm p U O N m U ap W W wZ OwOY O wm m J Z _ _ -III Z po }-�0>w �of_j QW0� II=ll oU Q= aoz:ui=ooO-'-U-wwo p W mFN ap C.%W m ZmWoao WQZwl-m mmoo W Z Wp}p N- y/\ o ~���c-mMz-aes W N - - N cD W (o m ,- ,- N WZ=U ZW¢ ajr R- Z . Q I- Q (n Z J U W J 0 QL�W o < 0 V)z W SUM N i d T \ y/ Jo U� I- I- aN wZ 'dki `„9 Z w Cn pW �Q J > O - \/ x w O U V) ON"'MA T (n w CL q O(A .. � to vo zz a. z w C7 3 Ld LLJ o U o M Q= N M 011 O mlro a� Onslow Water & Sewer Authority USE WITH "ONWASA MANUAL OF SPECIFICATIONS, STANDARDS and DETAILS, latest revision" SCALE: DETAIL # THRUST BLOCKING Not To Scale WS_TB3 REVISION DATE: SHEET#: May, 2016 3 or 4 0011101Ma]IIIIZ 5' BEYOND TOE OF SLOPE OR EDGE OF PAVEMENT OR RR TRACK SHOULDER DITCH PAVEMENT 01! z z to N N � II STEEL PIPE CASING MASONRY ENCLOSURE AT EACH END TYPICAL PIPE CROSSING ENCASEMENTS SHALL EXTEND FROM DITCH LINE TO DITCH LINE IN CUT SECTIONS, FIVE (5) FEET BEYOND THE TOE OF SLOPES IN FILL SECTIONS, AND TEN (10) FEET BEYOND EDGE OF PAVEMENT IN SECTIONS WITH NO DITCH OR FILL AREA. END SEAL RESTRAINED JOINT DUCTILE IRON CARRIER PIPE NOTES: 1. STEEL ENCASEMENT PIPE SHALL CONFORM TO THE REQUIREMENTS OF THE PROJECT SPECIFICATIONS. 2. CARRIER PIPE SHALL BE ADEQUATELY SUPPORTED THE ENTIRE LENGTH WITHIN THE CASING BY USING SPACERS OR "SPIDER" STEEL SUPPORTS AT A MAXIMUM OF 9 FOOT CENTERS (ONE AT EACH JOINT AND ONE INTERMEDIATE). OTHER METHODS MUST MEET APPROVAL OF THE ENGINEER. Onslow Water & Sewer Authority USE WITH "ONWASA MANUAL OF SPECIFICATIONS, STANDARDS and DETAILS, latest revision" ONMM DRY BORE AND JACK SCALE: DETAIL # Not To Scale WS_B&J PIPE ENCASEMENT REE: SHEET#: Mayy,,22016016 1 of 1 May, I.D. PIPE 6" - 36" 48" & greater I.D. PIPE 6" - 36" 48" & greater RESTRAINT GLAND ( UNDISTURBED SOIL BAR • a l 7° 1I 4 3' MIN. "Y" "•V W.." BAR 3" MIN. CLEARANCE "B" CLEARANCE REINFORCING REQUIREMENTS REBAR SIZE i"X" BAR LENGTH "X" BAR WEIGHT "Y" BAR LENGTH "Y" BAR WEIGHTI NO. REQUIRED 1 #5 12'-2"+ O.D. PIPE 1.043 LBS/FT I 1'-1" 1.1 LBS. EACH X-24, Y-12 #6 13'-0"+ O.D. PIPE 1.502 LBS/FT 1'-3" 1.9 LBS. EACH I X-24, Y-12 1 THRUST COLLAR, AND THRUST SCHEDULE "A" B. I "C-6"-16", 20"-24", 30"-36", 48" 1, 4" 1'-7" I 2" 3" 4" 11 r- Q , ^ Z f"I O ww Q G U w 2 � O O a z 00 } w Q I l% t1 a z U a U- O w N Z U �z Uj w O N f- cl� j I Q �- Q w �U LLJ Q� Z U z O wo Ln z O W iS _ p z N O M N Cfl U N � Z Q- 0 � 0U O C LL O� O 0) •�E z > ai Q LO (0 O .0 >+ 00 J O N m 00 � rn O z O N J Q W 0 r) rVol NOTES: 1. CONCRETE SHALL BE 3000 PSI AND TRANSIT MIXED. 2. REINFORCING BARS SHALL BE DEFORMED AND TIED TOGETHER. 3. TRENCH BOTTOM WIDTH IN VICINITY OF THRUST BLOCK INSTALLATION SHALL BE THE MINIMUM WIDTH AS SHOWN ON STANDARD EMBEDMENT DETAIL. 4. BACKFILL TAMPED IN 6" LIFTS PER STANDARD EMBEDMENT DETAIL. DESIGNED BY: CWD DRAWN BY: EBM CHECKED BY: KTP PROJECT NO.: 2896-AM Onslow Water & Sewer Authority DATE: W USE WITH "ONWASA MANUAL OF SPECIFICATIONS, STANDARDS and DETAILS, latest revision" MARCH 2024 n A SCALE: DETAIL# SCALE: O°"�°""� "ff�"° " `/~l THRUST BLOCKING Not To Scale WS_TB4 REVISION DATE: SHEET #: HORZ.. 1 "=40' May, 2016 4 of 4 VERT.: 1 "=4' 0 112 1 IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS FINAL DRAWING NOT TO FULL SCALE FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION SID-5 1i TT o ~ FT] FT 71 TT LTI �0 ` O o-' ti z -I UT Q- L F_ dill ° Iv FTI _ Q If TI - 1 111 11IT D F_ ICJ --� - Z 71 - C crl Iv � z O To 11 FT LO C-)11 �__T -IT_ FIT = T 0 FIT T�g) P__ z � O O ,F ➢ = rT F-I =r�� _ z� Dzz`I x (n z o FT ��0z -j z O FIT F_ O 11) z� n D �01> 0 -j0 C FIT O z z _ TT O fTT TT z FITz D FIT = D TT FIT m _ z TT z C11 TT O TC z TT O J 0 m 70 0 m �v M L7 D m cn < D 0F� r_ m � C 00> zm`_ �O czz 0 z p.p ►. P .D D. e A 4 p d. D D FITS I OF > -OCm> Z-H AD.a• �. . o Wom" a Q Z 0-HFTI omD% m .a .o.'.D4 2<C7 D KD m 0, mTOn� �cn=m5 OS�OD0 u) z n m S -0D 7 x r W W r- Z y T 1 C, 80-< O D Z Z - - Am_M o c-) m-H S - z M FIT rmZz 0 F1 0 CDTI CAN 000 �- ZOZ W ODD y0 MUn C (n< d yFT TO � .'A O O O O O O Z D Z O >m. OA 0 O o m�0 (f)m '.o o Z-H m z 0 FT] 0 0 0 0 =O <� / III II II III rn0a7 m0 D O < < y m Z D FIT n>� m A < -H D C) (7 m m D o= C -I D m S C m :5- n C D O TTM O r � < W 0Fri < 75 z y Er -H m � <A m �:JCT _> D z� J� _ N 0 o z FIT TT D F = TT z o z 00 D mC) � z o >� FT7 D FT] Y� z F TT ITT z m m D 0 o CAUTION � I, l D F_ _ �C S 60 O > ■■I w l HD O D' /I D 12' MIN. `,I Z MO r O0 �' CONCRETE MARKER 1J CROSS SECTION D CONCRETE MARKER AT I _ EACH END OF BORE - Z O (n y F� CD GATE VALVE C M V O , (TYP.) .ZJ NOTES: 1. A PROFILE AND PLAN SHALL BE PROVIDED FROM ENTRY TO EXIT FOR EACH DIRECTIONAL BORE SECTION BY THE DIRECTIONAL BORE CONTRACTOR. 2. ALL BORE SECTIONS SHALL BE HYDROSTATICALLY TESTED, PER SPECIFICATIONS UPON COMPLETION OF INSTALLATION AND PRIOR TO CONNECTION TO THE MAIN WATER LINE. 3. LENM GTH OF CROSSING, LOCATION OF INSPECTION/OBSERVATION EXCAVATION, NUMBER OF P.E. PIPE JOINTS, LOCATION OF BORE MACHINE, AUGER ENTRANCE LOCATION, AND TIE-IN POINTS ARE TO BE APPROVED BY ONWASA PRIOR TO ANY START OF WORK OR ORDERING MATERIALS, 4. CONCRETE MARKERS SHALL BE PLACED AT THE BOTH THE ENTRY AND EXIT POINT OF ALL DIRECTIONAL BORES, REFERENCING THE TYPE OF UTILITY UNDERGROUND. 5. THE BORE DEVELOPED FOR THE LEAD IN END OF THE PIPE SHALL BE KEPT AT AM I NIMUM DIAMETER FOR THE PIPE INSTALLATION. THE LEAD IN END SHALL BE PULLED THROUGH WITHOUT THE M.J. FLANGE ATTACHED FOR LARGER THAN 6" PIPE INSTALLATION. THE M.J. FLANGE FOR SAID LEAD IN END SHALL BE INSTALLED AFTER THE PIPE INSTALLATION WITH THE USE OF A SPLIT M.J. FLANGE. 6. IF BURIED OBSTRUCTIONS ARE LOCATED IN THE LENGTH OF THE DIRECTIONAL BORE, DIRECTIONAL BORE CONTRACTOR SHALL AVOID CONFLICT WITH THESE OBSTRUCTIONS BY GOING UNDER A MINIMUM OF 12" WITH PROPOSED PIPE UNLESS OTHERWISE SPECIFIED OR IDENTIFIED IN GENERAL NOTES ON SHEET, OR IN SPECIFICATIONS. P.E. PIPE TO BE INSTALLED WITH A MIN. OF 10' HORIZONTAL RUN. INSPECTION HOLE ONLY ALLOWED THIS LOCATION. o II DIP O ❑ P'r � I■■� 40' MIN SPACING OSELF m I"i -RESTRAINED PE/MJ ADAPTERS. NSF APPROVED FOR POTABLE WATER 'MTH �■1 • IT SLEEVE INSERTS. ADAPTERS TO BE 7y D �H HOPE DR-9 (TYP. BOTH ENDS.) ADAPTER O SHALL BE PE/MJ TRANSITION. O p y ❑ oC � to m C < 0. I�yN�o. G I0p O �J I - 1 FULL JOINT OF DIP (TYP.) WATER LINE OR SEWER FORCE MAIN ANCHOR STRAPS SEE NOTE 3, "C' - VARIES (SEE PLANS) _ CROSSING OF ROAD. CREEK AND SENSITIVE _ - AREAS AS NOTED ON PLANS - 10' MAX SPACING i- I, FOR DEPTH MEASUREMENT a � - HOPE DR-9 PER SPECIFICATION (ALL PIPE SIZES MAY VARY). LIMITS OF CREEK/DITCH CROSSING 40 LF RESTRAINED JOINT DIP (2 PIPE JOINTS TTP.) RESTRAINED JOINT MECHANICAL COUPLING CR flTANC AS SHOWN ON PLANS. HOPE DR9 RMNG PER PLANS AS AND SPECS QUIR T BUTT FUSION JOINT HDPE M✓ ADAPTER COMPACT MJ / BF DIP SIZE AS REWIRED PER PLANS = W / SST SLEEVE AN51/AWWA STANDARD MJ INSERTS GLAND AND GASKETS W/ EXTENDED BOLTS PER MJ RTRNG MANUFACTUREF \ DIP TO HDPE TRANSITION (TYP.) NOT TO SCALE APPROXIMATE GRADE OF ROAD SHOULDER DIP 40' MIN SPACING 4' MIN. TP z JUTE MATTING W/ WETLAND SEED MIX OR RIP -RAP AS EXISTING GRADE SHOWN ON THE PLANS i� HIGH WATER LEVEL FILTER 4' FABRIC _ WATER LINE OR CREEK BED _ �8' A CREEK BED / MIN. SEWER FORCE MAIN TYP. RESTRAINED JOINT DIP CONCRETE THRUST BLOCKING, TYPICAL NOTES: 1. ONLY FULL 1E' OR 20' JOINTS OF DUCTILE IRON PIPE SHALL BE USED ON EACH SIDE OF UPPER BENDS, UNLESS OTHERWISE APPROVED. 2. IF APPROVED FOR USE, RESTRAINING RODS SHALL BE STAINLESS STEEL OR GALVANIZED RODS WITH FIELD -APPLIED BITUMINOUS COATING. 3. PIPE UPSTREAM AND DOWNSTREAM OF UPPER BENDS, UNDER CREEK, AND BETWEEN UPPER BENDS TO BE RESTRAINED JOINT D.I.P. 4. THRUST AND GRAVITY BLOCKING NOT REQUIRED ON GRAVITY SEWER LINE. 5. OPEN CUT OF CREEKS IS ONLY ACCEPTABLE WHERE SHOWN ON PLAN AND PROFILE 6. EACH FITTING SHALL BE SECURED BY TWO FORMS OF RESTRAINT. RESTRAINING GLANDS AND CONCRETE THRUST BLOCKING ARE PREFERRED. WEDGE -ACTION RESTRAINT GLANDS (i.e. MEGALUGS) ARE APPROVED ONLY FOR USE ON DUCTILE IRON PIPE. FULL -CIRCUMFERENTIAL PIPE RESTRAINT GLANDS (i.e. GRIP RINGS) MAY BE USED ON PVC OR DUCTILE IRON PIPE. ALL RESTRAINT GLANDS SHALL BE SPECIFICALLY DESIGNED FOR USE ON THE TYPE OF PIPE FOR WHICH THEY ARE BEING INSTALLED. OTHER FORMS OF RESTRAINT SUCH AS THREADED ROD, BELL RESTRAINT, HARNESSES, ETC. MAY BE APPROVED BY ONWASA ON A CASE -BY -CASE BASIS. 1 FULL JOINT OF DIP _ (TYP.) WATER LINE ORJ SEWER FORCE MAIN ANCHOR STRAPS NOTES 4' MIN. TYP. 45' M.J. BEND (TYP.) LIMITS OF CULVERT CROSSING �z CONCRETE THRUST BLOCKING, TYPICAL CULVERT PIPE Z � EXISTING JOINT DIP WATER LINE OR SEWER FORCE MAIN CONCRETE GRAVITY BLOCKING -MIN. 5.25 CU. YDS. EACH SIDE, TYP. SEE BLOCKING CROSS SECTION 1. ONLY FULL 18' OR 20' JOINTS OF DUCTILE IRON PIPE SHALL BE USED ON EACH SIDE OF UPPER BENDS, UNLESS OTHERWISE APPROVED. 2. IF APPROVED FOR USE, RESTRAINING RODS SHALL BE STAINLESS STEEL OR GALVANIZED RODS WITH FIELD -APPLIED BITUMINOUS COATING. 3. PIPE UPSTREAM AND DOWNSTREAM OF UPPER BENDS, UNDER CREEK, AND BETWEEN UPPER BENDS TO BE RESTRAINED JOINT D.I.P. 4. THRUST AND GRAVITY BLOCKING NOT REQUIRED ON GRAVITY SEWER LINE. 5. EACH FITTING SHALL BE SECURED BY TWO FORMS OF RESTRAINT. RESTRAINING GLANDS AND CONCRETE THRUST BLOCKING ARE PREFERRED. WEDGE -ACTION RESTRAINT GLANDS (i.e. MEGALUGS) ARE APPROVED ONLY FOR USE ON DUCTILE IRON PIPE. FULL -CIRCUMFERENTIAL PIPE RESTRAINT GLANDS (i.e. GRIP RINGS) MAY BE USED ON PVC OR DUCTILE IRON PIPE. ALL RESTRAINT GLANDS SHALL BE SPECIFICALLY DESIGNED FOR USE ON THE TYPE OF PIPE FOR WHICH THEY ARE BEING INSTALLED. OTHER FORMS OF RESTRAINT SUCH AS THREADED ROD, BELL RESTRAINT, HARNESSES, ETC. MAY BE APPROVED BY ONWASA ON A CASE -BY -CASE BASIS. 0 D D O P0 M m D m m M m n z n ( >- Z „ n ^T z m • VOm= z w 0 = 0 O _H D �=z 0 75 Z o N M 70 D I In o m 70 N 70 N DMZ = 00 v I m -H II � 7C CIO (/7 N m N C7 = =z VIAw� ONWASA PROJECT No. CIP-028 ONSLOW COUNTY NORTH CAROLINA SOUTHEAST SERVICE AREA WASTEWATER CAPACITY IMPROVEMENTS CONTRACT 1 - TRANSMISSION SYSTEM Ilooten STANDARD DETAILS 120 North Boylan Avenue • Raleigh, NC 27603-1423 (919) 828-0531 • thewootencompany.com License Number: F-0115 PROJECT MANUAL FOR SOUTHEAST SERVICE AREA WASTEWATER CAPACITY IMPROVEMENTS CONTRACT 1 —TRANSMISSION SYSTEM PROJECT NO. CIP-28 tit oNwr� ONSLOW WATER AND SEWER AUTHORITY March 2024 Revised June 2024 DWI Project No. SRP-W-ARP-0189 TWC NO. 2896-AM RELEVANT FINAL SPECIFICATIONS - FOR REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION FOR THE SUMMERHOUSE WRF NON -DISCHARGE PERMIT (WQ0029945) MAJOR MODIFICATION Prepared by: \1 ooten 120 N. Boylan Avenue Raleigh, NC 27603 (919)828.0531 License Number: F-0115 CERTIFICATION PAGE A. Civil Engineering Design I, Carl Scharfe, P.E., hereby certify that the attached relevant specifications and drawings for the Summerhouse WRF non -discharge permit (WQ0029945) minor modification was prepared by me or under my supervision. SEAL RELEVANT SPECIFICATIONS FOR THE SUMMERHOUSE WRF NON -DISCHARGE PERMIT (WQ0029945) MAJOR MODIFICATION TECHNICAL SPECIFICATIONS TABLE OF CONTENTS SECTION PAGE DIVISION 1 -GENERAL REQUIREMENTS 01100 SUMMARY OF WORK 1-5 01270 UNIT PRICES 1-5 01330 SUBMITTAL PROCEDURES 1-5 01450 QUALITY CONTROL 1-3 01500 TEMPORARY FACILITIES AND CONTROLS 1-3 01600 PRODUCT REQUIREMENTS 1-2 01700 EXECUTION REQUIREMENTS 1-4 DIVISION 2 - SITE CONSTRUCTION 02082 SPECIALTY VALVES AND GATES 1-4 02230 CLEARING AND GRUBBING 1-3 02300 EARTHWORK 1-9 02315 TRENCHING FOR UTILITIES 1-9 02370 EROSION CONTROL 1-3 02445 BORE & JACK 1-4 02447 DIRECTIONAL DRILLING 1-6 02530 SANITARY SEWER SYSTEM 1-17 02606 PRECAST UTILITY STRUCTURE 1-5 02700 PAVEMENT AND APPURTENANCES 1-3 02920 LAWNS AND GRASSES 1-5 DIVISION 11 -EQUIPMENT 11307 SUBMERSIBLE PUMP STATION 1-12 DIVISION 13 - SPECIAL CONSTRUCION 13440 TELEMETRY EQUIPMENT 1-16 Relevant information for the Summerhouse WRF non -discharge permit major modification SECTION 01100 SUMMARY OF WORK PART 1 GENERAL 1.01 WORK COVERED BY CONTRACT DOCUMENTS A. Work described in this Project Manual includes the provision of labor, materials, equipment, and services required to complete the Southeast Area Wastewater Capacity Improvements: Contract 1 Transmission System project for the Onslow County Water and Sewer Authority (ONWASA). B. Contractor shall coordinate for telemetry/SCADA, forcemain tie-ins and pump station commissioning with the following Contractors for the following projects which are expected to be occurring concurrent with this project: 1. Upgrade of the existing Summerhouse Wastewater Treatment Plant (WWTP) at the Summerhouse Pump Station site. ONWASA is currently upgrading existing process units, adding new screens, membrane units, UV disinfection, and SCADA system controls. Telemetry for Contract 1 will need to be coordinated with the SCADA system installed in the Summerhouse WWTP upgrade project. This project is currently under construction and is scheduled to be completed in October/November 2024. 2. Southeast Area Wastewater Capacity Improvements: Contract 2 Transmission System. This project will be for the installation of a new 18-inch diameter raw wastewater force main from the termination of the 18-inch force main on this Contract 1 to the North Topsail Wastewater Treatment Plant (WWTP) influent diversion box. The length of this force main is approximately 6.5 miles. This project is currently under design and is anticipated to start construction in April/May of 2025. This force main must be completed in order to put the new Summerhouse and Holly Ridge Pump Stations in full operation. 3. A third contract for construction of a new screen and grit headworks at the diversion box area at the North Topsail WWTP is also planned. However, this may affect Contract 2 above but should not affect Contract 1 work. 1.02 CONTRACTS A. Project construction will be let under one Contract with construction including, but not limited to, the following major work items: 1. Construction of a new Holly Ridge Pump Station at the existing Holly Ridge Wastewater Treatment Plant (WWTP) site. New pump station to include submersible wet well, new submersible pumps, valve vault, meter vault, monorail pump lift crane under roof, back-up diesel pump, emergency generator, electrical building with electrical and telemetry equipment, and associated piping, appurtenances, roads, and site work. 2. Construction of a new Summerhouse Pump Station at the existing Summerhouse Wastewater Treatment Plant (WWTP) site. New pump station to include submersible wet well, new submersible pumps, valve vault, meter vault, monorail pump lift crane under roof, back-up diesel pump, emergency generator, electrical building with electrical and telemetry equipment, and associated piping, appurtenances, roads, and site work. SE Area Wastewater Capacity Improvements Summary of Work - 01100-1 Contract 1: Transmission 3. Installation of transmission lines including: 12-inch raw wastewater forcemain from the new Holly Ridge Pump Station to the new Summerhouse Pump Station along Homestead, Stump Sound, Moores Landing and Holly Ridge Roads; 18-inch raw wastewater forcemain from the new Summerhouse Pump Station to the intersection of Holly Ridge Road and Dolph Everett Road; and 8- inch reclaimed water line from the existing Reclaimed Water Pump Station at the Summerhouse WWTP along Holly Ridge Road and then north Dolph Everett Road to the existing Holly Ridge Spray Field Storage Pond. 4. Replacement of existing reclaimed water pumps, addition of VFDs, and replacement of pump control panel at the existing Reclaimed Water Pump Station. Also the addition of a tee and two automated valves on the 8-inch Reclaimed Water force main after the existing diversion box to the 5-day storage pond at the Summerhouse WWTP. Through the automated valves and SCADA system, effluent flow from the Summerhouse WWTP will be directed either to the existing infiltration basins or to the Holly Ridge Spray Field Storage Pond. 5. Holly Ridge Pump Station will pump to the Summerhouse WWTP, and flow will be split before the new screens at the Summerhouse WWTP and flow to either the new screens or to the new Summerhouse Pump Station. Pinch valves and flow meters are to be used to split this flow. 1.03 WORK SEQUENCE A. The following construction sequence is intended to aid the Contractor in project scheduling. This sequence does not cover all details of the project and is not intended to replace the Contractor's schedule required by the specifications. 1. All erosion control measures shall be installed prior to the start of all other construction activities. 2. Coordinate and install construction entrances with designated ingress/egress point as shown on the plans. 3. Contractor shall not allow bypassing of sewage during construction. Construction activities that interfere with normal operation of the existing Holly Ridge WWTP, Summerhouse WWTP or Holly Ridge spray field shall be specifically noted on construction schedule. For each of these activities, provide a detailed construction sequence, which shall prevent bypassing of the sewage treatment process. 4. Contractor is responsible for all bypass pumping required to construct the project as shown. Construction activities that interfere with normal operation of existing facilities shall be specifically noted on construction schedule. For each of these activities provide a detailed construction sequence showing the bypass pumping arrangement. 5. Indicate switchovers and cut -ins between new work and existing facilities on the construction schedule. Submit proposed date for switchover in writing to Engineer and Owner a minimum of seven (7) days and again 24-hours in advance of actual field work. Owner shall have the right to delay Work due to operational requirements, without additional cost to Owner. 6. Perform switchovers and cut -ins during low flow periods at the facility. This shall normally require night / weekend operations by Contractor at no additional compensation. 7. Critical path considerations: a. Critical path activities for each work location (Holly Ridge PS, Summerhouse PS, Summerhouse Reclaim Water PS and force mains) SE Area Wastewater Capacity Improvements Summary of Work - 01100-2 Contract 1: Transmission may be addressed as separate projects with no portion of one path infringing on the work of another path. b. The Holly Ridge and Summerhouse Pump stations and forcemains cannot be made fully operational until the new 18-inch forcemain to Topsail WWTP is completed in Contract 2. The Reclaimed Water Pump Station cannot be made fully operational until the 8-inch reclaimed water line to the existing Holly Ridge Spray field Storage Pond is complete. c. Holly Ridge Pump Station 1) Construct pump station. Holly Ridge WWTP will continue to operate during pump station construction and after construction as required by Owner. 2) Construct new forcemain up to the connection tie-in point to the existing 12-inch forcemain. 3) Connection to the existing 12-inch forcemain cannot commence until the Summerhouse PS and associated forcemains are installed and ready to receive the flow from the new Holly Ridge Pump Station. 4) Contractor to test the pump station and line with water. The location for the disposal of the test water must be determined by the Contractor and approved by the Owner. 5) The pump station cannot be made operational until the Summerhouse Pump Station is operational. 6) Once Summerhouse Pump Station is operational, make new tie-in to existing 12-inch influent sewer along Holly Ridge Road. d. Summerhouse Pump Station 1) Relocate existing chemical pipe before installation of new wet well. 2) Construct new pump station and yard piping. (Note that there is an existing well at the location for the new Summerhouse Pump Station. The well is to be removed and/or abandoned by the owner prior to construction. The Contractor may not start pump station or line work until after this well is removed and/or abandoned; and permission is obtained from ONWASA to being work). 3) Summerhouse WWTP is to remain operational during construction, except as approved by the Owner. 4) Construct 18-inch diameter forcemain on Summerhouse WWTP site and along Holly Ridge Road. 5) Contractor to test the pump station and line with water. The location for the disposal of the test water must be determined by the Contractor and approved by the Owner. 6) The pump station cannot be made operational until the 18-inch forcemain to the North Topsail WWTP is completed. 7) Contractor shall remobilize to the site to retest and startup the pump station once the North Topsail WWTP is ready to receive flow. At this time, the Summerhouse Pump Station will also be ready to receive flow from the Holly Ridge Pump Station and the existing Summerhouse WWTP. (Note that there may be as much as a six- month delay between completion of the pump station and when the North Topsail WWTP is ready to accept flow). 8) The Summerhouse WWTP will remain operational after the Summerhouse Pump Station is made operational. e. Reclaimed Water Pump Station SE Area Wastewater Capacity Improvements Summary of Work - 01100-3 Contract 1: Transmission 1) Coordinate with Owner on shut down of existing reclaimed pump station for installation of pumps, control panel, and new piping/valves. 2) Contractor can by-pass pump treated effluent from the manhole downstream of the new UV structure and pump treated effluent from this manhole to the 5-day storage pond for a total of up to two, 24-hour days. 3) Install new control panel and control wiring from new control panel to Summerhouse WWTP SCADA system. Install new doghouse valve vault around existing 8-inch reclaimed water piping. 4) Install new pumps, piping/valves, valve box and connect power and control wiring to the new control panel. 5) As soon as the 8-inch reclaimed water force main is installed and tested and the Reclaimed Water Pump Station is ready, make the system operational. 8. Complete final grading, seeding, and paving at pump stations and along forcemain alignments. 1.04 OWNER OCCUPANCY A. Owner will occupy site during entire period of construction. B. Contractors shall cooperate with Owner to minimize conflict, and to facilitate Owner's operations. 1.05 CONTRACTOR COORDINATION A. Other Contractors may be on site performing construction activities related to this project while the work required by this contract is underway. 1. We anticipate that work for the Summerhouse WWTP upgrade will be completed prior to or be close to substantial completion when this contract starts. However, it is possible there will be some work areas that will overlap, especially regarding telemetry/SCADA work. 2. We anticipate that Contract 2 for the construction of the 18-inch force main to the North Topsail WWTP will commence in April/May 2025 and be completed and ready for operation in October/November of 2026. 3. It is anticipated that this contract (Contract 1) will commence in November/December of 2024 and be completed by approximately April 2026. Thus, there will be an approximate 6-month period when the pump stations will be idle before being fully operational. (Reference 1.03 7d above for Contract 1 responsibilities upon Contract 2 completion). B. It is the Contractor's responsibility to communicate with the Owner, Engineer, and any other Contractors to coordinate his work with all other activities on site and in proximity to the sites. There will be no additional compensation for the contractor's coordination efforts nor for any alleged delays or inconveniences because of the activities of others on site or in proximity to the sites. C. The Contractor shall attend all coordination meetings with the owner, engineer, and other contractors to facilitate the project's progress. D. While every effort will be made to phase the project to minimize potential conflicts working alongside of other contractors, the Contractor will nonetheless be expected to adjust the phasing and sequencing of his work as necessary to accommodate the work of others for the overall benefit of the project. SE Area Wastewater Capacity Improvements Summary of Work - 01100-4 Contract 1: Transmission E. Staging areas will be provided for the use of all contractors. The Contractor will be expected to relocate stored materials and/or equipment should it be necessary to accommodate the materials of others. PART 2 PRODUCTS Not Used PART 3 EXECUTION Not Used END OF SECTION SE Area Wastewater Capacity Improvements Summary of Work - 01100-5 Contract 1: Transmission SECTION 01270 UNIT PRICES PART 1 GENERAL 1.01 SECTION INCLUDES A. Delineation of measurement and payment criteria applicable to Work performed under Contract by the unit price payment method. 1.02 FIELD MEASUREMENT A. Take measurements and compute quantities for submittal of the monthly pay request unless specified otherwise in the measurement paragraphs as indicated in this Section. 1.03 CHANGE IN QUANTITIES A. Increase in the quantity of a bid item above what is indicated in the Bid Form shall only be made by a Change Order as required by the Contract Documents. B. A final adjusting Change Order shall be made for adjustment of the actual quantities installed prior to submittal of the final pay request. 1.04 GENERAL A. Items with a "(X)" and/or "(Y)"in the title of the following bid items represents the size or depth as indicated on the Bid Form. 1. (X)-inch: (X) is the place holder for the pipe or casing size. 2. (Y)-inch: (Y) is the place holder for the pipe size. B. Method of measurement for the individual Bid Items shall be as specified below. C. Payment for each item shall be in accordance with the Contract Unit Price times the number of units installed in accordance with the Contract Documents. D. Work for each bid item shall include, but not be limited to, the work listed below, and the labor, materials, equipment, and services required and reasonably implied by the Contract Documents for a complete installation. 1.05 MOBILIZATION A. Measurement shall not be made for this item. B. Work shall include administrative cost including, but not limited to, mobilization, bonds, insurance, project signage, shop drawing submittal, as -built documentation, and construction trailers. General office administration for the Project construction shall be included in the individual unit price items. C. Bid Price for Mobilization shall not exceed 3 percent of the total bid. Half of the mobilization may be requested on the first pay request and the remainder on the second. 1.06 UTILITY PIPING A. Measurement: Measure horizontally or from station to station as shown or indicated on the Drawings for the various types and sizes of pipes installed. 1. (X)-inch Force Main: No deduction will be made for space occupied by valves or fittings. SE Area Wastewater Capacity Improvements Unit Prices - 01270-1 Contract 1: Transmission B. Work shall include, but not be limited to (unless specifically noted otherwise on the Bid Form and this specification Section), the following: 1. Clearing and grubbing where necessary. 2. Traffic control. 3. Temporary removal and restoration or temporary support of, but not limited to, existing mailboxes, signs, fences, shrubs, plants (under 6 feet in height), guard rails, power and telephone poles. 4. Excavating, shoring and bracing where required, dewatering as required, installing, backfilling (including Class I material as specified for the pipe bedding, haunching, and initial backfill). 5. Installation of warning / identification tape over utilities. 6. Installation of tracer wire on non-metallic utilities. 7. Temporary support and protection of existing underground facilities. 8. Pipe, concrete blocking and encasement, connection to existing piping, and fittings. 9. Flushing and testing. 10. Repair to damaged new and existing utilities. 11. Cutting and removal of existing paved surfaces. Patching of existing paved surfaces shall be paid as indicated in the paragraph, "Patching of Asphalt and Concrete Pavement." 12. Grade disturbed areas to original surface profile prior to seeding. 13. Clean up and seeding. C. Payment: The first Application for Payment will be approved based on the utilities installed during the agreed upon payment period without testing. Subsequent Application for Payments shall not be approved by the Engineer unless utilities installed during the previous payment period have passed the specified tests and clean up and seeding is complete. 1.07 BID ITEMS LISTED BY THE UNIT "EACH" (EA) A. Measurement: By the number installed. B. Sanitary sewer work items: 1. (X)-inch Valve and Box: Valve, valve box, valve marker, concrete setting pad, and concrete top collar. 2. Sewer Air Release Valve and Manhole: Combination air release valve, tee, pipe tap, and manhole (including stone base, frame and cover). 1.08 (X)-INCH STEEL ENCASEMENT PIPE WITH (Y)" CARRIER FORCE MAIN BY BORE AND JACK A. Measurement: Along the centerline of the various sizes of steel encasement pipes installed. B. Work: Excavation and backfilling for bore pit, encasement pipe, and carrier pipe installed in encasement pipe with spacers and casing seals. Include costs for the provision of bonds, insurance and inspection fees required by the respective agency or authority in charge of inspection of the encasement pipe. No payment shall be made for failed attempts to install pipe by bore and jack. 1.09 (X)-INCH FUSIBLE C900 PVC FORCE MAIN BY HORIZONTAL DIRECTIONAL DRILL A. Measurement: Measurement for one complete directional drill installed. SE Area Wastewater Capacity Improvements Unit Prices - 01270-2 Contract 1: Transmission B. Work: Complete installation from station to station as indicated on the Drawings including, but not limited to, clearing, access to launching and target pits, excavating, installing, horizontal directional drilling, backfilling, (including class I material as specified for the pipe bedding, haunching, and initial backfill), off -site borrow material, compacting, testing, flushing, pipe material (including FPVC, RJDIP, and DI piping, MJ adapter, reducer, and fittings), valves, transition to open cut installation, as necessary, seeding, mulching and tacking, associated erosion control measures, and all labor, materials, and accessories required for a complete installation. No payment shall be made for failed attempts to install pipe by directional drill. 1.10 UNDERCUT AND BACKFILL WITH #57 STONE A. Measurement: Measure along the centerline of the trench times the undercut depth below the pipe bedding as approved by Engineer times the pipe OD plus two feet. Measure unstable soils at manholes on the maximum basis of 1-foot greater diameter than the outside diameter of the manhole and a depth as approved by the Engineer. Measurement shall be based on the actual quantities removed but not exceeding the maximum specified trench dimensions. Measure unstable soils at pump station structure excavations areas times depth below subgrade as approved by Engineer. Take measurements in the presence of the Engineer. Maintain daily log sheets of measured quantities. Log sheets must be signed by Engineer and submitted with payment request. Payment shall not be made for quantities that have not been field verified by the Engineer. B. Work: Complete removal and disposal of unstable soil including, but not limited to, excavating, loading, hauling, properly disposing of excavated material, and providing stone for backfill. Providing stone material for backfilling shall include, but not be limited to, material, loading, hauling, placing and compacting. 1.11 GEOTEXTILE FABRIC A. Measurement: Measure by the square yard of fabric installed. Payment shall not be made for fabric overlaps. B. Work: Installation in accordance with the manufacturer's recommendations and as directed by the Engineer. Payment shall include all labor, materials and accessories required for a complete installation including fine grading of surface on which the fabric is placed. 1.12 SELECT BACKFILL A. This item shall be paid for at the unit bid price per cubic yard of off -site select backfill for backfill and compaction of pipeline trench or structure backfill where on -site material is not suitable. Payment shall include only the cost of off -site material as placement and compaction of the trench or structure is already included in the unit bid price of the pipeline or structure. Material will only be placed at the direction of the Owner's representative. B. Payment: Payment shall be based upon the actual cubic yardage as measured in the field and verified by the Owner's representative. Pay width based on pipe OD plus two feet for material placed above initial backfill. For structures, pay quantity based on volume calculation verified by Engineer. SE Area Wastewater Capacity Improvements Unit Prices - 01270-3 Contract 1: Transmission 1.13 ASPHALT PAVEMENT PATCHING A. Measurement: Measure by the square yard along centerline of pavement cut times the pipe OD plus two feet. Payment shall not be made for pavement repair required due to excessive open cut caused by Contractor. B. Work: Backfilling, compacting, stone sub -base, asphalt at the depths as specified. 1.14 CONCRETE PAVEMENT PATCHING A. Measurement: Measure by the square yard along centerline of pavement cut times the pipe OD plus two feet. Payment shall not be made for pavement repair required due to excessive open cut caused by Contractor. B. Work: Backfilling, compacting, stone sub -base, concrete at the depths as specified. 