HomeMy WebLinkAboutSW8091210_Historical File_20240315 TIDEWATER ASSOCIATES , INC . tic
ENGINEERS • SURVEYORS • PLANNERS
E5T.1961 CEDAR POINT, NORTH CAROLINA * JAN 08 2024
t+,
VIA EMAIL AND MAIL DELIVERY
Mr. Thom Edgerton January 4th, 2024
Environmental Engineer
NCDEQ—Stormwater Section
127 Cardinal Drive Extension
Wilmington,NC 28405
RE: Stella Landing Subdivision
Stormwater Transfer Review
Permit SW8 091210
Dear Mr. Edgerton:
This letter is in response to your review comments relating to the stormwater permit transfer for Stella
Landing Subdivision dated December 7th, 2023. Responses to your comments are addressed below:
1. Correct,since the project has not yet been built we are submitting the Division's low density
residential subdivision deed restrictions&protective covenants form. We will eventually pursue
a permit modification once the permit has been transferred. Until that time,the deed restrictions
form is being submitted based on the Lot count and BUA distribution as currently permitted.
Please find enclosed Two(2)originals of the Division's low density residential subdivision deed
restrictions &protective covenants form with associated BUA Chart. If you need any additional
information to transfer this permit,please contact me.
Sincerely,
TIDEWATER ASSOCIATES,INC.
Jonathan L. McDaniel,PE
Vice President
ec: Mrs.Jennifer Ward
CP#21268
ADMIN/Letters/Edgerton.StellaLanding.Transfer.ReviewComments.01.4.24
604E Cedar Point Blvd. I Cedar Point, NC 28584 I (252) 393-6101
Firm License Number F-0108 I www.tidewaterenc.com
ROY COOPER
Governor �+
ELIZABETH S.BISER awIr•
t9r Iyf ✓
Secretary
�'
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Interim Director Environmental Quality
December 7,2023
Via email only: Jennifer a?sorrthstatedevelopmenLcom
South State Development,LLC,proposed permittce
Attn.Jennifer Ward;Member
121 Garnet Lane
Jacksonville,NC 28546
Subject: Request for Additional Information
State Stormwater Management Permit No.SW8 091210
Stella Landing
Carteret County
Dear Ms. Ward:
The Wilmington Regional Office of the Division of Energy,Mineral and Land Resources(DEMLR)received and
accepted a signed Permit Transfer Application Form for the subject project on May 17,2023 with additional
information requested on August 15,2023 and received on September 15,2023. The successor-owner of the
property has requested to transfer the permit without consent of the permit holder in accordance with 15A NCAC
02H.1045(1)(c)and G.S. 143-214.7(c5). A preliminary in-depth review of the documentation submitted with the
transfer request determined that the application is incomplete and that additional information is needed.
Since the transfer was submitted under 15A NCAC 02H.1045(1)(c)and G.S. 143-214.7(c5), please provide the
following documentation in a single,hard copy submittal package to complete the application:
1. 15A NCAC 02H.1045(2)(e):
a. The following was requested as item 2 in the Additional Information Request dated August 15,
2023:
i. Please provide the recorded deed restrictions and protective covenants limiting the
maximum allowed built-upon area for the lots with original signatures.
ii. Since the project has not been built,please provide a signed agreement to submit the final
recorded deed restrictions and protective covenants. Examples of a signed agreement and
proposed language is available on the Division website at:
https://deq.nc..gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-
rules/stormwater-program/post-construction
b. Clarification? Thank you for submitting the deed restrictions form on September l 5,2023.
However,the impervious area per lot values listed on that form would set the impervious area as
3,285 square feet for each lot. The impervious area per lot values in the current permit are listed
in Attachment A included below. A permit transfer application only changes the ownership of
the permit. If changes to the impervious area per lot are needed,that would require a permit
modification. Please provide signed and notarized deed restrictions indicating that the
impervious area per lot will be as listed in Attachment A. Otherwise,please also apply for a
permit modification revising the values to 3,285 square feet for each lot.
All of the requested information listed above should be received in this Office by January 8,2024 in accordance
with 15A NCAC 02H.1045(4)(a)(i). Please note that only two letters requesting additional information is
allowed in the State Stormwater Program, this being the second. If the requited information is not satisfactorily
provided by this date,the project will be returned in accordance with 15A NCAC 02H.1045(4)(a)(ii). If the
project is returned and you wish to re-submit later,you will need to resubmit all required items at that time,
including the application fee.
t.
,7 North Carolina Department of Environmental Quality 1 Division of Energy.Mineral and Land Resources Wilmington Regional Office • 127 Cardinal Dove Extension I Wilmington North Carolina 28405
ltof 910.796.7215
State Stormwater Permit No. SW8 091210
Page 2 of 3
Please note that if,upon review of the submitted information or upon a deficient compliance inspection of the
project, it is determined that a major modification to the permit is required to resolve the compliance issues,the
transfer application will be returned as incomplete.Upon the issuance of the modified permit,and the successful
completion of any work required by the modified permit and/or the restoration of the site to design condition,the
applicant will need to submit an updated transfer application and a new fee to the Division to start the transfer
process over again.
Please remember that the permittee is responsible for complying with the terms and conditions of the permit and
the approved plans and specifications until the Division approves the transfer request.
Please reference the State assigned permit number regarding all correspondence. If you have any questions
concerning this matter,please feel free to call me at(910) 796-7215 or email me at thom.edgerton@deq.nc.gov.
Sincerely,
Woot Eitas
Thom Edgerton
Environmental Engineer
Enclosure: Compliance Inspection Report
DES/tae: G:\\\Stormwater\Permits&Projects\20091091210 LD\2023 addinfo 091210
cc: Jonathan McDaniel PE,Tidewater Associates,Inc.;via email:jmcdaniel(a_dtidewaterenc.coin
M&M Land Development,Inc;James E. Maides,President;via email .jamesmaides@a csbenc.com
Ashley Smith,Wilmington Regional Office Permitting Assistant;via email
Wilmington Regional Office Stormwater Permit File
ZNorth Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources
D E.-------, Wilmington Regional Office i 127 Cardinal Drive Extension I Wilmington.North Carolina 28405
WJft'll:,p xil Fit. '^
n�yeme.t`eta sebaNdia 910.796.7215
State Stormwater Permit No SW8 091210
Page 3 of 3
Attachment A
STELLA LANDING
BUA Allocation Chart
Lot# BUAAVL) '
1 3115
2 3,115
3 3,115
4 3,635
5 4,100—
6 3,635
3,636
8 3,115
9 • 3,tin
- 10 3,115
11 3,115
12 3,115
13 3,115
14 3,115
15 j 3,115
16 3,115
17 3,115
18 3,116-
_
19 3,635
20 3,635
L 21 3,635
n 3,1 i5
23 3,115
24 3,115
25 3,115
_26 _ 3,115
273115
28 3,635
29 4,100
30 3,115
— 3
--
32 _4_
33 i 3,115
Lot BUA sq.ft. =1 108,4051
Road so.ft. = 45,8771
Total BUR 15282i
Total BUA 158,282N.ft,
Project Area - t318,997sq.ft. - 12.0 %
North Carolina Depar meat a t Environmental Quality Division Et*rgy.Weral and Land Resources
WilnhunonRegionsl Office l fi
WilrMrigton,North Carolina 28405
4..tiNsde 9K/79b1215
Edgerton, Thom
From: Edgerton,Thom
Sent: Thursday, December 7,2023 4:46 PM
To: Jonathan McDaniel;jennifer@southstatedevelopment.com
Cc: Hal!, Christine; Smith,Ashley M;jamesmaides@csbenc.com
Subject: Stella Landing Additional Information Request SW8 091210
Attachments: 2023 12 addinfo 091210.pdf
All,
Attached is a pdf of the request for additional information for the subject project. There are just a few items that need
to be addressed. Please note that the requested information is to be received in this office by January 8,2024,and feel
free to let me know if you have any questions or concerns.
Thanks!
Thom
Thom Edgerton
Environmental Engineer
Division of Energy,Mineral,and Land Resources—State Stormwater Program
North Carolina Department of Environmental Quality
Updated Direct#: 910 796 7344
Email: thom.edgerton a(�•deq.nc.00v
Address:127 Cardinal Drive Ext.
Wilmington,NC 28405
D_E
\195)
Er';ail ct::respo.:dence to cm"ft th,address• s: r ct to the
R•-CFr o!ina Public R cordaL:... ar.:t may i ais...lsedtothe!dparraz
1
Johnson, Kelly
From: Johnson, Kelly
Sent: Wednesday, December 6, 2023 2:36 PM
To: Edgerton,Thom
Cc: Hall, Christine
Subject: FW: Stella Landing - SW8 091210
Attachments: 2023 12 Checklist 091210 DRAFT.docx
Thom,
Here are my recommendations.
1. Deed Restrictions: When you asked me if a deed restrictions form needed a list of lot numbers yesterday or if
they could have a single value written on the form, I did not realize that there would be a BUA/lot change
associated with a permit transfer. I thought it was a general question about whether or not they needed the list
of lots attached to the form. None of the permitted elements should change for a transfer. The current SW8
091210 permit does not have the same BUA per lot for all lots, and those same values should go forward with
the permit transfer. If they want to go from having lots at a varying BUA/lot to having all lots at the same
BUA/Iot then that is a modification. They need to submit the deed restrictions form signed by the incoming
permittee indicating they will transfer the permit as-is, listing the current BUA/lot that is written in the current
permit. Then at a later date they can apply for a modification to change the BUA/lot allocation. (FYi,sometimes
we do a minor modification with a permit transfer in one letter with both forms. in those cases it is so the
outgoing permittee can achieve compliance which requires a modification prior to transferring the permit to the
incoming permittee. In those cases the outgoing permittee signs the modification form and it is processed ahead
of the permit transfer. We give them a "quick modification"because it is part of achieving compliance. Here, the
transfer form is only signed by the incoming permittee. That entity will have to sign the modification form. I do
not recommend the "quick modification"here because it is not necessary to get the permit in compliance and
transferred. That would be hurrying them through the modification review process.)
2. Inspection: When i first saw that there were two BIMS reports for this I thought it was because there were to
inspection events. After we talked, it turns out that one of them was a draft that did not get deleted. I
recommend deleting the original draft May BIMS report and renaming the one that was re-written in August as
2023 05 CEI_BIMS 091210.
Thanks,
Kelly
KeLL _pi/In sot&
Kelly Johnson
Environmental Engineer
NC Division of Energy, Mineral and Land Resources
Stormwater Permitting
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Phone: 910.796.7335
kelly.p.johnson@deq.nc.gov**New Email Address**
Effective October 3'a 2023,permit fees have increased as a result of recent legislation. For more information on
the new fees,please refer to Section 12.14(a)of House Bi!i 259. The website and forms are in the process of
being updated to reflect these new fees.
1
From: Hall, Christine<Christine.Hall@deq.nc.gov>
Sent:Tuesday,August 15,2023 3:45 PM
To:Johnson, Kelly<kelly.p.johnson@deq.nc.gov>; Edgerton,Thom <thom.edgerton@deq.nc.gov>
Subject: RE:Stella Landing-SW8 091210
Kelly,
I agree it's time to use the new checklist. I can show you how I've protected documents recently.
Christine Hall, PE(she/her/hers)
Wilmington Regional Storm water Program Supervisor
Division of Energy, Mineral and Land Resources—Post Construction Stormwater Program
North Carolina Department of Environmental Quality
Office: (910)796-7339
Address: 127 Cardinal Drive Ext.,Wilmington, NC 28405
christine.hall@deq.nc.gov**effective May 23',2023**
Einail correspondence to and from this address is su.',eot to tie
North Carona Public Records Law and may be divc'osed to third parties.
From:Johnson, Kelly<kelly.p.iohnson@deq.nc.gov>
Sent:Tuesday,August 15,2023 3:39 PM
To: Edgerton,Thom<thom.edgerton@deq.nc.gov>
Cc: Hall,Christine<Christine.Hall@deq.nc.gov>
Subject:Stella Landing-SW8 091210
Hi Thom,
I think this Addlnfo is ready. In the future I would recommend that you save the checklist on the G drive
electronically. That way we have a record of what we found during the review.
Christine,
It might be a good time to transition to the new transfers checklist(Transfers Process_Checklist_2023 08 15)and stop
using the old one(Checklist_Transfers Process_DRAFT 2020 09 08_reprotected). I will need to remember/Google how
to protect documents and get whatever the current common password is from you to do that. The old checklist is from
before (c5). I have been using the new one for quite some time now. I have kept a list of updates, and made all of
those this afternoon. Please let me know if you agree.
Kelly
Joliln,sol.,
Kelly Johnson
Environmental Engineer
NC Division of Energy, Mineral and Land Resources
Stormwater Permitting
127 Cardinal Drive Extension
2
" 1 '. TIDEWATER ASSOCIATES , INC .
A ENGINEERS • SURVEYORS • PLANNERS
CEDAR POINT, NORTH CAROLINA am. `
EST.1961 -
,/- /5 .)
LETTER OF TRANSMITTAL 4'?
•
TO: Ms. Christine Hall,PE DATE: September 13th,2023
NCDEQ - Stormwater Section REF: Stella Landing
127 Cardinal Dr. Ext. Carteret County,NC
Wilmington,NC 28405-3845 Stormwater Review Comments
WE ARE SENDING YOU:
This letter is a response to your review comments dated August 15th,relating to the Stormwater Permit
Transfer for Stella Landing Subdivision. One (1) original of the operation and maintennce agreement
(0 & M) agreement form, One (1) origional of the Low Density Residential Subdivisions Deed Restrictions
& Protective Covenances Form.
DELIVERY VIA:
El Regular Mail 0 Hand 0 Federal Express
❑ UPS Overnight 0 UPS Ground El Other Email
Christine.Hallancdenr.gov
THESE ARE TRANSMITTED AS CHECKED BELOW:
I] For Approval ❑x As Requested ❑ For Review and Comment
❑ For Your Use El For Rids Due
❑ Other
COMMENTS:
__7Z2 .....-
Annalei M. Beaudet
Staff Engineer
Copies To: South State Development (w/enclosures)
JLM CP#21268
(f enclosures are not as noted, kindly notify us at once)
AMKB/Stella Landing/Hall.StellaLanding.SWTrans.RevComments.9.13.23
604E Cedar Point Blvd. I Cedar Point, NC 28584 I (252) 393-6101
Firm License Number F-0108 , www.tidewaterenc.com
Johnson, Kelly
From: Johnson, Kelly
Sent: Tuesday,August 15, 2023 3:39 PM
To: Edgerton,Thom
Cc: Hall, Christine
Subject: Stella Landing - SW8 091210
Hi Thom,
I think this Addlnfo is ready. In the future I would recommend that you save the checklist on the G drive
electronically. That way we have a record of what we found during the review.
