HomeMy WebLinkAboutSW5240301_Supplemental Info Review_20240703 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 7/3/2024 8:57:25 AM(Supplemental Submittal)
Accept by bethany.georgoulias 7/8/2024 7:31:26 AM(Supplemental Info Submittal)
0 Project name and owner doesn't match BIMS for this permit number, but B. Holland verified the new
project name.
• The task was assigned to DEMLR Post-Construction Team 7/3/2024 8:57:26 AM
• The task was assigned to bethany.georgoulias by round robin distribution 7/3/2024 8:57:26 AM
=DEQ •
Submittal from 7/3/2024
Permit Information:
Please provide specific permit details below.
................................................................................................................................................................................................................................................................................................................................................................................................
What Type of Permit? Choose one:
* NPDES Industrial or MS4 Permit
State Stormwater(Post-Construction)Permit
Other
Permit Number* SW5240301
Begins with"SW","NCG",or"NCS"
What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact.
the Primary Contact? Central Office
*
Washington Regional Office(Attn: Carl Dunn)
Wilmington Regional Office(Attn:Christine Hall)
................................................................................................................................................................................................................................................................................................................................................................................................
Project Name* Juniper Ridge Subdivision
Owner/Operator* GreyHill Development, LLC
County: Nash
Submitter Name:* Briana Eddy
Who is submitting this information?
E-mail Address:* beddy@joynerkeeny.com
Phone Number* 2524287146
Additional E-mail for fletcher@futrellproperty.com
Submittal (Optional)
Confirmation:
State Stormwater (Post-Construction) Information Uploads
Choose file type and upload attachment(Reviewer may remove unnecessary submittals)
File Type* Application Form
File Upload Click the upload button,or drag and drop files to attach
Application Page 3.pdf 350.72KB
Only PDF files are accepted.
File Type* BUA Allocations
File Upload Click the upload button,or drag and drop files to attach
JuniperRidgeBUAlotsV2.pdf 80.42KB
Only PDF files are accepted.
File Type* Deed Restriction/Protective Covenant Form
File Upload Click the upload button,or drag and drop files to attach
Signed Deed Restriction.pdf 647.93KB
Only PDF files are accepted.
File Type* Design Calculations
File Upload Click the upload button,or drag and drop files to attach
JuniperRidgeDitchCalc.pdf 561.51 KB
Only PDF files are accepted.
File Type* O&M Agreement/Plan
File Upload Click the upload button,or drag and drop files to attach
SignedO&M.pdf 1.16MB
Only PDF files are accepted.
File Type* Plansheet-Proposed Conditions/Site Plan
File Upload Click the upload button,or drag and drop files to attach
C-04A_Post Construction Stormwater.pdf 840.59KB
Only PDF files are accepted.
File Type* Supplement-EZ Form
File Upload Click the upload button,or drag and drop files to attach
S u p p E Z-2020-Version-2.1.3-20201203-D E M L R-
936.96K6
SW_JuniperRidge.pdf
Only PDF files are accepted.
File Type* Response To Comments
File Upload Click the upload button,or drag and drop files to attach
RESPONSE_LTRJuniper_Ridge_StateStorm#3_2...
237.87KB
07-03.pdf
Only PDF files are accepted.
Is this project funded No
with ARPA grant Yes
funds?*
Uploads contain NO
Confidential YES
Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant
or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided
by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)].
Notes about the attachments:
Updated per Comment letter 6/20/24;will mail sealed originals
* By checking the box and signing box below, I certify that:
o I have given true,accurate,and complete information on this form;
o I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the
NC General Statutes(the"Uniform Electronic Transactions Act")
o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes
(the"Uniform Electronic Transactions Act');
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature;AND
o I intend to electronically sign and submit the Supplemental Information Upload form.
Full Name:* Briana Eddy
Signature:
Date Submitted: 07/03/2024
Initial Review
Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary.
SW5240301
Who needs a Copy?* Reviewer selections will only be required for offices checked here.
Central Office Staff
Regional Office Stormwater Contact
State Stormwater RO Staff
No Copy Needed
Central Office Reviewer:*
Notifies CO Staff with Email
Brianna Holland
Any Comments or BIMS project name and owner doesn't for this permit number(Brianna H.verified
Added Info for CO project name had changed).
Staff Reviewer?
Review Date* 07/08/2024