HomeMy WebLinkAbout20240435 Ver 1_More Info Received_20240625 (3)Baker, Caroline D
From:
Alex Berlick <aberlick@sehinc.com>
Sent:
Tuesday, June 25, 2024 2:19 PM
To:
Krystynka.B.Stygar@usace.army.mil; Dailey, Samantha J CIV USARMY CESAW (USA)
Cc:
Harbour, Jeff W; Homewood, Sue; Christopher Cole; Debbie Joyce
(debbie@snakerive rdevelopment.com); Kenton Brose; Charles Pearman; Sarah Cole
(sarah@snakeriverdevelopment.com); Kory Reimann
Subject:
[External] Caleb's Creek Subdivision - SAW-2015-01697 - Kernersville, NC
Attachments:
20240625 - Utility Crossing Memo.pdf
Follow Up Flag:
Follow up
Flag Status:
Flagged
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook
menu bar on the Home tab.
Good afternoon Krysynka and Sam,
Hope all is well. As we discussed on site a few months ago, construction is progressing at Caleb's
Creek. Unfortunately, directional drilling costs have escalated significantly. I'm reaching out today to see if we
can get permission to proceed with two utility crossings as "open cut" construction instead of "directional drilling"
prior to us receiving approval of the overall permit(s) for the entire project. Please see the attached memo and
click the links below to download the associated documents related to the request.
20240624 - Utility Crossing Memo \u0026 Details
Please don't hesitate to reach out with any questions. We would be happy to facilitate a virtual meeting if further
clarification is required.
Lastly, we have not yet received comments from the USACE on the overall impact permit(s). Please let us know if
there is anything outstanding on our end so we can expedite this process.
Thankyou again for your consideration and cooperation through this process,
Alex
Alex Berlick I Civil Engineering Group
Short Elliott Hendrickson Inc.
507.254.4495 mobile 1507.288.6464 main
Building a Better World for All of Us@
Follow SEH on Linkedln