Christine,
It might be a good time to transition to the new transfers checklist(Transfers Process_Checklist_2023 08 15) and stop
using the old one (Checklist_Transfers Process_DRAFT 2020 09 08_reprotected). I will need to remember/Google how
to protect documents and get whatever the current common password is from you to do that. The old checklist is from
before (c5). I have been using the new one for quite some time now. I have kept a list of updates, and made all of
those this afternoon. Please let me know if you agree.
Kelly
fCeLI,I joliV1.501A,
Kelly Johnson
Environmental Engineer
NC Division of Energy, Mineral and Land Resources
Stormwater Permitting
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
Phone: 910.796.7335
kelly.p.johnson(a7deq.nc.gov**New Email Address**
1
ROY
COOPER
eommg- '. ;
ELIZABETH S.RISER ,,,• :' i
Secretary `�a�v+v►+� ,..
DOUGLAS R.ANSEL NORTH CAROLINA
interim Director lnvinu Mentcl Quality
August 15,2023
Via email only: ienniferasouthstatedevelopmenLcom
South State Development,LLC,proposed permittee
Attn: Jennifer Ward;Member
121 Garnet Lane
Jacksonville,NC 28546
Subject: Request for Additional Information/Notice of Inspection
State Stormwater Management Permit No. SW8 091210
Stella Landing
Carteret County
Dear Ms. Ward:
The Wilmington Regional Office of the Division of Energy,Mineral and Land Resources(DEMLR)received and
accepted a signed Permit Transfer Application Form for the subject project on May 17,2023. The successor-
owner of the property has requested to transfer the permit without consent of the permit holder in accordance with
15A NCAC 02H.1045(1)(c)and G.S. 143-214.7(c5). A preliminary in-depth review of the documentation
submitted with the transfer request determined that the application is incomplete and that additional information is
needed.
Since the transfer was submitted under 15A NCAC 02H.1045(1)(c)and G.S. 143-214.7(c5), please provide the
following documentation in a single,hard copy submittal package to complete the application:
1- 15A NCAC 02H.1045(2)(d): The operation and maintenance agreement(O&M)submitted is a copy and
not the original notarized signatures. Please provide the O&M with original signatures.
2. 15A NCAC 0211.1045(2)(e):
a. Please provide the recorded deed restrictions and protective covenants limiting the maximum
allowed built-upon area for the lots with original signatures.
b. Since the project has not been built,please provide a signed agreement to submit the final
recorded deed restrictions and protective covenants. Examples of a signed agreement and
proposed language is available on the Division website at:
https J/deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-
rules/stormwater-program/post-construction
Notice of Inspection
On May 31,2023,the Wilmington Regional Office of the Division of Energy,Mineral and Land Resources
(DEMLR)inspected the subject project to determine the status of compliance with this permit,most recently
issued on March 9,2010. A DEMLR file review and site inspection revealed that construction has yet to consist
of built upon area and determined as compliant. Please be reminded;the site is to be maintained per the terms and
conditions of the SW8 091210 permit approved March 9,2010. A copy of the completed form entitled
"Compliance Inspection Report" summarizing the findings of the recent inspection is attached to this letter.
All of the requested information listed above should be received in this Office by September 14,2023 in
accordance with 15A NCAC 02H.1045(4)(axi). Please note that only two letters requesting additional
information is allowed in the State Stormwater Program, this being the,first. If the required information is not
satisfactorily provided by this date,the project will be returned in accordance with 15A NCAC
02H.1045(4)(a)(ii). If the project is returned and you wish to re-submit later,you will need to resubmit all
required items at that time, including the application fee-
E North Carolina Depa''Intent of Environmental(�tality I Division of Energy.Mineral and Land liesources
sm.ii**e._ _C/ l0 Wilmington Regional Office j 127 Cardinal Drive Extension! Wilmington,North Caroline 28405
rurrrsas areS 910.746.7215
State Stormwater Permit No. SW8 091210
Page 2 of 2
Please note that if,upon review of the submitted information or upon a deficient compliance inspection of the
project, it is determined that a major modification to the permit is required to resolve the compliance issues,the
transfer application will be returned as incomplete.Upon the issuance of the modified permit,and the successful
completion of any work required by the modified permit and/or the restoration of the site to design condition,the
applicant will need to submit an updated transfer application and a new fee to the Division to start the transfer
process over again.
Please remember that the permittee is responsible for complying with the terms and conditions of the permit and
the approved plans and specifications until the Division approves the transfer request.
Please reference the State assigned permit number regarding all correspondence. If you have any questions
concerning this matter,please feel free to call me at(910) 796-7215 or email me at thom.edgerton(adeq.nc.gov.
Sincerely,
Woof Solfertmt
Thom Edgerton
Environmental Engineer
Enclosure: Compliance Inspection Report
DESitae: G:\\\Stormwater\Permiis&Projects12009\091210 LD12023 08 addinfo CI l._coinnliwu 091210
cc: Jonathan McDaniel PE; Tidewater Associates,Inc.;via email.jmcdaniel(tidewaterenc com
M&M Land Development,Inc;James E. Maides,President;via email:jamesmaides@csbenc.corn
Ashley Smith,Wihnington Regional Office Permitting Assistant;via email
Wilmington Regional Office Stormwater Permit File
r
North Carolina Department:if Environmental Quality Division of Energy.Nfineral and Land Pesources
00401 "Z�EWilmington Regional Office 127 Cardinal Drive Extension• Wilmington North Carolina 213405
,w.aoirr wo.ra � 910196.7215
Compliance Inspection Report
Permit: SW8091210 Effective:03/09/10 Expiration:
Project: Stella Landing
Owner: M&M Land Development
County: Carteret Adress: E Wetherington Landing Rd
Region: Wilmington
City/State/Zip: Stella NC 28582
Contact Person:James E Maides Title: Phone:910-938-5900
Directions to Project:
Entrance is 1150'east of intersection of Stella Rd and Wetherington Landing Road.
Type of Project: State Stormwater-Low Density
Drain Areas:
On-Site Representative(s):
Related Permits:
Inspection Date: 05/31/2023 Entry Time 12:35PM Exit Time:01:OOPM
Primary Inspector: Creighton A Brown Phone:910-796-7215
Secondary Inspector(s):
Thom Edgerton
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: State Stormwater
Facility Status: • Compliant ❑ Not Compliant
Question Areas:
El State Stormwater
(See attachment summary)
page 1
Permit: SW8091210 Owner Project: M&M Land Development
Inspection Date: 05/31/2023 Inspection Type Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Project was started but currently inactive. The inspection pictures are on the G Drive. No BUA on site.
Please note: the site is to be maintained per the terms and conditions of the active site permit SW8 091210.
The operation and maintenance (O&M) agreement on file is to be the original signed and notorized form which
includes the projects maintenance requirements.
When the permit transfer permit is issued, the project certification form will be attached and is to be completed
and submitted to become a part of the permit file when the project construction is completed.
page 2
Permit: SW8091210 Owner-Project: M&M Land Development
Inspection Date: 05/31/2023 Inspection Type Compliance Evaluation Reason for Visit: Routine
File Review Yes No NA NE
Is the permit active? • El ❑ ❑
Signed copy of the Engineer's certification is in the file? ❑ E ❑ O
Signed copy of the Operation & Maintenance Agreement is in the file? ■ ❑ ❑ ❑
Copy of the recorded deed restrictions is in the file? • ❑ El ❑
Comment: The transfer application notes never built, however some swales and basins were previously
added with sparsely vegetated stabilization added.
Built Upon Area Yes No NA NE
Is the site BUA constructed as per the permit and approval plans? El El • ❑
Is the drainage area as per the permit and approved plans? ❑ ❑ • ❑
Is the BUA(as permitted) graded such that the runoff drains to the system? ❑ ❑ ■ El
Comment: No BUA constructed.
SW Measures Yes No NA NE
Are the SW measures constructed as per the approved plans? • El ❑ ❑
Are the inlets located per the approved plans? • 0 El El
Are the outlet structures located per the approved plans? El ■ ❑ ❑
Comment: Project was started but currently inactive. There is no BUA. Swales and LS Basins were
installed without other site construction.
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? El II El ❑
Are the SW BMP inspection and maintenance records complete and available for review or ❑ El ❑
provided to DWQ upon request?
Comment: Swales& Basins installed without further site construction.
Other Permit Conditions Yes No NA NE
Is the site compliant with other conditions of the permit? El ❑ El II
Comment:
Other WQ Issues Yes No NA NE
Is the site compliant with other water quality issues as noted during the inspection? El El El •
Comment:
page 3
Edgerton, Thom
From: Edgerton,Thom
Sant: Tuesday,August 15' 2O234:42PM
To: ]onmthanK4cDanie|; 'ennifer@southstatedeve|opment.com
Cc: HaU' [hhstine; Smith,Ash|eyM; 'ameunmmides@csbenc.com
Subject: Stella Landing Additional Information Request-S\N809121O
Attachments: 202308addinfo091210.pdf, 202308[E|_[omp|imnt091210.pdf
All,
Attached is a pdf of the request for additional information for the subject project. There are just o few items that need
tobeaddressed. Please provide the information no later than September 14, 2023 and let me know if you have any
questions or concerns.
Thanks!
Thom
Thom Edgerton
Environmental Engineer
Division of Energy,Minuno|'and Land aauounceo—Otate omnnwate,pmgmm
North Carolina Department of Environmental Quality
Direct: e1079e7327
Updated Email: mom.ednertnnO-uwq.oc.00x
Address:127comina|on"aExt.
Wilmington,mCua400
bT q I
„ Q$K J
t o EEE3939$d3$EE35 a gg n a $: g Ao E ! gvi a ,� E '33$saIE:'a$'E p as 3 g ° aaaaaagggggg � ihg � _ a s
A. $ _ Y yy kgkg g 47 � w
�t o { SILL LL S 5 gig,11i i glEgl N ., 1 _ i�i
,� A� r 3 ,nm Cn8 iYz _
__-- . ' ~ . m'Rm g:dIS€ �EEil�l$ a �o
.— q ; s y 1 6 et //;// \r- . 00 8
_ 1 ) \ 1 1 0
\\ ��_—�\ ��� L\-- \\\\' 7 1
1
1 1 `N.
I� O \ 1/
I N ) '
ra
1
o
l i " N f/' k 1(1
Ism:�3t \ // I
�/ Li
11
I `s % r _ � _ ! 1, `� E
)/ k. V z i
iI I r �. t R
i 1
I � \
\ 1
o g 1 ry �.
1 /I .\
r-NTH �N.
( N.
1— k \
W
w I
111 roar �� \\
`/ 1
1 -
/ i I
I 1
I I
1 I
I I
I /
I /
I /
Is tl9 6F as E ;$ — ° ' vi
11 ig
irYE e § E U R. 6.iiiii , n: . 1.ie ,: ,
i .'PE,F,Ivil
@ p
$ 3` Se d 3% 5Ie 3 p aE " v=k $ n !Q#5g a ��€ �� a� ' �iwi,
15.
1/1:11 a 333 q13 E 1: an .4 F c:
e' s . . W a M y:'i
-511X 1s ..g I I\I I I 11 i
� i Vi 2
ga
U1
.sa.ew.e o-waa un.-sv+.am,.eos.°aur,s.u,
ert
JIT
Rg ➢B9�, NA
I 8
FR Pees
i In §tis_ggv, R. d Pofs £..: Q
REV_ Mg VI G I\ `\•,. , ae I 9 g3 PQ
e $ n \I� 4 //,,,, p�pP 1
3 . 1 I S1 .
42
• " I i
t.
a n 1 /� 1@Mouv . �9�g� 9 I CAI
: J
�S 7 N■
� !ru... / 1.1 F r4 a 1-EL
\.
Al *,'1141 .gASO/ \\ Lii
N C%sg, I_N \ ;
\ N \' 1. 3
@ s
ii
N. ;,'.4 = 1 1
u x 1. A% , ill Oil I :
03K \\ F 21 illI01 g:
gia ' __ / 9,
AZ g tCr!b . \\° 2 €� a
i' I rA G I ;
� N
5 ni Cl'. a I
A 1 ! A 11
\\\\A �k fl
i
!, . \ 81
k \\\ -I
it q
e Ilk Al
�----- r/ / flif
3 \
ak
% o t� i \\ $E
sar.,15 i % i \\ \
sl
_ $ $ o f \\i _ i
Fir� RPN11 $ 1 q i S4.n.is.,,rr e.'�`R g1 \ ' `;•
mmg gggig l jt La ' a� �
r-^. i r''LI - .P$P4451014/111 fig :.97..11 ; tl E t - pa 8
�< to pa 11
F, r!!' 2 Pilaignli 0 iii, ie.
'o: 9 j
s �s ! ' ""...
W — mg �ig 1$ill ;1 1 ti a m 2 Ia 8 -`' {�
02
Y'11:7
W / ` 1\ Laasi6i�gismaaW be' •k < 7 / ) a�
$a Z ` r\J \
�' \/ l
1
g a s c 9^ 1 ( \ \
s-
i p g gad a Ai / \ TA \
1 ! am"'Q
,11l
2: ` ) \\\`— i -$m 'sk.lii iI
nrax 351.u05 8 '\ " , \ \ / 1 Ia
�P J ': ,1 �e Vi y¢a
I
iiI
�3!� 6
aQ
i \ \I
/71
\ 1
\ /
\
\ \ - \ ._, a n m 4 s a
\ / 4 F n Z ,
\ \ ( QLL Y Z : 6 d
\ Jr Y
\ im m� P. a
\ \ *3 -O..ed 3 9
o-.
\ I ¢ end"
\sy�\ \ \/� o <ma g W $ 5
\ \
/' # E K' m a K 1
gDI
2 o
-,.. \-•--,R,, -(-7'
4.4
N. N. % / I 88Id m 15 ! s
\ 1 88 � c c
\ I j§; 5 i ' g
\ 1
1
\ \ y
U s4'
\ r
Z 3Nf1H31YW W k
1 \ °E..
11
1/4
g M a= e6
\ 1b6ya
\ P., a
3 \ l
}1 \`\ x
U 1
an 6rn<[o-io-w ewsfKIj%vON�Wsomtvuscr.
PO \ \ � ' 1
i\ r i' 1 — 1
n 11, // 1 uag .
.1
. ,• ,-....-/
1
,, 0 I' - ,„--4/ \ 04411 0 i
1€� . Y. II
--0..400Ti---..-c . s \ 10M111213d :. lir
...1 ...
LI
.._ i 3
—�
a \ 1
\ 1
\ \
te
v \ ; Z 3M1F101.V1 0
I \ 44} j
I\ \\ 11
o` il
! i iill 3i \\ 1\ 4.!011 {fie5erif
11
PI
I F;
iag
I \�
I -.1 \ Li
el 1 / I \ F ccJ
'Ogg 1 \ w = &
c d 4 t �� p
� �
I xX
8,14 / I
II
1 1
mJ_
IL'z I I
ill 1 1
I
fin
find / ��
` V / s E. Ei
‘4oN iff
:,- //
I , 6
-
1 -/ g
III t,
---
E.