1.15 GRAVEL DRIVEWAY REPAIR A. Measurement: Measure by the square yard along centerline of pavement cut times the pipe OD plus five feet for stone placed and compacted to a depth of 6 inches. Loss of material due to inadequate backfill compaction shall be replaced at no additional cost. Engineer shall approve location and dimension of repair area to be used prior to placement. Payment shall not be made for pavement repair required due to excessive open cut caused by Contractor. B. Work: Stone, hauling, placement, and compacting 1.16 EROSION CONTROL A. Measurement shall not be made for this item. B. Payment for the erosion control shall be in accordance with the Contract lump sum price for the installation of erosion control measures as required by the Contract Documents. Payment shall be for the labor, material, equipment, and accessories required for a complete installation including, but not limited to, the cost of installing, maintaining, and removal of the individual erosion control devices. Erosion control devices shall include, but not be limited to, the following: 1. Silt fence. 2. Silt fence outlet. 3. Riprap. 4. Inlet protection. 1.17 HOLLY RIDGE PUMP STATION A. Measurement: Measurement for one station installed B. Work: Complete installation including, but not limited to, the cost of the pumps, piping (both pressure and gravity), wet well, manholes, valves, valve vault, surge relief valve, jib crane, meter and meter vault, sump pump, hatches, stilling well, floats, connections, miscellaneous concrete, transformer pad, control panel, generator, electrical control and power wiring and conduits, electrical building, site work (including access road, site piping, water line to connection at water main, lawn hydrant, fencing, and electrical service), excavation, backfilling, compacting, start up, testing, SCADA and all other related work as indicated on the drawings for a complete and operational pump station. Price includes any remobilization required for re -testing and start-up when downstream facilities are ready to accept flow. 1.18 SUMMERHOUSE PUMP STATION A. Measurement: Measurement for one station installed. SE Area Wastewater Capacity Improvements Unit Prices - 01270-4 Contract 1: Transmission B. Work: Complete installation including, but not limited to, the cost of the pumps, piping (both pressure and gravity), wet well, valves, valve vault, surge relief valve, monorail and trolley system, gates, meter and meter vault, sump pump, hatches, stilling well, floats, connections (including that to the WWTP), miscellaneous concrete, transformer pad, pre-engineered metal canopy, control panel, generator, electrical, control and power wiring and conduits, electrical building, site work (including access road, site piping, water line to connection at water main, lawn hydrant, fencing, and electrical service), excavation, backfilling, compacting, start up, testing, SCADA and all other related work as indicated on the drawings for a complete and operational pump station. Price includes any remobilization required for re -testing and start-up when downstream facilities are ready to accept flow. 1.19 SUMMERHOUSE RECLAIM WATER PUMP STATION A. Measurement: Measurement for one station installed B. Work: Complete installation including, but not limited to, the cost of the pumps, piping, automated valves, valve vault, control panel, electrical control and power wiring and conduits, piping including connections to existing, site work (including access road, site piping, and electrical service), excavation, backfilling, compacting, start up, testing and all other related work as indicated on the drawings for a complete and operational pump station. Price includes any remobilization required for re -testing and start-up when downstream facilities are ready to accept flow. PART 2 PRODUCTS Not Used PART 3 EXECUTION Not Used END OF SECTION SE Area Wastewater Capacity Improvements Unit Prices - 01270-5 Contract 1: Transmission SECTION 01314 PROJECT MEETINGS PART 1 GENERAL 1.01 MEETINGS A. Pre -construction conference shall be held prior to the beginning of the Work. B. Construction progress meetings shall be held monthly. C. Project close-out conference shall be held during the final phases of the Work. D. Engineer may schedule additional meetings. E. Meetings scheduled by the Engineer shall be held at the F. Contractor's project superintendent shall attend meetings. G. Notify suppliers and subcontractors to attend meetings as appropriate or as required by Engineer. H. Contractor shall schedule pre -installation conferences as required in the individual specification sections. I. Notify Engineer of project meetings scheduled by the Contractor. J. Engineer will schedule and administer meetings throughout the progress of the Work, except for meetings held by the Contractor for normal coordination of the Work. K. Meeting agenda shall include, but not be limited to, the following: Project Administration, Submittals, Construction Schedules and Methods, Safety and Health Regulations, Project Coordination, Payment Application, Change Orders, and Site Inspections. L. Engineer will prepare agenda with copies to participants, preside at meetings, prepare minutes and distribute to participants for meetings scheduled by the Engineer. PART2 PRODUCTS NOT USED PART 3 EXECUTION NOT USED END OF SECTION SE Area Wastewater Capacity Improvements Project Meetings - 01314-1 Contract 1: Transmission SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. This Section includes, but is not limited to, requirements for the following: 1. Submittal procedures. 2. Construction progress schedule. 3. Schedule of values. 4. Proposed product list. 5. Project record documents. 6. Certificates of compliance. 7. Catalog data. 8. Shop drawings. 9. Manufacturer's installation procedures. 10. Samples. 11. Test reports. 12. Operation and maintenance instructions. 13. Warranties. 14. Spare parts and maintenance materials. 1.02 SUBMITTAL PROCEDURES A. Transmit each submittal with cover letter to Engineer at The Wooten Company, 120 N. Boylan Avenue, Raleigh, NC 27603. B. Sequentially number transmittal forms. Re -submittals to have original number with an alphabetic suffix. C. Cover letter for each submittal package shall list the following: 1. Contractors name: 2. Owners name: ONWASA 3. Project name: SOUTHEAST AREA WASTEWATER CAPACITY IMPROVEMENTS -CONTRACT 1 4. Wooten Job No.: 2896-AM D. Individual submittals shall each be listed by the following information: 1. Submittal reference no. 2. Specification section number. 3. Drawing and detail number when appropriate. 4. Equipment. 5. Type submittal. 6. Supplier. 7. Manufacturer. E. Apply Contractor's stamp to each submittal, signed or initialed and dated, certifying that Contractor has reviewed submittal for conformance with requirements of Contract Documents, and has coordinated submittal with related work. SE Area Wastewater Capacity Improvements Submittal Procedures 01330-1 Contract 1: Transmission F. Schedule submittals to expedite Project, and deliver to coordinate submission of related items. Allow a minimum of fifteen (15) working days for Engineer's review. G. Identify variations from Contract Documents and Product limitations as they relate to the satisfactory performance of the Project. H. Provide space for Contractor and Engineer review stamps. Revise and resubmit submittals as required; identify changes made since previous submittal. J. Distribute copies of reviewed submittals to concerned parties. Instruct parties to promptly report inability to comply with provisions. K. Work requiring submittal review by Engineer shall not be started until review has been obtained. L. Engineer's review of submittals shall not relieve Contractor of responsibility for complete compliance with Contract Documents. 1.03 ADMINISTRATIVE SUBMITTALS A. Construction Progress Schedule 1. Submit five (5) copies of the initial progress schedule 15 days after date of Owner -Contractor Agreement. One copy shall be returned to the Contractor. 2. Progress schedule shall be, as a minimum, a horizontal bar chart with a separate line for each major section of Work. Identify the first workday of each week. 3. Show complete sequence of construction by activity, identifying Work of separate stages and other logically grouped activities. Indicate the early and late start, early and late finish, float dates, and duration. 4. Indicate the expected monthly pay requests. 5. Submit revised schedule with each Application for Payment as required for updating, identifying changes since previous version. Indicate estimated percentage of completion for each item of Work at each submission. 6. Indicate submittal dates required for critical shop drawings, product data, samples, and product delivery dates . 7. Indicate specific work sequences and requirements as indicated in Section, Summary of Work. B. Schedule of Values 1. Submit three (3) copies of the schedule of values at least three (3) weeks prior to the first partial payment request. Schedule shall divide the lump sum contract items into major work tasks. Use the table of contents as a guide for itemizing the schedule. Schedule will be used only as a basis for review of the Contractor's request for payment. 2. Engineer may request additional delineation of work tasks and supporting data of the values, as he deems appropriate. Revise schedule and resubmit. 3. Revise schedule to list approved Change Orders, with each request for payment. C. Project Record Documents 1. Maintain on site, one set of the following record documents; record actual revisions to the Work: a. Contract Drawings. b. Project Manual. SE Area Wastewater Capacity Improvements Submittal Procedures 01330-2 Contract 1: Transmission c. Addenda. d. Change Orders and other Modifications to the Contract. e. Reviewed submittals. 2. Store Record Documents separate from documents used for construction. 3. Record information concurrent with construction progress. 4. Specifications: Legibly mark and record at each Product section description of actual Products installed, including the following: a. Manufacturer's name and product model and number. b. Product substitutions or alternates utilized. c. Changes made by Addenda and Modifications. 5. Record Documents and Shop Drawings: Legibly mark each item to record actual construction including: a. Measure elevations of structures in relation to NAD1988 datum. b. Measure and reference horizontal and vertical locations of underground utilities and appurtenances to existing permanent surface improvements that are indicated on the Drawings. c. Measure and reference location of internal utilities and appurtenances concealed in construction to visible and accessible features of the Work. d. Field changes from construction Drawings. e. Details not on original Contract Drawings. 6. Submit documents to Engineer with final Application for Payment. 1.04 TECHNICAL SUBMITTALS A. General 1. Submit the following as required by the individual sections of the technical specifications. 2. Unless noted otherwise, submit the number of copies that Contractor requires, plus three (3) copies that will be retained by Engineer. B. Certificates of Compliance 1. Certificates shall certify that the Products delivered to the project are in conformance with the specifications. 2. Certificates may be recent or previous test results on Product but must be acceptable to Engineer. 3. Certification shall not relieve the Contractor of responsibility for complying with requirements of the specifications. 4. When using federal CWSRF and / or DWSRF funds, a Certification will be required for all products including iron and steel to document conformance to the American Iron and Steel (AIS) requirement. This shall be in the form of a step certification. It shall be on company letterhead from each different manufacturer in the process (e.g., melting, bending, coating, galvanizing, etc.). At a minimum, the certification shall state that the products and / or materials for the subject project are in full compliance with the AIS requirements as mandated by EPA's State Revolving Fund programs and shall include the company name, company address, list the items/materials, where the process took place (physical location). C. Catalog Data 1. When shop drawings are not required, the catalog data shall include the following as a minimum: a. Parts schedule that identifies the materials to be used in each of the various parts. SE Area Wastewater Capacity Improvements Submittal Procedures 01330-3 Contract 1: Transmission b. Sufficient detail to serve as a guide for assembly and disassembly of the product and to serve as guide for ordering parts. 2. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information unique to this Work in the Shop Drawing submittal. D. Shop Drawing 1. Shop drawings shall consist of drawings, diagrams, illustrations, schedules, performance charts, brochures and other data, prepared specifically for a portion of the Work. 2. Shop drawings shall indicate the type, size, quantity, arrangement, location, mode of operation, component materials, utility connections, wiring and control diagrams, anchorage's, supports, factory applied coatings, and other information necessary to ensure satisfactory fabrication, installation and operation of the completed Work. 3. Shop drawings shall establish the actual detail of manufactured or fabricated items, indicate proper relation to adjoining work, amplify design details of mechanical and electrical equipment in proper relation to physical spaces in the structure, and incorporate minor changes to design and construction to suit actual requirements. E. Manufacturer's Installation Procedures 1. Installation procedures should indicate manufacturer's recommendations for proper installation of Product. F. Samples 1. Submit samples as required by the individual specification sections. Samples shall be physical examples to illustrate the materials and workmanship. Submit in sufficient size and quantity to clearly illustrate the functional characteristics of the Product, with integrally related parts and attachment devices, and the full range of color to be provided. G. Test and Start -Up Reports 1. Submit three (3) copies of report to the Engineer within seven (7) days of performing the test. 2. Report shall include the following as a minimum: a. Owners name: ONWASA b. Project name: SOUTHEAST AREA WASTEWATER CAPACITY IMPROVEMENTS -CONTRACT 1 c. Wooten job number: 2986-AM d. Firm performing work. e. Individual performing work. f. Specification section no.: g. Product tested or started. h. Date and time of work. i. Type of test or start-up. j. Specific location in the Project: (i.e., Structure name and location within the structure by a rough sketch.) k. Results. I. Opinion of firm doing the work as to the test or start-up being in compliance with the Contract Documents. 3. When requested by Engineer, the testing or start-up firm shall provide additional interpretation of results. SE Area Wastewater Capacity Improvements Submittal Procedures 01330-4 Contract 1: Transmission H. Operation and Maintenance Instructions 1. Submit three (3) copies of operation and maintenance instructions within 45 days after approval of the shop drawings. 2. Submit instructions in a navy blue vinyl, loose leaf binder containing the name of the equipment covered on the front and the spine of the binder. Provide tab dividers appropriately labeled. 3. As a minimum, the submittal shall contain complete operation and maintenance instructions, drawings, and complete parts list. 4. In addition, for equipment requiring periodic lubrication, provide two (2) lubrication charts; one shall be included in the binder, and the other shall be provided in weatherproof 10 mil. laminated plastic and shall be permanently affixed to the equipment. Charts shall contain pertinent information concerning the lubricating requirements including manufacturer's name, name of equipment, recommended service interval, and recommended lubricant, location of each of the points of lubrication. Warranties 1. Provide duplicate notarized copies. 2. Assemble documents from Subcontractors, suppliers, and manufacturers. 3. Provide Table of Contents and assemble in three D side ring binder with durable plastic cover. 4. Submit prior to final Application for Payment. 5. For items of Work delayed beyond date of Substantial Completion, provide updated submittal within 10 days after acceptance, listing date of acceptance as start of warranty period. Spare Parts and Maintenance Materials 1. Provide products, spare parts, maintenance, and extra materials in quantities specified in individual specification Sections. 2. Deliver to Project site and place in location as directed by the Owner. Obtain Owner's signature and date bill of materials as delivered to the site as required by this paragraph. Provide a copy of signed bill of materials to Engineer with request for payment. 3. Provide recommended manufacturer's list of spare parts, maintenance, and extra material as specified in individual specification sections. 4. Submit to Engineer. PART 2 PRODUCTS Not Used PART 3 EXECUTION Not Used END OF SECTION SE Area Wastewater Capacity Improvements Submittal Procedures 01330-5 Contract 1: Transmission SECTION 01450 QUALITY CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. Quality assurance and control of installation. B. Inspection and testing laboratory services. C. References. D. Field samples. E. Manufacturers' field services and reports. 1.02 QUALITY ASSURANCE/CONTROL OF INSTALLATION A. Manufacturer shall have the minimum number of years of proven successful experience required in each section in the design, manufacture, and servicing of Products specified. B. In lieu of the required experience, manufacturer may provide a cash deposit or bond equal to the cost of the Product, but pro -rated to the number of years of actual experience. C. Products from a manufacturer who does not meet the experience requirements must meet technical requirements. D. Monitor quality control over suppliers, manufacturers, Products, services, site conditions, and workmanship, to produce Work of specified quality. E. Comply fully with manufacturers' instructions, including each step in sequence. F. Should manufacturers' instructions conflict with Contract Documents, request clarification from Engineer before proceeding. G. Comply with specified standards as a minimum quality for the Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship. H. Perform work by persons qualified to produce workmanship of specified quality. I. Secure Products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement. 1.03 INSPECTION AND TESTING LABORATORY SERVICES A. Provide the services of an independent firm to perform soil and material inspections, testing and other services specified in the individual specification sections of this Contract Document. B. Testing laboratory shall be authorized to operate in the state in which Project is located. C. Testing laboratory shall have a full-time registered Engineer on staff to review services. SE Area Wastewater Capacity Improvements Quality Control - 01450-1 Contract 1: Transmission D. Testing equipment shall be calibrated at reasonable intervals with devices of an accuracy traceable to either National Bureau of Standards (NBS) standards or accepted values of natural physical constants. E. Prior to start of Work, submit testing laboratory name, address, and telephone number, names of full-time registered engineer, field inspector, and responsible project manager. Laboratory subject to the approval of the Engineer. F. The same independent firm shall perform retesting. Contractor shall pay for retesting required by the failure of the initial test to meet the requirements of the specifications. 1.04 LABORATORY RESPONSIBILITIES A. Testing Laboratory shall have the following responsibilities for the Project: 1. Attend pre -construction conferences and progress meetings as required by the Engineer. 2. Collect and test samples of mixes. 3. Provide qualified personnel at site. Cooperate with Engineer and Contractor in performance of services. 4. Perform inspection, sampling, and testing in accordance with Contract Documents and specified standards. 5. Ascertain compliance of soil compaction and material mixes with requirements of Contract Documents. 6. Promptly notify Engineer and Contractor of observed irregularities or nonconformance of Work or Products. 7. Perform additional inspections and tests required by Engineer when specified tests have failed. 1.05 LIMITS ON TESTING LABORATORY AUTHORITY A. The authority of the Testing Laboratory is limited as follows: 1. May not alter requirements of Contract Documents. 2. May not approve or accept any portion of the Work. 3. May not assume duties of Contractor. 4. Has no authority to stop the Work. 1.06 LABORATORY REPORTS A. After each inspection and test, the independent testing firm shall submit report(s) as specified in Section, Submittal Procedures. 1.07 CONTRACTOR RESPONSIBILITIES A. Unless specified otherwise, deliver to laboratory at designated location, adequate samples of materials proposed to be used that require testing. The proposed mix designs shall be included with delivery. B. Cooperate with laboratory personnel, and provide access to the Work and to manufacturer's facilities as specified. C. Provide incidental labor and facilities to provide access to Work to be tested, to obtain and handle samples at the site and at source of products to be tested, to facilitate tests and inspections, storage, and curing of test samples. D. Notify Engineer and laboratory 24 hours prior to expected time for operations requiring inspection and testing services. Highway 24 Utility Corridor Improvements Quality Control - 01450-2 Contract 1: Transmission 1.08 REFERENCES A. Conform to reference standard by date of issue current to date of Bid opening. B. Should specified reference standards conflict with Contract Documents, request clarification from Engineer before proceeding. C. Contractual relationship of parties to the Contract shall not be altered from the Contract Documents by mention or inference otherwise in any reference document. 1.09 FIELD SAMPLES A. Install field samples at site as required by individual specification sections for review. B. Acceptable samples represent a quality level for the Work. C. Remove field samples and clean area prior to final inspection unless specified otherwise in the individual specification sections. 1.10 MANUFACTURERS' FIELD SERVICES AND REPORTS A. Require suppliers and manufacturers to provide a qualified technician for required services as outlined by the individual equipment and material specification sections. B. Submit qualifications of technician to Engineer 30 days in advance of required work. Technician subject to approval of Engineer. C. Technicians shall report observations, site decisions, and instructions given to Contractor, installers, and Owner's staff that are supplemental or contrary to manufacturers' written instructions directly to the Engineer. D. Submit test and start-up report as specified in Section, Submittal Procedures. PART 2 PRODUCTS Not Used PART 3 EXECUTION Not Used END OF SECTION SE Area Wastewater Capacity Improvements Quality Control - 01450-3 Contract 1: Transmission SECTION 01500 TEMPORARY FACILITIES AND CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES A. Temporary Utilities: Electricity, lighting, telephone service, water, and sanitary facilities. B. Work on public right-of-way. C. Traffic control. D. Temporary Controls: Barriers, enclosures and fencing, water control, dust control, erosion and sediment control, and protection of the work. E. Construction Facilities: Access roads, parking, progress cleaning, project signage, and field offices. 1.02 TEMPORARY UTILITIES A. Electricity 1. Electrical Contractor shall make arrangements for and provide equipment necessary for temporary electrical service to the site for the use of all Contractors at the Site. 2. General Contractor shall pay the monthly cost for the temporary electrical service, which will include the electrical usage by all contractors, Owner and Engineer at the site. B. Lighting 1. Provide and maintain lighting for construction operations as required by Contractor. 2. Provide and maintain lighting to exterior staging and storage areas after dark for security purposes as required by Contractor. C. Telephone Service 1. Provide, maintain and pay for telephone service to field office as required by Contractor. D. Water 1. Owner will provide suitable quality water used for construction. Exercise measures to conserve water during construction. Contractor will be billed for water usage in excess of normal construction requirements at Owner's published water rates. Contractor shall provide any necessary metering and backflow prevention as required by Owner. 2. Contractor shall be required to extend water lines or provide hauling as required for Contractor's use from existing site hydrants as designated by the Owner. E. Sanitary Facilities 1. Provide and maintain required facilities and enclosures as necessary to comply with the laws and ordinances of the authority having jurisdiction and the State of North Carolina. 2. General Contractor shall provide the above sanitary facilities for all contractors, sub -contractors, Owner and Engineer at the Project Site. 3. Existing facilities shall not be used. SE Area Wastewater Capacity Improvements Temporary Facilities - 01500-1 Contract 1: Transmission 1.03 TEMPORARY CONTROLS A. General 1. Temporary controls shall be the responsibility of each Contractor for their respective work unless noted otherwise. B. Barriers 1. Provide barriers to prevent unauthorized entry to construction areas for the safety of the public, the protection of the work, and to protect existing facilities and adjacent properties from damage from construction operations. 2. Provide protection for plant life designated to remain. Replace damaged plant life. 3. Protect vehicular traffic, stored materials, site, and structures from damage. C. Water Control 1. Grade site to drain. Provide, operate, and maintain pumping equipment to maintain excavations free of water. 2. Protect site from running water. D. Dust Control 1. Execute Work by methods designed to minimize raising dust from construction operations. 2. Provide positive means to prevent airborne dust from dispersing into atmosphere. E. Erosion and Sediment Control 1. Provide Erosion and Sediment Control as indicated on the Drawings and specified in Section, Erosion Control. F. Protection of Installed Work 1. Protect installed Work and provide special protection where specified in individual specification Sections. 2. Provide temporary and removable protection for installed Products. Control activity in immediate work area to minimize damage. 3. Prohibit traffic from landscaped areas. 1.04 CONSTRUCTION FACILITIES A. General 1. Construction facilities shall be the responsibility of each Contractor for their respective work unless noted otherwise. B. Access Roads 1. Contractor shall construct and maintain temporary drives as necessary to access public thoroughfares and existing drives to serve the construction area. 2. Provide means of removing mud from vehicle wheels before entering streets. C. Parking 1. When site space is not adequate, arrange for temporary off site surface parking areas to accommodate construction personnel. 2. Do not allow vehicle parking in existing right-of-way or to block existing drives. 3. Do not allow vehicle parking on private property without prior approval. D. Progress Cleaning 1. Maintain areas free of waste materials, debris, and rubbish. Maintain site in a clean and orderly condition. SE Area Wastewater Capacity Improvements Temporary Facilities - 01500-2 Contract 1: Transmission 2. Remove waste materials, debris, and rubbish from site periodically and dispose off site. E. Project Signage 1. Contractor shall provide project sign of exterior grade plywood and wood frame construction, painted, with exhibit lettering by professional sign painter. Submit layout based on example in Supplementary General Conditions, to Engineer for approval. 2. List title of Project, name of Owner, Engineer, and Contractor. 3. Erect on site at location established by Engineer. 4. No other signs are allowed, without Owner's permission, except those required by law. F. Field Offices 1. Contractors shall locate a temporary office trailer at the Project Site. Each office shall be equipped with a phone for use by the Contractor's Superintendent. 2. Contractor shall provide office facilities for the Engineer and his representative. The office shall have minimum floor area dimensions of 8' x 10', contain windows, cylinder locked door and raised floor. Heating and air conditioning equipment shall be provided. Lighting shall provide a minimum of 50 foot- candles. Provide a minimum of three receptacles. Furniture shall consist of a desk, chair, legal size four -drawer file cabinet, and drafting board. 3. Locate field office as approved by Engineer. 1.05 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS A. Remove temporary above grade or buried utilities, equipment, facilities, and materials, prior to Final Inspection. B. Clean and repair damage caused by installation or use of temporary work. C. Restore existing facilities used during construction to original condition. Restore permanent facilities used during construction to specified condition. PART 2 PRODUCTS Not Used PART 3 EXECUTION Not Used END OF SECTION SE Area Wastewater Capacity Improvements Temporary Facilities - 01500-3 Contract 1: Transmission SECTION 01600 PRODUCT REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Products. B. Transportation and handling. C. Storage and protection. D. Product options. E. Substitutions. 1.02 PRODUCTS A. Products: Means new material, machinery, components, equipment, fixtures, and systems forming the Work. Does not include machinery and equipment used for preparation, fabrication, conveying, and erection of the Work. Products may also include existing materials or components specified in the Contract Documents for reuse. 1.03 TRANSPORTATION AND HANDLING A. Transport and handle Products in accordance with manufacturer's instructions. B. Ship fabricated assemblies in largest sections permitted by carrier regulations and properly marked for ease of field erection. C. Promptly inspect shipments to assure that Products comply with specified requirements, quantities are correct, and Products are undamaged. D. Provide equipment and personnel to handle Products by methods to prevent soiling, disfigurement, or damage. 1.04 STORAGE AND PROTECTION A. Keep on site storage of material to a minimum. B. Store and protect Products in accordance with manufacturer's instructions in unopened original packages, with seals and labels intact and legible. Store sensitive Products in weather -tight, climate -controlled enclosures. C. For exterior storage of fabricated Products, place on sloped supports, above ground. D. Provide off site storage and protection when site does not permit on site storage. E. Cover Products subject to deterioration with impervious sheet covering. Provide ventilation to avoid condensation. F. Store loose granular Products on solid flat surfaces in a well drained area. Prevent mixing with foreign matter. G. Arrange storage of Products to permit access for inspection. Periodically inspect to assure Products are maintained under specified conditions. SE Area Wastewater Capacity Improvements Product Requirements - 01600-1 Contract 1: Transmission 1.05 DAMAGED PRODUCTS A. Remove damaged Products from Project site. 1.06 PRODUCT OPTIONS A. Products Specified by Reference Standards: Product meeting standard and specific requirements of these specifications. B. Products Specified by Naming One or More Manufacturers: Products of manufacturers named and meeting specifications, no options or substitutions allowed. C. Products Specified by Naming Three Manufacturers with an "or equal" Provision for Substitutions: Submit a request for substitution for manufacturer not named during the shop drawing submittal. 1.07 SUBSTITUTIONS A. Engineer will consider requests for Substitutions for items not listed in Equipment Materials List in the Bid Form Attachment as noted in Instructions to Bidders. B. Substitutes shall not be allowed from the list submitted with the Bid Form, except for the following reasons: 1. Item of equipment is no longer available. 2. "Or approved substitute" product is not approved by Engineer. PART 2 PRODUCTS Not Used PART 3 EXECUTION Not used END OF SECTION 01600-2 Product Requirements SE Area Wastewater Capacity Improvements Contract 1: Transmission SECTION 01700 EXECUTION REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Examination. B. Cutting and patching. C. General installation provisions. D. Cleaning and protection. E. Final inspection and tests. F. Adjusting. G. Close-out procedures. 1.02 EXAMINATION A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions. B. Verify that existing substrate is capable of structural support or attachment of new Work being applied or attached. C. Examine and verify specific conditions described in individual specifications sections. D. Verify that utility services are available, of the correct characteristics, and in the correct locations. 