Loading...
HomeMy WebLinkAboutNC0020559_Pretreatment Compliance Inspection_20240628DocuSign Envelope ID: 6E45A538-766A-4EE3-8D3C-llD27D07A10B ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Christy Lipscomb WRF Director City of Henderson P.O. Box 1434 Henderson, NC 27536 NORTH CAROLINA Environmental Quality June 28, 2024 Subject: Pretreatment Compliance Inspection City of Henderson Water Reclamation Facility NPDES Permit No. NCO020559 Vance County Dear Ms. Lipscomb: On June 20, 2024, Cheng Zhang of the Raleigh Regional Office (RRO) conducted a Pretreatment Compliance Inspection of City of Henderson's pretreatment program. The assistance given by Mr. Brandon Elliott, Pretreatment Coordinator of the facility, was greatly appreciated. The inspection report is attached. Findings during the inspection were as follows: 1. There is only one Significant Industrial User (SIU) discharging to the POTW, which is not a Categorical Industrial User (CIU). It was noted that the SIU (Mars Petcare) was not in Significant Non -Compliance (SNC) for the two most recent semi-annual periods. 2. The review of Long Term Monitoring Plan (LTMP) data indicated that all locations were sampled with required frequencies and all samples analyzed with correct detection limits since last inspection. LTMP data were well maintained in spreadsheets. 3. A review of the files containing the pretreatment program elements was conducted. All elements were up to date. Files were available and well organized. Update of Long Term Monitoring Plan (LTMP) and Headworks Analysis were received by the Division on March 27, 2024 and September 11, 2023, and in review. 4. Mars Petcare's pretreatment file (Permit No. 0011) was reviewed during the inspection. During the second semi-annual period of 2023, the SIU was compliant. The City of Henderson's pretreatment program is very well managed. Thank you for your continued support of the Pretreatment Program. If you have questions regarding to the attached North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office I 3800 BarrettDrive I Raleigh, North Carolina 27609 NORTH CAROLINA ^ 919.791.4200 n�,Mo E,Amnm W1 Q. 1K, DocuSign Envelope ID: 6E45A538-766A-4EE3-8D3C-11D27D07A10B report or any of the findings, please contact Cheng Zhang at 919-791-4200 (or email: cheng.zhang@ncdenr.gov). Sincerely, DocuSigned by: Vaun t,ssa f. Ili aun ut,l, B2916E6AB32144F... Vanessa E. Manuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources Enclosure: City of Henderson PCI Form Cc: Central Files (Laserfiche) Brandon Elliott - City of Henderson (electronic copy only) D � ��� North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NORTH CAROLINA ��` 919.707.9000 nnpn .mo EnWromm�nfal n.. DocuSign Envelope ID: 6E45A538-766A-4EE3-8D3C-llD27D07A10B r C'. NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Water Resources ENVIRONMENTAL QUALITY BACKGROUND INFORMATION [Complete Prior To PCI; Review Prollram Info Database Sheet(s)] 1. Control Authority (POTW) Name: City of Henderson 2. Control Authority Representative(s): Brandon Elliott 3. Title(s): Pretreatment Coordinator 4. Last Inspection Date: 09/19/2023 Inspection Type (Check One): ❑ PCI ® Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO Order Type, Number, Parameters: Are Milestone Dates Being Met? ❑ YES ❑ NO ICIS CODING Main Program Permit Number MM/DD/YY I N I C 1 0 10 12101515191 1061201241 7. Current Number Of Significant Industrial Users (SIUs)? 1 8. Number of SIUs With No IUP, or With an Expired IUP? 0 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 0 13. Number of SIUs in SNC with Pretreatment Schedule? 0 14. Number of SIUs on Schedules? 0 15. Current Number Of Categorical Industrial Users CIUs ? 0 16. Number of CIUs in SNC? 0 POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during SNC for either of the Last 2 Semi -Annual Periods? Not Been Published for SNC for Public Notice?