\� ---—�� rc N4
- - - 8 Ri _
88 Mr 'es'3moa
S g �
A
0 i
li
1 g $8 �'
ii g 6 2 8 Y < ° dill 1i ! 8 • N
e i
..„i ! , g e 9 e { i AAelilSiAAiSEli 111410 u 5 0
•
i 01!111 II la i! 1 lallaaamagaiit 11/101491 i 4 1%1 1 ell
!!!
i � z �� �Nv bee�� A§G;GCG as3 3vgo
$.,= `i aieeliiQSARISi- d �i rc
3i 6
<m<
ss< ,
PXP
!”111. I 'W.Ma1'g1 3'!' aM33_33 og;a5ga?Mil6r:5 as IILI ?!I.77MintW vq*RRr` tE A!!1;A 'y
_ � _ ia7_,.:y._ci_..d�5..aaanel ! .
l ;{ r r ;r r Frr rr { {{rr; rr{ tr•F{r rr r rr r r rr E r r r Y i
Iliiiiiiiiiiiiiiii iiiiisiii iiiiiiisaiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiliiiii:iiiilifiiiiiiilli€iMil iii iI
§333A1PRi35993399i9355555555199393999993§3;3i339391§13ii33113§193339939533333y33g§9ii3§§3§1§333399333939
r
141MiliPA itlia 111114 1Minwa695614m1 :Wag6ge3?iainnt I.::95960§a100:13 In11§9:55.P
311 hi.iiiiiiiiiii:iiia 1i1 1i 1i1111 11"5i1 €iii iiiiiiiiiii iiiliff it �i iiiil
§39333533333333555555555535333339333§33i3333M3333393338333339333`333399333§33§33§33393333333315
qi9:3259i�J6§3SeiS5g36!!33l :eda :9'!g'gag3:.5.9_396di"�'JFaI"'6'3� ! �! `'�` �'! G_:ski GAS."s Li
- a a5_l_'l1_ii ae_�l�dee_eq+alll_ xIM1
1 r r rrr r rrr r r r z S 'o
FM511 its i1fi i i0i/Wle i 5= 0151M;""541 P1 reii�Yg541;55ix �i 5� Y; �6pi - * s
§a,ii;iii€iiIiiiiiiiiiailiiiiiiiiiiiiiliii6iiiiiliit6i=iiiiiiiiiiiiiiii6iiiii6966liiiiiiiiiiiiIi6i
§15113339335§913519333§333339339§iii3333i1§lgill§!33§313319313533i133113§53i33§i§3§3133333310113 w « = i
l ykik.q • kl '��� qp t k!R C ;+BgiilgC 4 kM Ak�isMMY�ik-kkk_iygkk.`d'�q'+ ��3a'r91+�i=5a.lI6a S0 a ; G a
_ l.1:t9.413>_ 3il6_.'1..3�.:'..'�:'�c�1'1c._. .�J9i9Ba!_.BA M:..."a�b.�e!_
C d
r =€ =�Y =6{� s£iEziiS 4'+�kk'�r C C "s1 A 5 5i Y Mcr 5 i e�irr� r r�6i =rr; €fi r W g .
33iiIII s9 ii55 5 3 §3339399iiii�ii9§ 91§ iiii§5 39 9 33 33 93 339339§99§i�ii3 939i33 333 39 33933 e a
1 11111tikti_ "''5'"i$9;5IPAI SMaea23')i1'l6kl�g6ggIM115 !"!!!!IS "'IE_�'"-93liK".56 M ti g kh i g
3 yRdtll�lalkidedp_kJl !__• coG__"•G_l- __:_ : � �_'199�13iai=l±cl�l Fl r �
{i r r;'r s Cr C: rYsr 7�Cssr rrSiCYg Ks# iE YKfs g F {• rr7•A
F r� " ii S i" 'sIE i l A"36 i 1 4 % "�l e== e 5 C
pp€!Ii ..Fiii iiii iiii iaiii aii¢€iii ..1111iiii ii Aiiiii ii€iai ii iiiii iii 6i i€ii€iifi iiii1iii:ii i11 iiii Li AS - ;
' �1115555s55]15s1§lllllllli3llill§all§lllll3lll§lllll9lll§li1119i'93§ssil§§3=l§llgll9l135!illlllli533
� iakie ` ka.1 i Eilks i ;kq�•�j""a 5q�j sy qkk llkkhkl 11 1Wa S 'G�{k_'!i! }kl :14 iIIkR ! �,q
§_s__■l:d���na__l� _�ldllG _�RlRGGM�Ny_Shcyrr�eaol�ddeaMdR}srdyt�}sdTaril}1C� 3sl}�MR/�dt■Ld:l�eae%areaadKdsf[�jd?wlp�GG
�� � Ei�;viir�i� �{F�iiF€r i���{j#ii=�iS� i==ik r�{��p�p si�7C��{?7sa Pip��{7 �)rt@ll[ @(r'iS�1l�F l�s rr��/P# iP b
5 is iiiiRi .iii ii ii1iiiiiiiiiai6$ii.ii aialea11.1.kaa€iiiiii1iaii.;ii. ..ilai1.i iaiAaii1i 1
§33§91§§'13§9339959§9§99iii§393513i119313§3933159995993993§33§;5,9§§331533393333959339§999 !!!!,l§
*tnlot :t �lk.g4g k=oq-44 lr 1.1-a J.'�'G'J�k � tptitl1kin.r5i .14.1.! ”.. !` k k k .Y1 ij;;r %��s4
l��_ G=== ='e_ys _llda�o____de_ l dide�Fcdad«.. 3h'l�1�.s9:i599.�1.b.3=., r�zTT E`
r { F{; { r•r{rr r•r��ii �i �i�i t �ifr. rr �ir �i r r ar r �
§'aiifiiiiil i��ii�i iiiii €i�iois6�i�iFsii i�6i � bi iiii ilaai6BiiiCi3iiiiaiii€S i�iiiiiAiiiii `*1,,, �,
§55331§99i399133§99i3393113111§19113999i999933§333339333§933;13,§3i9§99i93§933§3333393335a933993355
h'IP ' 'i`llak "ra363q="3659lNg11.:I•:ak.q.,kgi63 ° 11" " i ki; k k" i ik§:- " ti -
§ a3e .- 3e ----'________R----'ee.....a..--_ a...33d-_,d._ti3_.3-i$.9...i.i01_. .s.a3Bea$_de_
1 WEEEr=E= __ =s= {per{rE air i1W FAG =�i��i �i =�ii{= ;� 4 �is1r= i ;_{_ _ _ r== =r
i1hiiliisi6iiGiiliiiilEit65i/'.i,iiiii 111iiiiiiiiiiiiiii�aiiiiiiiiiiEA.iiiiiiiiiii;kimilliiiii€i 6
gpGR9g!!5!ipxRRrRRRapA!5111I11g1111111A1 11111g1g1111.3»>lRk:g1111!0,9g11.Ro.ilklR9§iiil99395§3355 Z
M
sqki i § 33 9 4i 6 VOI i innI k*Argr=13Yikii I k 91iq5 i .a6 Q ig
arh= iWr i _; c;iiiiiir i irrwi icgili€= ri; t=rr i r*= := i='6Es 311; "U 2' 3P�1ii;iiiiailiiiiiiii6ialiilnill iisiiiilliAAiiis6 ::i1iaiiiiipi6iii ilintills 2 AID SSc
A35595955595959559s12.IM3l9599ipipl!Mi939i9555559i56595559x559 ?9599599599;sia;eiriggspimgrm .4 sa5asii
• •E mtP.0
ri) C,11,1gr
y a W
Nq "i:i'■■k ai➢§Mik§hkyyq y as
iiil:iildlRdRddlllllldgk. 11 ` r. 5R 11011 �3
Bil�'sd�: xll¢Afi
1 ig11111111ii1i iii °iiii ! ;i'r' k
iiiiiie111111111
i
;S
]55s55n55]]]]]]]]]]5599 5
'r,
A=rrsrro Mr.026eek x V
U 2
S
ao..aw..to-.-s Maf'mn Yv.aNmiYLLs➢n
Burd, Tina J
From: Burd, Tina J
Sent: Thursday, May 18, 2023 11:08 AM
To: jennifer@southstatedevelopment.com;jmcdaniel@tidewaterenc.com
Cc: Edgerton, Thom
Subject: SW8 091210 - Stella Landing
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section)accepted
the Stormwater Transfer Permit Application and $505.00 fee for the subject project on May 17, 2023. The project has
been assigned to Thom Edgerton and you will be notified if additional information is needed.
If you have any questions about the project or status of the review, please contact Thom Edgerton (cc'd).
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Many employees are working remotely or are on staggered shifts. Please check with the appropriate staff before visiting our
offices, as we may be able to handle your requests by phone or email.
DEQ is updating its email addresses to @deq.nc.gov in phases from May 1st to June 9th.
Employee email addresses may look different, but email performance will not be impacted.
ansfer Ap• 'catio Corn.leteness Review Checklist-Short Version
Permit#: - • M 0:,.. ill", Date Delivered to WIRO: jai �n� 0A'
Project Name: !lf � RIMS Received/Accepted Date- r��.r/�
Project County/Location: Date Given to Adrnin: % tsg 23
BIMS Acknowledged Date1: I5 =, e� 23
*Permit Expiration Date* qV *If w/in 6 mo,STOP-needs renewal first. Exception:only new permittee is
—' submitting.Then transfer is logged in first
Proposed Permittee Signed Application? 4 N If N,ii will be evaluated under GS 143-214.7(c2),which requires:
Common Area Deed in HOA's Name
D50° Sold List
Current Permittee Signed Application? Y/40 If N,it will be evaluated under GS 143-214.7(c5)
Proposed Permittee Type&Documents Needed:
property Owner(s) (Purchaser Lessee DHOA Developer
cable? Viable? rViable? Viable? !�
�:_ I fVrable.
in purchase �;
-
h eed Pray base Agmt Lease I' Election Minutes
f nivut Subdivided:Deed ` Deed Restrictions Recorded
1. -_
I Subdivision: Common Area Deed L 1BUA/Lot Summary
FIO&M Of HOA Signed Applicati
Pa ork
02, / lb
*� .•plication 4
_ 15 Fee(within 6mo) Check#(s): , j.�
►�Deed Restrictions,if subdivided:
OPE Certification(if built or partially built)
ED Project Narrative
III .sements,Recorded(2017 Rules)
0 0&M on File(unless new one from HOA)
Electronic Copies
NOTES: -4 ...J
lip--
`Enter-BIMS Acknowledged Date on this Sheet
l
gliEMAILED ENGINEER DATE:
REVIEWER NAME: O01
G:\\\Reference Library\Procedures\Che_!c!ists\Completeness Review Checklist_2021 10 05
r LIMITED LIABILITY COMPANY ANNUAL REPORT
U6/2022
NAME OF LIMITED LIABILITY COMPANY: South State Development, LLC
Fling Office Use Only
SECRETARY OF STATE ID NUMBER: 1126365 STATE OF FORMATION: NC E-Filed Annual Report
1126365
REPORT FOR THE CALENDAR YEAR: 2023 CA202308902726 10:1 6
10:15
SECTION A: REGISTERED AGENT'S INFORMATION (Changes
1.NAME OF REGISTERED AGENT: Morton, Elijah T
2.SIGNATURE OF THE NEW REGISTERED AGENT:
SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT
3. REGISTERED AGENT OFFICE STREET ADDRESS&COUNTY 4.REGISTERED AGENT OFFICE MAILING ADDRESS
121 Garnet Lane 121 Garnet Lane
Jacksonville, NC 28546 Onslow County Jacksonville,NC 28546
SECTION B: PRINCIPAL OFFICE INFORMATION
1. DESCRIPTION OF NATURE OF BUSINESS: Land Development
2. PRINCIPAL OFFICE PHONE NUMBER: (910) 548-7575 3.PRINCIPAL OFFICE EMAIL: Privacy Redaction
4.PRINCIPAL OFFICE STREET ADDRESS 5.PRINCIPAL OFFICE MAILING ADDRESS
121 Garnet Lane 121 Garnet Lane
Jacksonville,NC 28546 Jacksonville, NC 28546
6.Select one of the following if applicable.(Optional see instructions)
The company is a veteran-owned small business EC 'V
The company is a service-disabled veteran-owned small business MAY 0 4 2023
BY
SECTION C: COMPANY OFFICIALS(Enter additional company officials in Section E.)
NAME: Elijah T. Morton , Sr. NAME: Jennifer Morton Ward NAME:
TITLE: Member TITLE: Member TITLE:
ADDRESS: ADDRESS: ADDRESS: u , JIVr
121 Garnet Ln 121 Garnet Lane
Jacksonville,NC 28546 Jacksonville, NC 28546
SECTION D:CERTIFICATION OF ANNUAL REPORT. Section D must be completed in its entirety by a person/business entity.
Elijah T.Morton Sr. 3/30/2023
SIGNATURE DATE
Form must be signed by a Company Official listed under Section C of This form.
Elijah T.Morton Sr. Member
Print or Type Name of Company Official Print or Type Title of Company Official
This Annual Report has been filed electronically.
MAIL TO:Secretary of State, Business Registration Division,Post Office Box 29525,Raleigh,NC 27626-0525
SOSID: 1126365
Date Filed: 12/3/2009 3:29:00 PM
Elaine F.Marshall
North Carolina Secretary of State
C200933700208
ARTICLES OF ORGANIZATION
OF
SOUTH STATE DEVELOPMENT,LLC
Pursuant to § 57C-2-20 of the General Statutes of North Carolina,the undersigned
hereby does submit these Articles of Organization for the purpose of forming a limited liability
company.
1. The name of the limited liability company is "South State Development,
LLC."
2. The period of duration of the limited liability company shall be perpetual.
3. The name and address of the organizer executing these Articles are:
Name Address
A.Rexford Willis, III 1001 College Court
New Bern,NC 28562
4. The street and mailing address of the initial registered office of the limited
liability company is 121 Garnet Lane, Jacksonville,Onslow County,North Carolina 28546; and
the name of the initial registered agent of the limited liability company at such address is
Elijah T. Morton.
5. The street and mailing address of the principal office of the limited
liability company is 121 Garnet Lane, Jacksonville, Onslow County,North Carolina 28546.
6. Except as provided in N.C.G.S. § 57C-3-20(a),members of the limited.
liability company shall not be managers of the limited liability company by virtue of their status
as members.
7. These Articles of Organization shall be effective upon the filing of same
by the North Carolina Secretary of State.
IN TESTIMONY WHEREOF, the undersigned has executed this instrument, this
the 1st day of December, 2009.
, /61/4.1kr
itt`
A. Rexford Willis, III, Organizer
Prepared by and return to:
A. Rexford Willis, III
For the firm of
Ward and Smith, P.A.
