Loading...
HomeMy WebLinkAboutNCC241799_Site Plan or Location Map_20240703 V) I- U LLI I- ZCV O Z 0 IY U BID DOCUMENTS Q Z Ti GREENE CENTRAL HIGH SCHOOL _. . W N U Lu o U 140 SCHOOL DRIVE, SNOW HILL, NC 28580cn Q LU ��_ tO Ce _ U m W p1 } W - 2Z O N Sheet List Table m a 2 Sheet Number Sheet Title C0.0 COVER SHEET *CO.1 KEY PLAN UTILITY / MUNICIPALITY CONTACTS:• CONSULTANT CONTACTS: C1.0 EXISTING CONDITIONS PLAN * e*'Q�'�H Cq�1"®,4* 6.es) .e C1.1 EXISTING CONDITIONS PLAN * A. GREENE COUNTY C. BURIED CABLE LOCATION OWNER SITE ENGINEER/LANDSCAPE ARCHITECT i QP gr.i2 C1.2 EXISTING CONDITIONS PLAN * PLANNING AND INSPECTIONS DEPARTMENT NC 811 s GREENE COUNTY SCHOOLS TIMMONS GROUP a92 v C1.3 DEMOLITION PLAN * CONTACT:BRANDON J SUTTON 301 KINGOLD BLVD CONTACT:WILL ALTMAN,PE ur: C1.4 DEMOLITION PLAN * COUNTY PLANNING DIRECTOR/ZONING D. PITT AND GREENE EMC SNOW HILL,NC 28580 5410 TRINITY ROAD,SUITE 102 +® ". C1.5 DEMOLITION PLAN * ADMINISTRATOR/GIS COORDINATOR 205 N GREENE ST (252)747-3425 RALEIGH,NC 27607 �"w P;,.R.`+""� C2.0 EROSION CONTROL PLAN PHASE I * 229 KINGOLD BLVD,SUITE E SNOW HILL,NC 28580 PHONE:919-866-4938 C2.1 EROSION CONTROL PLAN PHASE I * SNOW HILL,NC 28580 (252)747-7600 ARCHITECT C2.2 EROSION CONTROL PLAN PHASE II * MOSELEY ARCHITECTS C2.3 EROSION CONTROL PLAN PHASE II * B. GREENE COUNTY PUBLIC WORKS ASHLEY P DENNIS,AIA,LEED AP BD+C C2.4 EROSION CONTROL PLAN PHASE III * CONTACT:DAVID JONES VICE PRESIDENT I ARCHITECT ...IN. C2.5 EROSION CONTROL PLAN PHASE III * PUBLIC WORKS DIRECTOR 911 N WEST STREET,SUITE 205 TYOUR VISION ACNIEVED THROWN OURS. IMMONS GROUP C2.6 EROSION CONTROL PLAN PHASE III * 105 LANDFILL ROAD RALEIGH,NC 27603 - I 110MIGKLRIP PCS DRAWING PREPARED AT PIE MEM OFFICE C2.7 EROSION CONTROL PLAN PHASE IV * WALSTONBURG,NC 27888 919-840-0091 TEL 919.866.4951 C2.8 EROSION CONTROL PLAN PHASE IV * (252)747-5720 FAX 919.859.5663 C2.9 EROSION CONTROL PLAN PHASE IV * Norffi Carollna license Na.oms. see ematurnarney C2.10 EROSION CONTROL PLAN PHASE V * 5846'333 C2.11 EROSION CONTROL PLAN PHASE V SITE DATA TABLE C2.12 EROSION CONTROL PLAN PHASE V * PINS: 0830023,0830050 C3.0 SITE PLAN * TOTAL SITE AREA: 60 t ACRES C3.1 SITE PLAN * C3.2 SITE PLAN * DISTURBED AREA t20 ACRES ZONING: RURAL C3.3 STRIPING PLAN RIVER BASIN: NEUSE C3.4 STRIPING PLAN TOTAL IMPERVIOUS EXISTING IMP 11.15 AC;PROPOSED IMP 10.59 AC C3.5 UTILITY PLAN * PROPOSED BUILDING HEIGHT 42 FT-1.5 IN C3.6 UTILITY PLAN O FRONT:30 FT _ C3.7 WATER LINE PROFILES A FRONT(ON MAJOR THOROUGHFARE):40 FT -<0MINIMUM BUILDING SETBACK SIDE:10 FT CD SANITARY SEWER PROFILES m i SIDE(ON CORNER LOT):25 FT 10 FT C4. 21 C4.01 GRADING PLAN . SGNOOV ORN GRADING PLAN * E 59,13 5�W TOTAL PROPOSED BUILDING BUILDING:%,302 TOTAL SF SQUARE FOOTAGE C4.2 SPOT GRADE PLAN PARKING REQUIREMENTS C4.3 SPOT GRADE PLAN to m TOTAL PARKING SPACES :fIT PROVIDED 327 PARKING SPACES C4.4 STORMWATER PROFILES CO C4.5 STORMWATER PROFILES Tz,0 REQUIRED ADA PARKING 9 ADA SPACES REQUIRED D C4.6 STORMWATER MANAGEMENT PLAN * ADA SPACES PROVIDED 9 SPACES PROVIDED C4.7 DRAINAGE AREA MAP * C5.0 NOTES AND DETAILS CLI C5.1 NOTES AND DETAILS / SITE C5.2 NOTES AND DETAILS / O C5.3 NOTES AND DETAILS z C-SERIES DRAWING ABBREVIATIONS: pp Ln C5.4 NOTES AND DETAILS * ADV-ADVANCE MIN-MINIMUM CO C5.5 NOTES AND DETAILS * AFG-ABOVE FINISHED GRADE MIN S-MINIMUM SLOPE Q C l Z ' APPR LOC.