1.03 CUTTING AND PATCHING A. General 1. Do not cut, or alter the work of other contractors without written approval of the Engineer. 2. Work removed shall be replaced or repaired by the Contractor who removed or damaged the work, and a craftsman, skilled in the trade that the particular replacement requires, shall do the work. (i.e.: A mason, not an electrician, shall replace masonry removed by the Electrical Contractor.) 3. Conduct removal operations in a manner that will eliminate hazards to persons and property and prevent the release of dust and rubbish into the air. Existing work, which is to remain and is damaged by contract operations shall be replaced with new materials at no additional cost to the Owner. 4. For replacement of work removed, comply with specifications for type of work to be done. B. Inspection 1. Inspect existing conditions of work including elements subject to movement or damage during cutting and patching, and excavating and backfilling. 2. After uncovering work, inspect conditions affecting installation of new products. SE Area Wastewater Capacity Improvements Execution Requirements - 01700-1 Contract 1: Transmission C. Preparation prior to cutting 1. Provide shoring, bracing, and support as required to maintain structural integrity of project. 2. Provide protection for other portions of project. 3. Provide protection from elements. D. Performance 1. Execute fitting and adjustment of products to provide finished installation to comply with specified tolerances, finishes. 2. Execute cutting and demolition by methods to prevent damage to other work and provide proper surfaces to receive installation of repairs and new work. 3. Execute excavating and backfilling as specified in Section, Trenching for Utilities. 4. Restore work, which has been cut or removed; install new products to provide completed work in accordance with requirements of contract documents. 5. Refinish entire surfaces as necessary to provide an even finish. a. Continuous Surfaces: To nearest intersections. b. Assembly: Entire Refinishing. 1.04 GENERAL INSTALLATION PROVISIONS A. Require Installer of each major component to inspect conditions under which Work is to be performed. Clean substrate surfaces prior to applying next material or substance. Do not proceed until unsatisfactory conditions have been corrected. B. Comply with manufacturer's recommendations to the extent that they are more explicit or stringent than requirements contained in Contract Documents. C. Provide attachment and connection devices and methods necessary for securing Work. Secure Work true to line and level. Allow for expansion and building movement. D. Provide uniform joint widths in exposed Work. Arrange joints in exposed Work to obtain the best visual effect. Refer questionable choices to the Engineer for final decision. E. Check dimensions before starting each installation. F. Install each component during weather conditions and Project status that will ensure the best possible results. Isolate each part of the completed construction from incompatible material as necessary to prevent deterioration. G. Coordinate temporary enclosures with required inspections and tests, to minimize the necessity of uncovering completed construction for that purpose. H. Where mounting heights are not indicated, install individual components at standard mounting heights recognized within the industry for the particular application indicated. Refer questionable mounting height decisions to the Engineer for final decision. 1.05 CLEANING AND PROTECTION A. During handling and installation, clean and protect construction in progress and adjoining materials in place. Apply protective covering where required to ensure protection from damage or deterioration. SE Area Wastewater Capacity Improvements Execution Requirements - 01700-2 Contract 1: Transmission B. Clean and maintain completed construction as frequently as necessary through the construction period. Adjust and lubricate components as required to ensure proper operation. C. Limiting Exposures: Supervise construction activities to ensure that no part of the construction, completed or in progress, is subject to harmful, or dangerous exposure during the construction period. Where applicable, such exposures include, but are not limited to, the following: 1. Excessive static or dynamic loading. 2. Excessive internal or external pressures. 3. Excessively high or low temperatures. 4. Thermal shock. 5. Air contamination or pollution. 6. Water or ice. 7. Abrasion. 8. Heavy traffic. 9. Misalignment. 10. Improper shipping or handling. 11. Theft. 12. Vandalism. D. Clean Project prior to final inspection. Project clean up shall include, but not be limited to, the following: 1. Clean glass. 2. Clean surfaces exposed to view as recommended by manufacturer. 3. Remove temporary labels. 4. Vacuum carpeted areas. 5. Clean fixtures to a sanitary condition. 6. Repaint damaged paint surfaces. 7. Clean debris from roofs, gutters, down spouts, and drainage systems. 8. Sweep paved areas. 9. Rake clean landscaped surfaces. 10. Remove waste and surplus materials. 11. Remove temporary construction facilities. 1.06 FINAL INSPECTION AND TESTS A. Prior to final acceptance place equipment in operation and make necessary adjustments for proper operation. Test equipment under normal operating conditions in the presence of Engineer. Test shall show conclusively that requirements of the specifications have been fulfilled. B. Complete punch list items within 30 days of receipt from Engineer. Owner may have work not completed within 30 days performed by others with the cost deducted from Contractor's final payment. Additional engineering and inspection services required as a result of Contractor not completing punch list within 30 days shall be at Contractor's expense. 1.07 ADJUSTING A. Adjust operating Products and equipment to ensure smooth and unhindered operation. B. Provide proper fluids in equipment. C. Provide proper filters in equipment. SE Area Wastewater Capacity Improvements Execution Requirements - 01700-3 Contract 1: Transmission 1.08 CLOSE-OUT PROCEDURES A. Submit written certification that Contract Documents have been reviewed, Work has been inspected, and is complete in accordance with Contract Documents and ready for Engineer's inspection. B. Provide submittals to Engineer that are required by governing or other authorities. C. Submit set of Record Documents indicating changes during construction as required in Section, Submittal Procedures. D. Submit final Application for Payment identifying total adjusted previous payments, and final amount due. E. Submit the following with final Application for Payment: 1. Affidavit of Release of Liens 2. Consent of Surety for Final Payment 3. Affidavit of Payment of Debts and Claims 4. Final Certified Payroll Information F. Submit warranties as required by individual equipment specifications. PART 2 PRODUCTS Not Used PART 3 EXECUTION Not Used END OF SECTION Contract Sum, SE Area Wastewater Capacity Improvements Execution Requirements - 01700-4 Contract 1: Transmission SECTION 02082 SPECIALTY VALVES AND GATES PART 1 GENERAL 1.01 SCOPE A. The Section includes, but is not limited to, the following: 1. Piston Actuated Valves a. Surge Anticipator 2. Valve Accessories a. Valve Boxes, Below Ground 1.02 RELATED SECTIONS A. The following Sections have work that is directly related to this Section. This does not relieve the Contractor of his responsibility of proper coordination of all the work: 1. Section 02315 Trenching for Utilities 1.03 REFERENCES A. The latest revision, at the time of bidding, of the publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. 1. American Water Works Association (AWWA) Publications: a. C513 Open Channel Fabricated Metal Slide Gates b. C550 Protective Epoxy Interior Coatings for Valves and Hydrants. 2. National Sanitation Foundation (NSF) a. 61 Drinking Water System Components - Health Effects 1.04 SUBMITTALS A. Submit the following in accordance with Section, Submittal Procedures: 1. Catalog Data: Submit manufacturer's standard drawings or catalog cuts for the following. The equipment to be furnished for the Project shall be clearly indicated including all options to be provided. a. Surge Anticipator 2. Test Reports: Upon testing of the installed system, field test reports shall be submitted in booklet form showing field tests performed to adjust each component and field tests performed to prove compliance with the specified performance criteria. Each test report shall indicate the final position of controls. 3. Operation and Maintenance Instructions: Submit complete operation and maintenance manual for the total system. PART 2 PRODUCTS 2.01 SURGE ANTICIPATOR A. The surge anticipator valve shall be of wye (globe) body configuration or angle style as shown on the drawings, with cast iron body containing a securely fastened stainless steel ring. B. The valve disc will have a resilient replaceable seat firmly held in place by a stainless steel ring fastened to the disc with screws. In the closed position with the SE Area Wastewater Capacity Improvements Specialty Valves and Gates - 02082-1 Contract 1: Transmission line pressures below the spring setting, the valve shall provide driptight closure. The disc movement shall be guided for proper alignment throughout its stroke and provide for full opening of the pipe line area when required. C. The valve, normally closed, shall open when the system pressure exceeds the spring adjustment setting. Its opening stroke shall be limited to that which is necessary to provide protection against surge exceeding the spring setting. The valve shall close at a slow speed consistent with adjustment of a self-contained oil cushion chamber that is provided with the valve. The cushioning device shall permit a range of adjustment for closing speeds to prevent water hammer. D. External springs shall be enclosed in protective casings and shall be in compression. Springs that appear to be under extension are not permitted. The disc stem bushing shall be bronze capped with a lantern type gland vented to atmosphere for revealing gland leakage. E. Valve shall be full ported constructed of cast iron or ductile iron body with bronze trim and 125 lb flanges. F. Factory pre-set pressure relief settings: 1. Holly Ridge Pump Station: 90 psi 2. Summerhouse Pump Station: 40 psi 2.02 PINCH VALVES WITH ELECTRONIC MOTOR ACTUATOR A. Valves shall be 4" or smaller, of the full cast metal body, mechanical pinch type with flange joint ends. The valve length shall be as given in ISA S75.08. The flanges shall be drilled and tapped to mate with ANSI B16.1, Class 125 / ANSI B16.5, Class 150 flanges. B. The sleeve trim shall be one-piece construction with integral flanges drilled to be retained by the flange bolts. The sleeve trim shall be reinforced with calendared nylon or calendared polyester fabric to match service conditions. The sleeve trim shall be connected to the pinch bar by tabs imbedded in the sleeve trim reinforcing ply. All internal valve metal parts are to be completely isolated from the process fluid by the sleeve trim. For full port and reduced port sleeves the port areas shall be 100% of the full pipe area at the valve ends. For Cone and Variable Orifice sleeves the port area at the inlet shall be 100% of the full pipe area, reducing to a smaller port size at the outlet. C. The solid steel pinch mechanism shall be single acting, closing the sleeve from the top only. The mechanism shall be supported in the valve body. There shall be no cast parts in the operating mechanism. The mechanism shall be connected to the electrically actuated actuator through an ACME threaded stem. The electric motor shall be as specified. The pinch mechanism shall be adjustable for stroke without removing the valve from the line. Valve shall be manufactured in the USA. D. Manufacturer: All valves shall be of the Series 5200E as manufactured by the Red Valve Co., Inc. of Pittsburgh, PA 15220 or approved equal. SE Area Wastewater Capacity Improvements Specialty Valves and Gates - 02082-2 Contract 1: Transmission E. Electronic Motor Actuator 1. Function: An electric motor rotates a threaded nut pushing a threaded stem into the valve body, pinching the sleeve closed. Reversing the direction of the electric motor pulls the stem out of the valve body, opening the sleeve. 2. All electric actuators shall conform to the requirements of AWWA Standard C-540. 3. Actuators shall contain motor, gearing, manual override, limit switches, torque switches, drive coupling and integral motor controls (where required). 4. Valve closing time will be 60 seconds, unless otherwise noted. 5. The motor shall be specifically designed for actuator service. The motor will be of the induction type with class F insulation and protected by means of thermal Project ID : 03/22/2024 40 05 53 - 7 Specialty Valves and Gates switches imbedded in the motor windings. Motor enclosure will be totally enclosed, nonventilated. 6. Motors will be capable of operating on 460V/3ph/60Hz power, or as specified by the job. 7. Actuator housing shall be NEMA 4 (watertight) and suitable for short-term submersion in water to a depth of 8 feet for 30 minutes. 8. All gearing shall be grease lubricated and designed to withstand the full stall torque of the motor. 9. Manual operation shall be available by means of a handwheel. Return from manual to electric operation will be automatic upon motor operation. A seized or inoperable motor shall not prevent manual operation. 10. Limit switches will be furnished at each end of travel. Limit switch adjustment will not be altered by manual operation. Limit switch drive shall be by countergear. Limit switches must be capable of quick adjustment requiring no more that (5) turns of the limit switch adjustment spindle. One set of normally open and one set of normally closed contacts will be furnished and available for use by the plant control system at each end of travel where indicated. Contact shall be of silver and capable of reliably switching a low voltage DC source from the control system furnished by others. 11. Mechanically operated torque switches shall be furnished at each end of travel. Torque switches will trip when the valve load exceeds torque switch setting. The torque switch adjustment device must be calibrated directly in engineering units of torque. 12. All wiring shall be terminated at plug and socket connector. 13. Actuators will be capable of operating in an ambient temperature range of —20 to +175 degrees F. 14. Mechanical dial position indicator will be furnished on all valves. Two wire position feedback transmitter (4-20 mADC signal) will be furnished where indicated. 15. All actuators in open/close service will be furnished with integral, motor controls consisting of reversing starters, control transformer, phase discriminator, monitor relay, positioner, "open -stop -close" pushbuttons, "local -off -remote" selector switch in addition to red and green indicating lights. The positioner shall be capable of accepting a 4-20 mADC signal from the controller and positioning the valve by comparing the command signal with the present valve position as indicated by the feedback potentiometer mounted inside the actuator. The positioner shall be field adjustable to fail in the "open", "closed" or "last' position on loss of 4-20 mADC command signal. 16. All actuators shall be manufactured by AUMA Actuators, Inc. of Pittsburgh, PA SE Area Wastewater Capacity Improvements Specialty Valves and Gates - 02082-3 Contract 1: Transmission 2.03 VALVE ACCESSORIES A. General: 1. Provide accessories required for proper and accessible operation of valve at location indicated on the Drawings. 2. Accessories shall be compatible to proper valve operation as recommended by valve manufacturer. B. Valve Box, Below Ground: Box shall be high strength cast iron of the screw or telescopic type. Box shall consist of a base section, center extension as required, and a top section with cover marked "DRAIN," "SEWER," or "WATER," as applicable. PART 3 EXECUTION 3.01 INSTALLATION A. Install valves, gates, and accessories indicated on the Drawings and in complete accordance with the manufacturer's recommendations. 3.02 START UP SERVICES A. Provide the services of manufacturer's representative to check the valve(s) installation, supervise initial start up, and instruct Owner's personnel in proper operation and maintenance of the valve(s). A minimum of one trip to the site will be required, consisting of a minimum of one 8 hour working day. Regardless of the time spent at the site, services will not be considered complete until the valve operates as intended for a minimum of one (1) week of operation. B. Operate valve under actual field service to demonstrate that the valve performs to the specified flow capacity and head conditions. During the field test, make adjustments as necessary for proper operation. C. Submit copy of tests and checks performed in the field, complete with recordings, where applicable, to the Engineer. 3.03 PAINTING A. Equipment shall receive the manufacturer's standard coating for the intended application. Coatings shall be suitable in every way for the intended application. END OF SECTION SE Area Wastewater Capacity Improvements Specialty Valves and Gates - 02082-4 Contract 1: Transmission SECTION 02230 CLEARING AND GRUBBING PART 1 GENERAL 1.01 SECTION INCLUDES A. Work shall include, but not be limited, to the following: 1. Access roads. 2. Clearing and grubbing. 3. Removal of surface debris. 4. Demolition and removal of existing paving and structures. 5. Temporary and permanent ground cover. 1.02 RELATED SECTIONS A. The following Sections have work that is directly related to this Section. This does not relieve the Contractor of his responsibility of proper coordination of all the work: 1. Section 02370 Erosion Control 2. Section 02920 Lawns and Grasses. 1.03 WARRANTY AND FINES A. Contractor is liable for damages to public and private property and fines as may be placed on the Project by the governing agencies due to failure to provide adequate erosion control devices. PART 2 PRODUCTS Not Used PART 3 EXECUTION 3.01 PROTECTION A. Take reasonable care during construction to avoid damage to vegetation outside of clearing limits. B. Locate and protect property corners and survey control stakes prior to start of clearing operations. C. Provide temporary gates and fences as necessary to prevent unauthorized vehicular access to the site. D. Mark clearing limits. E. Refer to paragraph 4.04 of the General Conditions and 4.04.A.2 of the Supplementary Conditions concerning the protection of Underground Facilities. 3.02 ACCESS ROADS AND STAGING AREA A. Clear for access roads. B. Limit clearing and grubbing for access roads to a maximum width for two-way traffic of 30 feet for 20-foot drive and 5 foot shoulders. SE Area Wastewater Capacity Improvements Clearing and Grubbing 02230-1 Contract 1: Transmission C. Access roads shall have the following: 1. Provide "Temporary Construction Entrance" per the standard detail on the Drawings at connection to State Roads. 2. 6 inches of ABC stone. 3. Provide temporary seeding of shoulders as access drives are installed. 4. Provide storm pipes under drives at points of concentrated water flow. D. Clear for a staging area as directed by the owner. Total area to be cleared shall be approved by the Engineer. Area for parking and storage of material shall have 6 inches of ABC stone. E. Allow reasonable use of access drive by other Contractors, Owner, Engineer, and others authorized to be on the site by the Owner. F. When no longer required remove stone and restore access drives and staging area to original contours. Scarify and seed access drives and staging areas. 3.03 INSTALL EROSION CONTROL DEVICES A. Clear areas required to install erosion control devices, which shall be in place and operational prior to other land disturbing activity. Install erosion control devices in accordance with Section, Erosion Control. 3.04 BORROW AND DISPOSAL AREAS A. Obtain and pay for erosion control permit for borrow and disposal areas as required by Contractor. B. Install and maintain erosion control devices in accordance with Contractor's approved plan. 3.05 CLEARING AND GRUBBING A. Clear and grub vegetation within right-of-way as necessary to construct. B. For open cut installation, clear and grub total width of permanent easement. Clear within temporary construction easement only as necessary for construction. Do not grub within the temporary construction easement. For horizontal directional drill installation, do not clear and grub beyond installation pits unless required to complete construction. C. Clearing shall consist of cutting and removal of vegetation to the existing ground surface and removal of debris. Debris shall include, but not be limited to, fences, steps, walls, chimneys, footings, foundation slabs, basements, signs, junked vehicles, and other rubble. D. Grubbing shall consist of the removal of roots over 3 inches in diameter, matted roots, stumps, and other vegetable matter to 12 inches below existing grade. E. Do not precede grading operation by grubbing operation by more than seven days. F. When the depth of embankment exceeds 6 feet, cut sound stumps off at the existing ground level and do not grub. Remove decayed stumps to a depth of approximately 2 feet below the existing grade. G. Fill holes and depressions and bring cleared and grubbed area to a uniform contour to match existing grade. Provide positive drainage. SE Area Wastewater Capacity Improvements Clearing and Grubbing 02230-2 Contract 1: Transmission H. Remove and properly dispose of cleared and grubbed material from the site. Make reasonable effort to channel timber resulting from clearing operations into a beneficial use. Burning shall not be permitted at the site. END OF SECTION SE Area Wastewater Capacity Improvements Clearing and Grubbing 02230-3 Contract 1: Transmission SECTION 02300 EARTHWORK PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide labor, equipment, and material to perform site preparation and earthwork as specified herein and indicated on the Drawings. Work shall include, but is not limited to, the following: 1. Survey staking as required for construction. 2. Topsoil stripping and stockpiling. 3. Dewatering. 4. Protection of existing facilities. 5. Site grading. 6. Excavation, trenching, and backfilling for structures and foundation including stone base as indicated on the Drawings. 7. Borrow material including, but not limited to, material, excavating, hauling, placing, and compacting. 8. Maintenance and stability of site. 9. Disposal of waste and surplus material. 10. Soil testing. B. Examine the site to determine the extent of excavating, grading, and related items necessary to complete the work. 1.02 RELATED SECTIONS A. The following Sections have work that is directly related to this Section. This does not relieve the Contractor of his responsibility of proper coordination of all the work: 1. Section 02230 Clearing and Grubbing 2. Section 02315 Trenching for Utilities 3. Section 02370 Erosion Control 1.03 MEASUREMENT AND PAYMENT PROCEDURES A. Work in this section shall be included in the lump sum Base Bid, unless specifically noted otherwise, and shall include, but not be limited to, the following: 1. Topsoil stripping, stockpiling and spreading after the completion of the grading. 2. Backfilling of area stripped of topsoil and filling from existing grades to new subgrade elevation. Providing borrow material for backfilling and filling. 3. Excavating for structures. 4. Stone base as indicated on the Drawings. 5. Dewatering. 6. Use of explosives. 7. Protection of existing service lines and utility structures. 8. Maintenance and Stability of site grading. 9. Disposal of waste and surplus material. 10. Soil Testing. SE Area Capacity Improvements Earthwork - 02300-1 Contract 1 - Transmission 1.04 REFERENCES A. The latest revision, at the time of bidding, of the publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. 1. American Society of Testing Materials (ASTM) a. C33 Concrete Aggregates. b. D698 Moisture -Density Relations of Soils and Soil -Aggregate Mixtures Using 5.5-lb (2.49 Kg) Rammer and 12-inch Drop (Standard Proctor). c. D1556 Density of Soil in Place by the Sand -Cone Method. d. D1586 Penetration Test and Spilt -Barrel Sampling of Soils. e. D2167 Density and Unit Weight of Soil in Place by the Rubber Balloon Method. f. D2216 Laboratory Determination of Water (Moisture) Content of Soil, Rock, and Soil -Aggregate Mixtures. g. D2487 Classification of Soils for Engineering Purposes. h. D2922 Density of Soil and Soil -Aggregate in Place by Nuclear Methods (Shallow Depth). 1.05 DEFINITIONS A. Backfill: A specified material used in refilling a cut, trench, or other excavation, placed at a specified degree of compaction. B. Capillary Water Barrier: A layer of clean, poorly graded crushed rock, stone, or natural sand or gravel having a high porosity, which is placed beneath a building slab with or without a vapor barrier to cut off the capillary flow of water to the area immediately below the slab. C. Compaction: Process of mechanically stabilizing a material by increasing its density at a controlled moisture condition. "Degree of compaction" shall be expressed as a percentage of the maximum dry density obtained by the test procedure presented in ASTM D698 (Standard Proctor). D. Excavation: The removal of soil or rock to obtain a specified depth or elevation. E. Fill: Specified material placed at a specified degree of compaction to obtain an indicated grade or elevation. F. Hard Material: Solid, homogeneous material which are not included in the definition of "rock" but which usually require the use of heavy excavation equipment with ripper teeth. Material having a standard penetration resistance as determined by ASTM D1586 60 and 150 blows per foot is defined as "hard material." G. Lift: Layer of soil placed on top of a previously prepared or placed soil. H. Rock: Solid, homogeneous material which cannot be removed without the systematic drilling and blasting exceeding one (1) cubic yard in volume. Material having a standard penetration resistance as determined by ASTM D1586 greater than 150 blows per foot is defined as "rock." Removal of "hard material" will not be considered rock excavation because of intermittent drilling and blasting that is performed merely to increase production. I. Soil classification shall be in accordance with ASTM D2487. 1. Satisfactory materials: Soils classified as GW, GP, GC, GM, SP, SC, SM, SW, ML, and CL. SE Area Capacity Improvements Earthwork - 02300-2 Contract 1 - Transmission 2. Unsuitable materials: Soils considered as unsatisfactory shall be materials that do not comply with the requirements of satisfactory above and include, but shall not be limited to, the following: a. Soil containing organic matter, debris, stones larger than 6 inches, or frozen material. Stones greater than 4 inches will not be permitted in the top 12 inches. b. Soils classified as Pt, CH, MH, OH, and OL. 3. Cohesionless: Classified as GW, GP, SW, and SP. Soils classified as GM and SM shall be classified as cohesionless only when the fines have a plasticity index of less than 10. 4. Cohesive: Classified as GC, SC, ML, CL, MH, and CH. Soils classified as GM and SM shall be classified as cohesive only when the fines have a plasticity index greater than 10. J. Subgrade: Lowest elevation upon which fill or other work will be placed in the absence of unsuitable material. K. Topsoil: Natural, friable soil, representative of productive soils in the vicinity of the site. Topsoil shall be free from roots, stones larger than 1 inch, objectionable weed seeds, toxic substances, and materials that hinder grading, planting, and maintenance operations. 1.06 SUBMITTALS A. Submit the following in accordance with Section, Submittal Procedures: 1. Catalog Data: Submit manufacturer's standard drawings or catalog cuts for the following. a. Geotextile fabric. 2. Manufacturer's Installation Procedures. a. Structural fabric 3. Test Reports: Submit for the following: a. Moisture -density relations of soils. b. Field moisture content. c. Soil classification. d. In -place field density. e. Geotechnical engineer's daily field reports. 4. Permits a. Erosion control permits for borrow and disposal site(s). PART 2 PRODUCTS 2.01 MATERIAL A. Capillary water barrier: A clean crushed stone, crushed gravel, or uncrushed gravel conforming to ASTM C33 coarse aggregate grading size 57. B. Stone Base: A clean crushed stone, crushed gravel, or uncrushed gravel conforming to ASTM C33 coarse aggregate grading size ABC C. Geotextile Fabric: Provide nonwoven geotextile fabric specifically designed and manufactured to stabilize soft soils under an aggregate base in structural areas, provide separation, and allow filtration such as Mirafi 160N or equivalent. Fabric shall provide a permeable layer, planar flow, and tensile reinforcement for retaining the soil matrix. Fabric shall be inert to commonly encountered chemicals, SE Area Capacity Improvements Earthwork - 02300-3 Contract 1 - Transmission hydrocarbons, resistant to mildew, rot, and ultraviolet light exposure, and meet or exceed the following test standards: 1. Test ASTM 2. Fabric weight (oz / sq yd) D-1910 6 3. Grab tensile strength (lbs.) D-4632 160 4. Grab tensile elongation (%) D-4632 50 5. Trapezoid tear strength (lbs.) D-4533 60 6. CBR Puncture strength (lbs.) D-6241 410 7. Apparent Opening Size (sieve) D-4751 70 8. UV Resistance (%) D-4355 80 PART 3 EXECUTION 3.01 GENERAL A. Provide erosion control measures as specified in Section, Erosion Control and clearing and grubbing as specified in Section, Clearing and Grubbing. B. Protect existing structures and features to remain. C. Dispose of excavated material in such a manner that it will not obstruct the water flow, endanger existing improvements or Work in progress, impair the use or appearance of the existing facilities, or be detrimental to the completed Work. D. It is recommended that grading operations take place during the drier months from May to October, if practical. E. Weather Limitations: Proceed with fill and backfill operations based on the following weather conditions: 1. Temperature must be above freezing. 2. In windy, hot, or arid conditions with a high rate of evaporation add moisture to the material to maintain the optimum moisture content. 3. Do not proceed in rain or on saturated subgrade. F. Repair or undercut and backfill soils that become damaged by construction activity or unsuitable due to being left exposed to the weather at no additional cost. G. Do not place material on surfaces that are muddy, frozen, or contain frost. H. Excavation carried below the elevation indicated on the Drawings shall be backfilled and compacted in accordance with these specifications. I. Remove and properly dispose of unsatisfactory and excess material from the site. 3.02 CONSTRUCTION STAKING A. Provide construction staking as indicated in paragraph 4.05 of the General Conditions. Engineer will only provide key reference points and benchmarks. B. Contractor shall report to Engineer whenever a reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. Contractor shall be responsible for the accurate replacement or relocation of such reference points or property monuments by a registered professional surveyor in the State of North Carolina. SE Area Capacity Improvements Earthwork - 02300-4 Contract 1 - Transmission 3.03 PROTECTION OF UNDERGROUND FACILITIES A. Refer to paragraph 4.04 of the General Conditions and 4.04.A.2 of the Supplementary Conditions concerning the protection of Underground Facilities. B. Investigate underground facility locations prior to the start of construction. C. Repair damage to existing facilities at no additional cost to the Owner. D. A change in conditions may be considered due to the location of the existing facilities as allowed in the General Conditions. This does not include the cost for repair of damaged facilities not properly located in advance of construction. 3.04 WATER CONTROL A. The geotechnical investigation found the upper soils were conducive to temporary development of perched groundwater conditions during periods of wet weather. B. Inspect the site prior to mobilizing to determine the appropriate equipment for site grading and foundation work. C. Perform work to prevent surface water from accumulating in excavations, and unfinished fill areas. Perform grading and excavation so the work area and affected operations shall be continually and effectively drained. D. The geotechnical investigation found a high ground water table at the site, approximately 4 to 11 feet below the existing ground surface. Fluctuations of the groundwater table may be expected during the year due to seasonal and climatic changes. E. Install a dewatering system prior to excavating beneath the ground water table. Maintain the water table approximately 2 feet below the bottom of the excavation. F. Maintain dewatering until backfilling has proceeded above the natural ground water level and the structural weight is sufficient to prevent "floating" of the structure. Provide a job superintendent experienced in dewatering work. G. Horizontal seepage at the contact between clayey soil layers and overlying sandy soils may result in seeps in construction excavation slopes at these contacts, even when the groundwater level is controlled 2 feet below the construction excavation grade. If significant seepage occurs at these contacts that potentially destabilizes the construction excavation slope, it may be necessary to intercept and control the seepage with slope drains. H. Water from dewatering operations must be disposed of in accordance with the North Carolina Sedimentation Pollution Control Act. 3.05 USE OF EXPLOSIVES A. Explosives may not be used on the Project. 