1001 College Court
PO Box 867
New Bern,NC 28563-0867
Telephone: (252) 672-5400
Facsimile: (252)672-5477
091021-00004-001 •
ND:4838-2020-1733,v. 1
2
• File§an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online -
Add Entity to My Email Notification List • View Filings • Print a Pre-Populated Annual Report form • Print
an Amended a Annual Report form
Limited Liability Company
Legal Name
South State Development, LLC
Information
Sosld: 1126365
Status: Current-Active 0
Date Formed: 12/3/2009
Citizenship: Domestic
Annual Report Due Date: April 15th
CurrentAnnual Report Status:
Registered Agent: Morton, Elijah T
Addresses
Mailing Principal Office Reg Office
121 Garnet Lane 121 Garnet Lane 121 Garnet Lane
Jacksonville, NC 28546 Jacksonville, NC 28546 Jacksonville, NC 28546
Reg Mailing
121 Garnet Lane
Jacksonville, NC 28546
Company OfficiaLs
All LL Cs are managed by their managers pursuant to N.0 G.S. 57D-3-20
Member Member
Elijah T. Morton , Sr. Jennifer Morton Ward
121 Garnet Ln 121 Garnet Lane
Jacksonville NC 28546 Jacksonville NC 28546
FOR REGISTRATION REGISTER OF DEEDS
Karen S. Hardesty
Carteret County, NC
July 26, 2021 10:31:33 AM
DEED # Pages:2
Fee:$26,00 NC Revenue Stamp:$1,552.00
P.-.P.c..sue A_ ..,... d FILE# 1731438
4::g Ntio ti-. --ll
IQ If �.. MAY 0 4 2023
MAY 17 2073 By:
a . d
_____„, el/t•Aat J Aze—d-wi)
NORTH CAROLINA GENERAL WARRANTY DEED
Excise Tax:41.552.00 Recording Time,Book and Page set forth above
This instrument prepared by:Gaylor Edwards& Vatcher,P.A.,Licensed North Carolina Attorneys
Tax Parcel ID No(s),: 535702672076000
Brief description for index:Tract B, 133.134 acres,Map Bk 31,Pg 261
The hereinafter described property does xx does not include the primary residence of Grantor.
THIS DEED made this _ 2 day of July,2021 by and between:
*
GRANTOR: * GRANTEE:
*
STELLA LANDING,LLC,a North * SOUTH STATE DEVELOPMENT,LLC,a
Carolina limited Iiability company * North Carolina limited liability company
*
*
Mailing address: * Mailing address:
166 Center Street * 121 Garnet Lane
Jacksonville,NC 28546 * Jacksonville,NC 28546
*
The designation Grantor and Grantee as used herein shall include said parties,their heirs,successors and
assigns and shall indude singular,plural,masculine,feminine or neuter as required by context.
WITNESSETH,that the Grantor, for a valuable consideration paid by the Grantee, the receipt and
sufficiency of which is hereby acknowledged,has and by these presents does grant,bargain,sell,and
convey unto the Grantee,in fee simple,all that/those certain tract(s),lot(s)or parcei(s)of land,situated in
White Oak Township, Carteret County,North Carolina and more particularly described as follows:
Being all of Tract B,containing 133.134 acres,as shown on a map entitled, "Boundary Survey for M&M
Land Development,Inc., 138.710 Acre Tract on NCSR 1101 and NCSR 1100,White Oak Township, Carteret
County,North Carolina,Wetherington Landing Road and Molly Lane,"prepared by Charles F.Riggs&
Associates,Inc., dated June 4,2007 and recorded in Map Book 31,Page 261,in the Office of the Register of
Deeds of Carteret County,North Carolvna_The aforementioned map is incorporated herein by reference for
a more particular description of said property.
J:t4VPDOCS\GEVFORM1DEED$\STEUA IANDING_SOUTH STATE DEVr,wpd
• Submitted electronically by "Gaylor Edwards Vatcher LawFirm"
in compliance with North Carolina statutes governing recordable documents
and the terms of the submitter agreement with the Carteret county Register of Deeds.
■ l V ITVV
Together with a sixty(60)foot wide ingress,egress, regress and access easement for access to NCSR 1101 as
set forth in an Extinguishment of Existing Easement and Grant of New Easement recorded in Book 1646,
Page 232,Carteret County Registry.
The property herein above described was acquired,or is a portion of the property acquired,by Grantor by
instrument recorded in:Book 1646,Page 91,Carteret County Registry.
TO HAVE AND TO HOLD the aforesaid tract(s),lot(s)or parcel(s)of land and all privileges and
appurtenances thereto belonging to the Grantee, in fee simple.
THE GRANTOR COVENANTS WITH THE GRANTEE,that Grantor is seized of fee simple title to the
premises,has the right to convey the same in fee simple, that title is marketable and free and clear of all
encumbrances,and that Grantor will warrant and defend the title against the lawful claims of all persons
whomsoever except for the exceptions hereinafter stated.
Title to the property herein above described is subject to the following exceptions:
Property taxes for the year 2021 and thereafter;Extinguishment of Existing Easement and Grant of New
Easment recorded in Book 1646,Page 232,utility easements of record,and matters shown on any recorded
map or plat of the above described property.
IN WITNESS WHEREOF, the Grantor has hereto set his/her hand and seal, or if corporate or other
entity,has caused this instrument to be executed by its duly authorized partner(s),manager(s)or officer(s),
the day and year first above written.
Stella Landing,LLC,a North Carolina limited
liability company
By:
Name:Danny W ley
Title: Manager
STATE OF NORTH CAROLINA
COUNTY OF ONSLOW
I certify that the following person(s)personally appeared before me this day,each acknowledging to me
that he or she voluntarily signed the foregoing document for the purposes stated therein and in the
capacity(ies)indicated:
Date:July 4. . ,2021
; /),./.3,Ltom4,1J-A11,111.C_A—.. _ _
(Official fig afore of Notary) •JIESSl�Ces!ry LAWSENCE
i r ,. l
p �. � Nota Public
..,0 e Gs I C O LLA- ) North Garoiina
(Notary's printed or typed name) Onslaw County
, �. ww�ailrrl.F�v FfL7
My commission expires _...�- `4't- c1`O r o ,
J;\WPDOCS\CEVFORM}DEEDS\STELLA LANDING SOUTH STATE DEVT.wpd
Re:State Stormwater Permit SW8 091210-Stella Landing mailbox:///C:/Users/Jonathan/AppData/Roaming/Thunderbir...
Subject: Re: State Stormwater Permit SW8 091210-Stella Landing
From:Jonathan McDaniel<jmcdaniel@tidewaterenc.com>
Date: 5/12/2023, 10:21 AM
To: "Beasley, Michelle"<michelle.beasley@ncdenr.gov>, "jennifer@southstatedevelopment.com"
<jennifer@southstatedevelopment.com>
Good morning Michelle,
Please see the attached check going out to you today. Thank you for letting us know.
Thanks,
Jonathan McDaniel PE, Vice President
604E Cedar Point Blvd
Cedar Point NC, 28584
252-393-6101 �®
TIDEWATER
01.,
ASSOCIATES, INC.
lg
On 5/11/2023 2:20 PM, Beasley, Michelle wrote: f`
The Wilmington Regional Office is in receipt of a transfer application packet for the above referenced state stormwater permit.
However,the check included with the packet,check#2597,is dated 4/27/2022. Because it is over a year old,we cannot accept
it as most banking institutions operate on a 6-month expiration date. As a result,we cannot accept the application as it is
presented. You can submit a new check to replace check#2597 or,if you prefer,pick up the entire application packet for
resubmittal with a new check. Please advise how you might like to proceed.
ii
Information,applications and forms can be found on our website(here).
Updates on submitted applications can be found through the Environmental Application Tracker j NC DEQ.
Current Stormwater Permittees can be found here: DEQ Maps&Permit Data: Maps&Permit Data I NC DEQ
The Stormwater Laserfiche Repository can be found here.
Thank you for your understanding in this matter. Should you have any questions and/or comments or need additional
information,please feel free to contact me.
Michelle Beasley(she/her/hers)
Stormwater Permit Renewal Specialist
Division of Energy, Mineral,and Land Resources
North Carolina Department of Environmental Quaiity
Office:(910)796-7215 i Direct: (910)796-7287
Address: 127 Cardinal Drive Ext.,Wilmington, NC 28405
michelle.beasley@ncdenr.gov
1 of 2 5/12/2023, 1 n:24 AM
Re:State Stormwater Permit SW8 091210-Stella Landing mailbox:///C:/Users/Jonathan/AppData/Roaming/Thunderbir...
NORTH CAROLINA
Department of Environmental quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
—Attachments:
20230512100442191.pdf 370 KB
2 of 2 5/12/2023,10:24 AM
Beasley, Michelle
From: Jonathan McDaniel <jmcdaniel@tidewaterenc.com>
Sent: Friday, May 12, 2023 10:21 AM
To: Beasley, Michelle;jennifer@southstatedevelopment.com
Subject: [External] Re: State Stormwater Permit SW8 091210 Stella Landing
Attachments: 20230512100442191.pdf
CAUTION: External mall r r: click links or open attachments unless verified.Report su.W sinus emaiis with the deport Message
button located on your Ou he; menu bar nn the Home tab.
Good morning Michelle,
Please see the attached check going out to you today. Thank you for letting us know.
Thanks,
Jonathan McDaniel PE, Vice President
604E Cedar Point Blvd
Cedar Point NC,28584
252-393-6101
Asi. TIDEWATER
ASSOCIATES, INC.
On 5/11/2023 2:20 PM, Beasley, Michelle wrote:
The Wilmington Regional Office is in receipt of a transfer application packet for the above referenced
state stormwater permit. However,the check included with the packet,check#2597, is dated
4/27/2022. Because it is over a year old,we cannot accept it as most banking institutions operate on a
6-month expiration date. As a result,we cannot accept the application as it is presented. You can
submit a new check to replace check#2597 or, if you prefer, pick up the entire application packet for
resubmittal with a new check. Please advise how you might like to proceed.
Information, applications and forms can be found on our website (here).
Updates on submitted applications can be found through the Environmental Application Tracker I NC
DEQ.
Current Stormwater Permittees can be found here: DEQ Maps & Permit Data: Maps & Permit Data I
NC DEQ
The Stormwater Laserfiche Repository can be found here.
i
Beasley, Michelle
From: Beasley, Michelle
Sent: Thursday, May 11, 2023 2:21 PM
To: 'Jonathan McDaniel';jennifer@southstatedevelopment.com
Subject: State Stormwater Permit SW8 091210 - Stella Landing
The Wilmington Regional Office is in receipt of a transfer application packet for the above referenced state stormwater
permit. However,the check included with the packet,check#2597,is dated 4/27/2022. Because it is over a year old,
we cannot accept it as most banking institutions operate on a 6-month expiration date. As a result,we cannot accept
the application as it is presented. You can submit a new check to replace check#2597 or, if you prefer, pick up the
entire application packet for resubmittal with a new check. Please advise how you might like to proceed.
Information,applications and forms can be found on our website(here).
Updates on submitted applications can be found through the Environmental Application Tracker I NC DEQ.
Current Stormwater Permittees can be found here: DEQ Maps& Permit Data: Maps& Permit Data I NC DEQ
The Stormwater Laserfiche Repository can be found here.
Thank you for your understanding in this matter. Should you have any questions and/or comments or need additional
information, please feel free to contact me.
Michelle Beasley(she/her/hers)
Stormwater Permit Renewal Specialist
Division of Energy, Mineral,and Land Resources
North Carolina Department of Environmental Quality
Office: (910)796-7215 I Direct: (910)796-7287
Address: 127 Cardinal Drive Ext.,Wilmington, NC 28405
michelle.beasiev@ncdenr.gov
Qeperhnent of Envimmenfal Quality
Ernarr correspondence to end from this address is ,:gfibjer,? to the North
Caroline Pi bii1 Records Law a d may be disclose to thi'rci parties.
i
Carteret County
Property Data
Parcel Number: 535702672076000
Inquiry Date: 5/5/2023
DISCLAIMER: For confirmation of the number of buildings on each parcel, please contact the Carteret County Tax
Office.
Property Info Building Info
PARCEL NUMBER: 535702672076000 BATHS:
OWNER: SOUTH STATE DEVELOPMENT LLC BEDROOMS:
PHYSICAL ADDRESS 300 WETHERINGTON LANDING RD CONDITION:
STELLA
MAILING ADDRESS: 121 GARNET LANE EXTERIOR WALLS:
JACKSONVILLE NC 28546
LEGAL DESCRIPTION: TRACT B M&M LAND DEVELOPMENT STELLA FLOOR FINISH:
DEED REF: 1731-438 FOUNDATION:
PLAT REFERENCE: 31-261 HEAT:
NEIGHBORHOOD: 150001 ROOF COVER:
SALE DATE: 07/26/2021 ROOF STRUCTURE:
SALE PRICE: $776,000 SQUARE FOOTAGE:
ACREAGE: 133.93 YEAR BUILT:
LAND VALUE: $173,931 BUILDING VALUE: $0
EXTRA FEATURE VALUE: $0 PARCEL VALUE: $173,931
Sketches
16'
10'
26' 26' 30' 4'krL1940
40'
ONE1640 ONE1940 4Q
kft
816k' 16' ONE1940
uTL1840 760 ft2
32 H'4' 8.4'I 6' 2' T 760 ft2 20' 20' 16'
10'
CPT1640 4' 10' 14' 30' 8' 40'
1v2461r 20 20' PCH1940 4'IPCH1967 80 ft2
14' 20' 40 ft2 20'
PCH82840H'�°J r
_._._.
dM/PM wFM.�•="
40 ft2
UTL1940 40 ft2
38' ' 32' 4'13'14' 10' 4' 4' UTL1940 13' 26'
$ 4 u40 rn 0' 4 ONE1940 CPT1940 CPT1940 ONE1940
20' CAO� 0 zo' 16' cPrlsao 640 ft2
220 ft2 220 ft2 520 ft2
248, 12' 20' 20' 16' 16' 20' 20'
12' 2' 18' I
12' 13' 13' 16'
14' 22' 4' 4' JSTP1940 I I
PCH1940 4'
48 ft2 64 ft'
10'
28' 4' UTL1940
6' 60 ft2
ONE1940 10'
616 ft2 22' 22' 16'
CPT1940
248 ft2
10' 9' 14'
PCH 1940
I6 54 ft2
Photos
I ' 'rA
NI. TI ❑ EWATER ASSOCIATES , INC .
ENGINEERS 5LIRVEYORS PLANNERS L.....
.. r tli —
EST.1961 CE ❑AR POINT, NORTH CAROLINA fi MAY 04 2023
Y.
LETTER OF TRANSMITTAL
TO: Ms. Christine Hall, PE DATE: May 2nd, 2023
NCDEQ - Stormwater Section REF: Stella Landing
127 Cardinal Dr. Ext. Carteret County,NC
Wilmington,NC 28405-3845 Stormwater Permit Transfer
WE ARE SENDING YOU:
Two (2) copies of the stormwater permit transfer documents and Check#002597 in the amount of$505.00
for the permit transfer request.