-APPROXIMATE LOCATION MJ-MECHANICAL JOINT C5.6 NOTES AND DETAILS * / ? ASS'Y-ASSEMBLY NIC-NOT IN CONTRACT Z B/C-BACK OF CURB NTS-NOT TO SCALE Q J Z C5.7 NOTES AND DETAILS / z B/L-BASE LINE OHE-OVERHEAD ELECTRIC L1.0 PLANTING PLAN 7-'4. B/S-BOTTOM OF STAIR OHP-OVERHEAD POWER Ce J L1.1 PLANTING DETAILS B/W-BOTTOM OF WALL OHT-OVERHEAD TELEPHONE FS.0 Ce FIRE SYSTEM LAYOUT CB-CATCH BASIN PB-PLAT BOOK V CBR-CALIFORNIA BEARING RATIO PC-POINT OF CURVATURE CG-CURB AND GUTTER PED-PEDESTAL Z FS.1 TANK DRAIN VAULT CI-CURB INLET PG-PAGE FS.2 FIRE SYSTEM DETAILS C/L-CENTERLINE PH-PHASE I- O CL-CLASS PI-POINT OF INTERSECTION Loll Ce Z FS.3 FIRE SYSTEM DETAILS / CM-CONCRETE MONUMENT PKG-PARKING O (/) FS.4 FIRE SYSTEM DETAILS / V CMP-CORRUGATED METAL PIPE P/L-PROPERTY LINE Z CO-CLEAN OUT PT-POINT OF TANGENT �J,J / CONC-CONCRETE PP-POWER POLE CONN-CONNECTION PVC-POLYVINYL CHLORIDE I- Q CP-CORRUGATED PLASTIC PVMT-PAVEMENT CY-CUBIC YARD PWR-POWER DB-DEED BOOK (R)-RECORDED METES&BOUNDS Z OU J DI-DROP INLET RD-ROOF DRAIN VICINITY MAP DIP-DUCTILE IRON PIPE RJ-RESTRAINEDJOINT W O D.M.P-DOUBLE MERIDIAN DISTANCES RNV-RIGHT-OF-OF-WAY DR-DRIVE REQ'D-REQUIRED 1" = 500' DS-DOWNSPOUT RCP-REINFORCED CONCRETE PIPE Q ZLi] C.) E-ELECTRIC S-SLOPE W EA-EACH SAN-SANITARY SEWER Ce N E BOX-ELECTRICAL BOX SDWK-SIDEWALK ce CO ELEC-ELECTRIC SF-SILT FENCE d- EP-EDGE OF PAVEMENT SPT-SPOT GRADE CD r E/S-EDGE OF SHOULDER SS-SANITARY SEWER CONNECTION EX-EXISTING STA-STATION F/C-FACE OF CURB STD-STANDARD PROJECT NO: 623159 FDC-FIRE DEPARTMENT CONNECTION STM-STORM DATE: 03-22-2024 FF-FINISHED FLOOR STMH-STORM SEWER MANHOLE FHY-FIRE HYDRANT T-TELEPHONE DATE DESCRIPTION 1. THE CONTRACT DOCUMENTS ARE COMPLEMENTARY AND WHAT IS REQUIRED F/L-FLOW LINE TBC-TOP BACK OF CURB 04/08/2024 ADDENDUM#1 BY ONE SHALL BE AS BINDING AS IF REQUIRED BY ALL. IN THE CASE OF A FL-FIRE LANE TCM-TELECOMMUNICATIONS MANHOLE 04/12/2024 ADDENDUM#2 A CONFLICT,DISAGREEMENT,OR AMBIGUITY,PROVIDE THE BETTER QUALITY. IN G-GAS T/C-TOP OF CURB 04/18/2024 ADDENDUM#3 THE CASE OF A CONFLICT, DISAGREEMENT, OR AMBIGUITY, PROVIDE THE MG-GAS METER TEL-TELEPHONE REAT R QU;NTI OF WaRK. GI-GRATE INLET T/S-TOP OF STAIR 2. AL 0 -U ON = 'LL a, 0-• T. 'E -- N 0 • F - N -•D GRND-GROUND T/W-TOP OF WALL CONSTRUCTION STANDARDS. GTS-GAS TEST STATION UGE-UNDERGROUND ELECTRIC 3. CONSTRUCTION DRAWING APPROVAL IS REQUIRED PRIOR TO BEGINNING GV-GAS VALVE UNK-UNKNOWN CONSTRUCTION. THE MONUMENT CONTROL POINTS FOR THIS PROJECT IS: HDPE-HIGH DENSITY POLYETHYLENE UP-UTILITY POLE OBSERVED TIMMONS CONTROL, GPS 1, N:631,823.78'E: 2,395,355.22', ELEV.: HORIZ-HORIZONTAL VAR-VARIABLE 52.76' HVAC-HEATING,VENTILATION,&AIR VCP-VITRIFIED CLAY PIPE 4. IF THERE IS A GEODETIC MONUMENT LOCATED ON THIS SITE, IT MUST BE CONDITIONING VERT-VERTICAL PROTECTED OR IF RELOCATION IS NEEDED IT WILL BE THE RESPONSIBILITY OF INV-INVERT W/-WITH THE DEVELOPER TO RELOCATE IT WITH SURVEY ACCURACY. IPF-IRON PIPE FOUND W/L-WATER LINE IPS-IRON PIPE SET W-WATER IRF-IRON ROD FOUND WUS-WATERS OF THE US LSA-LANDSCAPED AREA X-ING-CROSSING LF-LINEAR FEET YI-YARD INLET COVER SHEET LP-LIGHT POLE 0 -DIAMETER (M)-MEASURED METES&BOUNDS MECH-MECHANICAL MH-MANHOLE C0.0