3.06 TOPSOIL A. A thin veneer of topsoil was encountered at the each pump station site. Strip topsoil from areas to be disturbed such that the underlying "clean" soils remain intact and stockpile separate from other excavated material. Locate topsoil so that the material can be used readily for the finished grading. Protect and maintain topsoil until needed. Place topsoil in thin lifts of 6-inch thickness or less after completion of work in accordance with Section, Lawns and Grasses. SE Area Capacity Improvements Earthwork - 02300-5 Contract 1 - Transmission B. Perform stripping with wide track dozer or other appropriate equipment to minimize disturbance to subgrade soils. Do not use rubber -tired equipment. 3.07 SITE GRADING A. Following topsoil stripping, identify unsuitable subgrade areas as determined by the Engineer. Based on the very loose near -surface soils and shallow groundwater at the site, the ground surface is not expected to support rubber -tired construction equipment. It is anticipated that loose near -surface soils (estimated to be 3 to 4 feet in depth) will require undercut and replacement in the footprints of all structures and pavements at the site, plus 5 feet outside. The undercut excavations will require dewatering as recommended in Paragraph 3.04 of this section. The undercut bottoms shall be observed by the Engineer to determine if sufficient undercut has occurred prior to fill placement. Payment for in place repair or undercutting and backfilling of unsuitable areas shall be as indicated in the Measurement and Payment paragraph. B. Perform undercutting of unsuitable soils with tracked excavators, top loading dump trucks or similar equipment approved for the use by the Engineer. Backfill undercut areas immediately. C. In -Place repair shall consist of discing and recompaction of existing soils to a depth of approximately 12 inches. D. At the direction of the Engineer provide a structural fabric for stabilization of unsuitable soil areas. Install fabric in accordance with the manufacturer's recommendation and the following minimum requirements. 1. Provide a fabric overlap of 24 inches. 2. Back dump and spread aggregate over fabric at the aggregate specified thickness. 3. Compact aggregate with vibratory roller prior to allowing additional construction traffic. E. Site grading shall be unclassified except as specifically indicated otherwise. Perform grading within the limits of the Project. Finished surface shall conform to the grades and cross sections indicated on the Drawings and be uniformly sloped for a positive drainage away from structures. F. Excavate rock encountered in cut sections to a depth of 6 inches below finished subgrade and backfill with satisfactory material. G. Scarify the existing subgrade surface to a minimum depth of 6 inches and recompact if subgrade density is less than the degree of compaction for the proposed fill material. Plow or bench existing ground surfaces steeper than one vertical to four horizontal in such a manner that the fill material will bond with or be keyed to the existing surface. Use compaction equipment suitable for the soil being compacted. Moisten or aerate material as necessary to obtain the optimum moisture content within plus or minus one percent to obtain specified compaction. H. Approved compacted subgrade that is disturbed by construction or adverse weather shall be scarified and re -compacted as specified previously. Re -compaction over utilities shall be by hand tamping. 3.08 FILL AND BACKFILL A. The soil types encountered within the anticipated excavation depths at this site include silty and clayey sands and low to high plasticity clays with SPT resistances SE Area Capacity Improvements Earthwork - 02300-6 Contract 1 - Transmission between 0 and 21 bpf. The silty and clayey sands and low plasticity soils may be used as backfill provided compaction moisture is maintained near optimum during placement. The moisture levels of these soils are expected to be well above compactable levels (especially those soils below the water table) and drying of these soils will be required prior to placement and compaction. Use of lime may be required if natural drying is not effective. B. Offsite borrow should consist of sandy soils having Unified soil classifications of SW, SM, SC, and SP. SW and SP soils are preferable as the initial fill lift in undercut bottoms. These soils shall have standard Proctor maximum dry unit weights of at least 110 pcf, a maximum plasticity index of 15 percent, and maximum particle size of 2 inches. C. Settlements due to the 3 to 4 feet of new site fill shall be allowed to substantially complete prior to construction of settlement -sensitive structures. All site grading shall be completed prior to any structure construction. D. Place and compact fill and backfill material adjacent to structures in a manner that prevents wedging and eccentric loading on or against structures. Do not use equipment adjacent to structures that may overload structure. Backfill against structure only after concrete has attained the specified 28-day compressive strength. It is recommended that no self-propelled compaction equipment be used within 5 feet of structure walls. E. Stone Base: Structures shall have a compacted crushed stone subgrade to the depth of 12 inches with a nonwoven geotextile placed below the bottom of the stone layer. F. All structural fill shall be placed in 8 to 10-inch loose lifts (6 to 8 inches for utility trench backfill) and compacted to at least 95 percent of the standard Proctor maximum dry density (MDD) (ASTM D 698). The moisture content of structural fill shall be maintained within +/- 3% of optimum moisture during compaction. The top 12 inches beneath pavements and structures shall be compacted to at least G. Place backfill and fill material in accordance with the following: 1. Maximum uniform loose lifts: 8-10 inches (6-8 inches for utility trench backfill) 2. Optimum moisture content: ± 3 percent of optimum 3. Percent compaction at optimum moisture content (MDD) (ASTM D 698): a. From ex. grade to within one (1) foot of struc. subgrade: 95 b. Final foot to subgrade under floor slabs and pavements: 98 H. Under sidewalks and grass areas: 90 I. Fill placement and compaction shall be observed by a qualified soil technician working under the supervision of the Engineer. An appropriate number of soil density tests shall be conducted to confirm that adequate fill compaction is achieved. J. Fill for asphalt pavement areas shall have soil classifications of SW, SM, SC, or SP, and a CBR of at least 10 percent. If off -site soils are placed at design subgrade, laboratory CBR testing shall be performed on these soils to confirm the CBR exceeds 10 percent. SE Area Capacity Improvements Earthwork - 02300-7 Contract 1 - Transmission 3.09 EXCAVATION FOR STRUCTURES A. Provide shoring or side slopes of excavations as necessary to protect workmen, and existing and new structures. Use, install, and remove shoring in accordance with State and Federal OSHA regulations. B. Furnish, erect, and maintain required guardrails at exposed boundaries of excavation. C. Perform excavation for utilities in accordance with Section, Trenching for Utilities. Install utilities to a minimum distance of five (5) feet beyond the face of the structure. D. Make excavation to the dimensions and elevations for the structures as indicated on the Drawings. Extend excavation a sufficient distance from walls and footings to allow for placing and removal of forms. E. Remove unsatisfactory material below required grade and replace with select backfill material as directed by Engineer. F. Excavation carried below the depths indicated, without specific directions, shall be backfilled and compacted as specified herein to the proper grade. In excavations for footings the concrete shall be extended to the bottom of the over excavation. Work caused by over excavation shall be at the Contractor's expense. G. The upper 9-inches of the subgrade after excavating for each structure should be compacted in place to at least 95% standard Proctor maximum dry density. The subgrade should be proof -rolled using a vibratory roller weighing a minimum of 10 tons (static load) until settlement from the last four complete passes does not exceed 1/8 inch. Any soft, unsuitable or unacceptable soils encountered in the subgrade should be replaced with structural fill placed and compacted to 95% of the standard Proctor maximum dry density. 3.10 ROCK EXCAVATION A. Notify Engineer immediately in the event that rock is encountered. 3.11 BORROW MATERIAL A. Provide borrow material required for fill and backfill to bring the site to the elevations indicated on the Drawings. Borrow material shall be subject to the approval of the Engineer. Notify Engineer as to the site selected for inspection and approval prior to transporting borrow material to the site. B. Obtain erosion control permit as necessary for borrow pit grading operations. C. Provide soil analysis for each type of material from proposed borrow pit(s) for Engineer's approval prior to placing borrow material. Contractor shall do necessary work to bring the borrow material to within plus or minus 1-1/2 percent of the optimum moisture content. A minimum of one sample per structure shall be obtained for analysis. 3.12 MAINTENANCE AND STABILITY A. Maintain fills and embankments to the grade and cross section indicated on the Drawings until the final completion and acceptance of the Project. Repair areas that are damaged. SE Area Capacity Improvements Earthwork - 02300-8 Contract 1 - Transmission 3.13 DISPOSAL OF SURPLUS MATERIAL A. Dispose of surplus material not required or unsuitable for filling, backfilling, or grading in an approved spoil area in accordance with local ordinances. B. Obtain erosion control permit as necessary for disposal site(s). 3.14 SOIL TESTING A. Provide the services of a soil -testing firm as specified in Section 01450, Quality Control. B. The testing laboratory soil specialist, as a minimum, shall be at the project site for the following: 1. Monitor proofrolling of existing soils to determine requirements for undercutting unsuitable soils 2. Monitor grading for the separation and wasting of unacceptable soils. 3. Providing tests in accordance with the following schedule: a. Optimum moisture and laboratory maximum density: Provide one (1) test per type of material to determine optimum moisture and maximum density values in accordance with ASTM D698. b. Moisture content: Provide two (2) tests per day per type of material in accordance with ASTM D2216. 4. Provide in -place field density in accordance with ASTM D1556 or other approved test and the following schedule: a. Provide a minimum of one (1) in -place bearing capacity test for every 1,200 sq ft of subgrade area under structures prior to the start of foundation work. b. While filling activities are in progress for structures and paved areas. Provide a minimum of one (1) in -place density test for every 1,200 sq ft of lift with a minimum of one (1) test for every lift. c. Provide a minimum of one (1) in -place bearing capacity test for every 100 feet of foundation trench. C. Submit test reports and soil specialist daily logs in accordance with Section 01450, Quality Control. END OF SECTION SE Area Capacity Improvements Earthwork - 02300-9 Contract 1 - Transmission SECTION 02315 TRENCHING FOR UTILITIES PART 1 GENERAL 1.01 SCOPE A. Provide labor, equipment, and material to perform required excavating, backfilling, and compacting for utilities and related structures as specified herein and indicated on the Drawings. Work shall include, but not be limited to, the following: 1. Survey staking as required for construction. 2. Protection of existing improvements. 3. Location of installed utilities. 4. Use of explosives. 5. Dewatering. 6. Excavating, backfilling, and compacting for utilities. 7. Installation of electronic marker balls. 8. Installation of warning / identification tape and tracer wire. 9. Borrow material. 10. Disposal of surplus material. 1.02 RELATED SECTIONS A. The following Sections have work that is directly related to this Section. This does not relieve the Contractor of his responsibility of proper coordination of all the work: 1. Section 02230 Clearing and Grubbing 2. Section 02370 Erosion Control 3. Section 02530 Sanitary Sewer System 4. Section 02920 Lawns and Grasses 5. Section 11307 Submersible Pump Stations 1.03 REFERENCED STANDARDS A. The latest revision, at the time of bidding, of the publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. 1. N.C. Department of Transportation - Standard Specifications for Roads and Structures (NCDOT). 2. American Society of Testing Materials (ASTM) a. D698 Moisture -Density Relations of Soils and Soil -Aggregate Mixtures Using 5.5-lb (2.49 Kg) Rammer and 12-inch Drop (Standard Proctor). b. D1556 Density of Soil in Place by the Sand -Cone Method. c. D1586 Penetration Test and Spilt -Barrel Sampling of Soils. d. D2049 Test for Relative Density of Cohesionless Soils. e. D2216 Laboratory Determination of Water (Moisture) Content of Soil, Rock, and Soil -Aggregate Mixtures. f. D2487 Classification of Soils for Engineering Purposes. 3. Uni-Bell PVC Pipe Association a. B-5-89 Recommended Practice for the Installation of Polyvinyl Chloride (PVC) Sewer Pipe. SE Area Wastewater Capacity Improvements Trenching for Utilities - 02315-1 Contract 1: Transmission 1.04 DEFINITIONS A. Backfill: A specified material used in filling the excavated trench and placed at a specified degree of compaction. 1. Materials: Materials listed herein include processed materials plus the soil classifications listed under the Unified Soil Classification System, (USCS) (Method D2487 and Practice D2488). The soil materials are grouped into five broad categories according to their suitability for this application. a. Class I: Angular, 6 to 40-mm (1/4 to 1-1/2-in), graded stone, including a number of fill materials that have regional significance such as coral, slag, cinders, crushed stone, and crushed shell. For these purposes of these specifications, Class 1 materials shall be NCDOT #57 or #67 stone. b. Class II: Coarse sands and gravels with maximum particle size of 44 mm (1-1/2 in.), including various graded sands and gravels containing small percentages of fines, generally granular and noncohesive, either wet or dry. Soil Types GW, GP, SW, and SP are included in this class. c. Class III: Fine sand and clayey gravels, including fine sands, sand -clay mixtures, and gravel -clay mixtures. Soil Types GM, GC, SM, and SC are included in this class. d. Class IV: Silt, silty clays, and clays, including inorganic clays and silts of medium to high plasticity and liquid limits. Soil Types MH, ML, CH and CL are included in this class. These materials are not recommended for bedding, haunching, or initial backfill. e. Class V: This class includes the organic soils OL, OH, and PT as well as soils containing frozen earth, debris, rock larger than 40 mm (1 1/2 in.) in diameter, and other foreign materials. These materials are not recommended for bedding, haunching, or initial backfill. 2. Backfill Zones: Each backfill zone shall extend the full width of the trench bottom. a. Foundation: Extending down from the bottom of bedding zone as defined below. b. Pipe Embedment 1) Bedding: Extending from 4 inches below the pipe bottom to the pipe bottom for 30-inch diameter and smaller and 6 inches below the pipe for pipes larger than 30 inches in diameter. 2) Haunching: Extending from the bedding (bottom of the pipe) to the pipe spring line. 3) Initial Backfill: Extending from the haunching (pipe spring line) to 1 foot above the top of the pipe. c. Final Backfill: Extending from the initial backfill to the finish ground elevation. B. Laying Conditions: 1. Type 1: Flat bottom trench with loose backfill. 2. Type 2: Flat bottom trench with backfill lightly consolidated to centerline of pipe. 3. Type 3: Pipe bedded in 4 inches minimum of loose soil and backfill lightly consolidated to top of pipe. 4. Type 4: Pipe bedded on Class I material to 1/8 pipe diameter (4 inch minimum) Backfill compacted to top of pipe a minimum of 80 percent of standard proctor. 5. Type 5: Pipe bedded in compacted Class I material to pipe centerline with 4- inch minimum under pipe. Backfill to top of pipe with Class I, II, or III and compact to 90 percent of standard proctor. SE Area Wastewater Capacity Improvements Trenching for Utilities - 02315-2 Contract 1: Transmission C. Compaction: Process of mechanically stabilizing a material by increasing its density at a controlled moisture condition. "Degree of compaction" shall be expressed as a percentage of the maximum dry density obtained by the test procedure presented in ASTM D698 (Standard Proctor). D. Excavation: The removal of soil or rock to obtain a specified depth or elevation. E. Hard Material: Solid, homogeneous material which is not included in the definition of "rock" but which may require the use of heavy excavation equipment with ripper teeth. Amount must exceed 1 cubic yard in volume. Material having a standard penetration resistance as determined by ASTM D1586 between 60 and 150 blows per foot is defined as "hard material." F. Lift: Layer of soil placed on top of a previously prepared or placed soil. G. Rock: Solid, homogeneous material which cannot be removed without the systematic drilling and blasting exceeding 1 cubic yard in volume. Material having a standard penetration resistance as determined by ASTM D1586 greater than 150 blows per foot is defined as "rock." Removal of "hard material" will not be considered rock excavation because of intermittent drilling and blasting that is performed merely to increase production. H. Pipe Springline: A line running horizontally through the center of the pipe. I. Topsoil: Natural, friable soil, representative of productive soils in the vicinity of the site. Topsoil shall be free from roots, stones larger than 1 inch, objectionable weed seeds, toxic substances, and materials that hinder grading, planting, and maintenance operations. 1.05 SUBMITTALS A. Submit the following in accordance with Section, Submittal Procedures: 1. Catalog Data: Submit manufacturer's standard drawings or catalog cuts for the following. Clearly indicate equipment to be furnished for the Project including options to be provided. a. Warning / Identification tape. 2. TEST REPORTS: SUBMIT THE FOLLOWING: A. Moisture -density relations of soils. B. Field moisture content. C. Soil classification. D. In -place field density. E. Geotechnical engineer's daily field reports." PART 2 PRODUCTS 2.01 STONE A. Class I material shall be #57 or #67 stone in accordance with NCDOT specifications Section 1005, General Requirements for Aggregate. 2.02 WARNING AND IDENTIFICATION TAPE A. Tape shall be a minimum 3-inch wide polyethylene plastic tape manufactured specifically for identification of buried utilities with means of enabling detection by a SE Area Wastewater Capacity Improvements Trenching for Utilities - 02315-3 Contract 1: Transmission metal detector to a depth of 18 inches below finished grade. Tape shall be laid continuously along utility line. Tape shall be color coded and continuously imprinted with warning and identification markings in bold black letters to read "CAUTION - BURIED (utility) LINE BELOW." Color and printing shall be permanent, unaffected by moisture or soil and shall be as follows: Utility Color 1. Water Blue 2. Gravity Sewer Green 3. Force Main Green 4. Electric Red 5. Gas Yellow 6. Telephone Orange 7. SCADA Orange Marking Caution - Buried Water Line Below Caution - Buried Sewer Line Below Caution - Buried Force Main Below Caution - Buried Electric Line Below Caution - Buried Gas Line Below Caution - Buried Telephone Line Below Caution - Buried SCADA Line Below B. Tape shall be by Blackburn Manufacturing, Joseph G. Pollard Co., or Reef Industries Inc. 2.03 TRACER WIRE A. Tracer wire shall be #12 solid copper wire, coated in insulation, suited for direct bury. Insulation color shall meet the APWA color code standard for identification of buried utilities. Wire shall be affixed to the pipe and tied off on valves. All connections shall be by wire nuts and taped B. Splices in tracer wire are to be kept to a minimum and joined with copper split nuts of appropriate size. PART 3 EXECUTION 3.01 PROJECT SAFETY A. Contractor is responsible for Project safety. B. Perform work in conformance with applicable State and Federal safety regulations including, but not limited, to the following: 1. North Carolina Safety and Health Standards for the Construction Industry (29CFR 1926 Subpart P). 2. NC OSHA Industry Guide No. 14, Excavations. 3. NC OSHA Industry Guide No. 20, Crane Safety. C. Provide barriers, warning lights, and other protective devices at excavations as necessary for safety of workers and the public. D. Provide sloping of bank, shoring, sheeting, or other means of maintaining the stability of the trench in accordance with the requirements of the Associated Contractor's Manual of Accident Prevention OSHA, Part 1926.P. 3.02 PROTECTION OF UNDERGROUND FACILITIES A. Approximate locations of existing underground facilities at the site are indicated on the Drawings based on information available to the Engineer. Engineer and Owner do not take responsibility for the accuracy of the information. B. Investigate underground facility locations prior to the start of construction. C. Repair damage to existing facilities at no additional cost to the Owner. SE Area Wastewater Capacity Improvements Trenching for Utilities - 02315-4 Contract 1: Transmission D. A change in conditions may be considered due to the location of the existing facilities as allowed in the General Conditions. This does not include the cost for repair of damaged facilities not properly located in advance of construction. E. Separation distances shall be in accordance with utilities requirements. 3.03 CONSTRUCTION STAKING A. Provide construction staking as indicated in paragraph 4.05 of the General Conditions. Engineer will only provide key reference points and benchmarks. 3.04 LOCATION OF INSTALLED UTILITIES A. Contractor shall be responsible for locating contract installed utilities as requested by third parties proposing to dig in the contract area until the date that the entire contract is recommended for final payment by Engineer to Owner. 3.05 WATER CONTROL A. Prevent surface water from entering the trench. B. When trench bottom is below the existing ground water table, install a dewatering system to maintain water table 1 foot below trench bottom. Provide a supervisor experienced in dewatering work at the job site. C. Maintain dewatering until backfilling has proceeded above the existing ground water level. D. Dispose of water from dewatering operations in accordance with the North Carolina Sedimentation Pollution Control Act. 3.06 USE OF EXPLOSIVES A. Explosives may not be used on the Project. 3.07 EXCAVATING A. Excavation shall be by open cut, unless otherwise indicated on the Drawings or specified herein. Short sections of trench may be tunneled or direct bored with the approval of the Engineer. B. Stockpile excavated material in such a manner that it will not obstruct the flow of runoff, streams, endanger Work, impair the use or appearance of existing facilities, or be detrimental to the completed Work. C. Contractor shall segregate excavated material so as to maintain material suitable for backfill separate from material that is unsuitable. D. Trench dimensions at the pipe embedment and foundation zone unless noted otherwise shall be as follows: 1. Minimum width: Pipe outside diameter plus 18 inches. 2. Maximum width: Pipe outside diameter plus 24 inches. 3. Sides shall be vertical to a minimum of one foot above the top of pipe. E. Shape trench bedding to provide uniform bearing for the full pipe length. Bottom shall be free of protrusions that could cause point loading on pipe. Provide bell holes as required for properly making pipe joint. F. Do not over excavate. Excavation below grade without approval of Engineer shall be backfilled with Class I material at no additional cost. SE Area Wastewater Capacity Improvements Trenching for Utilities - 02315-5 Contract 1: Transmission G. Undercut soils that become unsatisfactory by construction activity or by being left exposed to the weather and backfill with Class I material at no additional cost. H. Remove shoring, bracing, and sheeting, unless otherwise noted, as the trench is backfilled. Engineer shall have the authority to require that the sheeting be left in place. 1. Excavation of trench shall not advance more than 200 feet ahead of the installation. In no case should the excavation extend beyond that which can be backfilled by the end of the workday. J. Correct unstable soil conditions encountered at trench foundation by: 1. Excavate below grade as approved by Engineer and backfill with Class I material or approved substitute material at unit price bid or the cost to be included in pipe unit bid price as indicated in Section, Unit Prices. K. Rock and Hard Material 1. Excavate rock and hard material to a minimum depth of 4 inches below the pipe for pipes smaller than 30 inches and 6 inches for pipes 30 inches and larger. L. Pressure Lines: 1. Provide a minimum 3 feet of cover, unless indicated otherwise on the Drawings. 2. Excavate trenches to provide vertical curve chords that will not exceed the pipe manufacturer's recommended joint deflection. 3. Provide concrete thrust blocks having a compressive strength of 3,000 psi at 28 days at change in horizontal and vertical direction and reduction in the pipe size, in addition to other restraint systems are indicated otherwise on the Drawings. Cut trench sides vertical and square to receive concrete. Provide bearing area against trench wall as indicated on the Drawings. M. Gravity Lines: 1. Excavate trench to the alignment and grade indicated on the Drawings. N. Utility Structures: Provide a minimum of 12 inches below subgrade and backfill with Class I compacted to 95 percent maximum density. If the soil conditions are found to be unsuitable for structural stability of the manhole, Engineer may require additional depth of Class I material. 3.08 BACKFILLING A. Weather Limitations: Proceed with backfill operations based on the following weather conditions: 1. Temperature must be above freezing and rising. 2. In windy, hot, or arid conditions with a high rate of evaporation add moisture to the material to maintain the optimum moisture content. 3. Do not proceed in rain or on saturated subgrade. 4. Do not place material on surfaces that are muddy, frozen, or contain frost. B. General 1. Maintain backfill operation within 200 feet from pipe laying operation. 2. Backfill trench to existing ground surface with select excavated material at the specified compaction. 3. If excavated material is unsuitable to obtain specified compaction, provide suitable off -site borrow material for backfill. 4. Re -excavate trenches improperly compacted. Backfill and compact as specified. SE Area Wastewater Capacity Improvements Trenching for Utilities - 02315-6 Contract 1: Transmission 5. Provide appropriate tamping equipment, and water to obtain proper moisture content, to achieve specified compaction of backfill. 6. Conduct operation of heavy equipment above pipe installation as to prevent damage to pipe. 7. Install warning / identification tape over utilities. Bury tape one foot below finished grade above the utility. 8. Install tracer wire for non-metallic pressure pipe. Bury tracer wire with pipe. Wire shall be looped into valve boxes to allow access for direct contact location. C. Backfill in pipe embedment zone (bedding, haunching, and initial backfill). 1. General: a. Backfill with material as specified below. Material shall be free from objects larger than 2 inches. b. Where rock and hard material has been excavated below pipe bottom, backfill and compact bedding with Class I material. Class II or III material may be used for bedding with Engineer's approval. c. Place backfill material to assure placement of material under pipe haunches. d. Take care during placement and compacting of material to avoid movement of pipe. 2. Place backfill in bedding and haunching zones in 6 inch maximum lifts and compact to 90 percent density. Place initial backfill in one lift do not compact. Provide backfill material in pipe embedment zone as specified below. a. Pressure Lines (Flexible and Rigid Pipe) 1) Excavation in Class I, Class II, Class III, and stable Class IV soils suitable for bedding, the bedding surface shall provide a firm foundation of uniform density. Backfill with select excavated material. 2) Excavation in Class V, unstable Class IV soils, running water, and other unstable soil conditions, excavate a minimum of 4 inches below pipe bottom and provide Class I material for bedding and haunch zone. Backfill with Class I, II, or III material in initial backfill. D. Final Backfill 1. Backfill with materials free of stones and debris larger than 6 inches in dimension. Place backfill in lifts not exceeding the thickness and compacted to the minimum density specified below. 2. Trench backfilled with noncohesive materials may be compacted with water flooding; except under roadways, shoulders of roadways, and other areas subject to vehicular movement, provided the method of compaction is approved by the Engineer and provides the degree of compaction required. 3. Lifts and density: a. Undeveloped areas (i.e., forests, fields, and, croplands): Trench may be filled with bulldozer blade provided material fall will not damage pipe. Mound soil over the trench area sufficiently to settle level over time. Degree of compaction shall be 85 percent. b. Lawns: Backfill in 12-inch lifts and compact to 90 percent. Top 12 inches shall be free of material with a dimension over 2 inches. c. Roads (including Rights -of -way), drives, parking areas (including areas within 20 feet), and adjacent to existing utilities: Backfill in 6 inch lifts compact to 95 percent. d. Within 20 feet of foundations: Backfill in 6-inch lifts compacted to 95 percent. SE Area Wastewater Capacity Improvements Trenching for Utilities - 02315-7 Contract 1: Transmission E. Utility Structures: Bring backfill to grade in even lifts on all sides. Lift depths and compaction densities shall be as specified according to area of installation for pipe above. Backfill against cast -in -place concrete structure only after concrete has attained the specified 28-day compressive strength. 3.09 SOIL TESTING A. Provide services of a soil -testing firm as specified in Section, Quality Control. B. Testing laboratory soil specialist, as a minimum, shall be at the project site for the following: 1. Provide a minimum of one (1) in -place density test for every 1,000 If of trench. C. Density tests shall be made in accordance with ASTM D-698, Standard Proctor Method. D. Submit test reports and soil specialist daily logs in accordance with Section, Quality Control. E. Based on test results, make corrections, adjustments, and modifications of methods, materials, and moisture content for proper trench compaction. 3.10 PAVEMENT PATCHING A. Repair damaged pavement structure. B. Cut existing pavement for utility installation in straight lines generally parallel to the utility. Properly dispose of removed pavement structure. C. Extend pavement patch 1 foot beyond each side of trench on firm subgrade. Slope new surface to drain. D. Asphalt Pavements: Replace asphalt pavement with a pavement structure equal to existing but no less than as detailed on the Drawings. E. Concrete Pavements: Replace concrete pavement with pavement structure equal to existing but no less than as detailed as Drawings. Concrete shall be minimum 3,000 psi. When existing concrete joint is within 5 feet of trench remove existing concrete to joint. Provide expansion joint at edge of existing concrete. Surface treatment shall match existing. F. Curbs, Gutters, and Sidewalks: Replace curbs and gutters, and sidewalks removed or damaged with similar sections to match the existing. Remove to nearest existing joint. G. Approval of Other Authorities: Pavements under the jurisdiction of the NC Division of Highways shall be subject to the approval of a representative of that Division. H. Raise existing and new manholes and valve boxes to finished pavement grade. Excavate around top of existing manhole and valve box as necessary. Remove existing top ring, and install new grade ring(s) as necessary. Install existing cover. Raise existing valve box. Provide concrete collar around manhole ring and valve box. I. Pavement patching shall include the cost to adjust existing and new manhole and valve boxes to finished pavement elevations. SE Area Wastewater Capacity Improvements Trenching for Utilities - 02315-8 Contract 1: Transmission 3.11 GRADING AND CLEAN-UP: A. Provide for testing and clean up as soon as practicable, so these operations do not lag far behind the pipe installation. Perform preliminary clean up and grading as soon as backfill is complete. B. Provide positive drainage of finished grade and drain away from structures. Finished grade shall be reasonably smooth, compacted, free from irregular surface changes and comparable to the adjacent existing ground surface. C. Seed disturbed areas in accordance with Section, Lawns and Grasses. D. Upon completion of backfilling, remove and properly dispose of excess material and waste. END OF SECTION SE Area Wastewater Capacity Improvements Trenching for Utilities - 02315-9 Contract 1: Transmission SECTION 02370 EROSION CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. Work shall include, but not be limited to, the following: 1. Erosion control at project site. 2. Erosion control at borrows and disposal areas as required by Contractor. Cost shall include erosion control permits as necessary for borrow and disposal areas. 