DELIVERY VIA:
N Regular Mail ❑ Hand ❑ Federal Express
El UPS Overnight ❑ UPS Ground N Other Email _
Christine.Hall(dIncdenrciov
THESE ARE TRANSMITTED AS CHECKED BELOW:
N For Approval ❑ As Requested ❑ For Review and Comment
❑ For Your Use Cl For Bids Due
❑ Other
COMMENTS:
9
°' 1—?
Jonathan L. McDaniel, PE
Vice President
Copies To: South State Development(w/enclosures)
JLM CP#21268
(f enclosures are not as noted, kindly notify us at once)
ADM1N/LOT/Ha11.SteilaLanding.SWTrans5.2.23
604E Cedar Point Blvd. I Cedar Point, NC 28584 I (252) 393-6101
Firm License Number F-0108 I www.tidewaterenc.com
! 41
1
Ii \
i 1 :
0.1.; .
' I..... ......‘..R.• i 1 .f. ..--•:- '
i / :'04:fti..-'s;? l'1‘.‘i•.
..0,.• ..7.• • ft.ft..ft r
rd';:i•J : . ‘1.'
ON
e .° :..... .2.
?if ,
. _ •
....-
\ ,
, .
•-,, Cs\ ,
. -
k \ ,
\ ‘ 1
" / t -, -4
... .-0 • t -\ .,
, .
, 4..: "
,
r,,:
......_...4„
....
i- ,,,,A._
....,....' ' ' I
z,_ I, 'rt......r..
. \
”- ''' \
- --
.....
, ,• - -- 0
...1,
14
Is'
. V
,_ ...
..a
0
...i
•
N..00
. Pil
! CY
1
Oft
. . . . r
111111
...._ 1
, c_1-
et i i ' .
t)14....-. -.Z
...
' 1.1 - C Iiiit' s vr
! 1' 1 '.' 1'* s' I.i . .:.. . i.-3 i .11 ';Cil ;i''
1 il R' : "
sLi '
I :1 , .
ot f 7 1 0: -. :
i a .... "' ' • ' ' ' : 1 I/
File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online •
Add Entity to My Email Notification List • View Filings • Print a Pre-Populated Annual Report form • Print
an Amended a Annual Report form
Business Corporation
Legal Name
M&M Land Development, Inc.
Information
Sosld: 0698323
Status: Current-Active 0
Date Formed: 11/10/2003
Citizenship: Domestic
Fiscal Month: December
Annual Report Due Date: April 15th
CurrentAnnual Report Status:
Registered Agent: Maides, James E.
Addresses
Mailing Principal Office Reg Office
166 Center Street 166 Center Street 166 Center Street
Jacksonville, NC 28546 Jacksonville, NC 28546 Jacksonville, NC 28546
Reg Mailing
166 Center Street
Jacksonville, NC 28546
Officers
President Vice President Secretary
James E Maides Elijah Morton Danny Whaley
1054 Country Club Dr 125 Garnet Ln 213 Lyman Rd
Jacksonville NC 28546 Jacksonville NC 28546 Beulaville NC 28518
Stock
Class: Common
Shares: 100000
No Par Value: Yes
Lewis,Linda
From: Lewis,Linda
Sent: Wednesday, June 13, 2012 9:02 AM
To: 'Kathy Vinson'; 'James Maides'
Cc: Styron, Heather
Subject: SW8 091210 Stella Landing
Kathy-
Thanks for your letter dated May 1, 2012. I understand now that the subdivision is not being "abandoned",
merely delayed. However, I am still concerned about the road construction. Although it is not mentioned in your
letter, I must have assurances that the road side swales and associated lot line swales and level spreaders will
be installed when the road is built to serve the pier project.
I would like to issue a plan revision approval to at least acknowledge this phased approach and specify what
swales and level spreaders associated with this part of the phased road must be constructed with the road as
part of the pier project.
Please submit a completed plan revision application form (1-page), signed by the permittee. Please revise the
8.5 x 11 highlighted drawing you provided with your May 1, 2012, letter to show the roads, the buffer and the
swales and level spreaders to be built with the pier project. Please submit 2 copies of that revised plan with the
plan revision application and we will use that as the approved plan for the "temporary condition" , i.e., the pier
project.
Thanks,
Linda Lewis
NC Division of Water Quality
127 Cardinal Drive Ext.
Wilmington, NC 28405
910-796-7215
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may
be disclosed to third parties.
1
1411.14
COASTAL PLANNING SERVICES, INC.
Kathy B. Vinson, AICP
Comprehensive Land Use Planning and Development Assistance
P.O. Box 827 Office 252.354.4916
Morehead City,NC 28557 Fax 252.247.5875
May 1,2012
Ms. Linda Lewis
NC Division of Water Quality
127 Cardinal Drive Extension
Wilmington,NC 28405
Originally sent by email: linda.lewisancdenr.gov
paitext@bizec.rr.com E
jamesmaides@csbenc.com �C
Re: Stormwater Project No. SW8 091210 MAY 2012
Stella Bridge Landing Piers Stf:
M&M Land Development,Inc.
Carteret County
Dear Linda:
This letter is in response to your email of April 5,2012 regarding the Stella Bridge Landing Piers CAMA
permit application and your April 10,2012 Request for State Stormwater Management Permit
Application sent to James Maides,President of M&M Land Development,Inc.
As you know, stormwater permit SW8 091210 was issued in March 2010 for development of Stella
Landing subdivision, including roadways,piers,earthen pathways,and stormwater infrastructure. The
owners now wish to obtain a CAMA permit for construction of the piers in order to be poised to go
forward with the project when economic conditions improve.
We regret that our narrative for the recently submitted CAMA application has raised questions regarding
the intentions of the owners regarding future development of the subdivision.Construction of the
subdivision has not been abandoned,but merely delayed.I would like to clarify the status of this project
and provide additional information that I hope will satisfy your concerns.
In conversations with the owners,they used the term"abandon"in reference to the original intentions of
constructing the subdivision simultaneously with the two piers and earthen walkways and not in terms of
abandoning the subdivision plans.In our CAMA application narrative we followed through with this
terminology,but realize now that"abandon"was not the best choice of words.
As stated in the CAMA permit application narrative, at this point the original plans(construction of the
piers simultaneous with the construction of the subdivision)are uncertain due to the condition of the
Ms.Linda Lewis
May 1,2012
Page Two
economy. The CAMA narrative states that the owners hope to pursue further residential development of
the site,but may need to modify project plans to make the project economically feasible.They are
optimistic that the subdivision will be built,but it is not known how, or if, any changes to the current plan
will be needed.
It is possible(probable)that no changes will be made to project plans.It is impractical at this point to
modify the stormwater permit when we do not know the final form of the subdivision.We have been
forthcoming with our intentions to only construct stormwater—approved features(upon CAMA
authorization)and in no way intended to confuse or mislead agency reviewers.I emphasize that the
owners have delayed,not abandoned,plans to develop a subdivision.
Per the CAMA permit application, if the piers are constructed prior to the subdivision, a section of the
roadway authorized by SW8 091210 will also be constructed at that time to allow for access and parking.
Attached is a drawing that indicates the section of the stormwater-permitted roadway to be constructed
(highlighted in yellow)and areas of the road to be used for parking(red on drawing).Construction of the
road section will not require any reallocation of built-upon-area(BUA)as authorized by SW8 091210.
The drawing is also being provided to the Division of Coastal Management, since the roadway section
must be constructed simultaneously with the piers.
The earthen walkways are also authorized by the stormwater permit,with 4,000 square feet of BUA
allocated for the paths.The 6' width as shown on the original CAMA plans came about due to
miscommunication among project engineers and would have exceeded the allocated BUA. That
discrepancy has now been remedied.We have notified the Division of Coastal Management(DCM)that
the walkway widths are reduced to 4',thus bringing the BUA for the pathways into consistency with the
stormwater permit.
Construction of the roadway section and earthen paths will disturb more than an acre. An erosion and
sedimentation control plan will be developed and submitted to the Division of Land Quality prior to any
land disturbing activity.
In summary,no changes are being made to the permitted subdivision plans and no stormwater
modification should be needed.In the future event that changes must be made,the owners will then
request a modification to the plan authorized by SW8 091210.
I hope this letter clarifies our intentions and resolves the questions that have arisen.Please call me at 252-
240-9297 if you need additional information.You may also reach me at kbvinson@ec.rr.com
Thank you for your assistance with this project.
Respectfully,
1Jmson AICP
KathyY
Attachment
cc: James Maides
John Parker
Daniel Govoni
/ _ _ j
Wooded '(131'�.'�-
rAnsa 5iapatwatt 11 J. >---.-.-
i `�24 GAG nor. ,.02;r eader� with Right of Way For [ 'e Public Road � a L
In,) D.8. 252, Pq. 171 l5p - ,,, p�; -,..- S►
�Waac
rc. _'_...5 Ara
�ii•li•li•I�M'i•li•=In MI iiiifl�ME N ii•i mild OzL - 4. 4 I —I—
IMM
ii3 '� ' y.
i d\-- - ... ) \i/i;:‘ .., ir i oil i , gir,.
6.- I d 4-...d -
/ ,, / hii.
— ;,,ram► '' ii,,/ ,� �!
it p/ j 1 . ,
�y\
j
itz 0 0 c / / -.-.I
H�
I.�I / ,
521e Q 0 0 O I 0
.-Ifor''' i ,
1 , -- .E�....,.... ,,.�..__..._� ,
�-- 1! .4 .11!
• I �
# I
, - inl
.�.� I ,,_ kw 4.A c - 20= existing . ist!13nS
�r 4.3 �1� 7.9 Ailq S.2
4 ,� -- ---
=Mug _1:: w•-• 'Po
i ,% ` 5ei awaIs 0I
\ r I
I ,,;�1 r \ FEBi1 f x
~ - Out 4.0 I - 7.4 Si...._
_It ir
tirj a
i. , i
..
0 5.4 c ....— "4" - --— IFF --- &
\,' •
vCr► t
.�" kwik _ ....... - ,
`l�1 0,-
1 °� _ 1 I i' �''
1.41#
COASTAL PLANNING SERVICES, INC.
Kathy B. Vinson, AICP
Comprehensive Land Use Planning and Development Assistance
P.O. Box 827 Office 252.354.4916
Morehead City,NC 28557 Fax 252.247.5875
May 1, 2012
Mr. Daniel Govoni
Assistant Major Permits Coordinator
NC Division of Coastal Management
400 Commerce Avenue
Morehead City,NC 28557
Originally sent by email: Daniel.Govoni@ncdenr.gov
paitextaizec.rr.com
iamesmaides(aksbenc.com reenfie
finda.lewis@ncdenr.gov
AY042011
Re: Stella Bridge Landing Piers BY,
M&M Land Development, Inc.
Major CAMA Permit Application
Dear Daniel:
M &M Land Development, Inc. received state stormwater permit SW8 091210 in March 2010
for development of Stella Landing subdivision, including piers, earthen pathways, roadways. and
stormwater infrastructure. In February 2012 the owners requested CAMA authorization to
construct the piers and earthen pathways in order to be poised to go forward with the project
when economic conditions improve.
The stormwater permit allocates 4,000 square feet of built-upon-area(BUA) for the earthen
pathways. The BUA allocation will accommodate 4' wide earthen pathways,based on the
proposed length. We originally requested authorization for 6' wide paths, due to a
miscommunication between project engineers. By this letter I am requesting that the proposed
earthen paths shown on project plans and described in the application be reduced to 4' in width..
We regret that our narrative for the CAMA application has raised questions regarding the
intentions of the owners for future development of the subdivision. Construction of the
subdivision has not been abandoned, but merely delayed, as explained in our letter to Linda
Lewis of the Division of Water Quality (copy enclosed). If the proposed piers are constructed
prior to the subdivision, a section of the roadway authorized by SW8 091210 will be constructed
at that time to allow for access and parking associated with the piers. A drawing indicating the
Daniel Govoni
May 1, 2012
Page Two
section of the roadway to be constructed (highlighted in yellow) and areas of the road to be used
for parking(red on drawing) is enclosed. Construction of this section of roadway will not require
any reallocation of BUA.
Construction of the roadway section and earthen paths will disturb more than an acre. An
erosion and sedimentation control plan is being developed and will be submitted to the Division
of Land Quality prior to any land disturbing activity.
In summary, no changes are being made to the permitted subdivision plans and no stormwater
modification should be needed. In the future event that changes must be made,the owners will
then request a modification to the plan authorized by SW8 091210, as well as any needed
changes to the CAMA permit we anticipate receiving.
I hope this letter clarifies our intentions and resolves the questions that have arisen. Please call
me at 252-240-9297 if you need additional information. You may also reach me at
kbvinson@ec.rr.com
Thank you for your assistance with this project.
Respectfully,
0.
Kathy B. Vinson,AICP
Enclosures
Cc: James Maides
John Parker
Linda Lewis
&TA
DERR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Charles Wakild,P.E. Dee Freeman
Governor Director
Secretary
April 10,2012
James E.Maides, President
M&M Land Development,Inc.
166 Center Street
Jacksonville,NC 28546
Subject: Request for State Stormwater Management Permit Application
Stella Bridge Landing Piers
Stormwater Project No.SW8 091210 MODIFICATION
Carteret County
Dear Mr. Maides:
On March 29,2012,the Wilmington Regional Office received a copy of the CAMA Major Permit application for the subject
project The North Carolina Administrative Code requires any project that is part of a larger common plan of development,or
that proposes more than 10,000 square feet of new built-upon area,or that must receive Sedimentation and Erosion Control
Plan approval,or that must receive a CAMA Major permit,to apply for and receive a Stormwater Management Permit from the
Division of Water Quality.Any construction on the subject site, prior to receipt of the required permit,will constitute a violation of
15A NCAC 2H.1000 and may result in appropriate enforcement action by this Office.
Either a Stormwater Permit Application Package including 2 sets of plans,completed application form,fee,and supporting
documentation,or a written response regarding the status of this project and the expected submittal date must be received in
this Office no later than May 10,2012.Failure to respond to this request may result in the initiation of enforcement action,and
construction may experience a subsequent delay.
The NPDES 010000 Federal Stormwater Permit that accompanies the Erosion Control Plan approval letter must NOT be
considered the Coastal Storm:rater Management Permit,which will be signed by the Supervisor of the Surface Water Protection
Section. Please reference the Project Number above on all correspondence. If you have any questions,please call me at
(910)796-7215.
Sincerely,
4 &7-riGu
Linda Lewis
Environmental Engineer Ill
GDSlari: S:IWQS1StormwaterlPermits&Projectsl20091091210 LD12012 04 req_SWapp 091210
cc: Kathy Vinson; Coastal Planning Services, Inc.