(May refer to PAR if Excessive SIUs in SNC) Not Pul 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? [—]YES ® NO ❑ YES ® NO Limits: None Reporting: None dished: None None [—]YES ® NO LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO 26. If NO to 23 - 26, list violations 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO If yes, which ones? Eliminated: Added: NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1 DocuSign Envelope ID: 6E45A538-766A-4EE3-8D3C-llD27D07A10B 28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 9/11/2023 ® Yes ❑ No 11/4/2019 ® Yes ❑ No 4/1/2022 Industrial Waste Survey IWS 4/14/2022 ® Yes ❑ No 3/2/2023 ® Yes ❑ No 4/30/2027 Sewer Use Ordinance SUO 11/9/2012 ® Yes ❑ No 11/19/2012 ® Yes ❑ No Enforcement Response Plan (ERP) 1/24/2020 ® Yes ❑ No 2/12/2020 ® Yes ❑ No Long Term Monitoring Plan (LTMP) 1 3/27/2024 ® Yes ❑ No 2/14/2020 ® Yes ❑ No INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 29. User Name 1. Mars Petcare 2. 3. 30. IUP Number 0011 31. Does File Contain Current Permit`? ® Yes ❑ No 32. Permit Expiration Date 4/3/2027 33. Categorical Standard Applied I.E. 40 CFR, Etc.) Or N/A N/A 34. Does File Contain Permit Application Completed Within One Year Prior ® Yes ❑ No to Permit Issue Date? 35. Does File Contain an Inspection Completed Within Last Calendar Year? ® Yes ❑ No 36. a. Does the File Contain a Slug/Spill Control Plan? a. ®Yes ❑No b. If No, is One Needed? (See Inspection Form from POTW) b. []Yes []No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ❑Yes❑No[g Organic Management Plan TOMP ? 38. a. Does File Contain Original Permit Review Letter from the Division? a. ®Yes ❑No b. All Issues Resolved? b.❑Yes❑No❑N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete ®Yes ❑ No its Sampling as Required by IUP, including flow? 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? ® Yes ❑ No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its ®Yes❑No❑N/A Sampling as Required by IUP, including flow? 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports ®Yes❑No❑N/A I F on time? 42a. For categorical IUs with Combined Wastestream Formula (CWF), does 0Yes0No[9 file include process/dilution flows as Required by IUP? 42b. For categorical IUs with Production based limits, does file include ❑Yes❑No®N/A production rates and/or flows as Required b IUP? 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑Yes❑No®N/A All Limits Non -Compliance from Both POTW and SIU Sampling? 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑Yes❑No®N/A All Reporting_Non-Compliance from SIU Sampling? 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- a.❑Yes❑No®N/A Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? b.❑Yes❑No®N/A c. If applicable, Did POTW resample within 30 days of becoming aware c.❑Yes❑No®N/A of SIU limit violations in the POTW's sampling of the SIU? 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes ® No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken ❑Yes❑NoON/A as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? 48. Does the File Contain Penalty Assessment Notices? ❑Yes❑No®N/A 49. Does The File Contain Proof Of Penalty Collection? ❑Yes❑No®N/A 50. a. Does the File Contain Any Current Enforcement Orders? a.❑Yes❑No®N/A b. Is SIU in Compliance with Order? b.❑Yes❑No®N/A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This ❑ Yes ®No Requested Information For You? NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2 DocuSign Envelope ID: 6E45A538-766A-4EE3-8D3C-llD27D07A10B FILE REVIEW COMMENTS: Mars Petcare was compliant during the most recent semi-annual period. INDUSTRY INSPECTION ICIS CODING: Main Program Permit Number MM/DD/YY 1. Industry Inspected: 2. Industry Address: 3. Type of Industry/Product: 4. Industry Contact: Title: Phone: Fax: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: The program is well managed; files are well organized. Requirements: None Recommendations: None NOD: [—]YES ® NO NOV: ❑ YES ® NO QNCR: ❑ YES ® NO POTW Rating: ® Satisfactory ❑ Marginal ❑ UnSatisfactory PCI COMPLETED BY: Chen Zhan2, Raleigh Regional Office DATE: June 20, 2024 NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3