3. Removal of surface debris. 4. Temporary and permanent ground cover. 5. Maintain and remove erosion control devices. 6. Self Inspection and Monitoring 1.02 RELATED SECTIONS A. The following Sections have work that is directly related to this Section. This does not relieve the Contractor of his responsibility of proper coordination of all the work: 1. Section 02920 Lawns and Grasses 1.03 REFERENCED STANDARDS A. "Erosion and Sediment Control Planning and Design Manual," issued by the N. C. Sedimentation Control Commission. 1.04 QUALITY ASSURANCE A. Conform to rules and regulations of the Erosion Control Laws of the State of North Carolina, specifically the Sedimentation Pollution Control Act of 1973 (G.S. 113A) as amended, and the local jurisdiction where the project is located. B. Post a copy of the approved erosion control permit, furnished by Owner, at the site prior to starting work. Maintain a copy of the approved erosion control plan at the site. C. Provide permanent ground cover as soon as possible, and no later than 15 working days after completion of work in a specific area. 1.05 WARRANTY A. Contractor is liable for damages to public and private property and fines as may be placed on the Project by the governing agencies due to failure to provide adequate erosion control devices. PART 2 PRODUCTS 2.01 MATERIALS A. Wire Staples: 16 gauge steel wire, with minimum of 3" top and 4" long legs. B. Gravel for Stone Filters: #57 crushed stone. C. Filter Fabric: 7-1/2 oz. burlap fabric or other silt filtering fabric. SE Area Wastewater Capacity Improvements Erosion Control - 02370-1 Contract 1: Transmission D. Riprap: 1. Class A: Stone shall conform to NCDOT standards and shall range in size from 2 to 6-inches with the stone gradation being equally distributed within the required size range. 2. Class B: Stone shall conform to NCDOT standards and shall range in size from 5 to 12-inches with the stone gradation being equally distributed within the required size range. 3. Type 1: Stone shall conform to NCDOT standards and shall range in size from 5 to 17-inches with the stone gradation being equally distributed within the required size range. PART 3 EXECUTION 3.01 INSTALL EROSION CONTROL DEVICES A. Install erosion control devices, which shall be in place and operational prior to other land disturbing activity. B. After installing erosion control devices as indicated on the Drawings, verify that reasonable measures have been taken to prevent the sedimentation of nearby watercourses, existing and new facilities, and adjacent property. C. Should Contractor believe that additional measures are necessary to adequately prevent erosion, immediately notify Engineer. If rain is predicted before the Engineer can be notified, take measures as necessary to prevent siltation of nearby water courses and work will be paid for as provided in the General Conditions. D. After installing erosion control devices, request an inspection by the local agency having jurisdiction and the Engineer. E. Incorporate permanent erosion control work into the project at the earliest practicable time. Coordinate temporary erosion control measures with permanent erosion control measures and other work on the project to assure effective and continuous erosion control throughout the construction and post construction period. F. Maintain erosion control devices during construction until the disturbed areas are stabilized and the agency having jurisdiction and the Engineer have approved the removal of the erosion control devices. 3.02 BORROW AND DISPOSAL AREAS: A. Obtain and pay for erosion control permit for borrow and disposal areas as required by Contractor. B. Install and maintain erosion control devices in accordance with Contractor's approved plan. 3.03 MAINTENANCE A. Inspect erosion control devices after each rainfall. Make required repairs immediately. Remove sediment deposits when deposits reach approximately one- half of the capacity of the erosion control device. B. Respread accumulated sediments on the project site in a manner that will not adversely affect erosion control facilities and permanent ground cover. SE Area Wastewater Capacity Improvements Erosion Control - 02370-2 Contract 1: Transmission C. Silt Fence: Should the filter fabric decompose or become ineffective before approval of its removal by the Engineer, replace fabric immediately at no additional cost to the Owner. D. Temporary Construction Entrance: Maintain entrance in a condition that will prevent tracking or flow of mud onto public rights -of -way. This may require periodic top dressing with 2 inches of stone, as conditions require, at no additional cost to the Owner. 3.04 SEEDING A. Disturbed areas not covered by new construction shall be seeded. B. Provide temporary and permanent seeding in accordance with Section, Lawns and Grasses. 3.05 STABILIZATION AND CLEAN-UP A. Remove erosion control devices upon the approval of the permanent stabilization of this site by the agency having jurisdiction of the area and the Engineer. Dress sediment deposits remaining in place after the erosion control devices are removed to conform to the existing grade, prepared and seeded. Include cost of removal and cleanup in the cost of the installation of the device. 3.06 SELF INSPECTION AND MONITORING A. Provide self -inspection and reporting as required by the Sedimentation Pollution Control Act for the duration of the project. These inspections will performed to ensure that the approved sedimentation and erosion control measures on the Drawings are installed, maintained, and working adequately. 1. The inspections need to be conducted after each phase of the project, and continue until permanent ground cover is established. 2. The self -inspection forms and information regarding this program are provided at the following website: httD://www.dlr.enr.state.nc.us/Daaes/sedimentation new.html. 3. Documentation of inspections shall be recorded on a single copy of the approved erosion and sedimentation control drawings. These Drawings and inspection reports shall be made available at the project site. B. Provide weekly self -monitoring in accordance with the NPDES Stormwater permit for all construction activities. END OF SECTION SE Area Wastewater Capacity Improvements Erosion Control - 02370-3 Contract 1: Transmission SECTION 02445 BORE AND JACK OF CONDUITS PART 1 GENERAL 1.01 SCOPE A. Provide, complete in place, carrier pipe installed within steel encasement pipe under railroads and highways as indicated on the Drawings. 1.02 RELATED SECTIONS A. The following Sections have work that is directly related to this Section. This does not relieve the Contractor of his responsibility of proper coordination of all the work: 1. Section 02315 Trenching for Utilities 2. Section 02530 Sanitary Sewer System 1.03 INDUSTRY REFERENCES A. The latest revision, at the time of bidding, of the publications listed below form a part of this specification. 1. Highway Crossing: Install pipe under highways in accordance with "Policies and Procedures for Accommodating Utilities on Highway Rights -of -Way," NC Department of Transportation, as a minimum. 1.04 SUBMITTALS A. Submit the following in accordance with Section, Submittal Procedures: 1. Affidavit of Compliance: Affidavit shall attest that supplied products conform to the referenced standard and this specification and that all tests set forth in each applicable referenced publication have been performed and that all test requirements have been met. Submit for each of the following materials: a. Encasement Pipe. 2. Catalog Data: Submit manufacturer's standard drawings or catalog cuts for the following. Clearly indicate equipment to be furnished for the Project including options to be provided. a. Encasement pipe. b. Pipe support. c. Casing seal. 1.05 QUALITY ASSURANCE A. Work covered in this Section of the specifications is within the right(s)-of-way of the following: 1. N.C. Department of Transportation (NCDOT) a. All Work in Onslow County b. Division 3, District 1 c. District Engineer 299 Wilmington Highway, Jacksonville, NC 28540 Phone: 910-467-0550 B. Bear costs, including but not limited to, bonds, insurance, coordination, inspection fees, flagmen, permanent and temporary signage, etc. as required by the respective agency indicated above. Specific agency requirements are indicated in the Encroachment Agreement as attached to Section, Supplementary Conditions. SE Area Wastewater Capacity Improvements Bore & Jack of Conduits — 02445-1 Contract 1: Transmission C. Comply with requirements of the Encroachment Agreement(s). D. Prior to start of Work provide notifications as indicated in the Encroachment Agreement. E. Work shall conform to the requirements and be subject to the approval of the above agency. PART 2 PRODUCTS 2.01 MATERIALS A. Encasement Pipe: Encasement pipe shall be uncoated, welded steel meeting ASTM A-139, Grade B, with minimum yield strength of 35,000 psi. Pipe length, and size shall be as indicated on the Drawings. The minimum wall thickness shall be as shown below. Encasement thickness shall be stenciled on exterior of pipe. 1. N.C. Department of Transportation Pipe Size (O.D.-inches) 4-12-3/4 16-24 30 36 42 48 Wall Thickness (inches) 0.188 0.250 0.312 0.375 0.500 0.500 B. Carrier Pipe: Carrier pipe shall be of the type, size, and joints as indicated on the Drawings and specified in Section, Water Distribution System and Section, Sanitary Sewer System. C. Pipe Support: Provide pipe supports designed and manufactured for the support of the carrier pipe size and material to be used for the Project within the encasement size indicated on the Drawings. Supports shall be designed to carry the pipe at the support spacing specified and meet the following minimum requirements: 1. Band Width: 8 inches for pipes 14 inches and under and 12 inches for pipes 16 inches and over. 2. Band and Riser Material: 14 gauge steel for band and riser except if the riser is over 6 inches high the steel shall be 10 gauge for riser. Riser shall be of the channel shape. Band with risers shall a fusion bonded PVC coating of a minimum of 10-mil thickness. Band shall be bolted together with stainless steel bolts, nuts, and washers. 3. Band Liner: Provide PVC liner a minimum of 0.09 inches. 4. Runners: Glass Reinforced Polyester or UHMW Polymer plastic. Runner shall be a minimum of 1 inch wide and not more then 1 inch shorter than the bandwidth. Provide 2 top and 2 bottom runners for pipe sizes through 12 inches and 2 top and 4 bottom runners for pipes over 12 inches. 5. Pipe position within casing: Centered and Restrained. 6. Support Spacing: a. General: SE Area Wastewater Capacity Improvements Bore & Jack of Conduits — 02445-2 Contract 1: Transmission 1) Provide a support within one foot on each side of joints. Provide a support within one foot of each end of casing. 2) Provide additional supports as needed per manufacturer's recommendations. b. PVC: Provide pipe supports at a maximum of 6 foot spacing along pipe in addition to the above requirement. 7. Supports shall be as manufactured by Advance Products & Systems, Inc., Pipeline Seal and Insulator, Inc or equal. D. Casing End Seal: Provide casing seal designed and manufactured for sealing around the casing and carrier pipe. The seal may be a wrap -around or a pull -on. Seal shall be made of 1/8-inch thick synthetic rubber. Seal shall be secured with stainless steel banding straps with worm gear tightening device. PART 3 EXECUTION 3.01 GENERAL A. Verify the subsurface conditions at each boring site. Payment will not be made for encasement pipe installed but not usable. B. Stabilize and maintain bore pit bottom to provide proper equipment support and maintain pipe alignment. Dewater as necessary for site. Excavate bore pit in accordance with OSHA regulations. Provide adequate barricades, railings, and warning lights throughout the boring operation. Conduct operation in such a manner so as not to create a hazard to, nor impede the flow of traffic. C. Install encasement pipe by dry boring and jacking. D. Boring auger diameter shall not be greater than the outside diameter of the encasement pipe and shall not extend more than 6-inches ahead of the cutting edge of the encasement pipe. Fill voids that are formed during the operation with a 1:3 portland cement grout pumped at 50 psi to ensure that there will be no settlement of the roadway. E. As the boring operation progresses, butt weld each new section of the encasement pipe to the section previously jacked into place. Maintain proper alignment. Confirm the grade of the encasement pipe as the Work progresses. F. If an obstruction is encountered during the boring operation, efforts should be made to remove the obstruction. If obstruction cannot be removed, withdraw the encasement pipe and fill the void with 1:3 portland cement grout at 50 psi. If the encasement pipe cannot be withdrawn, seal ends before moving to another bore site. Engineer shall approve location of new bore site. A maximum of two (2) attempts as described above as necessary, including additional bore pits, shall be made by the Contractor at the bid unit price. G. If, after the second attempt, it is found to be impossible to install the encasement pipe by boring due to rock or some other obstruction, a change order will be negotiated for placing the pipeline by open -cut or tunneling in accordance with the Contract Documents. H. Provide seals at each end of encasement pipe SE Area Wastewater Capacity Improvements Bore & Jack of Conduits — 02445-3 Contract 1: Transmission 3.02 CARRIER PIPE A. Install carrier pipe in the encasement pipe using manufactured pipe supports. Supports shall prevent movement of the carrier pipe within the encasement. Space supports as specified. END OF SECTION SE Area Wastewater Capacity Improvements Bore & Jack of Conduits — 02445-4 Contract 1: Transmission SECTION 02447 HORIZONTAL DIRECTIONAL DRILLING FOR PIPE INSTALLATION PART 1 GENERAL 1.01 SCOPE A. Provide complete installation of fusible polyvinylchloride pipe (FPVCP) by horizontal directional drilling (HDD) as indicated on the drawings. B. Work shall include, but not be limited, to the following: 1. General site and access preparation necessary for construction operations. 2. Assembly of pipe. 3. Hydrostatic testing of the pipe prior to installation (Contractor's option). 4. Erection of drilling equipment. 5. Drilling of a small diameter pilot hole. 6. Reaming the pilot hole as specified herein to a diameter suitable for installation of the pipe. 7. Pulling the assembled pipe through the reamed hole along with the detector wire. 8. Hydrostatic testing of pipe after installation. 9. Cleanup and final restoration of work area. 1.02 RELATED SECTIONS A. The following Sections have work that is directly related to this Section. This does not relieve the Contractor of his responsibility of proper coordination of the work: 1. Section 02230 Clearing and Grubbing 2. Section 02315 Trenching for Utilities 3. Section 02530 Sanitary Sewer System 1.03 REFERENCES A. Publications are referred to in the text by basic designation only. 1. American Society for Testing and Materials (ASTM) a. D1784 Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds b. D2152 Test Method for Degree of Fusion of Extruded PVC Pipe and Molded Fittings by Acetone Immersion c. D3350 Polyethylene Plastics Pipe and Fittings Materials 2. American Water Works Association (AWWA) a. B300 Hypochlorites b. B301 Liquid Chlorine c. C104 Cement -Mortar Lining for Ductile -Iron Pipe and Fittings for Water d. C105 Polyethylene Encasement for Ductile -Iron Piping for Water and Other Liquids e. C111 Rubber -Gasket Joints for Ductile -Iron Pressure Pipe and Fittings f. C150 Thickness Design of Ductile Iron Pipe g. C151 Ductile -Iron Pipe, Centrifugally Cast, for Water h. C153 Ductile -Iron Compact Fittings, 3-inch through 24-inch and 54-inch through 64-inch, for Water Service SE Area Wastewater Capacity Improvements Horizontal Directional Drilling — 02447-1 Contract 1: Transmission i. C600 Standard for Installation of Ductile Iron Water Mains and Their Appurtenances j. C651 Disinfecting Water Mains k. C900 PVC Pressure Pipe for Water Distribution I. C905 PVC Pressure Pipe for Water Distribution and Transmission m. M23 Manual of Supply Practices PVC Pipe — Design and Installation 3. National Sanitation Foundation (NSF) Standards a. 14 Plastic Piping Components and Related Materials b. 61 Drinking Water System Components — Health Effects 1.04 SUBMITTALS A. Submit the following in accordance with Section, Submittal Procedures: 1. Affidavit of Compliance: Affidavit shall attest that supplied products conform to the referenced standard and this specification and that all tests set forth in each applicable referenced publication have been performed and that all test requirements have been met. Submit for each of the following materials: a. FPVC Pipe. 2. Catalog Data: Submit manufacturer's standard drawings or catalog cuts for the following. Clearly indicate equipment to be furnished for the Project including options to be provided. a. FPVC Pipe. 3. Test Reports: Submit for the following: a. Field test including calibration report and pressure testing. 4. Description of the arrangement of directional drilling including method of monitoring and controlling line and grade, schedule, and procedure of installation. 5. Provide pipe manufacturer's recommended pull -back pressure to be utilized during installation. 6. Log sheets as required herein. 7. Provide certified as -built drawing (plan and profile), including beginning and ending locations of drill, upon completion of drilling. 1.05 QUALITY ASSURANCE A. Pipe manufacturer shall have an established quality control program responsible for inspecting and testing incoming and outgoing material. B. Manufacturer shall maintain permanent Quality Control (QC) and Quality Assurance records. C. Contractor shall employee personal that have a minimum of ten (10) similar installations of FPVC by horizontal directional drilling as appropriate for the installation. Fusing technician shall be qualified by the pipe supplier to install the type(s) and size(s) being used. Qualification shall be current as of the actual date of fusion performance on the project D. Directional drilling method shall be mechanical with fluid assistance. Pneumatic, water jetting, jacking, and boring method will not be permitted. E. Install pipe by directional drilling in accordance with the best industry practice, manufacturer's recommendations and the Contract Documents. F. Equipment used to monitor pull -back pressure shall be calibrated prior to each installation. SE Area Wastewater Capacity Improvements Horizontal Directional Drilling — 02447-2 Contract 1: Transmission G. Pipe and fusion services shall be warrantied for a minimum of one year from date of acceptance. PART 2 PRODUCTS 2.01 GENERAL A. Products with surfaces intended to be in contact with the drinking water shall be certified and listed in accordance with NSF 61 for potable drinking water and bear the NSF seal on each section of pipe. 2.02 MATERIALS A. Fusible Polyvinylchloride Pipe 1. Fusible polyvinylchloride pipe shall conform to AWWA C900 or AWWA C905. Testing shall be in accordance with AWWA standards. 2. Pipe shall be DIPS standard dimensions with a minimum pressure rating of 235 psi (DR18) and the size as indicated on the Drawings. 3. Piping shall be made from a PVC compound conforming to cell classification 12454 per ASTM D1784. 4. Fusible polyvinylchloride pipe shall be extruded with plain ends. The ends shall be square to the pipe and free of any bevel or chamfer. There shall be no bell or gasket of any kind incorporated into the pipe. 5. Fusible polyvinylchloride pipe shall be manufactured in standard 40 ft. and 45 ft. nominal lengths. 6. Fusible polyvinylchloride pipe shall be blue in color for raw water use. 7. Pipe generally shall be marked per industry standards, and shall include as a minimum: a. Nominal pipe size b. PVC c. Dimension Ratio d. Pipe legend or stiffness designation, or AWWA pressure class e. AWWA Standard designation number f. Extrusion production -record code g. Trademark or trade name h. Cell Classification 12454 and/or PVC material code 1120 may also be included. 8. Pipe shall be homogeneous throughout and be free of visible cracks, holes, foreign material, blisters, or other visible deleterious faults. PART 3 EXECUTION 3.01 GENERAL A. Investigate the subsurface conditions at the crossing location. B. Provide water for the drilling process. C. Handle pipe in accordance with manufacturer's recommendation. D. Utilize pipe rollers during layout and pull -back operations to prevent excess sagging of the pipe. Pipe rollers shall be of sufficient size to fully support the weight of the pipe while being hydro -tested before installation and during pull -back operations. SE Area Wastewater Capacity Improvements Horizontal Directional Drilling — 02447-3 Contract 1: Transmission E. Directional drilling procedure shall include provisions to guard against electrical shock such as ground mats, ground cables, hot boots and gloves. Drilling equipment shall include an alarm system capable of detecting electrical current as it nears electrical lines. F. Maintain log sheets for drilling fluid pressure, flow rate, drill thrust pressure, pull- back pressure, drill head torque and drill head location plots at 20 foot intervals. G. Drilling fluids shall be inert and of no risk to the environment. No fluid will be utilized that does not comply with permit requirements and environmental regulations. Drilling fluid should remain in the bore hole to increase the stability of the surrounding soil and to reduce the drag on the pulled pipe. H. No additional payment will be made for failed attempts. 3.02 DIRECTIONAL DRILLING A. General 1. Drill pilot hole along the path shown on the Drawings to the following tolerances: a. Vertical Location - Plus or minus 1 foot b. Horizontal Location - Plus or minus 6 feet. 2. At the completion of the pilot hole drilling, provide a tabulation of coordinates referenced to the drilled entry point which accurately describes the location of the pilot hole. 3. Perform reaming diameter to 1.25 to 1.5 times the outside diameter of the pipe being installed. Prepare pipe to facilitate connection to the remainder of the pipeline being installed. 4. Use care to protect the pipe from scarring, gouging, or excessive abrasion. 5. Method of connection between HDD pipe and other pipe materials shall be as indicated on the Drawings. 6. Pipe shall be deflected within the tolerances as provided by the pipe manufacturer. 7. For drills under structural conditions (i.e., roadways), perform reaming diameter to 2 inches maximum greater than outside diameter of the pipe being installed. If larger size is necessary, provide statement from North Carolina Professional Engineer stating that "an overbore in excess of 2-inches will arch and no damage will be done to pavement or sub -grade". B. Fusible Polyvinylchloride (FPVC) pipe 1. General a. Installation guidelines from the pipe supplier shall be followed for all installations. b. The fusible polyvinylchloride pipe will be installed in a manner so as not to exceed the recommended bending radius guidelines. c. Where fusible polyvinylchloride pipe is installed by pulling in tension, the recommended maximum safe pulling force, established by the pipe supplier, shall not be exceeded 2. Handling and Storage a. Pipe shall be offloaded, loaded, installed, handled, stored and stacked per the pipe supplier's guidelines. These guidelines include compliance with the minimum recommended bend radius and maximum safe pull force for the specific pipe being used. SE Area Wastewater Capacity Improvements Horizontal Directional Drilling — 02447-4 Contract 1: Transmission b. The general best practices of the industry per AWWA M23 shall also be observed. 3. Fusion Joints a. Fusible polyvinylchloride pipe lengths shall be assembled in the field with butt -fused joints. The fusion technician shall follow the pipe supplier's guidelines for this procedure. All fusion joints shall be completed as described in this specification. 4. Fusion Process a. Fusible polyvinylchloride pipe will be handled in a safe and non-destructive manner before, during, and after the fusion process and in accordance with this specification and pipe supplier's guidelines. b. Fusible polyvinylchloride pipe will be fused by qualified fusion technicians holding current qualification credentials for the pipe size being fused, as documented by the pipe supplier. c. Pipe supplier's procedures shall be followed at all times during fusion operations. d. Each fusion joint shall be recorded and logged by an electronic monitoring device (data logger) affixed to the fusion machine, which utilizes a current version of the pipe supplier's recommended and compatible software. e. Only appropriately sized and outfitted fusion machines that have been approved by the pipe supplier shall be used for the fusion process. This includes requirements for safety, maintenance, and operation with minor modifications made for PVC. 5. Installation: a. Pull heads for use with FPVCP 1) Pipe pull heads shall be utilized that employ a positive through -bolt design assuring a smooth wall against the pipe cross-section at all times. 2) Pipe pull heads shall be specifically designed for use with fusible polyvinylchloride pipe, and shall be as recommended by the pipe supplier. b. Pipe shall be fused prior to insertion, if the site and conditions allow, into one continuous length. c. Contractor shall handle the pipe in a manner that will not over -stress the pipe prior to insertion. Vertical and horizontal curves shall be limited so that the pipe does not bend past the pipe supplier's minimum allowable bend radius, buckle, or otherwise become damaged. Damaged portions of the pipe shall be removed and replaced. d. The pipe entry area shall be graded as needed to provide support for the pipe and to allow free movement into the bore hole. 1) The pipe shall be guided into the bore hole to avoid deformation of, or damage to, the pipe. 2) The fusible polyvinylchloride pipe may be continuously or partially supported on rollers or other Owner and Engineer approved friction decreasing implement during joining and insertion, as long as the pipe is not over -stressed or critically abraded prior to, or during installation. 3) A swivel shall be used between the reaming head and the fusible polyvinylchloride pipe to minimize torsion stress on the pipe assembly. e. Buoyancy modification shall be at the sole discretion of the Contractor, and shall not exceed the pipe supplier's guidelines in regards to maximum pull SE Area Wastewater Capacity Improvements Horizontal Directional Drilling — 02447-5 Contract 1: Transmission force or minimum bend radius of the pipe. Damage caused by buoyancy modifications shall be the responsibility of the Contractor. Once pull -back operations have commenced, the operation shall continue without interruption until the pipe is completely pulled through the bore hole. The pipe shall be installed in a manner that does not cause upheaval, settlement, cracking, or movement and distortion of surface features. Any damages caused by the Contractor's operations shall be corrected by the Contractor. Once installed, the contractor shall make connections to the open cut pipe by means of mechanical joint fittings, taking care to correct horizontal or vertical alignment with the fittings rather than the Fusible PVC. 3.03 CLEAN UP A. Upon completion of the pipe installation, backfill the drilling pit and receiving pit as specified. B. Properly remove and dispose of drilling fluid and spoil material in compliance with relative environmental regulations, right-of-way and work space agreements under permit requirements. Drilling fluid returns at locations other than the entry and exit points shall be minimized. Immediately clean up drilling fluid that inadvertently surfaces. C. Using available technology, Contractor shall provide a certified as -built drawing with profile indicating the depth from existing grade to the top of HDD pipe from the beginning to the end of the HDD construction. 3.04 FIELD TESTS A. Prior to Installation Contractor may elect, at his expense, to hydrostatically test or perform a low pressure air test on the pipe line to determine the integrity of the joints. This shall not be considered an alternative to the testing required after installation. B. Following installation test pipe in accordance with pressure testing in Section 02530, Sanitary Sewer System. END OF SECTION SE Area Wastewater Capacity Improvements Horizontal Directional Drilling — 02447-6 Contract 1: Transmission SECTION 02530 SANITARY SEWER SYSTEM PART 1 GENERAL 1.01 SECTION INCLUDES A. Work under this section includes, but is not limited to, piping, valves, and appurtenances for a complete sanitary sewer collection system. 1.02 RELATED SECTIONS A. The following Sections have work that is directly related to this Section. This does not relieve the Contractor of his responsibility of proper coordination of all the work: 1. Section 02315 Trenching for Utilities 1.03 REFERENCES A. Publications are referred to in the text by basic designation only. 1. American Society for Testing and Materials (ASTM) a. A126 Gray iron Castings and Valves, Flanges and Pipe Fittings. b. C443 Flexible Watertight Joints for Precast Manhole Sections c. C478 Precast Reinforced Concrete Manhole Sections d. C890 Minimum Structural Design Loading for Monolithic or Sectional Precast Concrete Water and Wastewater Structures e. C923 Resilient Connectors Between Reinforced Concrete Manhole Structures, Pipes and Laterals f. C1244 Test Method for Concrete Sewer Manholes by the Negative Air Pressure g. D1248 Polyethylene Plastics Molding and Extrusion Materials h. D1784 Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds i. D2241 Poly(Vinyl Chloride) (PVC) Pressure Rated Pipe (SDR Series) j. D 2321 Recommended Practice for Underground Installation of Flexible Thermoplastic Sewer Pipe k. D3139 Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals I. D3350 Polyethylene Plastics Pipe and Fittings Materials m. F477 Elastomeric Seals (Gaskets) for Joining Plastic Pipe n. F794 Poly(Vinyl Chloride) (PVC) Profile Gravity Sewer Pipe and Fittings Based on Controlled Inside Diameter o. F949 Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe With a Smooth Interior and Fittings p. F894 Specification for Polyethylene (PE) Large Diameter Profile Wall Sewer and Drain Pipe 2. American Water Works Association (AWWA) a. C104 Cement -Mortar Lining for Ductile -Iron Pipe and Fittings for Water b. C105 Polyethylene Encasement for Ductile -Iron Piping for Water and Other Liquids c. C110 Ductile -Iron and Gray -Iron Fittings, 3 inch through 48 inch, for Water and Other Liquids d. C115 Flanged Ductile -Iron Pipe with Threaded Flanges SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-1 Contract 1: Transmission e. C151 Ductile -Iron Pipe Centrifugally Cast in Metal Molds or Sand -Lined Molds, for Water or Other Liquids C153 Ductile -Iron Compact Fittings, 3 inch through 16 inch, for Water and Other Liquids C508 Swing -Check Valves for Waterworks Service, 2 inch Through 24 inch NPS C509 Resilient -Seated Gate Valves for Water Supply Service C512 Air -Release, Air / Vacuum, and Combination Air Valves for Waterworks Service j. C550 Protective Epoxy Interior Coatings for Valves and Hydrants k. C600 Standard for Installation of Ductile Iron Water Mains and Their Appurtenances I. C605 Underground Installation of Polyvinyl Chloride (PVC) Pressure Pipe and Fittings for Water m. C900 Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 inch through 12 inch, for Water Distribution n. M23 PVC Pipe - Design Installation 3. National Sanitation Foundation (NSF) Standards a. 14 Plastic Piping Components and Related Materials 4. UNI-BELL Plastic Pipe Association (UNI) a. B-5 Recommended Practice for the Installation of Polyvinyl Chloride (PVC) Sewer Pipe b. B-6 Recommended Practice for Low -Pressure Air Testing of Installed Sewer Pipe 1.04 SUBMITTALS A. Submit the following in accordance with Section, Submittal Procedures: 1. Affidavit of Compliance: Affidavit shall attest that supplied products conform to the referenced standard and this specification and that tests set forth in each applicable referenced publication have been performed and that test requirements have been met. Submit for each of the following materials: a. Pipe 1) Ductile iron 2) Polyvinyl Chloride (PVC) pressure pipe i) AWWA C900 ii) Schedule 40 & 80 b. Pre -cast concrete manholes c. Valves 1) Plug 2) Check 3) Air Release 2. Catalog Data: Submit manufacturer's standard drawings or catalog cuts for the following. Clearly indicate equipment to be furnished for the Project including options to be provided. a. Pipe 1) Ductile iron 2) Ductile Iron with restrained joints 3) Polyvinyl Chloride (PVC) pressure pipe i) AWWA C900 ii) Schedule 40 & 80 b. Pre -cast Concrete Manholes and the following appurtenances: SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-2 Contract 1: Transmission 1) Manhole steps 2) Pipe connectors 3) Joint material 4) Castings c. Valves 1) Plug 2) Check 3) Air Release 3. Reports: a. Field test report for each section of pipe for the following: 1) Pressure test for force mains. 