Carteret County Building Inspections
Division of Coastal Management
Wilmington Regional Office File
Wilmington Regional Office
127 Cardinal Drive Extension,Wilmington,North Carolina 28405
Phone: 910-796 72151 FAX 910-350-2004 ��'���nnneee
Internet www.nrwaterquaGly org 1VQxthhCaro�]na
An Equal Opportunity 1 Arhtmative Action Employer Naturally ra"y
Lewis,Linda to 1f 210
From: Lewis,Linda
Sent: Thursday,April 05, 2012 12:38 PM
To: Styron, Heather
Cc: 'Kathy Vinson'
Subject: Stella Landing SW8 091210(M&M Land Development)
Heather:
I'm looking at the CAMA Major for this project and am concerned about the lack of parking. What would be the
point of having these 2 piers if there was nowhere to park your car to access and use them?Without the
subdivision in place, access and parking are an issue.
On page 5 of the narrative that M&M Land Development submitted, they say that if the piers are constructed
prior to development of the subdivision, then they will "rough in" sections of the permitted roads in order to
provide access to parking for users of the dock. Since the permittee has abandoned the subdivision project,
these piers will be built before the subdivision is, so per their narrative, some of those permitted roads will be
constructed. This would be high ground development and if added to the earthen paths, may disturb >1 acre
total. By the way, DWQ considers the earthen paths as built-upon area.
From my perspective, because we already have a stormwater permit for the now abandoned subdivision, and
approved plans that are not being followed, I will be requiring the developer to submit a permit modification to
add this particular scheme of development to the permit, or to replace the previously permitted plans with this
scheme. They will also need to account for the BUA in the paths and show what roads will be built with this
phase, and where those pier users will park their cars.
Also, the only place that the width of the earthen path (6 feet) is mentioned is in the narrative. A detail of the
earthen path should be added to the plans, or the 6 foot path width should be noted on the plans somewhere.
Linda Lewis
NC Division of Water Quality
127 Cardinal Drive Ext.
Wilmington, NC 28405
910-796-7215
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may
be disclosed to third parties.
i
Lewis,Linda
From: Lewis,Linda
Sent: Wednesday, May 02, 2012 9:45 AM
To: 'Kathy Vinson; Govoni, Daniel; 'James Maides'; 'Parker&Associates, Inc.'
Subject: FW: Stella Landing Piers
Slight correction—in red below.
Linda Lewis
NC Division of Water Quality
127 Cardinal Drive Ext.
Wilmington,NC 28405
910-796-7215
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may
be disclosed to third parties.
From: Lewis,Linda
Sent: Wednesday, May 02, 2012 9:38 AM
To: 'Kathy Vinson'; Govoni, Daniel
Cc: 'Parker&Associates, Inc.'; 'James Maides'
Subject: RE: Stella Landing Piers
Thank you Kathy. My only concern at this point, after reading your letter dated May 1, 2012, is for the required
level spreaders and vegetated buffer. Because these are SA waters, new direct discharges are prohibited. The
approved plans show the level spreaders and vegetated buffers that must be provided to meet the "no
discharge" requirement of the 2008 rules. If the "highlighted" roads are to be constructed, then the associated
road ditches, lot line swales, level spreaders and buffers must also be provided.
Linda Lewis
NC Division of Water Quality
127 Cardinal Drive Ext.
Wilmington, NC 28405
910-796-7215
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may
be disclosed to third parties.
From: Kathy Vinson [mailto:kbvinsonOec.rr.com]
Sent: Wednesday, May 02, 2012 8:15 AM
To: Lewis.Linda: Govoni. Daniel
Cc: 'Parker&Associates, Inc.'; 'James Maides'
Subject: Stella Landing Piers
Linda,
Attached is the written response to your letter of April 10,2012 requesting a state stormwater management permit
application for Stella Landing Piers. I regret that the narrative previously submitted with the major CAMA permit
application was confusing regarding the owners' plans for the subdivision. I hope that the additional information will
clarify their intent.
1
Included with our response is a drawing taken from the stormwater plans for this project showing the section of
roadway to be constructed to allow for access and parking if the proposed piers are constructed prior to the subdivision.
We have also notified DCM of parking plans and have asked them to modify the proposed earthen pathways(please see
Govoni letter).
Daniel-attached is our letter requesting that the width of the proposed earthen pathways be reduced in width consist
with BUA allocated for paths in the stormwater permit. I have also included a copy of the drawing showing the proposed
section of roadway to be built(outside the AEC) if the piers are constructed prior to the subdivision.
Hard copies of the letters will also be mailed. Please let me know if you have questions.
Thank you both for your assistance with this project.
Kathy
Kathy B.Vinson,AICP
Coastal Planning Services,Inc.
P.O. Box 827
Morehead City,NC 28557
Office 252.354.4916
Fax 252.247.5875
Mobile 252.240.9297
kbvinson@ec.rr.com
2
117:F+A A
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue Braxton C. Davis Dee Freeman
Governor Director Secretary
PI10 4 -
March 27, 2012 ,
MEMORANDUM:
TO: t2��
Linda Lewis 5w � /� S.
•
Joanne Steenhuis 5s�'`2 ,� '�o4A
Division of Water Quality T
N ,� ,
FROM: Doug Huggett `5 -
Major Permits Processing Coordinator In 'n h0
W S
ham' ,
SUBJECT: CAMA/DREDGE&FILL Permit Application Review Ott, Vrar 2
Applicant: M&M Development Inc. nei
Project Location: Carteret County, Wetherington Landing Rd., adjacent to the White Oak
River, in the community of Stella.
Proposed Project: Proposes to construct two private/community 10-slip docking facilities with
fish cleaning stations,4 platforms, 12 finger piers,20 boatlifts,and 2 earthen .
pathways.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
April 16, 2012. If you have any questions regarding the proposed project, please contact
Permit officer at(252)808-2808. When appropriate,in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
p< This agency approves of the project only if the reco mended changes a•e
incorporated. See attached. Need poi/ •
h
This agency objects to the project for reasons described in the attached comments.
SIGNE ) DATE 4-S iZ-
400 Commerce Ave.,Morehead City,NC 28557 One
Phone:252-808-28081 FAX:252-247-3330 Internet:www.nccoastalmanagement.net North?Carolina
An Equal Opportunity Affirmative Action Employer ;Va
r •
Major Permit Fee Schedule
Circle One
-- - --. DCM % DM ��°
Development Type _� Fee 143001601435100C3316256253) ' (2430016024351000952341)
P YP ( q..
I.Private,non-commercial
development that does not involve
the filling or excavation of any
wetlands or open water areas: $250 100%($250) 0% ($0)
II.Public or commercial
development that does not involve
the filling or excavation of any
wetlands or open water areas: $400 100%($400) 0%($0)
III.For development that involves
the filling and/or excavation of up
to 1 acre of wetlands and/or open
water areas,determine if A,B,C,
or D below applies:
III(A).Private,non-commercial
development,if General Water .
Quality Certification No.3490 •
(See attached)can be applied: $250 - 100%($250) 0% ($0)
III(B).Public or commercial
development,If General Water
Quality Certification No.3490
(See attached)can be applied: $400 100%($400) 0%($0)
III(C).If General Water Quality
Certification No.3490(see
attached)could be applied,but
DCM staff determined that
additional review and written
DWQ concurrence is needed -
because of concerns related to
water quality or aquatic life: $400 60%($240) 40% ($160)
III(D).If General Water Quality
Certification No.3490(see
attached)cannot be applied: $400 60%($240) 40%($160)
IV.Development that involves the
filling and/or excavation of more
than one acre of wetlands and/or
open water areas: $475 60%($285) 40%($190)
DI VISION OF COASTAL MANAGEMENT •
FIELD I_ti VES:i'I GATI ON I:EPORT
I T^.cL li.. f Dev&Loprnerit, Inc.
2 X.c i ,1, .1) I ,Ii.`a" T SITE: WetlIerington Landing Road adjacent to the\T.hite
Oak River Stella., Car_ere,: Coun y
��. �e -p :9' (C .r,:-q 9 7 p F a.e�•�'� (C
2 lr':;'i:. ... -.I � (.��.\ �.�+-~.J1� E ."5 af• _.7� �1 4:%..T 9 \ � -_ 9
2006: 31-•6507 't 14-15" 13--I' (Q. 12-i ; (R 9-15 d, 2-1 (V
10-15), (W-X 11-12)
State Plane Coordinates -X: 2556507.736 Y: 376806.286
LAT 34°46'15.82 LON 77°08'48.37
3. INVESTIGATION TYPE: CAMA
4. INVESTIGATIVE PROCEDURE:Dates of Site Visit—several visits within the past...
, most recent 2/27/12
Was Applicant Present No,No
5. PROCESSING PROCEDURE: Application Received—3/1/12
Office—Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan Carteret County 12/22/2010
• Land Classification from LUP—Rural with Conservation
• (B) AEC(s)Involved: Public Trust Area,Estuarine Water
(C) Water Dependent: pier-yes,upland development-no
(D) Intended Use: Private/Community
(E) Wastewater Treatment: Existing—none
Planned—none
(F) Type of Structures: Existing-undeveloped with the exception of an existing dirt
road
Planned—2 earthen paths,two 10-slip docking facilities
with covered platforms, finger piers, pilings, fish
cleaning stations and boatlifts.
(G) Estimated Annual Rate of Erosion: N/A
Source—N/A
7. HABITAT DESCRIPTION:
DREDGED FILLED OTHER
(A) Shallow Bottom Dock A N/A N/A 1,698ft2 Shaded
_ 3,910ft2lncorp.
(B) Shallow Bottom Dock B • N/A N/A 180 ft2 Shaded
180 ft2 Incorp.
(C) Deep Bottom Dock B N/A N/A 1,176 ft2 Shaded
3,580 ft2 Incorp.
(D) High Ground Earthen Path A N/A 996 ft2 N/A
(E)High Ground Earthen Path B N/A 4254 ft2 N/A
-Field Investigation Report
& N1 Development, Inc
Page 2 of 5
_
(C) High osr,.I.~.-_ N/A _. ..�. `. i14' f ?U� i
`I Wetlands L_71._f
(D) Total Are` __istu-,13e"l: 17,564 i2
(E) Primary blurs.ry Ar.a.: yes
(F) Wager Classification: SA/HQW Open: no
8. PROJECT SJ?MNIARY: The applicant is proposing to build(2)private/community 10-slip
docking facilities with fish cleaning stations, 4 platforms, 12 finger piers, 20 boatlifts and 2
earthen pathways. Other than the earthen pathways no other high ground development is
proposed at this time.This site previously received subdivision sketch plan approval from the
Carteret County Tech Review Committee as well as a low density residential stormwater
permit(SW8091210); however, per the applicant, due to the poor economy and pessimistic
outlook for residential sales; they have abandoned their previous plans for development. A
multi agency meeting was conducted previously on 6/3/09 by Mr. Barry Guthrie (previous
field rep for the Stella Area within Carteret County).
9. Narrative Description:
The M & M Land Development, Inc project is located along Wetherington Landing Road,
approximately 1,800' south of the Stella Bridge in Stella, Carteret County. Wetherington
Landing Road is found by following NC Hwy 24 east from the Swansboro area over the
existing Swansboro/Cedar Point Bridge. Follow until you reach the 4-way stoplight within
Cape Carteret(EI to the right) and turn left onto NC 58 (North toward Stelia).Follow NC 58
for approximately 8.49 miles and turn left onto Stella Road. Follow Stella Road until it
intersects Wetherington Landing Road then turn left. The property is located on the right
approximately 1/4 of a mile(1,169'). This area of Stella is known for large bear population so
all agencies should be aware and prepared due the current time of year(hibernation ending).
The subject property is 138.7 acres (6,042,208 sf) in its entirety, has 7000' of shoreline on
the White Oak River and averages 8' in elevation above NHW. Currently on the high
ground portion of the site is an existing open field, dirt road,typical vegetation(grass) and
native trees (pines etc.). Along the property(adjacent to the White Oak River) is densely
populated with coastal and 404 jurisdictional wetlands that is approximately 320' x 1,500'
in area and contains Juncus roemerianus (Black Needlerush).There are several canals (relic
mosquito ditches that are a max width of 30')that were previously dredged through the
coastal wetlands. The ditches are not navigable during nlw due to the shallow water depths
but are navigable at high tide with kayaks and small john boats. There is a tidal creek along
the eastern portion of the site that would not be impacted by this project.
Field verification determined that the water depths along the White Oak River shoreline
for proposed dock A are an average of-3.6' with connecting water depths ranging from-5'
nlw inshore to -14'nlw offshore. The water depths along the river for dock B are an
average of-7.25' with connecting depths ranging from-5' nlw to -16' nlw depending on
location. The Division of Water Quality classifies this area as SA/HQW Waters. The
Field Investigation Report
Development, Inc
ti
Fare 3 of
‘;',';aite Oak River within this artz. ?:. ''. ., c;i as a Y._. _:1' `+:..._. Ar i:i'. arid is el( =o t_o
the taking of shellfish. Car'i.ti,re. C:C''... "S 1_=3:'..:J. iJ Pain Ca... [
area as Rural with Conservatio,....‘ . .. __. tht EC.. :r.e .. . no F..:..,.:.I Ti:a.r�:ro ices
project area. The shoreline is of i' C0'. x .cr i i;. _a.t• land to 1;
north :_,t _ L•:. i. railroad trestlethe
south with the Stella Bridge to fie iA�.���i 0���.t';F'�.'�'�• ...5:... 1-[..,. .... a i... . t,.e., � to i.;�
north of pier A. The site is also bordered to the north by the Carno Lejune to Cherry Point
railway which is owned by the federal government and managed by Camp Lejune Marine
Core Base. The property is bordered to the east by a campground.
10. Project Description:
The applicant is proposing to build two 10-slip docking facilities, finger piers, platforms,
boatlifts and two earthen pathways for the undeveloped tract.No other upland development is
proposed at this time.
A total of 7,500 ft2 of high ground would be graded,filled or disturbed during the process
for the proposed earthen pathways (approximately 640' above nhw for path A and 30'
above nhw(canal area) for path B). The impervious surface is .086%within the Coastal
Shoreline AEC and 0%for the entire tract. The applicant previously obtained a Stormwater
Management Permit(SW8 091210) and preliminary subdivision sketch approval from the
Carteret County Technical Review Committee however no documentation was supplied
with the major permit application due to the fact there are no other plans for high ground
development due to the poor economy. A Sedimentation and Erosion Control Plan was not
submitted to the Division of Land Resources due to the minimal land disturbance (<1
acre).
The applicant is proposing to disturb 7,500 square feet of high ground with the placement
of two earthen paths for the proposed docking facilities. All portions of the earthen
pathways would be a minimum of 30' above nhw for path B and 640' above nhw for path
A. Path A would be 3' above existing grade, 6' in width, 166' in length and would connect
to pier A which is located on the northeast side of the property(near the existing railroad
tracts). Path B would be 3' above existing grade, 6' in width, 709' in length and would
connect to pier B which is located on the southeast side of the property. No parking is
proposed in this application.
