Loading...
HomeMy WebLinkAbout310457_Compliance Evaluation Inspection_20240626 ivision of Water Resources / Facility Number - r�� 0 Division of Soil and Water Conservation ✓ 0 Other Agency Type of Visit: ,,o/mpliance Inspection Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: �y Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: ZE Arrival Time: Departure Time:1 2.3?1-)—] Count Region: Farm Name: s ek) V I(� 'G=tt,/"t� Owner Email: Owner Name: V 9 G I4 Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: NLJ5 5 I-y-s? Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish 3; Layer —� DairyCow Wean to Feeder Non-Layer Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey POUItS Other Discharp_es and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes [g"No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑ Yes [f No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes (off ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes Q-N-o ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 511212020 Continued Facility Number: 31 - 4tT7 Date of Inspection: Waste Collection&Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes ❑No ❑ NA ❑ NF a.If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ N f Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): Observed Freeboard(in): *3 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Eg'No ❑ NA ❑ NE (i.e., large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ED-No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes Ea"No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes EgAo ❑ NA ❑ NE maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need Yes [ - o ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes I_,4o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [gNo ❑ NA ❑NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes �o ❑ NA ❑NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ®No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [gll�0 ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes P<1 ❑ NA ❑ NE Required Records& Documents 19. Did the facility fail to have the Certificate of Coverage& Permit readily available? ❑ Yes [ No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes [D]No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists [—]Design [—]Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes []No ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and V Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? [:] Yes ENo ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes Lj-/No ❑ NA Dd Page 2 of 3 S11212020 Continued Facility Number: - Date of inspection: Z 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [g�No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes [!3/No ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ED-< ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes [:] No [�]NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes [t*No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑'No ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [.�fvo ❑ NA ❑ NE permit?(i.e.,discharge, freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA E]-16 ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [3/No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [TNo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes E4//o ❑ NA ❑ NE Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility 1to better explain situations(use additional pages as n�ec,,esssary). Reviewer/Inspector Name: 1A 4V k6 0 Phone: -I (d -'716-22—,N Reviewer/Inspector Signature: Date: JG/71 Page 3 of 3 511212020