2) Low-pressure air test for gravity mains. 3) Vacuum test for manholes. 4. Operation and Maintenance Instructions: Submit complete operation and maintenance manual for the following: a. Valves. 1.05 DELIVERY, STORAGE, AND HANDLING A. Provide a suitable pipe hook or rope sling when handling the pipe with a crane. Lifting of the pipe shall be done in a vertical plane. Under no conditions shall the sling be allowed to pass through the pipe unless adequate measures are taken to prevent damage to both tongue and groove ends. B. Deliver pipe in the field as near as practicable to the place where it is to be installed. Distribute pipe along the side of the trench opposite to the spoil bank. Where necessary to move the pipe longitudinally along the trench, it shall be done in such a manner as not to injure the pipe or coating. C. Shield PVC pipe and fittings stored on site from the sun's ultraviolet rays by suitable cover, or indoor storage. PART 2 PRODUCTS 2.01 DUCTILE -IRON PIPE A. Pipe and fittings shall conform to the following requirements: 1. Size shall be as indicated on the Drawings. 2. Suitable for a system working pressure of 150 psi. 3. Cement -mortar lined with seal coat in accordance with AWWA. B. Ductile -iron pipe for below ground service shall have push -on or mechanical joints, unless noted otherwise on the Drawings, conform to AWWA C151, and to the following requirements: 1. Pipe thickness class shall be suitable for a laying condition as specified in Section, Trenching for Utilities, at the depth indicated on the Drawings, and at the system working pressure specified above. 2. Provide mechanical joint fittings, unless noted otherwise on the Drawings. C. Ductile -iron pipe for above ground service shall have flanged joints, unless noted otherwise on the Drawings, and conform to AWWA C115. 1. Pipes to be painted shall have only a shop primer on the outside by the manufacturer. Verify that proposed manufacturer's primer is compatible with the proposed paint system. SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-3 Contract 1: Transmission D. Fittings for ductile -iron pipe shall conform to AWWA C110, or C153 and to the following requirements: 1. Joint type shall be as specified above for the supplied ductile -iron pipe. 2. Fittings shall be made of gray -iron or ductile -iron. E. Special Pipe Joints 1. Restrained a. Provide restrained joint pipe at fittings and valves where indicated on the Drawings. Length of restrained pipe shall be as shown. Restrained joints shall be Snap-Lok (Griffin Pipe), Flex Ring and Lok-Ring (American), TR Flex (U.S. Pipe) or approved equal. b. Restrained joint pipe and fittings shall meet all AWWA standards and other requirements as specified above for standard ductile iron pipe and fittings unless addressed herein. c. Field made joints are allowable but should be avoided where possible. Careful planning to locate field cuts in standard pipe sections is preferred. For field made joints in restrained piping, use field weldments or an insert equal to TR Flex Gripper Rings or approved equal. Gasket type field made joints will not be allowed. d. Restrained joint fittings shall be provided by the restrained joint pipe supplier where located within restrained joint pipe sections. Fittings shall be of the same model / type as the pipe supplied from the pipe manufacturer. e. Restrained joint fittings may be push -on joint type. f. Megalugs, Series 1100, as manufactured by EBAA Iron Sales or approved equal shall be allowable for restraint where fittings or valves are not available with restrained joints from the pipe manufacturer. g. Where additional fittings/valves are required and not shown on Drawings, consult with Engineer for length of restrained joint pipe necessary each side of fittings/valve prior to installation of pipe/fitting. h. Contractor shall develop a field layout schedule and drawing for restrained joint pipe installations. 2.02 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE A. General 1. Pipe and fitting size shall be as indicated on the Drawings. 2. PVC materials shall comply with ASTM D1784 with a cell classification of 12454-B. B. AWWA C900: C900 PVC pipe 4-inch to 12-inch shall conform to AWWA C900 and the following requirements: 1. Outside diameter shall conform to ductile -iron pipe. 2. Pipe shall be pressure class 150 with a standard dimension ratio of DR 18. 3. Pipe shall have plain end and elastomeric-gasket bell ends. 4. Fittings shall conform to AWWA C110, or C153 and have mechanical joints. Fittings shall be made of gray -iron or ductile -iron. Interior of fittings shall be cement -mortar lined with seal coat in accordance with AWWA C104. 5. Restraining mechanism for joint restraint must be approved by pipe manufacturer. Restraining system shall not result in a point load on the pipe. Gasketed-type restraint systems will not be allowed. SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-4 Contract 1: Transmission C. Schedule 40 & 80: Schedule 40 & 80 PVC pipe '/2-inch to 12-inch shall conform to ASTM D1785 and the following requirements: 1. Outside diameter shall conform to iron pipe. 2. Pipe shall be schedule 40 or 80. 3. Pipe shall have an integral elastomeric-gasket bell end or solvent weld joints. 4. Fittings for the pipe shall conform to ASTM D2466 or D2467 as appropriate for the pipe schedule. 2.03 POLYVINYL CHLORIDE (PVC) GRAVITY SEWER PIPE A. General 1. Pipe and fitting size shall be as indicated on the Drawings. 2. PVC materials shall comply with ASTM D1784 with a cell classification of 12454-B. 3. Pipe shall have an integral elastomeric-gasket bell end. Gaskets shall be in conformance with ASTM F477. 4. See Section, Trenching for Utilities, for trench bedding and haunching requirements. B. SDR 35: PVC SDR 35 gravity sewer pipe 4-inch to 15-inch and related fittings shall conform to ASTM D-3034 and the following requirements: 1. Pipe shall have standard dimension ratio of SDR 35. 2. Nominal pipe length shall be a minimum of 13 feet. 2.04 MANHOLES A. Provide manholes made of precast concrete sections in conformance with ASTM C478, NC Department of Transportation, and the following requirements: 1. General a. Provide manholes to the depth as indicated on the Drawings. Manhole style, type, and inside diameter shall be as noted on the Drawings. b. Precast concrete manholes shall be as manufactured by Tindall Concrete Products, Inc., Adams Concrete, Hanson Pipe and Precast, D & M Concrete Specialties, Inc., N. C. Products Corp., Stay Right Tank, or approved substitute. c. T-series manholes as manufactured by Tindall Concrete Products or approved equal shall be an acceptable substitute to round manholes as specified herein. The T-series shall be the same size manhole as shown on the Drawings for round manholes (e.g., 6' ID manhole, etc.) and shall meet all applicable requirements of the specifications. No reduction in size of the riser sections and top slab shall be allowable. 2. Precast Concrete Sections a. Minimum wall thickness shall be 5-inches. b. Base: Cast monolithically without construction joints or with an approved PVC waterstop in the cold joint between the base slab and the walls. The width of the base extensions on Extended Base Manholes shall be no less than the base slab thickness. c. Riser: Minimum lay length of 16 inches. d. Eccentric Cone: Top inside diameter shall be 24 inches. Width of the top ledge shall be no less than the wall thickness required for the cone section. e. Transition Cone: Provide an eccentric transition from 60-inch and larger manholes to 48-inch diameter risers, cones, and flat slab top sections. Minimum slope angle for the cone wall shall be 45 degrees. SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-5 Contract 1: Transmission f. Transition Top: Provide an eccentric transition from 60-inch and larger manholes to 48-inch diameter risers, cones, and flat slab top sections. Transition Top sections shall be furnished with vents as shown on the manhole details. Tops shall not be used in areas subject to vehicle traffic. g. Flat Slab Top: Designed for HS-20 traffic loadings as defined in ASTM C890. Items to be cast into Special Flat Slab Tops shall be sized to fit within the manhole ID and the top and bottom surfaces. Provide a float finish for exterior slab surface. h. Precast or core holes for pipe connections. Diameter of hole shall not exceed outside diameter of pipe by more than 3-inches. i. Lifting Devices: Devices for handling precast components shall be provided by the precast manufacturer and comply with OSHA Standard 1926.704. 3. Joints a. Manufacturer in accordance with tolerance requirements of ASTM C 990 for butyl type joints. b. Minimize number of joints. Do not use riser section for manholes up to 6 feet tall and no more than one riser for each additional 4 feet in height. c. Flexible Joint Sealants: Preformed butyl rubber based sealant material conforming to Federal Specification SS-S-210A, Type B and ASTM C990. d. External Seal: Polyethylene backed flat butyl rubber sheet no less than 1/1 6-inch thick and 6-inches wide. 4. 1 nverts a. Brick and mortar or precast concrete invert. b. Form and finish invert channel to provide a consistent slope from inlet(s) to outlet up to 4-inches. c. Channel walls shall be formed to 3/4 of the height of the outlet pipe diameter. d. Finish benches with a minimum uniform 1.5:12 slope. Provide a 1/4-inch radius at the edge of bench and trough. 5. Flexible Pipe Connectors: Provide flexible connectors for pipe to manhole that conform to ASTM C923. Location of connectors shall vary from Drawings no more than 1/2-inch vertically and 5 degrees horizontally. Boot sleeves shall have stainless steel expansion bands and pipe clamps that meet or exceed ASTM C923 and A167. 6. Manhole Steps: a. Steps shall be made of 1/2-inch grade 60 steel encapsulated by co- polymer polypropylene and have serrated tread and tall end lugs. b. Secure steps to the wall with compression fit in tapered holes or cast -in - place. Align steps along a vertical wall and shall not be located over a pipe opening. First step shall be a maximum of 26 inches from the bottom. c. Steps shall be provided inside manholes and shall be provided on the outside when the top of manhole elevation is greater than three (3) feet above the existing ground elevation. d. Steps shall be as shown on the Drawings. e. Steps shall be by American Step Co., Inc., Bowco Industries, Inc., M. A. Industries, Inc. or approved substitute. B. Coatings 1. When applying coatings to new manholes, coatings will be applied above ground (before manhole components are installed). Areas to be coated shall SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-6 Contract 1: Transmission meet coating manufacturer requirements for surface preparation. Joints shall be coated after manhole installation. 2. Epoxy: a. The epoxy system shall be a spray applied, two component, 100% solids, solvent -free epoxy developed specifically for use in the wastewater environment. Epoxy liner shall be Raven 405, manufactured by Raven Lining Systems; Dura-Plate 5900 or 6100 manufactured by Sherwin- Williams; Perma-shield H2S Series 434 and Perma-glaze Series 435, manufactured by Tnemec, or approved equal. b. Application procedures for the epoxy lining system shall be in accordance with the manufacturer's recommendations, including materials handling, mixing, environmental controls during application, safety and spray equipment. c. The epoxy liner, when cured, shall have the following minimum characteristics measured by the applicable ASTM standards referenced herein: 1) Hardness, Shore DASTM D-2240 70 2) Tensile Strength ASTM D-638 >7,000 psi 3) Flexural Strength ASTM D-790 >10,000 psi 3. When cured, the lining shall form a continuous, tight -fitting, hard, impermeable surface which is suitable for sewer system service and chemically resistant to any chemicals or vapors normally found in domestic sewage. 4. The lining shall be compatible with the thermal condition of the existing sewer manhole surfaces. Surface temperatures will range from 20OF to 100°F. 2.05 CASTINGS A. General 1. Made of gray iron, ASTM A-48 - class 30, or ductile iron, ASTM A536, grade 65-45-12. 2. Castings shall be free from imperfections not true to pattern. Casting tolerances shall be plus or minus 1/16-inch per foot of dimension. Top shall set neatly in frame, with edges machined for even bearing and proper fit to prevent rattling and flush with the edge of frame. 3. Castings shall be as manufactured by Neenah Foundry Co., East Jordan Iron Works, or approved equal. B. Manhole Ring and Cover: 1. Minimum clear opening shall be 22 inches. 2. Minimum weight for frame and cover shall be 300 pounds and suitable for Heavy Duty Highway Traffic Loads of H-20. 3. Frame shall have four 3/8-inch anchor bolt holes equally spaced. 4. Cast "DANGER PERMIT REQUIRED — CONFINED SPACE DO NOT ENTER" on the cover. Casting shall bear the name of the manufacturer and the part number. 5. Provide camlocks on all manholes located in sanitary sewer easement. 6. Provide cover with one 1-inch perforated holes unless noted as watertight on the Drawings. 7. Provide the following where indicated on the Drawings: a. Ring and cover shall be watertight. b. Bolt down cover. Bolt down covers shall be provided with four (4) 3/8-inch stainless steel hex head bolts at 90 degrees. SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-7 Contract 1: Transmission 2.06 VALVES A. General: Valves shall meet the following requirements: 1. Size shall be as required for the pipe size and material as indicated on the Drawings and specified. 2. Open by counterclockwise rotation. 3. Standard system working pressure is 110 psi. 4. Equip valves with a suitable means of operation. 5. For buried valves over 5 feet deep, provide extension stems of cold rolled steel to bring the operating nut to within 2 feet of the ground surface. 6. Provide valve accessories as required for proper valve operation for valve locations as indicated on the Drawings and as recommended by valve manufacturer. 7. Valve accessories shall be compatible to proper valve operation. 8. Similar valve types shall be of one manufacturer. B. Plug Valves: Plug valves shall conform to the following requirements: 1. Plug valves shall be of the non -lubricated, eccentric type designed for a working pressure of 175 psi for valves 12 inch and smaller, 150 psi for vales 14 inch and larger. 2. Valves shall provide tight shut-off at rated pressure. 3. The plug valve body shall be cast iron ASTM A126 Class B with a welded -in overlay of not less than 90% nickel alloy content on all the surfaces contacting the face of the plug. 4. The valve plug shall be constructed of cast iron conforming to ASTM A126 Class B, with Buna N resilient seating surface to mate with the body seat. 5. Valve flanges shall be in accordance with ANSI B16.1 Class 125. 6. Shaft bearings shall be sleeve -type, sintered, oil impregnated, and permanently lubricated stainless steel. 7. Plug valve shaft seals shall be of the multiple V-ring type and shall be adjustable. Sealing system shall conform to AWWA C504 and C507 standards. All packing shall be replaceable without removing the bonnet or actuator and while valve is in service. 8. Valves 6" and larger shall be provided with gear actuators. 9. Provide levers or hand wheels to operate the valve as recommended by the manufacturer. 10. Full ported (i.e,. 100% flow area) and piggable. C. Swing Check Valves: Swing check valves from 2 to 24 inch shall conform to AWWA C508 and to the following requirements: 1. Provide lever and weight for swing check control. 2. Resilient material to Metal seat construction. 3. Ends shall be flanged. 2.07 AIR VALVES A. General 1. Provide air valves in conformance with AWWA C512 and the following: 2. Valves shall be suitable for use in raw wastewater. 3. Valve type shall be a combination valve. a. Inlet size: as shown on drawings 4. Valve shall be designed for the following automatic operation: a. Release of large quantities of air during the filling of the main. SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-8 Contract 1: Transmission b. Permit air to enter the main when it is being emptied. c. Release accumulated air while the main is in operation and under pressure. 5. Valve shall be designed for a system pressure 150 psi. Valve shall also operate at a minimum system pressure of 0 psi. 6. Valve shall be manufactured by Vent -Tech or equal. B. Valve Type 1. Valves shall be tubular in design with direct acting cylindrical hollow and solid float mechanisms. 2. Valves shall be designed to perform efficiently in the standard wastewater environments of domestic and municipal influents which include particulates, fibers and grease. 3. Valve shall achieve a gas tight seal from the buoyance effect of the floats without requiring additional internal pipeline pressure and shall be designed to be self -flushing of the valve internals at pump shut -down and valve emptying. C. Valve Function 1. Exhaust large quantities of air at start-up during the filling of a pipeline system. 2. Release accumulated air in a pipeline system while the system is operational and under pressure. 3. Open and admit large quantities of air into the pipeline system during draining or if negative pipeline pressure occurs. 4. Prevent the development of hydraulic transients (surge control) during start-up and pressure surges and shall operate automatically. D. Valve Construction 1. Valve shall be specifically designed and manufactured for wastewater applications. 2. Valve bodies shall be tested to a minimum 1.5 times the system pressure specified and shall not experience leakage or deformation. 3. The valve size shall be the nominal size of its connection fitting. 4. The valve inlet, outlet, and internal clearance shall each have a cross- sectional area greater than or equal to the cross -sectional area of the valve's nominal size. 5. The valve shall have a built-in anti -surge device with relief openings that are between 1/30th and 1/40th the cross -sectional area of the nominal valve size, designed to automatically limit the surge and transient pressure. 6. The valve body shall be a tubular, single chamber, extended body capable of accepting a smooth bonded low -density lining to minimize adhesion of fats and debris and manufactured of Type 304L (or optionally Type 316L) Stainless Steel. The valve body shall be internally constructed to provide an unobstructed circular space between the UHMW floats and inner valve body wall. Valves shall include an upper gauge port and lower flushing port and these ports shall be of the same material as the valve body. 7. Flanges shall be manufactured of Type 304L Stainless Steel Stainless Steel 8. The valve's outlet fitting at the connection to the piping shall be formed to provide a smooth toroidal transition to minimize turbulence and improve ease of cleaning. 9. Valves shall provide compatibility with threaded or flanged connections to specified piping systems. SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-9 Contract 1: Transmission 10. The air inlet (upper) opening shall have a cross sectional area greater or equal to that of the valves nominal size. The air inlet opening shall be protected with a high efficiency punched stainless steel screen to prevent ingression of airborne debris and bugs with an effective open flow area at least twice that of the valve's nominal size. This screen shall be removable. Expanded metal and welded or woven wire mesh shall not be acceptable. The air inlet shall allow and provide for the connection/disconnection of optional external piping to direct the flow of air/gas intake, exhaust or valve discharge. The connection from the air inlet to the valve body shall be a smooth toroidal transition to facilitate air movement with minimal energy losses. Intake/Exhaust pipework should be one size larger than the valve's nominal size. The valve shall be designed to form an airtight seal at an internal pressure of zero (0) psi. 11. The ANTI-SHOCK/SURGE FLOAT shall be manufactured from UHMW-PE (Ultra High Molecular Weight— Polyethylene). The ANTI-SHOCK/SURGE FLOAT shall not restrict the full flow capacity of the Valve's air release or vacuum relief functions. The ANTI-SHOCK/SURGE FLOAT shall have not less than three (3) tubular orifices to distribute pressurized air across the face of the float. The tubular orifices shall have 316 stainless steel inserts to protect the orifices from heat softening and abrasive wear. 12. The NOZZLE FLOAT shall be manufactured from UHMW-PE (Ultra High Molecular Weight —Polyethylene). HDPE (High Density Polyethylene) shall not be accepted. The NOZZLE FLOAT shall be smooth and flat across its surface. The combination of the NOZZLE FLOAT and the CONTROL FLOAT shall constitute the CONTROL FLOAT ASSEMBLY. The noz- zle face shall be finished so that repeated seating does not damage the rubber seat. Discharge of pressurized air/gas shall be accomplished by the seating and unseating of the small nozzle on the rubber seat. The lower CONTROL FLOAT shall be manufactured from UHMW-PE (Ultra High Molecular Weight— Polyethylene, shall be tubular in construction and open ended. The lower CONTROL FLOAT shall be dimensioned and streamlined relative to the valve body to achieve the necessary physical characteristics of buoyancy and lift to create a seal between the NOZZLE FLOAT and ANTI-SHOCK/SURGE FLOAT and between itself and the NOZZLE FLOAT. The lower CONTROL FLOAT shall have sufficient weight to drop away from the NOZZLE FLOAT as air accumulates in the valve chamber at the valve's full rated pressure. E. Materials Materials specified are considered the minimum acceptable for the purpose of durability, strength, and resistance to erosion and corrosion. Alternative materials may be offered for the purpose of providing greater corrosion resistance, to meeting required stress limitations or customer specified performance characteristics. However alternate materials shall provide at least the same qualities as those specified. Standard materials of construction are listed in the table below. SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-10 Contract 1: Transmission Component Material Bodyy and Flanges ASTM ,42_40 516L SS Hardtivare ASTM ,42_40 516L SS Trim and Venting 0rifizes ASTM A2_40 516L SS P-irnary and Secondary Floats UHMW-PE F. Quality Assurance 1. Table 2 specifies the minimum acceptable performance for venting air or relieving vacuum conditions for a given size 2. valve under the differential vacuum conditions stated. 3. Valve sealing performance shall: 4. Float mechanism shall only require buoyance effects to obtain a gas tight seal (hence has no minimum pipeline pressure requirements.) 5. The seal referenced in (1), once achieved shall remain bubble free for one hour against a 1" water head. 6. The seal reference in (1), once achieved will occur with a minimum fluid level inside the valve. The fluid level shall be sufficiently low enough to trap an air - pocket above it and the air pocket shall be of sufficient volume such that when the water pressure is now increased to maximum rated working pressure (e.g. 145 psi, which will compress the air -pocket to 10% of its original volume) the resulting fluid level will stay a minimum of 2" below the lowest sealing surface. 7. The performance referenced in (3) shall be achievable with only the buoyance effects of a high fat/oil fluid by assuming the liquid density is only 0.96 s.g. 8. Valves shall be tested for performance verification by a qualified test facility. 2.08 VALVE BOX A. Valve Box, Below Ground: Boxes shall be high strength cast iron of the screw or telescopic type. Box shall consist of a base section, center extension as required, and a top section with cover marked "SEWER." 2.09 THRUST BLOCKING A. Provide concrete thrust blocking for pressure lines in accordance with the detail on the Drawings. B. Thrust blocking is required in addition to restrained joint fittings and equivalent length of restrained joint pipe are used unless shown otherwise on the Drawings. C. All products that are to be in contact with concrete shall be covered with 4 mil polyethylene sheets prior to pouring concrete. PART 3 EXECUTION 3.01 GENERAL A. Pipe installation shall meet the following general guidelines: 1. Lay pipe in the presence of Engineer, unless specifically approved otherwise. 2. Handle pipe and accessories in accordance with manufacturer's recommendations. Take particular care not to damage pipe coatings. 3. Carefully inspect pipe immediately prior to laying. Do not use defective pipe. Replace pipe damaged during construction. SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-11 Contract 1: Transmission 4. Lay pipe to grade and alignment indicated on the Drawings. 5. Provide proper equipment for lowering pipe into trench. 6. Provide tight closure pipe ends when work is not in progress. 7. Keep pipe interior free of foreign materials. 8. Do not lay pipe in water or when the trench or weather conditions are unsuitable for the work. 9. Clean bell and spigots before joining. Make joints and lubricate gasket in accordance with pipe manufacturer recommendation. 10. Block fittings with concrete, or restrained as indicated on the Drawings or as required to prevent movement. B. Gravity Pipe: Gravity pipe installation shall meet the following general guidelines: 1. Lay pipe upgrade from the lower end and at the grades and alignment indicated on the Drawings. 3.02 RELATION OF WATER MAINS TO SEWERS A. Lateral Separation: Lay water mains at least 10 feet laterally from existing and proposed sewers. Where existing conditions prevent a 10-foot lateral separation, the following shall be followed with approval of the Engineer: 1. Lay water main in a separate trench, with the elevation of the bottom of the water main at least 18 inches above the top of the sewer. 2. Lay water main in the same trench as the sewer with the water main located at one side on a bench of undisturbed earth, and with the elevation of the bottom of the water main at least 18 inches above the top of the sewer. B. Crossing Separation: Lay bottom of water main at least 18 inches above the top of the sewer. Where existing conditions prevent an 18-inch vertical separation, construct both the water main and sewer of ferrous materials and with joints that are equivalent to water main standards for a distance of 10 feet on each side of the point of crossing. C. Crossing a Water Main Under a Sewer: When it is necessary for a water main to cross under a sewer, construct both the water main and the sewer of ferrous materials and with joints equivalent to water main standards for a distance of 10 feet on each side of the point of crossing. A section of water main pipe shall be centered at the point of crossing. 3.03 SEWER PIPE A. Lay sewer pipe to true lines and grades by use of laser beam equipment or other acceptable means. B. Minimum Separation Distances: 1. 100-foot horizontal separation from wells or other water supplies. 2. 24-inch vertical separation from storm sewers or ferrous pipe shall be used. 3. For separation from water mains see paragraph 3.02 above. 3.04 DUCTILE IRON PIPE A. Install pipe in conformance with AWWA C600 and the following: 1. For laying pipe in a vertical or horizontal curve, each full length pipe may be deflected by the following offset distance: a. Push -on joint 1) 3 to 12-inch pipe: 14-inch offset 2) 14 to 36-inch pipe: 8-inch offset SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-12 Contract 1: Transmission b. Mechanical joint 1) 3 to 6-inch pipe: 20-inch offset 2) 8 to 12-inch pipe: 15-inch offset 3) 14 to 20-inch pipe: 8-inch offset 4) 24 to 36-inch pipe: 6-inch offset 2. For laying restrained joint pipe in a vertical or horizontal curve, except for horizontal directional drills (HDD), each full length pipe may be deflected by the following offset distance: a. 6 to 12-inch pipe: 11-inch offset b. 16 to 20-inch pipe: 7-inch offset c. 24 to 30-inch pipe: 5-inch offset d. 36-inch pipe: 4-inch offset e. 42 to 48-inch pipe: 1 114 -inch offset 3.05 PVC PRESSURE PIPE A. Install PVC C900 pipe in conformance with AWWA C605. B. Solvent Weld: Where indicated in these specifications or on the plans, solvent weld type joints shall be used. Field cut ends shall be sanded to roughing the surface. Joints shall be cleaned of foreign material. Solvent shall be applied to the joint and joint made as recommended by the manufacturer. Excess solvent shall be wiped off. The joint should not be moved until sufficiently set up. C. Bell and Spigot Joints: Clean bell and spigot ends prior to jointing. Ends of field cut pipe shall be beveled with file. Gasket shall be clean and lightly lubricated. Joint shall be made as recommended by the manufacturer. 3.06 VALVES AND FITTINGS A. Install buried valves on top of an 18-inch square, 3-inch thick, solid concrete pad (minimum dimensions). The concrete pad may be provided by a pre -cast manufacturer or cast -in -place in the field above grade. Concrete used for the pads shall be a minimum 3,000 psi mix. The pads may not be cast -in -place in the pipe trench. Connection to pipe shall be such that there shall be no stress at the joint caused by misalignment or inadequate support of pipe or valve. B. Install fittings as recommended by the manufacturer. Fittings shall be blocked or otherwise restrained from movement. C. Valve Boxes: Set valve boxes flush with finished grade. Box shall be supported so that no stress shall be transmitted to the valve. Operating nut shall be centered in box. D. Install valves, gates, and accessories indicated on the Drawings and in complete accordance with the manufacturer's recommendations. E. Valve boxes shall be set straight with the operating nut centered and supported on (2) 4" concrete blocks, to prevent load transfer onto valve body or pipe line. Set top of box at finished grade. Provide a 24-inch x 24-inch wide by 6-inch thick concrete pad at top of valve boxes outside paved areas. 3.07 AIR VALVES A. Air valve shall be installed with a tee fitting into the force main. B. Install air valve in a flat top manhole. SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-13 Contract 1: Transmission 3.08 MANHOLES A. Set base plumb and level. Align manhole invert with pipe invert. B. Secure pipe connectors to pipe in accordance with manufacturer's recommendation. C. Clean bells and spigots of foreign material that may prevent sealing. Unroll the butyl sealant rope directly against base of spigot. Do not stretch. Follow manufacturer's instructions when using O-ring seals. D. Set precast components so that steps align. E. Plug lift holes using a non -shrink grout. Cover with a butyl sealant sheet on the outside and seal on the inside with an application of an epoxy gel 1/8-inch thick extending 2 inches beyond the opening. F. Set manhole frames to grade with grade rings. Seal joints between cone, adjusting rings, and manhole frame with butyl sealant rope and sheet. G. Apply external seal to the outside of joint. H. Finish the interior by filling fractures greater than 1/2-inch in length, width or depth with a sand cement mortar. I. Clean the interior of the manhole of foreign matter. 3.09 PAINTING A. Equipment shall receive the manufacturer's standard coating for the intended application. Coatings shall be suitable for the intended application. B. Repaint damaged paint services. C. Above ground piping and piping within vaults shall be painted in accordance with Section, Painting. 3.10 TESTING A. General 1. Clean and flush pipe system of foreign matter prior to testing. 2. Notify Owner and Engineer a minimum of 48 hours prior to testing. 3. Perform tests in the presence of Engineer. 4. Length of line to be tested at one time shall be subject to approval of Engineer. 5. Pipe sections shall not be accepted and placed into service until specified test limits have been met. 6. Repair defects in the pipe system. Make repairs to the same standard as specified for the pipe system. 7. Retest repaired sections until acceptance. 