The applicant is also proposing a 6' x 766' fixed pier and access (A) along the (northeast)
White Oak River portion of the property. It would house 10 slips with 13' x 13' boatlifts,
(6) 3' x 16' finger piers, one 8'x 24' platform and one 12' x 24' covered platform with an
12' x 12' unenclosed covered gazebo on the south east side of the platform located at the
end of the pier. Pier A would extend from the earthen pathway (640' above nhw) west for
335' in which it would then connect to an 8' x 24' observation platform located on the
north side of the pier and over jurisdictional and coastal wetlands. The pier would continue
west from this point over coastal and 404 jurisdictional wetlands for 320' until the edge of
marsh appears. It would then continue from the edge of marsh over open water for a final
110' and intersect an 8' x 24't-head platform. The south east side of the platform would
house an 8' x 12' unenclosed covered gazebo. The 10 slips would be located on the
.Field Investigation Report
1 '?&M Development, Inc
Pace 4 o.f 5
ia:ndw_id&de of the pr000se-. platform. Sri:. would':.Cto 4 te Y cn the crth of the
p. ::, would '....fir' (6) x 1.. - nge- and (3 13' x l cea it :s. ps 6-10 wc,117 be of
± e ((6-, ' _ /' -C' (5) 13' butv-Iluld
i - south
Ct of ie -o er. .VS: .. C' _ :i.._. V, +'_,.a:.. cie t°a. . .... o . e .6' :I`. 'ith .
wwt:er depths ranging from. -.5' rdw closecsit to t°.... ....:r up to .. " .lw cf shore. P eo A.
would be located a dista..]ce of 150' from the.1-....Jrth West rip Irian cor i.dor and would not
extend farther than 125' beyond the edge of rna:_ into a 506' wide water body.
The second docking facility (Pier B) would be located on the southeast side of the property
950' from the eastern riparian corridor. It would be 6' wide x 822' long and house two
platforms ( one with a unenclosed covered gazebo), 6 finger piers, 10 slips with(10) 13'
x13' boatlifts. Pier B would be 6' in width and extend over coastal and 404 jurisdictional
wetlands for 84'. It would then cross over the existing manmade mosquito canal (30' wide)
and would be elevated to a minimum height of 5' above nhw over the canal portion and a
minimum of 3' above the marsh substrate. It would continue for 295' over coastal
wetlands where at this point it would intersect an 8' x 24' observation platform. It would
then continue for 287' over coastal wetlands until it reaches the edge of marsh.At this
point it would extend over open water for a final 101' and connect with a 12' x 24'
platform which would house a 12' x 12' unenclosed covered gazebo on the south east end.
All slips would be located on the landward side of the platform with slips 1-5 located on
the west side of the pier and slips 6-10 located on the east side. Slips 1-5 would contain (3)
3' x 16' finger piers and (5) 13' x 13' boatlifts with slips 6-10 consisting of the same
design(3) 3' x 16' finger piers and(5) 13' x 13' boatlifts. The water depths for pier B are
an average of-7.25' nlw with connecting water depths from -5'nlw nearshore and-16' nlw
offshore. The pier and platform would not extend farther than 113' from the edge of marsh
into a 667' wide water body.
11. Anticipated Impacts:
This proposed installation of the dock and pilings would result in temporary turbidity
during installation. The pier placement would shade 1,698 ft2 of shallow bottom habitat for
pier A and 180 ft2 of shallow bottom habitat for pier B while incorporating 3,910 square
feet for pier A and 180 square feet for pier B of this same habitat. Pier B would shade a
total of 1,170 square feet of deep bottom habitat while incorporating 4,254 square feet
Estuarine and Public Trust Waters.A total of 4,374 square feet of coastal and 404
jurisdictional wetlands would be shaded as well. The platforms located over the wetland
areas have the potential to cause greater shading impacts due to the 8' width(min. 6'
allowed over coastal wetlands).The high ground work would fill a total of 7,500 ft2 of the
property with 312 ft2 of fill/disturbance occurring within the 75' AEC. The impervious
surface would be .086% within the Estuarine Shoreline AEC and 0%for the entire tract.
There should be no impacts to shallow bottom from dock A due to the fact that the water
depths within this area are an average of-3.6' nlw. There should be no hazard to
navigation resulting from the pier placement due to its location, as well as the piers would
not extend farther than 1/4 of the width of the water body(in this case a maximum of 125'
for pier A and 113' for pier B).No coastal marsh would be filled or excavated during this
project,however there is a potential for rutting and substrate alteration during construction.
..,• -
:IV8. 1\:.. .1".......-velopalent, iflC
4
_11'1 I .ci :J: cf cT I
S.AV'S
•
•
Stella Bricig Landing Piers
M and M a.,a?id Devellpment,
Stella, Car'; wet Coy;,-,,. North 1varollm
Project 11ad°.rative
Introdur_,'o
M and M Land Development, Inc. proposes to construct two 10-slip piers with associated
elevated walkways and earthen paths on acreage located along the White Oak River in Stella,
White Oak Township, Carteret County.The piers will include platforms, boat lifts, and fish
cleaning stations. Each pier will transition to an elevated walkway to cross over wetlands and
then connect to earthen walkways to connect to highground portions of the site. The structures
are identified as Pier A and Pier B on project plans.
The project consists of the two piers and associated walkways. There are no current plans to
further develop the property. Prior to the current economic downturn the owners hoped to
develop a single-family residential subdivision on the site.A sketch plan was reviewed by the
Carteret County Technical Review Committee in November 2007 and the owners also received
a low-density residential stormwater permit. However, due to the poor economy and the
pessimistic outlook for new residential sales the owners have now abandoned their original
plans. They hope to develop the site in the future, but at this point it is not known if or how a
residential plan will be pursued. In the event they decide to go further with the project, any
proposed development in the CAMA AECs will be addressed in a modification request for the
major CAMA permit that may be issued for this proposal.
Site Description
The project site consists of± 138.71 acres of undeveloped land located adjacent the White Oak
River in Stella.The Camp Lejeune to Cherry Point Railroad passes along the north of the
property and is an adjacent riparian neighbor of the project site. The railroad property is owned
by the United States of America, and is managed through Camp Lejeune Marine Corps Base.
The project site is connected to Wetherington Landing Road (NCSR 1101) by a recorded right-
of-way crossing and re-crossing agreement over the railroad property. The adjacent riparian
property on the east is owned by First and Last Child, LLC and is utilized as a camp ground.
Stella Bridge Landing Piers
M and M Land Development,Inc.
Major CAMA Permit Application
March 2,2012 Page 1
The parcel contains extensive coastal and non-coastal wetlands, including a large peninsula-
shaped a-ea of coastal wetlands located on the western portion of the site. The US Army Corps
of Engineers approved the Section 404 wetland delineation of 28.02 acres on December 19,
2007 (copy enclosed with this application). Staff of the NC Division of Coastal Management
provided assistance with the delineation of coastal wetlands and the locations of Normal High
Water as shown on project plans. The shoreline of the property measures about 7,000 linear
feet, including the wetland peninsula.
Several canals were previously dredged through the coastal wetlands and are not navigable at
normal low water, although some can be passed through at high tide.The site also contains a
tidal creek that meanders along the eastern portion of the site. The creek is not impacted by
this project.
The White Oak River varies in width at the site. It is 506' wide at the location of Pier A (see
plans) and 667' at Pier B, measured from the waterward edge of marsh.
Existing normal low water depths in the river range from -1.0' near the shoreline of the main
portion of the property to more than -15.0' in the center of the channel. Boat slips are located
in a minimum of-3.0' NLW as requested by the Division of Marine Fisheries. Depths at the
waterward end of Pier A measure-3.7' NLW. Depths at the waterward end of Pier B are-10'
NLW. No submerged aquatic vegetation or shellfish were observed at the site.
The White Oak River at the project site is classified as SA by the Environmental Management
Commission. This portion of the river is also classified as a Primary Nursery Area by the Marine
Fisheries Commission and is considered to be an Essential Fish Habitat. Project impacts to
these resources will be minimal, with no dredging proposed. Boat slips will be located in a
minimum of-3' NLW and will extend no more than one-fourth the width of the river. The
bottom of the pier decking over wetlands will be elevated a minimum of 3' above the wetland
substrate.The proposed piers will provide for wet dockage only; no marina services are
included.
Earthen walkways connecting to the piers are the only proposed upland development.The
walkways have been located to avoid wetland areas and are outside the coastal shoreline AEC.
IlMill3ZIMMEMZIECIM7
Stella Bridge Landing Piers
M and M Land Development, Inc.
Major CAMA Permit Application
March 2, 2012 Page 2
The average elevation of the site is 3' above nc::mai high ail ce.r. In addition to coastal and non-
coastal wetlands, shrubs,trees, and grasses al exist on the site. There is an existing cleared
area located in the center of the parcel. An exhting unpaved roadway connecting to
Wetherington Landing Road is the cnly man-m..1de feats; a on the site.
The parcel is unzoned by Carteret Cs inty, As is eviousi/ noted,the Carteret County Technical
Review Committee considered a sketch plan for a residential subdivision at the site in 2007. The
owners did not pursue, nor did Carteret County review, any further project plans for the site.
Sheet 1 of the project plans provides an overview of the project and site. There are no existing
wastewater treatment facilities, drinking water supply•sources, stormwater management or
treatment systems, or man-made structures on the site, other than the previously mentioned
unpaved road.The large peninsula-shaped area of wetlands located on the western portion of
the site will not be impacted by this project.
Project Description
The owners propose to construct two 10-slip fixed piers with associated elevated and earthen
walkways. The elevated walkway sections will cross wetland areas and will transition to earthen
paths or walkways to be constructed on the highground portion of the site. All components of
the two piers will be fixed.
Pier A measures 766' in length by 6'wide. The length measurement is based on 113' from the
waterward end of the pier to normal high water plus 653' of elevated walkway over coastal and
non-coastal wetlands. The proposed earthen path/walkway connecting to this pier measures an
additional 166' and is 6'wide.
Pier B measures 822' in length by 6'wide. Of this length, 101' extends from the waterward end
to normal high water with an additional 721' of elevated walkway over wetlands. The proposed
earthen path/walkway connecting to Pier B measures 709' x 6 '.
Pier B will be elevated a minimum of 5' above NHW for a span of 6' at the canal crossing, as
shown on Sheet 4 of project plans. (Pier A does not incorporate a canal crossing) The bottom of
the decking over wetlands (both Pier A and Pier B)will be elevated a minimum of 3' above the
wetland substrate.
Stella Bridge Landing Piers
M and M Land Development,Inc.
Major CAMA Permit Application
March 2,2012 Page 3
The earthen pathways will consist of dirt, wood chips, pine straw, or other natural materials.
The earthen pathways are located in non-wetland areas as shown on project plans (see sheets 2
and 3).
Each pier will contain two platforms. A t-head platform measuring 12' by 24' will be located at
the waterward end of each proposed structure. A section of each t-head platform will contain a
covered gazebo measuring 9' x 12' with a 16" overhang. The remaining area of the t-head
platform will not be covered. An observation platform measuring 8' x 8' with 45'angled sides
will be located in the section to be elevated over wetlands (see proposed pier plan view on
sheet 4 of project plans). •
The two piers will be located more than 1500' apart, as shown on project plans. Pier A will be
located 150'from the adjacent riparian corridor and more than 800'from adjacent docking
facilities (per Google Earth). Pier B will be located 950' from the adjacent riparian corridor and
more than 1900'from the adjacent docking facility.
As previously noted, each pier will contain 10 boat slips, for a total of 20 slips for the project.
Boat lifts measuring 12.5' x 12.5' are proposed for each slip. Six finger piers measuring 16' x 3'
are proposed for each pier,for a total of 12 finger piers. Cantilevered fish cleaning stations are
proposed adjacent the t-head platforms and along the pier landward of the slips,for a total of
two per pier or four total (see pier details on Sheet 4).
Upland Development
Proposed upland development is limited to the earthen walkways connecting to the elevated
walkway sections of the two piers. All upland work will occur outside the CAMA AEC. The
project will disturb approximately 7500 square feet, with .086 %of the entire tract being
covered with impervious surfaces (compacted dirt walkways). No impervious surfaces are
proposed for the coastal shoreline AEC.
No parking is proposed for this project. Parking for trailers is not needed since boats will be
placed in the water elsewhere and brought to the site. (There is no existing or proposed
boatramp on the property.) The existing stormwater permit SW8 091210 previously issued for
the site authorizes a roadway system, located outside the CAMA AEC,to serve a low-density
• . - -- -
Stella Bridge Landing Piers
M and M Land Development,Inc.
Major CAMA Permit Application
March 2,2012 Page 4
stormwater subdivision. Should the piers be cons fcted prior to development of a subdivision,
appropriate. se,-ions o: permitted roads will be "r_nghed in" to allow parking for users of the
clocks. Upon ro npleti; n of any future su Aivision; o.•iHers' vei li es will remain on individual
F3sidential lots eliminating any need for addition3' parking areas associated with th:: piers.
either possibilil:y, vehi;les will be pz:ked CAMA .:C a mini.num of ap pr•.-,xi:nately
500'fr.,,T. Normal High Water.
Construction Methods
Dock construction in the river will employ conventional marine construction techniques using
barge mounted equipment with pile driving capability. Walkway pilings over wetlands will be
installed by portable pile-driving equipment. A small tractor for mowing and light grading will
be used for construction of the earthen walkways. The barge will be stored in deep water. The
portable pile-driving equipment and tractor will be stored onsite on highground.
Summary
The proposed project is limited to two 10-slip fixed piers in the White Oak River with elevated
sections over wetlands, connecting to earthen highground walkways. Each pier will include two
platforms—one at the waterward end of the structure and an observation platform over
wetlands. Lifts are proposed for each boat slip.
Project impacts will be minimal, with no dredging or other development proposed. Boat slips
will be located in a minimum of-3' NLW and will extend no more than one-fourth the width of
the river. Piers will be elevated a minimum of 5' above NHW for a span of 6' at the canal
crossings. The bottom of the pier decking over wetlands will be elevated a minimum of 3' above
the wetland substrate. The proposed piers will provide for wet dockage only; no services are
included.
Two earthen walkways (one for each pier) connecting to the piers are the only proposed upland
development.The walkways have been located to avoid wetland areas. No impervious surfaces
are proposed for the coastal shoreline AEC. This proposal will cover a very small percentage
(< .1%) of the entire tract with impervious surfaces.
The owners hope to eventually pursue further residential development of the site. At this time
it is not known if, or how,future plans will be developed. If additional plans proceed for
Stella Bridge Landing Piers
M and M Land Development,Inc.
Major CAMA Permit Application
March 2, 2012 Page 5
residential development of the site,the proposed piers will enhance the project and create less
impact than individual piers.
Stella Bridge Landing Piers
M and M Land Development, Inc.
Major CAMA Permit Application
March 2, 2012 Page 6
•
9CMf MP-1
• PPIICMIOt1 .14/.46,000,4
11.461tor lavelegiatitts •
(La_ revised 12;MOO)
North C: Aria CP/ISION OF COASTAL MANAGEMENT
t. Primary Applicant)Larif.1,1iwn .
Busir;ess Name ProEct Name(if applicable)
M And M Land Development, Inc. Stella Bridge Landing Piers
Applicant 1: First Name MI Last Name
James Maides
Applicant 2: First Name MI Last Name
n/a .
If additional applicants,please attach an additional page(s)with names listed.
Mailing Address PO Box City State
166 Center Street Jacksonville NC
ZIP Country Phone No. FAX No.
28546 USA 910-938-5900 ext.
Street Address(if different from above) City State ZIP
n/a
Email
jamesmaides@csbenc.com
2. Agent/Contractor Information
Business Name
Coastal Planning Services, Inc.
Agent/Contractor 1: First Name MI Last Name
Kathy B. Vinson
Agent/Contractor 2: First Name MI Last Name
n/a
Mailing Address PO Box City State
827 Morehead City NC
ZIP Phone No. 1 Phone No. 2
28557 252-240-9297 ext. 252-354-4916 ext.
FAX No. Contractor#
252 247 5765 n/a
Street Address(if different from above) City State ZIP
n/a
Email
kbvinson@ec.rr.com
<Form continues on back>
Form DCM MP-1 (Page 2 of 5) APPLICATION for
Major Development Permit
3. Project Location
County(car.be multiple) Street Address State Rd.#
Carteret Wetherington Landing Road 1101
Subdivision Name City State Zip
n/a Stella NC 28582-
Phone No. Lot No.(s) (ii;nary, attach additional page with list)
n/a- - ext. n/a,
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
White Oak White Oak River
c. Is the water body identified in(b)above,natural or manmade? d. Name the closest major water body to the proposed project site.
®Natural ❑Manmade DUnknown White Oak River
e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed
DYes ®No work falls within.
Carteret County
4. Site Description
a. Total length of shoreline on the tract(ft.) b. Size of entire tract(sq.ft.)
7,000 6,042,208
c. Size of individual lot(s) d. Approximate elevation of tract above NHW(normal high water)or
n/a, NWL(normal water level)
(If many lot sizes,please attach additional page with a list) 8' ®NHW or❑NWL
e. Vegetation on tract
Coastal and non-coastal wetland vegetation,shrubs,trees, grasses.
f. Man-made features and uses now on tract
The tract is undeveloped.An existing dirt road approximately 10'wide connects the site to Wetherington Landing Road.
g. Identify and describe the existing land uses adiacent to the proposed project site.
Camp Lejeune to Cherry Point Railroad to the north,camp ground to the east.
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
not zoned (Attach zoning compliance certificate,if applicable)
DYes No �74NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? DYes ENo
k. Has a professional archaeological assessment been done for the tract? If yes,attach a copy. DYes No DNA
If yes,by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a DYes No DNA
National Register listed or eligible property?
<Form continues on next page>
m. (i) Are there wetlands on the site? ®Yes ❑No
(ii)Are there coastal wetlands on the site? ®Yes ❑No
(iii)If yes to either(i)or(ii)above,has a delineation been conducted? EYes ❑No
(Attach documentation,if available)
Form, DCM MP-1 (Pagw?•of 5) APPLICATION for
Major Development Pem,it
n. Describe existing wastewater treatment facilities.
none
o. Describe existing water supply source.
p. ilioscribe existing sta d water rri,:lagemenc or tre5ir.. >ystems.
nc ie
5. Activities and Impacts
a. Will the project be for commercial,public,or private use? ❑Commercial ❑Public/Government
ZPrivate/Community
b. Give a brief description of purpose,use,and daily operations of the project when complete.
Project will provide for water access to the White Oak River by owners of the tract.
c. Describe the proposed construction methodology,types of construction equipment to be used during construction,the number of each type
of equipment and where it is to be stored.
Conventional marine construction technology will be used.A barge with pile-driving capability will be stored in deep water in
the White Oak River.Walkway pilings will be installed by portable pile-driving equipment.A small tractor for mowing and light
grading will be used to construct the earthen paths.The portable pile-driving equipment and tractor will be stored onsite on
high ground.
d. List all development activities you propose.
Construction of two 10-slip piers,with platforms,gazebos,and boat lifts connecting to earthen paths(two)on highground
portion of site.
e. Are the proposed activities maintenance of an existing project,new work,or both? new
f. What is the approximate total disturbed land area resulting from the proposed project? 7500 Sq.Ft or❑Acres
g. Will the proposed project encroach on any public easement,public accessway or other area ®Yes ❑No DNA
that the public has established use of?
h. Describe location and type of existing end proposed discharges to waters of the state.
Sheet flow runoff to the White Oak River.
i. Will wastewater or stormwater be discharged into a wetland? ❑Yes ®No DNA
If yes,will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No DNA
j. Is there any mitigation proposed? Oyes igNo DNA
If yes,attach a mitigation proposal.
<Form continues on back>
6. Additional Information
In addition to this completed application foram, (MP-1)the following items below,if applicable,must be submitted in order for the application
package to be complete. Items(a)—(t)are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate,dated work plat(including plan view and cross-sectional drawings)drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work,clearly indicate on maps, plats,drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
Form DCM MP-1 (Page 4 of 5) APPLICATION for
Major Development Permit
d. A copy of the deed(with state applicatit,n only)or other instrument under which the applicant claims title to the affected properties.
e. The appropriate applicaticn fee Check or money order made payable:::o DENR.
f. A list of the names and complete addresses of The adjacent waterfront(riparian)landowners and signed return receipts as proof that such
owners have received a copy of the applicatic i and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project tc the Division of Coastal Management.
Name United States of Amerir
Phone No.
Address Commanding Officer,Public Works Code 408 Harold Napier, PSC Box 20004, Marine Corps Base,Camp Lejeune, NC 28542-0004
Name First&Last Child, LLC
Phone No.
Address 322 C-Wood Farm Road,Stella, NC 28582
Name
Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers,permittee,and issuing dates.
SW8 091210 issued to James Maides,President,M and M Land Development,Inc. on March 9,2010.
h. Signed consultant or agent authorization form,if applicable.
i. Wetland delineation,if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act(N.C.G.S.113A 1-10),if necessary. If the project involves expenditure
of public funds or use of public lands,attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date February 16,2012 Print Name Kathy B.Vinson
Signature ,
Please indicate application attachments pertaining to your proposed project.
❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts
®DCM MP-3 Upland Development
DCM MP-4 Structures Information
Form DCM MP-1 (Page 5 of 5) APPLICATION for
Major Development Permit
•
•
Form DCM MP-3
PEVE R ENT
(Construction £r3J/cr land disturbing actihrlt ss)
Attach this form to Joint Application for CAMA Major Permit, Form DCM] MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
GENERAL UPLAND DEVELOPMENT
a. Type and number of buildings,facilities, units or structures b. Number of lots or parcels.
proposed.
one
Two earthen paths connecting the highground portion of the
site to the proposed piers and elevated walkways are the
only upland development proposed at this time.The
earthen path connecting to Pier A will measure 166'x 6'.
The path connecting to Pier B will measure 709'x 6'. Both
earthen paths will be located to avoid impacts to wetlands
(see project plans).
c. Density(give the number of residential units and the units per d. Size of area to be graded,filled,or disturbed including roads,
acre). ditches,etc.
n/a Current proposal will disturb approximately 7500 sf.
e. If the proposed project will disturb more than one acre of land,the f. List the.materials(such as marl,paver stone,asphalt,or concrete)
Division of Land Resources must receive an erosion and to be used for impervious surfaces.
sedimentation control plan at least 30 days before land-disturbing Dirt,wood chips, pine straw.
activity begins.
(i) If applicable,has a sedimentation and erosion control plan been
submitted to the Division of Land Resources?
DYes ®No DNA
(ii)If yes, list the date submitted:
g. Give the percentage of the tract within the coastal shoreline AEC to h. Projects that require a CAMA Major Development Permit may also
be covered by impervious and/or built-upon surfaces,such as require a Stormwater Certification.
pavement,building, rooftops,or to be used for vehicular driveways (i) Has a site development plan been submitted to the Division of
or parking. Water Quality for review?
0% ®Yes ❑No DNA
Give the percentage of the entire tract to be covered by impervious (ii)If yes,list the date submitted: A low-density stormwater
and/or built-upon surfaces,such as pavement,building, rooftops, permit was issued by the NC Division of Water Quality on
or to be used for vehicular driveways or parking. 3/9/2010.
.086% —.
j. Describe proposed method of sewage disposal. k. Have the facilities described in Item(i)received state or local
There are currently no plans to develop the site. No method approval?
of sewage disposal is proposed at this time. DYes No DNA
If yes,attach appropriate documentation.
I. Describe location and type of proposed discharges to waters of the m. Does the proposed project include an innovative stormwater
state(e.g.,surface runoff,sanitary wastewater,industrial/ design?
commercial effluent,"wash down"and residential discharges). DYes No DNA
Sheet flow runoff to the White Oak River. If yes,attach appropriate documentation.
m. Describe pm posed drinking writer s�:ppl source(e.g.,well, n. (I) Will wat sr be impounded? ['Yes No DNA
community,public system,etc.;
(ii)If yes,how many acres?
There are no current plans to develop the site. No source:
for drinking water supply iu proposed at this time.
a. .:vas the lot(s)piattzd snd I..corded? p. If r posed development is a subdivision,will =,iditional utilities be
June 5, 2007 41st:aped for this upland development?
❑Yes ❑No ®NA
February 16,2012
Date
Stella Bridge Landing Piers
Project Name
M and M Land Development, Inc.
Applicant Name
6414.1a4v.
A P.. icant Sig ure
Form DCM MP.4
TRU c
. j
(Construct)on lo.ggthiin Trast Aroma)
Attach this form to Joint Application for CAA/IA.Mdor Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
I. DOCKING FACILITY/MARINA CHARACTERISTICS ❑This section not applicable
a. (i) Is the docking facility/marina: b. (i)Will the facility be open to the general public?
❑Commercial ❑Public/Government Private/Community ❑Yes ®No
c. (i)Dock(s)and/or pier(s) d. (i)Are Finger Piers included? Yes ❑No
(ii)Number 2 If yes:
(iii)Length Pier A=766' Pier B=822' (ii)Number 6 per pier,total of 12
(iv)Width 6' (iii)Length 16'
(v)Floating ['Yes ®No (iv)Width 3'
(v)Floating DYes No
e. (i) Are Platforms included? Yes DNo f. (i) Are Boatlifts included? Yes ONo
If yes: If yes:
(ii)Number 2 per pier,total of 4 (ii)Number 10 per pier, for a total of 20
(iii)Length 12'Iplatform w/gazebo)and 8'(observation (iii)Length 12.5'
platform)
(iv)Width 12.5'
(iv)Width 24'(platform w/gazebo)and 8'(observation
platform)
(v)Floating ❑Yes No
Note: Roofed areas are calculated from dripline dimensions.
g. (i)Number of slips proposed h. Check all the types of services to be provided.
10 per pier,for a total of 20 0 Full service,including travel lift and/or rail,repair or
(ii)Number of slips existing maintenance service
0 0 Dockage,fuel,and marine supplies
®Dockage("wet slips")only,number of slips: 20
❑Dry storage;number of boats:
❑ Boat ramp(s);number of boat ramps:
❑Other,please describe:
i. Check the proposed type of siting: j. Describe the typical boats to be served(e.g.,open runabout,
❑ Land cut and access channel charter boats,sail boats,mixed types).
['Open water;dredging for basin and/or channel mixed types
®Open water;no dredging required
['Other;please describe:
k. Typical boat length: 20'-26' I. (i)Will the facility be open to the general public?
m. (i)Will the facility have tie pilings? ❑Yes ®No
['Yes No
(ii)If yes number of tie pilings?
n/a
2. DOCKING FACILITY/MARINA OPERATIONS ❑This section not applicable
•
a Check each of the following sar;_.ary facilities that will be included in the proposed project.
' 0 Office Toilets
c\x0 Toilets for patrons;Number: ; Location:
1 ❑S powers
❑ f :atholding tar:,:pump,;ut;Give type and lc ration:
b. Dee.w.be treatmec: type and disposal location for a+!sanitary wastewater.
nor.•
c. D. •,n-ibe the disposal of solid waste, fish offal and trash.
trash receptacles located on highground
d. How will overboard discharge of sewage from boats be controlled?
none allowed •
e. (i)Give the location and number of"No Sewage Discharge"signs proposed.
two signs-one at each pier
(ii)Give the location and number of"Pumpout Available"signs proposed.
none
f_ Describe the special design,if applicable,for containing industrial type pollutants,such as paint,sandblasting waste and petroleum products.
n/a
g. Where will residue from vessel maintenance be disposed of?
n/a
h. Give the number of channel markers and"No Wake"signs proposed. none
i. Give the location of fuel-handling facilities,and describe the safety measures planned to protect area water quality.
none
j. What will be the marina policy on overnight and live-aboard dockage?
not allowed
k. Describe design measures that promote boat basin flushing?
n/a
I. If this project is an expansion of an existing marina,what types of services are currently provided?
not an existing marina
m. Is the marina/docking facility proposed within a primary or secondary nursery area?
®Yes ❑No
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
INIYes ❑No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh(CW),submerged aquatic vegetation(SAV),shell bottom
(SB),or other wetlands(WL)? If any boxes are checked,provide the number of square feet affected.
®CW 5280 sf shaded ❑SAV ❑SB
OWL 2404 sf shaded ONone
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No •
If yes,give the name and address of the leaseholder(s), and give the proximity to the lease.
3. BOATHOUSE(including covered lifts) El This section not applicable
a. (i) Is the boathouse structure(s):
['Commercial ❑Public/Government ❑Private/Community
(ii)Number
(iii)Length
(iv)Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) 0 This section not applicable
a. (i) Number
(ii)Length
(iii)Width
8. BREAKWATER (e.g., wood,sheetpile, etc.) This section not applicable
a. Length b. Average distance from NHW, NWL,or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
8. MOORING PILINGS and BUOYS ®This section not applicable
a. Is the structure(s): b. Number
❑Commercial ❑Public/Government ❑Private/Community
c• Distance to be placed beyond shoreline d. Description of buoy(color,inscription,size,anchor,etc.)
Note: This should be measured from marsh edge,if present.
e. Arc of the swing
7. GENERAL
a. Proximity of structure(s)to adjacent riparian property lines b. Proximity of structure(s)to adjacent docking facilities.
950'to east, 150'to northwest 1,950'to east, 840'to northwest
Note: For buoy or mooring piling, use arc of swing including length
of vessel.
c. Width of water body d. Water depth at waterward end of structure at NLW or NWL
506'at Pier A,667'at Pier B -3.7'NLW at Pier A,- 10'NLW at Pier B
e. (i) Will navigational aids be required as a result of the project?
Dyes No DNA
(ii)If yes,explain what type and how they will be implemented.
8. OTHER ®This section not applicable
Give complete description:
February 16,2012
Date
Stella Bridge Landing Piers
Project Name
M and M Land Development, Inc.
Applica t Name
Ap licant SiigrIure