8. Repair visible leaks regardless of the test results. B. Pressure Mains 1. The Engineer shall approve the source, quality, and method of disposal of water to be used in test procedures. 2. Obtain Owner's permission 48 hours prior to filling or flushing of pipe system with water from Owner's water system. Owner shall operate valves connected to the existing water system. Keep pipe interior clean during construction to minimize the amount of water required for flushing. Where large quantities of water may be required for flushing, Engineer reserves the right to require that flushing be done at periods of low demand. SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-14 Contract 1: Transmission 3. Pressure test in accordance with AWWA C600 for ductile iron pipe and AWWA C605 and M23 for PVC pipe and the following. 4. Make pressure tests between valves. Furnish suitable test plugs where line ends in "free flow." 5. Provide air vents at the high points in the line section to be tested for releasing of air during filling. Service corporation stops may be used for air vent when located at a high point. Include cost of air vents in price of testing. Leave corporation stops in place after testing and note locations on As -Built Drawings. 6. Allow concrete blocking to reach design strength prior to pressure testing. 7. Force main shall be completely filled with water, all air expelled from the pipe, and the discharge end of the pipeline shall be plugged and adequately blocked before hydrostatic test begins. 8. Upon completing a section of pipe between valves, test pipe by maintaining for a two hour period the following hydrostatic pressure for each main: a. Force main: 150 psig 9. Test pressure shall not vary by more than +/- 5 psi for the duration of the test. 10. No length of line shall be accepted if the leakage is greater than that determined by the following formula based on the appropriate test pressure: L = Allowable leakage per 1,000 feet of pipe in gallons per hour. D = Nominal diameter of the pipe in inches. 100 psi: L = D x 0.07 150 psi: L = D x 0.08 200 psi: L = D x 0.09 250 psi: L = D x 0.10 C. Gravity Sewer Mains 1. Test gravity lines between manholes. 2. Light Testing: Engineer will check for displacement of pipe as follows: a. A light will be flashed between the ends of the pipe section being tested. b. If the illuminated interior shows misalignment, or other defects as designated by Engineer, defects shall be repaired. 3. General a. Infiltration shall not exceed 100 gallons per inch of diameter, per mile of pipe, per 24 hours. Engineer may require flow measurement for verification of infiltration. b. Verify that maximum infiltration rate shall not be surpassed by air testing as follows. 4. Low Pressure Air Test: a. Air testing of sewer mains shall conform to UNI-B-6 and the following requirements: b. Perform initial air test when each section of main is complete including services to right of way. Test as construction proceeds. c. Wet interior surfaces of porous pipe material prior to testing. d. Safety 1) Provide a superintendent who has experience in low pressure air testing of gravity sewer mains. 2) Follow safety recommendations of air testing equipment manufacturer. 3) Properly brace sewer plugs during testing. Test plugs prior to use in air testing. 4) No one shall be allowed in manhole or trench when pipe is under pressure. SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-15 Contract 1: Transmission 5) Pressurizing equipment shall include a regulator and a pressure relief valve, which are set no higher than 9 psig. Monitor gauges continuously to assure that the pressure does not exceed 9 psig. e. Equipment 1) Sewer plugs shall be specifically designed for low pressure air testing. 2) Use two separate air hoses. i) One to connect the control panel to the sealed line for introducing the air. ii) One from the sealed line to the control panel to provide constant monitoring of the air pressure in the line. iii) If Pneumatic plugs are used a separate line shall be used to inflate the plugs. 3) As a minimum the above ground air testing equipment shall include a shutoff valve, pressure regulating valve, pressure relief valve, input pressure gauge, and a continuous monitoring pressure gauge having a pressure range from 0 to at least 10 psig. 4) Continuous monitoring pressure gauge shall be at least 4 inches in diameter with minimum divisions of 0.10 psi and an accuracy of +/- 0.04 psi. 5) Monitoring gauges shall be subject to calibration as deemed necessary. 6) Air used for testing shall pass through a single above ground control panel. f. Testing 1) Groundwater Determination: Immediately prior to each air test, determine groundwater level by a method acceptable to the Engineer. Adjust pressure used in air test in accordance with groundwater level. 2) Apply air slowly to the test section until the pressure reached is 4.0 psi plus an adjustment of 0.433 psi for each foot of ground water above the crown of the pipe. Internal air pressure, including adjustment for ground water, should never exceed 9.0 psi. 3) When the above required pressure is reached, throttle air supply to maintain internal pressure for at least two minutes to permit stabilization. 4) When pressure has stabilized at required pressure, shut off air supply. 5) While observing the continuous monitoring pressure gauge, decrease pressure approximately 0.5 psi from required pressure. 6) At this reading timing shall commence with a stop watch and allowed to run until pressure has dropped 1.0 psi or allowable time has lapsed. Line shall be "Acceptable" if the pressure drop does not exceed 1 psig in the time prescribed for the test in Table 1, Low Pressure Air Testing for Gravity Sewer Mains, at the end of this section. 5. Deflection Test for SDR 35 and Ribbed (ASTM F 949) PVC pipe. a. Measure for deflection of pipe no sooner than thirty days after installation and backfill. b. Deflection shall not exceed 5 percent of pipe diameter. Maximum allowable long term deflection shall be 5 percent. c. Measure deflection with an approved "GO -NO-GO GAUGE" method or by an approved recording deflectometer. Verify gauge on site prior to testing. SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-16 Contract 1: Transmission D. Vacuum test each manhole in accordance with ASTM C1244 and the following: 1. No personnel shall be allowed in manhole during testing. 2. Test manhole after assembly and prior to backfilling. 3. Plug pipes with suitably sized and rated pneumatic or mechanical pipeline plugs. Brace plugs to prevent displacement. 4. Position vacuum test head assembly to seal against interior surface of the top of cone section in accordance with manufacturer's recommendation. 5. Draw vacuum of 10 inches of mercury on manhole. Shut off the vacuum pump and close valve on vacuum line. 6. Measure time for vacuum to drop to 9 inches of mercury. Manhole shall pass if time meets or exceeds the following: Manhole I.D. (inches) 48 60 72 84 96 120 Seconds 60 75 90 105 120 150 7. If manhole fails test, remove head assembly, coat interior with a soap and water solution, and repeat vacuum test for approximately 30 seconds. Leaking areas will have soapy bubbles. Make necessary repairs to the satisfaction of Engineer and repeat test until manhole passes. E. Air Release Valves 1. Hydrostatic pressure leakage test at '/2, 1, and 1 '/2, times the valves rated pressure. Each test pressure level shall be held for not less than 5 minutes. Valves showing signs of leakage or weeping shall be rejected. 2. Low head vacuum leakage test at 0 psi. The valve shall be rejected if the valve shows any leakage after 2 minutes. Valves rated at zero pressure sealing will be tested at 0.1psi for 5 minutes. END OF SECTION SE Area Wastewater Capacity Improvements Sanitary Sewer System - 02530-17 Contract 1: Transmission SECTION 02606 PRECAST CONCRETE WATER STRUCTURES PART 1 GENERAL 1.01 SECTION INCLUDES A. Rectangular, monolithic, or sectional precast water and wastewater structures, pipe connectors, and accessories. 1.02 RELATED SECTIONS A. Section 02300 — Earthwork. B. Section 02315 — Trenching for Utilities. 1.03 REFERENCES A. Prestressed Concrete Institute: Manual for Quality Control for Plants and Production of Precast and Prestressed Concrete Products. B. National Precast Concrete Association: Quality Control Manual for Precast Concrete Plants. C. American Society for Testing and Materials (ASTM): a. C858 Standard Specification for Underground Precast Utility Structures b. C890 Standard Practice for Minimum Structural Design Loading for Monolithic or Sectional Precast Concrete Water and Wastewater Structures. c. C891 Standard Practice for Installation of Underground Precast Concrete Utility Structures. d. C923 Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures, Pipes and Laterals. e. C913 Standard Specifications for Precast Concrete Water and Wastewater Structures. D. American Association of State Highway and Transportation Officials: Standard Specification for Joints for Circular Concrete Sewer and Culvert Pipe Using Flexible Watertight Gaskets (AASHTO M198). E. American Concrete Institute: Building Code Requirements for Reinforced Concrete (ACI 318). F. Occupational Safety and Health Administration: Standard 1926.704 - Requirements for Precast Concrete. 1.04 SUBMITTALS A. Submit in accordance with Section, Submittal Procedures: 1. Affidavit of Compliance: Affidavit shall attest that supplied products conform to the referenced standard and this specification and that all tests set forth in each applicable referenced publication have been performed and that all test requirements have been met. 2. Catalog Data: Submit manufacturer's standard drawings or catalog cuts for the following. Clearly indicate items to be furnished for the project including options to be provided. SE Area Wastewater Capacity Improvements Precast Concrete Water Structures - 02606-1 Contract 1: Transmission a. Each type of precast concrete structure. b. Hatches. c. Joint Materials. d. Connectors. 3. Sealed Calculations a. Structural analysis and design calculations for Precast Components, performed in accordance with applicable codes and standards, showing that allowable stresses will not be exceeded when installed as shown on the Drawings. All calculations must be sealed by a Professional Engineer registered in the State of North Carolina employed by the Precast Concrete Manufacturer. 1.05 QUALIFICATIONS A. The Precast Manufacturer shall be a NCDOT approved manufacturer of Precast Concrete Structures and have a minimum of 5 years experience in manufacturing the required components. B. The Precast Manufacturer shall have a recognized Quality Improvement Process installed at the manufacturing facility. C. The Precast Manufacturer shall employ at least one Registered Professional Engineer at the manufacturing facility through the life of the project. D. Concrete compressive strength testing shall be performed in a laboratory inspected by the CCRL of the National Bureau of Standards. Testing shall be performed by Grade I ACI Certified Laboratory Technicians or by Level I PCI Certified Technicians. PART 2 PRODUCTS 2.01 MATERIALS A. Concrete shall conform to ASTM C858 and C913 as applicable and as follows: 1. Compressive strength: 5000 psi minimum at 28 days. 2. Air Content: 4 percent minimum. 3. Cementitious Materials: Minimum of 564 pounds per c.y. 4. Coarse Aggregates: ASTM C33. Sound, Crushed, Angular Granitic Stone only. Smooth or rounded stone shall not be used. 5. Fine Aggregates: ASTM C33. Free from organic impurities. 6. Chemical Admixtures: ASTM C494. Calcium Chloride or admixtures containing calcium chloride shall not be used. 7. Air Entraining Admixtures: ASTM C260. B. Reinforcing steel shall be ASTM A615 grade 60 deformed bar, ASTM A82 wire or ASTM A185 welded wire fabric. C. Lift loops shall be ASTM A416 steel strand. Lifting loops made from deformed bars are not allowed. D. Butyl Rubber Sealant shall conform to Federal Specification SS-S-210A, AASHTO M-198, Type B - Butyl Rubber and as follows: maximum of 1 % volatile matter and suitable for application temperatures between 10 and 100 degrees F. E. Butyl Rubber with Bentonite Sealant shall contain 99% solids with a maximum of 1 % volatile matter and suitable for application temperatures between 5 and 125 degrees SE Area Wastewater Capacity Improvements Precast Concrete Water Structures - 02606-2 Contract 1: Transmission F. Epoxy Gels used for interior patching of wall penetrations shall be a 2-component, solvent -free, moisture -insensitive, high modulus, high -strength, structural epoxy paste adhesive meeting ASTM C-881, Type I and II, Grade 3, Class B and C, Epoxy Resin Adhesive. 2.02 COMPONENTS A. Precast Component Fabrication and Manufacture shall be as described in this paragraph and as described in the paragraphs for the specific components. 1. Precast concrete structure shall be watertight. 2. Precast Manufacturing shall be in conformance with ASTM C858 or C913 as applicable. Wall and inside slab finishes resulting from casting against forms standard for the industry shall be acceptable, except form ties through the wall of the product are not allowed. Exterior slab surfaces shall have a float finish. Small surface holes, normal color variations, normal form joint marks, and minor depressions, chips and spalls will be tolerated. Dimensional tolerances shall be those set forth in the appropriate References and as specified below. 3. Joint surfaces on joints between Precast Structure Components shall be keyways or tongue and grooves manufactured to the joint surface design and tolerance requirements of ASTM C858 or C913 as applicable. 4. Lift Inserts and Holes shall be sized for a precision fit with the lift devices, shall conform to OSHA Standard 1926.704, and shall not penetrate through the precast structure wall. 5. The structural design of Precast Components shall be in accordance with applicable codes and standards listed in Article 1.05 of this Specification Section. No less than 80 psf per foot of depth of Equivalent Fluid Pressure should be used for lateral earth design loads plus the lateral surcharge design loads possible from HS-20 Traffic. Vertical design loads shall include structure dead loads, earth loads, hydrostatic loads, and traffic live loads where applicable with no less than 300 psf live load. The empty and liquid full container conditions shall both be considered. B. Precast Base Sections shall be cast monolithically without construction joints, or with an approved galvanized or PVC waterstop cast in the cold joint between the base slab and the walls. Where shown on the Project Plans, Base Section Slab Extensions shall be provided on the short sides of the section. The width of the extensions shall be the slab thickness unless shown differently. C. The Minimum Lay Length of Precast Riser Sections shall be 36 inches. D. Precast Top Sections shall be cast monolithically without construction joints, or with an approved PVC waterstop cast in the cold joint between the base slab and the walls. Joints cast on top sections for round manhole Transition Assemblies shall have ASTM C361 joint surfaces. E. Pipe to Precast Structure Connectors shall conform to ASTM C923. F. Joints between Precast Components shall be sealed with a polyethylene backed flat butyl rubber sheet no less than 1/16 inch thick and 6 inch wide applied to the outside perimeter of the joint. Joints shall also be sealed internally with a sealant having a cross -sectional area no less than the joint annular space times the joint height as follows: 1. Butyl Rubber Sealant in joints with perimeters less than 18 feet. 2. Bentonite impregnated Butyl Rubber Sealant in all other joints. SE Area Wastewater Capacity Improvements Precast Concrete Water Structures - 02606-3 Contract 1: Transmission G. Access Hatch 1. Provide access hatches in conformance to the following requirements: a. Size as indicated on the Drawings. The size on the Drawings is for the required minimum clear opening. Unless specifically indicated on the Drawings the doors can be single or double door as required for opening size. b. Frame shall be aluminum extrusion and aluminum checkered tread plate for the door(s). Frame shall be equipped with necessary anchors for setting in concrete. Hinges, nuts, bolts, and washers shall be stainless steel and tamper proof from outside. c. Design and construct hatches for a minimum 300 lb. live load unless an H2O load is indicated on the Drawings. d. Provide the following: 1) Bituminous coating at locations, which will have contact with concrete. 2) Waterproof hatch where indicated on the Drawings. 3) Positive open door latch. 4) Retractable lifting handle. 5) Double doors shall be interlocked. 6) Padlocking provision. Provide lock for each hatch and keyed alike for multiple hatches. 7) Provide a stainless steel interior automatic slam lock with an interior operating handle. The lock shall be operated from the outside by a removable handle key. 8) Provide doors requiring greater then a 50 lb lift with a stainless steel spring assist. e. Hatches shall be of one manufacturer. H. Lifting Devices for handling Precast Components shall be provided by the Precast Manufacturer and shall comply with OSHA Standard 1926.704. I. Coatings: Where shown on the Plans, the interior/exterior of the Precast Structure wall shall be coated with 21 mils of Coal Tar Epoxy, Kop-Coat Bitumastic No. 300-M or equal. The coating shall be spray applied according to the manufacturer's recommendations by an applicator with a minimum of 5 years experience. PART 3 EXECUTION 3.01 EXAMINATION A. Inspect Precast Components prior to unloading from the delivery truck. 3.02 PREPARATION A. Product Delivery, Storage, and Handling: Coordinate delivery with the manufacturer, handle and store the Precast Components in accordance with ASTM C891 and the manufacturer's recommendations using methods that will prevent damage to the components and their joint surfaces. 3.03 PLACING PRECAST CONCRETE SECTIONS A. Excavate to the required depth and remove materials that are unstable or unsuitable for a good foundation. Prepare a level, compacted foundation extending 6" beyond the precast base and follow ASTM C891 excavation standards. SE Area Wastewater Capacity Improvements Precast Concrete Water Structures - 02606-4 Contract 1: Transmission B. Set base plumb and level, aligning pipe opening with pipe invert. C. Thoroughly clean joint tongue and grooves to remove dirt and other foreign materials that may prevent sealing. Unroll the Butyl Sealant rope directly against bottom groove. Leave protective wrapper attached until sealant is entirely unrolled against groove. Do not stretch. Overlap from side to side not top to bottom. D. Set risers and tops, aligning internal wall surfaces, so that proper alignment is achieved, taking particular care to clean, prepare and seal joints. E. When recommended by the manufacturer, fill the void between horizontal joint surfaces with a sand cement grout around the outside perimeter as risers are set. F. After joining precast sections, apply the butyl sealant sheet around the outside perimeter of the joints below grade. G. Secure Pipe Connectors to Pipe according to the Connector Manufacturer Instructions. When pipe stub outs are installed, provide restraint from longitudinal movement before backfill. H. Lift Holes leaving less than 2" of wall thickness shall be plugged from the outside using a sand cement mortar and then covered with butyl sealant sheet. Lift Holes penetrating the wall shall be additionally sealed with an interior application of an epoxy gel 1/8" thick extending 2" beyond the penetration. I. Test structure after installation in accordance with ACI 350.IR "Testing Reinforced Concrete Structures for Water -tightness." Plug pipe connections and fill tanks to the overflow elevation. There shall be no loss of water over a 24 hour period. If test fails, a second test shall be run for an additional 24 hours. If the test fails a second time, Contractor shall coat interior of tank with NSF approved water proofing compound. The tank shall be retested and the process repeated until the tank passes the test. A report of the test process and results shall be signed by Contractor and submitted to Owner. J. Perform the final finishing to the Structure interior by filling all chips or fractures greater than 1/2" in length, width or depth and depressions more than 1/2" deep in inverts with a sand cement mortar. Clean the interior of the Structure, removing all dirt, spills or other foreign matter. END OF SECTION SE Area Wastewater Capacity Improvements Precast Concrete Water Structures - 02606-5 Contract 1: Transmission SECTION 02700 PAVEMENT AND APPURTENANCES PART 1 GENERAL 1.01 SCOPE A. Provide pavement, curb and gutter, and sidewalk sections as indicated on the Drawings and specified herein. Construction shall conform with the lines, grades, thickness, and typical cross-section indicated on the Drawings. B. Provide for the milling of the existing pavement, if necessary. 1.02 RELATED SECTIONS A. The following Sections have work that is directly related to this Section. This does not relieve the Contractor of his responsibility of proper coordination of all the work: 1. Section 02300 Earthwork 1.03 REFERENCED STANDARDS A. The latest revision, at the time of bidding, of the publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. 1. N.C. Department of Transportation — Standard Specifications for Roads and Structures (NCDOT). B. Paragraphs in the NCDOT standard regarding measurement and payment do not apply to this Project. 1.04 SUBMITTALS A. Submit the following in accordance with Section, Submittal Procedures: 1. Certificates of Compliance: Certificates shall attest that supplied products conform to the referenced standard and this specification, that all tests set forth in each applicable referenced publication have been performed, and that all test requirements have been met. Submit for each of the following materials: a. Asphalt Concrete b. Aggregate Base Course c. Pavement Marking Material 1.05 PROTECTION OF EXISTING PAVEMENT, CURB AND GUTTER, AND SIDEWALK A. Existing pavement, curb and gutter, and sidewalks at the site are in good condition. Contractor, Owner, and Engineer shall inspect the entire site prior to the start of construction and mark existing damaged areas and note areas on Contractor's plan set to be used for the Record Drawings. B. Protect existing pavement, curb and gutter, and sidewalks during construction. C. Remove areas of existing curb and gutter, and sidewalks damaged during construction. Removal shall include to the nearest existing joint. Replace damaged areas with new curb and gutter, and sidewalks to match the existing section. SE Area Wastewater Capacity Improvements Pavements & Appurtenances - 02700-1 Contract 1: Transmission D. Remove areas of existing pavement damaged during construction. New pavement patch shall consist of re -stabilizing the subgrade, and providing 8 inches of ABC and 2 inches of SF9.5A asphalt to match existing pavement surface. E. Repair damage to existing pavement, curb and gutter, and sidewalks. PART 2 PRODUCTS 2.01 MATERIALS AND MIXES A. Aggregate Base Course: Stone meeting the requirements under Section 520, pages 5-10 through 5-15 and Section 1010, pages 10-30 through 10-40. B. Tack Coat: Conforming to materials and compositions required in NCDOT Section 605, Asphalt Tack Coat. C. Asphalt Concrete Surface Course - Type S-9.513: Conforming to materials and composition required in NCDOT Section 610, Asphalt Concrete Plant Mix Pavements, pages 6-27 through 6-51. D. Concrete for Curb and Gutter, and Sidewalks: Conforming to materials and composition required in NCDOT Section 846, Concrete Curb, Curb and Gutter, Concrete Gutter, Shoulder Berm Gutter, Concrete Expressway Gutter, Concrete Valley Gutter and Concrete Flumes, and Section 848, Concrete Sidewalks and Driveways and Wheelchair Ramps. E. Pavement Markings and Symbols: Conforming to materials and composition required in NCDOT Section 1205, Pavement Marking General Requirements. PART 3 EXECUTION 3.01 PREPARATION OF SUBGRADE A. Refer to applicable portions of Section, Earthwork. B. Compaction shall be to at least 95 percent maximum density Standard Proctor Method. C. Remove unsuitable material to a depth of one foot and replace with an approved material. Loosen exceptionally hard spots and re -compact. Finish subgrade to provide uniform bearing surface. D. Maintain subgrade in satisfactory condition and properly drain until surface courses are placed. E. Preparation, shaping, and compaction shall be in accordance with NCDOT Section 500, Fine Grading Subgrade, Shoulders, and Ditches. 3.02 AGGREGATE BASE COURSE A. This applies to both the aggregate base course as indicated on the Drawings for paved and unpaved roads. B. The stone base shall be constructed in accordance with the applicable paragraphs of NCDOT Section 520. C. Compacted base shall be of the thickness indicated on the Drawings. SE Area Wastewater Capacity Improvements Pavements & Appurtenances - 02700-2 Contract 1: Transmission D. The base course stone shall be compacted to ate least 100 percent of the maximum dry density as determined by the modified Proctor compaction test, AASHTO T-180 as modified by NCDOT. 3.03 ASPHALT CONCRETE SURFACE COURSE A. Spreading, compaction, and finishing shall comply with the requirements of NCDOT Section 610 Asphalt Concrete Plant Mix Pavements. B. The asphalt concrete surface course shall be placed in tow lifts. Compacted thickness shall be as indicated on the drawings. 3.04 TACK COAT A. Application rates, method of application, and curing shall be in accordance with the requirements of NCDOT Section 605. 3.05 CONCRETE CURB & GUTTER A. Provide concrete curb and gutter where indicated on the Drawings. Curb and Gutter shall conform to the section indicated on the Drawings. B. Construct Curb and Gutter in accordance with NCDOT Section 846. 3.06 PAVEMENT MARKINGS AND SYMBOLS A. Mark parking spaces in paved areas with 4 inch white paint stripe the length of the parking space. B. Stripe roads maintained by the NCDOT or the local municipality in accordance with the agency requirements. C. Provide painted pavement symbols as indicated on the Drawings. END OF SECTION SE Area Wastewater Capacity Improvements Pavements & Appurtenances - 02700-3 Contract 1: Transmission SECTION 02920 LAWNS AND GRASSES PART 1 GENERAL 1.01 SECTION INCLUDES A. Work shall include, but not be limited to, the following: 1. Surface preparation of subsoil. 2. Placing topsoil. 3. Addition of lime and fertilizer. 4. Seeding. 5. Maintenance to produce a permanent stand of grass. 1.02 PAYMENT PROCEDURES A. Base bid for the work on the specified quantities of lime, fertilizer, and seed. After the specified soil tests have been made, Engineer may vary specified quantities. Should the actual quantities applied in the field vary appreciably from those specified, an adjustment in the contract price may be made. 1.03 REFERENCES A. N.C. Department of Agriculture - NCDA B. U.S. Department of Agriculture - USDA 1.04 PERFORMANCE REQUIREMENT A. Grassed area shall be considered established when it presents a green appearance from eye level 50 feet away and the grass is vigorous and growing well in each square foot of seeded area. It is not required that the seeded area be thick and heavy as an old established lawn. B. Should the permanent seed not germinate and produce a strand of grass, reseed affected areas until a permanent stand is established. 1.05 SUBMITTALS A. Not less than 6 weeks prior to seeding, obtain representative soil samples from areas to be seeded and deliver the properly packaged samples with an information sheet for each sample properly filled out to the Soils Division of the NC Department of Agriculture or a private laboratory. Based on the test results, submit to the Engineer a recommendation as to the quantity and type of lime, fertilizer and seed for the area covered by the test. 1.06 QUALITY ASSURANCE A. Quality of fertilizer, lime, and seed, and operations in connection with the furnishing of this material, shall comply with the requirements of the N.C. Fertilizer, Lime and Seed Law; and with the requirements of the rules and, regulations adopted by the NC Department of Agriculture in accordance with the provisions of the said law. B. Seed containers shall bear an official "Certified Seed" label as inspected by the N.C. Crop Improvement Association. C. Packages for soil conditioners and fertilizer shall bear manufacturer's guaranteed analysis. SE Area Wastewater Capacity Improvements Lawns & Grasses - 02920-1 Contract 1: Transmission D. Do not apply lime, fertilizer or seed in strong wind, when the soil is extremely wet, or otherwise unworkable. No rolling shall be done if precipitation after seeding would make the operation detrimental to the seed bed. 1.07 DELIVERY, STORAGE, AND PROTECTION A. Deliver grass seed mixture in sealed containers showing percentage of seed mix, year of production, net production, net weight, date of packaging, and location of packaging. B. Deliver fertilizer in waterproof bags showing weight, chemical analysis, and name of manufacturer. 1.08 MAINTENANCE SERVICE A. Maintain seeded areas until grass is well established and exhibits a vigorous growing condition for a minimum of two cuttings. Mow grass at regular intervals to a maximum height of 3 inches. Hand clip where necessary. B. Control growth of weeds. Apply herbicides in accordance with manufacturer's instructions. C. Water areas seeded between May 1 and July 15 at such intervals as to maintain the seeded area in a moist condition until the grass is established and accepted by the Engineer. Provide equipment to transport and distribute the water to the seeded areas. Areas seeded between September 1 and November 1 need not be irrigated beyond the initial watering specified above except that the Contractor may apply water at his own discretion. PART 2 PRODUCTS 2.01 MATERIALS A. Topsoil: Fertile, agricultural soil, typical for locality, capable of sustaining vigorous plant growth, taken from drained site; free of subsoil, clay or impurities, plants, weeds, and roots; pH value of minimum 5.4 and maximum of 7.0. B. Lime: Ground Dolomitic agricultural limestone, not less than 85 percent total carbonates, ground so that 50 percent passes 100 mesh sieve and 90 percent passes 30 mesh sieve. Coarser material will be acceptable, provided the specified rates of application are increased proportionately on the basis of quantities passing No. 100 mesh sieve. C. Fertilizer: Mixed, commercial, fertilizer containing 10-10-10 percentages of available nitrogen, phosphoric acid, and potash respectively, plus superphosphate with 20 percent P2O5 content. Fertilizer shall be dry, in granular (pellet) form, shall be delivered to the site in the manufacturer's original bag or container which shall be plainly marked as to formula. D. Seed: Fresh seed guaranteed 95 percent pure with a minimum germination rate of 85 percent within one year of tests. Provide the following seed mixtures with lime and fertilizer in disturbed areas outside of NCDOT Rights -of -Way, when within NCDOT Rights -of -Way, provide seeding per NCDOT encroachment requirements: SE Area Wastewater Capacity Improvements Lawns & Grasses - 02920-2 Contract 1: Transmission 1. Temporary Seeding Plantina Dates Grass Type Pounds/Acre Feb. 15 - May 15 Rye (Grain) 120 Korean Lespedeza 50 May 15 - Aug. 15 German Millet 40 or Sudangrass 50 Aug.15 - Dec. 15 Rye (Grain) 120 Lime 3,000 Fertilizer 10-10-10 800 Mulch Straw 4,000 2. Permanent Seeding Plantina, Dates Grass Type Pounds/Acre Feb. —July Common Bermudagrass 60 Lime 3,000 Fertilizer 10-10-10 500 Mulch Straw 4,000 E. Matting / Erosion Control Fabric (ECF): Matting and ECF shall be heavy jute mesh over mulch held in place by staples. Commercially available ECFs may be used upon approval of the engineer. Approval of fabrics will require manufacturer's design data regarding velocity, ditch slopes, method of installation, decay cycle, repair techniques, and grass growth enhancement characteristics. F. Wire Staples: 16 gauge steel wire, with minimum of 3" top and 4" long legs. G. Mulch: Threshed straw of oats, wheat, or rye; free from seed of obnoxious weeds; or clean salt hay. Straw which is fresh and excessively brittle or straw which is in such an advanced stage of decomposition as to smother or retard growth of grass will not be acceptable. H. Water: Water shall be free from substances harmful to growth of grass SE Area Wastewater Capacity Improvements Lawns & Grasses - 02920-3 Contract 1: Transmission PART 3 EXECUTION 3.01 PREPARATION OF SUBSOIL A. Complete operations in the area to be seeded and prepare subsoil to eliminate uneven areas and low spots. Bring surface to the approximate design contours. B. Scarify subsoil to a depth of 3 inches. Remove weeds, roots, stones and foreign materials 1-1/2 inches in diameter and larger. 3.02 PLACING TOPSOIL A. Place topsoil during dry weather and on dry unfrozen subsoil. B. Spread topsoil to a minimum depth of 4 inches. Remove vegetable matter and foreign non -organic material from topsoil while spreading. Grade surface to provide positive drainage and prevent water ponding. Lightly compact topsoil with at least one pass of a cultipacker or similar equipment C. Maintain the finished surfaces by protecting, and replacing topsoil and subsoil as necessary until the area is accepted under the contract. 3.03 APPLICATION OF LIME A. Liming shall be done immediately after grading has reached the fine grading stage, even though actual seeding may not be done until several months later. B. Spread lime evenly by means of a mechanical distributor. C. When lime is distributed by commercial liming dealers, sales slips showing the tonnage delivered shall be filed with the Engineer and shall show the full tonnage required for the acres treated. D. Incorporate lime in the top 2 to 3 inches of soil by harrowing, disking, or other approved means. 3.04 APPLICATION OF FERTILIZER A. Spread fertilizer not more than 2 weeks in advance of seeding. B. To verify application rate, determine acreage to be fertilized and provide Engineer with total weight of fertilizer applied to the area. C. Provide mechanical spreader for even distribution and spread half of the rate in one direction, and the other half at right angles to the first. Mix thoroughly into upper 2 to 3 inches of soil by disking, harrowing or other approved methods. 3.05 SEEDING A. Accomplish seeding by means of an approved power -drawn seed drill, combination corrugated roller -seeder, approved hand operated mechanical seeder, or other approved methods to provide even distribution of seed. B. Do not seed when ground is excessively wet or excessively dry. After seeding, roll area with a roller, not less than 18 inches in diameter and weighing not more than 210 pounds per foot of width. Upon completion of rolling, water area with a fine spray. C. Immediately following seeding apply mulch or matting. Do not seed areas in excess of that which can be mulched on same day. SE Area Wastewater Capacity Improvements Lawns & Grasses - 02920-4 Contract 1: Transmission D. Apply water with a fine spray immediately after each area has been mulched. Saturate to 4 inches of soil depth 3.06 MULCHING AND MATTING A. Apply mulch or matting as required to retain soil and grass, but no less then the following: 1. Slopes from 0 to 20 percent by spreading a light cover of mulch over seeded area at the rate of not less than 85 lbs. per 1000 sq. ft. 2. Slopes greater than 20 percent mulch with matting. Pin matting to the ground with wire staples at 5 foot intervals, immediately after seeding. 3. Use tack to prevent disruption of mulch. B. For tack use an asphalt tie -down of emulsified asphalt grade AE-3 or cut -back asphalt grade RC-2 or other approved equal. The application rate shall be 11 gal per 1000 sq ft. An approved jute mesh or net may be used in lieu of tacking straw mulch. C. Other types of mulch and anchoring methods may be used upon approval by the Engineer. 3.07 PROTECTION A. Protect seeded areas from damage by barricades, signs, and other appropriate means. Maintain and protect slopes from weather damage. END OF SECTION SE Area Wastewater Capacity Improvements Lawns & Grasses - 02920-5 Contract 1: Transmission SECTION 11307 SUBMERSIBLE NON -CLOG PUMP STATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide complete submersible non -clog pump(s) for the following location(s): 1. Holly Ridge Pump Station 2. Summerhouse Pump Station 3. Reclaimed Water Pump Station (existing) 4. Each pump shall have variable/adjustable frequency drives (VFDs) for speed adjustment. B. Work shall include, but not be limited to, the following major items and necessary accessories for a complete and operational pump system: 1. Submersible non -clog centrifugal sewage pumps and motors with mounting plates and guide rails. 2. Control panels. 3. Precast or cast in place concrete wet well and valve vault. 4. Lifting hoist. 1.02 RELATED SECTIONS A. The following Sections have work that is directly related to this Section. This does not relieve Contractor of his responsibility of proper coordination of all the work: 1. Section 02530 Sanitary Sewer System 2. Section 02606 Precast Concrete Water Structures 3. Section 03100 Cast -in -Place Concrete 4. Section 13440 Telemetry Equipment 5. Section 14301 Hoist 6. Section 14650 Jib Crane 1.03 SYSTEM DESCRIPTION A. Holly Ridge Pump Station 1. Function: Pump raw sewage from the Town of Holly Ridge collection system to the Summerhouse Pump Station/WWTP. 2. Number of Pumps: One (1) in single pump operation plus one standby pump. 3. One (1) spare pump ready for storage. 4. Performance Requirements per pump a. Maximum Flow Capacity: 1,400 gpm at 187 ft of Head b. Minimum Flow Capacity: 700 gpm at 63 ft of Head 5. Pump Characteristics a. Impeller Type: Nonclog, 1 or 2 vane b. Discharge Flange Outlet: 6 inch, 125 lb flanges c. Pass Sphere Size: 3 inch d. Minimum Efficiency: 66% 6. Pump operating condition at both duty points shall be in pump's preferred operating range. SE Area Wastewater Capacity Improvements Submersible Non -Clog Pump Station- 11307-1 Contract 1: Transmission 7. One (1) trimming of impeller for each pump to meet field conditions after startup, as necessary as determined by Engineer. 8. Motor Characteristics a. Maximum Horsepower: 125 HP b. Maximum Speed: 1,780 rpm c. Voltage: 230 or 460 V, 3 phase, 60 Hz d. Motor shall be non -overloading over the entire pump curve. 9. Controls a. Automatic pump operation. b. Primary level control shall be via submersible pressure transducer. c. Audible and visual alarms. 10. Wet Well and Valve Vault a. Cast in place wet well as indicated on the Drawings. b. Precast concrete or Cast in place valve vault as indicated on Drawings. B. Summerhouse Pump Station 1. Function: Pump raw sewage from the Summerhouse Pump Staiton to the headworks structure of the North Topsail WWTP. 2. Number of Pumps: Three (3) pumps with two (2) duty and one (1) standby. 3. One (1) spare pump ready for storage. 4. Performance Requirements per pump a. Maximum Flow Capacity: 1,400 gpm at 134 ft of Head b. Minimum Flow Capacity at reduced speed: 1,250 gpm at 113 ft of Head 5. Pump Characteristics a. Impeller Type: Nonclog, 2 vane b. Discharge Flange Outlet: 6 inch, 125 lb flanges c. Pass Sphere Size: 3 inch d. Minimum Efficiency: 69% 6. Single pump run out at maximum speed, up to 2,100 gpm, must be on pump curve. 7. One (1) trimming of impeller for each pump to meet field conditions after startup, as necessary as determined by Engineer. 8. Motor Characteristics a. Maximum Horsepower: 125 HP b. Maximum Speed: 1,770 rpm c. Voltage: 230 or 460 V, 3 phase, 60 Hz d. Motor shall be non -overloading over the entire pump curve. 9. Controls a. Dual pump operation. b. Audible and visual alarms. 10. Wet Well and Valve Vault a. Cast in place wet well as indicated on the Drawings. b. Precast concrete or cast in place valve vault as indicated on Drawings. C. Reclaimed Water Pump Station 1. Function: Pump treated effluent from the Summerhouse WWTP to the Sprayfield Storage Pond at the Holly Ridge site north of Dolph Everett Road. 2. Number of Pumps: One (1) in single pump operation plus one standby pump. 3. One (1) spare pump ready for storage. 4. Performance Requirements per pump: 400 gpm at 56 ft of Head 5. Pump Characteristics a. Impeller Type: Nonclog, 1 or 2 vane SE Area Wastewater Capacity Improvements Submersible Non -Clog Pump Station- 11307-2 Contract 1: Transmission b. Discharge Flange Outlet: 4 inch, 125 lb flanges c. Pass Sphere Size: 3 inch d. Minimum Efficiency: 70% 6. One (1) trimming of impeller for each pump to meet field conditions after startup, as necessary as determined by Engineer. 7. Motor Characteristics a. Maximum Horsepower: 15 HP b. Maximum Speed: 1,720 rpm c. Voltage: 230 or 460 V, 3 phase, 60 Hz d. Motor shall be non -overloading over the entire pump curve. 8. Controls a. Automatic pump operation. b. Audible and visual alarms. 9. Wet Well and Valve Vault a. The existing Reclaimed Water Pump Station pumps will be replaced with new pups to allow treated effluent pumping to the existing Summerhouse infiltration basins or to the existing Holly Ridge Sprayfield Stroage Pond. The existing wet well, valve vault, and pump hatches will remain as is unless modified as indicated on the Drawings. b. Precast concrete or cast in place valve vault as indicated on Drawings. 1.04 SUBMITTALS A. Submit the following in accordance with Section, Submittals: 1. Certification: Submit certified pump curves after approval of Manufacturer's Data and Shop Drawings and prior to purchase. 2. Catalog Data: Submit manufacturer's standard drawings or catalog cuts for the following: a. Pumps. b. Air Release Valves. c. Access hatch. d. Lifting hoist. e. Removable trash basket. f. Float switch. g. Pressure Transducer. h. Pressure Gauges. 3. Shop Drawings: Submit Project specific shop drawings for the following: a. Dimensional mounting detail for pumps and trash basket within wet well indicating position of equipment with respect to access hatches in wet well top. b. Electrical diagram(s) for complete operating system. c. Layout of control panel face. 4. Manufacturer's Installation Procedures. 5. Test Reports: Upon testing of the installed system, field test reports shall be submitted in booklet form showing field tests performed to adjust each component and field tests performed to prove compliance with the specified performance criteria. Each test report shall indicate the final position of controls. 6. Operation and Maintenance Instructions: Submit complete operation and maintenance manual for the total system as indicated below. 7. Parts: Provide a parts list for each piece of equipment. SE Area Wastewater Capacity Improvements Submersible Non -Clog Pump Station- 11307-3 Contract 1: Transmission 8. Equipment and Performance Data: Pump characteristic curves showing capacity in gpm, minimum submergence, head, efficiency, and pumping horsepower from 0 to 110 percent of design capacity. B. Submit Operation and Maintenance Instructions in accordance with Section, Submittals and the following: 1. Pump station equipment shall be submitted in one or binders as appropriate and shall include equipment in this section and the generator and associated electrical components. 2. Front page(s) in binder shall include the following as a minimum: a. Name, address and phone number for manufacturer and manufacturer's local representative capable of providing service for each piece of equipment. b. Pump and motor plate data. 3. After the front page provide the pump curve and field test report. 1.05 QUALITY ASSURANCE A. Quality assurance shall be as required in Section, Quality Control and the following requirements. 1. Product manufacturer shall have a minimum of five (5) years of experience. 2. Equipment shall be as manufactured by ABS, Inc., Fairbanks Morse Company, Flygt Corporation, or Wilo EMU. B. Pumps and motors shall have the manufacturer's name, address, type or style, model or serial number, and catalog number on a plate secured to the item of equipment. C. Submit the name, address, and phone number of the firm that will provide required repair or replacement during the warranty period. 1.06 DELIVERY, STORAGE, AND HANDLING A. Deliver pumps and controls to the job site in as large of units as practical to require the minimum amount of field connection and assembly. 1.07 WARRANTY A. Provide standard manufacturer's warranty but shall not be less than one year. Warranty shall start from date of substantial completion of pump station. PART 2 PRODUCTS 2.01 PUMP A. General: Provide submersible, nonclog, centrifugal pumps specifically designed for the specified use. Openings and passages of pump shall permit passage of the specified sphere diameter and typical trash and stringy material associated with sanitary sewage. Pump with appurtenances shall be capable of continuous operation at specified submergence depth. Pump shall be designed for remote connection to a base elbow using one or two guide bars. B. Casing: Pump casing shall be constructed of cast iron ASTM A-48, Class 30. The casing shall be of uniform quality, surface, and free from defects. The casing shall be capable of withstanding operating pressures 50 percent greater than the SE Area Wastewater Capacity Improvements Submersible Non -Clog Pump Station- 11307-4 Contract 1: Transmission maximum operating pressure. Volute shall have smooth passages, which provide unobstructed flow through the pump. 1. Mating Surfaces: Mating surfaces where watertight seal is required shall be machined and fitted with nitrile rubber O-rings. Fitting shall be such that sealing is accomplished by metal -to -metal contact between mating surfaces, resulting in proper compression of the O-rings without the requirement of specific torque limits. 2. Exterior Surfaces: A factory applied sewage resistant coating shall protect exterior surfaces of the casing in contact with sewage. Exposed nuts and bolts shall be stainless steel. C. Impeller: Impeller shall be of cast iron and shall be of the single or double shrouded nonclogging design. Impeller shall be statically, dynamically, and hydraulically balanced. Impeller shall be securely keyed to the shaft with a locking arrangement whereby the impeller cannot be loosened by torque from either forward or reverse direction. D. Wearing Rings: Renewable wearing rings shall be provided on the impeller and casing and shall have wearing surfaces normal to the axis of rotation. Wear rings shall be constructed of bronze or stainless steel. Wearing rings shall be designed for ease of maintenance and shall be adequately secured to prevent rotation. E. Shaft: Provide one piece 416 Stainless steel shaft of adequate strength to transmit full motor horsepower to the impeller. F. Seals: A tandem mechanical shaft seal system running in an oil bath shall be provided. Seals shall be of tungsten carbide alloy with each interface held in contact by its own spring washer. G. Bearings: Pump shall rotate on a minimum of two (2) permanently lubricated bearings with a L-10 bearing life of 40,000 hours. 2.02 MOTOR A. Provide sealed squirrel cage induction motor for submersible operation in conformance with NEMA standards for type motor specified and shall meet the following requirements: 1. UL listed for Class I, Division 1, Group C and D explosion proof hazardous locations. 2. Service factor of 1.15. 3. Horsepower, RPM, voltage and phase shall be as specified in the paragraph, System Description. Nameplate horsepower rating shall not be exceeded by the brake horsepower requirements of the specified head and capacity conditions. 4. Continuous duty submerged and 15 minutes in air at nameplate horsepower and a minimum of 15 evenly spaced starts per hour. 5. Motors shall be capable of sustaining 15 starts per hour at a minimum ambient temperature of 40°C. 6. Exterior hardware shall be stainless steel. 7. Class F insulation. 8. Lifting lugs of adequate strength to lift the pump and motor assembly shall be cast into the motor housing. 9. Two moisture detector probes to detect seal failure shall be wired internally to control cable. SE Area Wastewater Capacity Improvements Submersible Non -Clog Pump Station- 11307-5 Contract 1: Transmission 10. Two normally closed automatic reset thermostats shall be imbedded in the motor windings to open on excessive heat stopping the motor. 11. Provide waterproof power and control cable sized to conform to NEC and ICEA standards and adequate length to connect to the control panel. Seal cables at motor entry point to prevent moisture from entering motor housing and cable wicking. 12. Motor shall not overload throughout the pump -operating curve. 13. Motor to be rated for VFD operation (inverter duty). 2.03 PAINTING A. Exterior surface of pump and motor shall receive as a minimum the following paint system at the factory: 1. SSPC-SP6, Commercial Blast Cleaning 2. One coat of Modified Alkyd Enamel to a minimum 2 mils dry film thickness. 2.04 INSTALLATION SYSTEM A. Provide a rail mounted installation system consisting of stainless steel guide rails, upper rail guide bracket, sliding bracket, intermediate rail guide bracket(s) (for rails over 20 ft), and a discharge connection elbow. System shall be of the size and type standard with the pump manufacturer for pump type to be supplied and shall not be used to support the weight of the pump. Stainless steel sliding guide bracket shall be an integral part of the pump unit. Discharge connection elbow and piping shall be permanently installed in the wet well. Pump shall be automatically connected to the discharge connection elbow when lowered into place and shall be easily removed for inspection and service without entering the wet well. B. Lifting cable: Provide a pump lifting system for each pump station as noted below. 1. Reclaimed Water Pump Station — Portable Hoist a. Provide one stainless steel portable hoist at pump station with reach as required for the safe removal of each pump. b. Hoist shall have a capacity of 150 percent of equipment weight and capable of 360-degree rotation. c. Hoist shall have winch with quick disconnect cable anchor for receiving stainless cable with swagged ball end. d. Provide lifting cable for each pump and trash basket. Lifting cable shall be stainless steel with snap hook on pump / trash basket end and swagged ball on winch end. Cable shall have sufficient length to reach from installed equipment to lifting winch. e. Provide number of floor mounted stainless steel sockets at each pump station as required for the removal of the equipment. f. Portable hoist shall be as manufactured by Halliday Products, Thern Inc., or Wallace B E Products. 2. Holly Ridge Pump Station — Jib Crane, See Section 14650 3. Summerhouse Pump Station — Monorail and Trolley, See Section 14301 2.05 CONTROL SYSTEM A. General 1. All pumps with variable frequency drives (VFDs) with one or two duty and one standby. Normal operation will be to alternate duty between the pumps based SE Area Wastewater Capacity Improvements Submersible Non -Clog Pump Station- 11307-6 Contract 1: Transmission on a programmed sequence so that all pumps are operated on a rotation basis. Duty pump alternation will occur if pumps are in Auto mode 2. The operator shall have the ability to adjust level set points (at the control panel PLC). a. Pumps off level (all pumps). b. Pumps low level alarm (all pumps). c. Wet well maintain water level. 1) Start Pump 1 and maintain level. 2) Start Pump 2 and maintain level. d. Wet well high level (high level alarm and start back-up float control). e. Minimum motor turn down speed for each influent pump (should all be set equal). 3. When pumps are in Auto mode, the pump control shall be by the Control Panel PLC. 4. Alternative sequence of operation methodology for start and speed control logic can be proposed to the Engineer for review and approval. 5. Variable Frequency Drive provided for each motor drive shall be in a free- standing enclosure and are not included in the control panel. See Section 16420 — Motors, Drives and Starters for VFD specifications. B. Sequence of Operation 1. Pump operating mode to be set by HOA switch for each pump. 2. HAND mode. Pump shall operate when turned in the hand mode. Pump shall stop when selector switch is switched to OFF. 3. OFF mode. Pump shall be off. 4. Auto mode. a. The pressure transducer shall provide the PLC with wet well liquid level and the PLC shall set VFD speed to maintain operator set maintain level. b. Normally, one pump shall operate and adjust speed to maintain the wet well "Maintain" level set point. c. If one pump is operating at full speed and the wet well level continues to rise, the second pump will be called to operate at an operator adjustable "2nd Influent Pump Start" wet well level. When two pumps are in operation, they shall each operate at the same speed to maintain level. d. If the level continues to rise to the High Level, the High Level Alarm shall be triggered and float back-up mode initiated. e. If Pumps Low Level Alarm level is reached, the Low Level Alarm shall be triggered. C. Float Backup Control: The pump control panel shall have a five —float back-up control system that is independent of the PLC. The float levels shall be positioned above/below the set points for the primary level transducer. Backup float control is initiated with when the wet well reaches the High Level float. 1. While the system is operating in the backup float control mode, the PLC and primary level transducer control will be disabled. Influent and EQ pumps are called to start by the activation of the floats. Floats: a. Pumps off level (all pumps) float b. Pumps low level alarm (all pumps) float c. Start 1 st Pump float d. Start 2nd Pump float e. Wet well high level and alarm float SE Area Wastewater Capacity Improvements Submersible Non -Clog Pump Station- 11307-7 Contract 1: Transmission 2. Upon activation of the 1st Pump float, the first duty Pump will immediately start. Upon activation of the 2nd Pump float, the second duty Pump shall start. Pumps will run at full speed. 3. All pumps operating will continue to operate until the wet well water level drops below the PUMPS OFF float and then all pumps will shut down. 4. Pumps will continue to operate in float backup control until the system is manually reset using the FLOAT BACKUP RESET pushbutton on the control panel. D. Control panel shall be a NEMA 12 steel enclosure with a front enclosure door. Panel shall be UL labeled, as a complete unit, following assembly. Panel shall include, but not be limited to, the following items: 1. Enclosure door shall be provided with steel clamps and provisions for padlocking or shall be equipped with a three-point latching mechanism operated by an oil -tight key -locking handle. 2. Alternator relay to alternate pumps between successive starts. 3. Mount the following devices on panel enclosure door: a. Hand -off -automatic (H-O-A) control switch for each pump. b. Non-resettable elapsed time meter for each pump. Meter shall read in tenth of hours through 99,999 hours total time. c. Float backup reset pushbutton. 4. Mount operating and warning lights on the enclosure door for the following. Color indicates required lens color. a. Power on (white). b. High water level (red). c. For each pump. 1) Running (green). 2) Seal failure (red). 3) Thermal overload (red). 5. Provide alarm horn and light (red) mounted on exterior of the electrical building housing the influent/EQ pump panel. Horn sound level shall be a minimum of 100 decibels at 10 feet. Provide horn silence switch on panel. All control panels in the electrical building from other process units shall be connected to this horn single horn and alarm light. a. In the event of a power loss at the pump station or a failure of the automatically activated stand-by generator, the alarm system shall be operated from a battery back-up power source. Battery back-up power source shall be provided with continuous charge. No alarm relays or indicator lights (except the alarm silence relay and alarm light) shall be part of the battery charging circuit. b. At a minimum, the following conditions shall be monitored by the system, and each shall cause activation of the audible and visual alarms: 1) Loss of power supply. 2) Pump failure for each pump for seal failure or thermal overload. 3) High water level. 4) Loss of telemetry transmission line. Provide contacts for signal from telemetry system. 6. Auxiliary contacts for remote signal for the following: a. Pump run status for each pump. b. High water alarm. c. Pump failure alarm for each pump. SE Area Wastewater Capacity Improvements Submersible Non -Clog Pump Station- 11307-8 Contract 1: Transmission d. Loss of power. 7. Provide laminated plastic labels to identify all control components. 8. Provide a plastic laminated electric diagram with wire / terminal numbers and color codes permanently fastened to inside of enclosure door. E. Switches, push buttons, and indicator lights shall be oil tight / watertight units. Lights shall be push -to -test type. F. Wire shall be sized as required for load and application according to NEC. Wiring shall be neatly bundled and continuous from point to point. Wiring shall be totally accessible with permanent marking on each end to match the schematic drawing. Control and signal wire shall be a minimum of #14 AWG, stranded, 90 degree insulated and color - coded. Color coding shall be as follows: 1. Red AC control 2. Blue DC control 3. Yellow External source control 4. White AC neutral 5. Green Ground G. Provide UL listed mercury float switches encapsulated in buoyant waterproof housing with sufficient cable to extend to control panel. Float and cable shall be designed and manufactured for use in a sewage wet well environment. Sensor levels shall be field adjustable. H. Conduits running into wet well shall have a positive seal in accordance with NFPA 70. 2.06 PROGRAMMABLE LOGIC CONTROLLER (PLC) A. The PLC shall be off -the -shelf commercially available as a non-proprietary device programmable and available for purchase by all Systems Integrators. B. The PLC shall be by Allen Bradley CompactLogix or approved equal. C. The PLC shall provide all of the local inputs and outputs required per the RTU schedule. D. The PLC shall have all electronic components housed in a card rack. The card rack components shall be plug-in and interchangeable without calibration and be mounted for easy operator access. E. Each card rack assembly shall contain its own plug-in power supply. Card edge connectors and their mating edgeboard connectors shall be gold plated or gold flashed. All 1/0 wiring shall be accomplished via plug-in terminal blocks. F. The PLC shall have at a minimum the following specific performance requirements: 1. Basic processing time of 22ns per instruction. 2. Program Size: 128K instructions 3. RAM size: 64 M bytes 4. Flash Memory size: 128 Mbytes G. The discrete input cards shall provide a maximum of 32 optically isolated inputs per card. The input card shall provide a 24 VDC excitation to remote sensors and switches. H. The discrete output cards shall provide a minimum of 4 relay isolated contacts wired to PLC clamps or plug-in relays located in the PLC panel. The contacts from plug-in SE Area Wastewater Capacity Improvements Submersible Non -Clog Pump Station- 11307-9 Contract 1: Transmission relays shall be wired to terminal blocks for interfacing with remote devices and remote panels. The PLC shall contain the total number of analog 1/0 points as indicated in the RTU Schedule. Analog 1/0 shall include 0-5 VDC input, 0-5 VDC isolated input, RTD thermocouple input, 4-20 mA isolated input and 4-20 isolated output. Each analog shall be converted to digital with 12 bit resolution, then automatically scaled, without making manual calculations or entering constants, by the unit's CPU to either a 10 bit or 12 bit for transmission. Signal conditioners shall be provided to convert signals to a 4-20 mA signal where necessary. J. The PLC shall have at a minimum the following communications requirements: 1. One (1) Ethernet Port 2. One (1) Serial Port K. All 1/0 modules shall be individually replaceable without removing power to the unit. L. Power supply shall be 120 VAC. M. The PLC programming software shall be compatible with the IEC 1131-3 standard protocol. 2.07 PRESSURE GAUGES A. Pressure gauges shall meet the following requirements: 1. Use: Pressure reading for sanitary sewer force main. 2. Liquid fill: Glycern 3. Dial: White aluminum with black markings. 4. Dial size: 4 inch minimum. 5. Case & Ring: Aluminum 6. Accuracy: 1/2 % of full scale (Grade 2A). 7. Stem connection: Back. 8. Gauge reading: Combination reading in psi and feet of water (ft) with range as follows: a. Holly Ridge: 0-160 psi (0-370 ft) b. Summerhouse: 0-100 psi (0-231 ft) c. Reclaimed Water: 0-60 psi (0-139 ft) 9. Equipped with a stopcock and a diaphragm isolator for use with sewage. 10. Mounted on piping in the valve box. Provide accessories as necessary so gauge shall face up with numbers reading towards access hatch. B. Provide a 1/4-inch tap on each effluent pipe for pressure gauge. 2.08 ACCESS HATCH A. Provide access hatches in conformance to the following requirements: 1. Size as indicated on the Drawings. The size on the Drawings is for the required minimum clear opening. Unless specifically indicated on the Drawings the doors can be single or double door as required for opening size. 2. Frame shall be aluminum extrusion and aluminum checkered tread plate for the door(s). Frame shall be equipped with necessary anchors for setting in concrete. Hinges, nuts, bolts, and washers shall be stainless steel and tamper proof from outside. 3. Design and construct hatches for a minimum 300 lb. live load unless an H2O load is indicated on the Drawings. SE Area Wastewater Capacity Improvements Submersible Non -Clog Pump Station- 11307-10 Contract 1: Transmission 4. Provide the following: a. Bituminous coating at locations, which will have contact with concrete. b. Waterproof hatch where indicated on the Drawings. c. Positive open door latch. d. Retractable lifting handle. e. Double doors shall be interlocked. f. Padlocking provision. Provide lock for each hatch and keyed alike for multiple hatches. g. Provide a stainless steel interior automatic slam lock with an interior operating handle. The lock shall be operated from the outside by a removable handle key. h. Provide doors requiring greater then a 50 lb lift with a stainless steel spring assist. 5. Hatches shall be of one manufacturer. 2.09 YARD HYDRANT A. For Summerhouse Pump Station, provide a non -freeze, self draining, post type yard hydrant with wheel handle operator. Interior parts and casing shall be bronze with cast aluminum casing guard. Seat washer shall be replaceable. Drain port shall be a minimum of 1/8-inch diameter. Hydrants shall have a 3/4-inch hose bib and a 3/4- inch inlet. 2.10 SIGN A. Provide a metal sign shall be a minimum read "Owner's name number." PART 3 EXECUTION mounted on the fence at the gate to the pump station. Sign of 18 inches square and white with blue lettering. Sign shall Name of Station Pump Station, Emergency Contact Phone 3.01 WET WELL AND VALVE VAULT A. Wet Well Testing 1. Test wet well for water -tightness. Perform water -tightness test in the presence of the Engineer. 2. Water -tightness test shall be in accordance with ACI 350. IR "Testing Reinforced Concrete Structures for water -tightness." Plug influent line and fill wet well with water to 6-inches below the force main pipe. Allow water to sit for 24 hours to allow for absorption by the concrete. There shall be no loss of water over a 24 hour period. If the water level has dropped the test may be run again at the Contractor's option. If the test fails a second time, the interior of the wet well shall be coated with water proofing compound and the wet well retested. 3. Vacuum test may be used upon approval of the Engineer. Test shall meet the requirement for manhole testing as indicated in Section, Sanitary Sewer Systems. 4. Submit record of test signed by the Contractor. 3.02 WATER SERVICE TO PUMP STATION SITE A. Provide water service to the pump station site as indicated on the Drawings. The service shall include, but not be limited to, the tapping of the existing water main, installation of the service piping, meter box, backflow preventer and yard hydrant. SE Area Wastewater Capacity Improvements Submersible Non -Clog Pump Station- 11307-11 Contract 1: Transmission B. Yard hydrant shall be as indicated on Drawings. 3.03 INSTALLATION A. Install pumps in accordance with manufacturer's installation instructions. B. Level base. C. Provide electrical work in accordance with Division 16. Coordinate electrical service to site with local power company. D. Mount pressure gauges as described above. 3.04 START UP SERVICES A. Provide the services of manufacturer's representative to check the pump station installation, supervise initial start up, and instruct Owner's personnel in proper operation and maintenance of the pumps and appurtenances. A minimum of two separate trips to the site will be required, each consisting of a minimum of one 8 hour working day. Regardless of the time spent at the site, services will not be considered complete until the pump station operates as intended for a minimum of one (1) week of operation. B. Operate pump station under actual field service to demonstrate that all equipment performs to the specified criteria flow capacity and head conditions. During the field test, make adjustments as necessary for proper operation. Adjust impeller size as necessary to meet field conditions. C. Manufacturer's recommended start up tests shall be performed according to the installation schedule. Start up tests shall include the following as a minimum: 1. Data for each pump under operating conditions: a. Amperage reading. b. Pressure head reading. c. Drawdown flow test. 2. Pull out each pump and reinstall using guide rails and hoist. 3. Test alarm condition for high flow. 4. Test auxiliary contacts. 5. Test float control system. D. Submit copy of tests and checks performed in the field, complete with recordings, where applicable, to the Engineer. 3.05 PAINTING A. Provide touch up of exterior paint system as appropriate. END OF SECTION SE Area Wastewater Capacity Improvements Submersible Non -Clog Pump Station- 11307-12 Contract 1: Transmission