Loading...
HomeMy WebLinkAboutNCG020587_DMR Upload Review_20240703 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 7/1/2024 9:37:59 AM(DMR Submittal) Submit by Brittany.Cook 7/3/2024 2:18:16 PM(DMR Submittal Review) • The task was assigned to DEMLR SW Admin for DMRs 7/1/2024 9:38:00 AM • Brittany.Cook assigned the task to Brittany.Cook 7/3/2024 2:07:24 PM DEQ - r'n.r-.. Monitoring ' - • • 1 • • . • DMR Submittal from 7/1/2024 Permit and Facility Information: .............................................................................................................................................. Permit Number* Enter COC or Individual Permit Number NCG020587 Must begin with NCS or NCG Facility Name:* Camden Yard Materials, LLC Owner/Operator Camden Yard Materials LLC Name:* County:* Camden Note: Facility name and county are used to help the reviewer verify the permit number entered,and to display the Regional Office address on the submitter's form(not here).These metadata details will be pulled from current BIMS information after the DMR(s)are filed. If the submittal is accepted,simply note any errors in the reviewer's comments. Reason for not yet If applicable: reporting data Registration forms will be submitted after my signature authorization is approved. through eDMR for this permit: Monitoring Period Information: .............................................................................................................................................................................................................................................................................................................................................................................................. Monitoring Period What is the YEAR of the sample date(s)? Year:* 2024 DMR Upload* Click the upload button or drag and drop files here to attach document. Q2_2024 Signed Wastewater DMR.pdf 443.11 KB Only PDFs are accepted. Comments: Per conversations with operations manager Albert Guarin,the outfall did not discharge during the second quarter of 2024. 1 observed the outfall on 6/19/2024, shortly after being hired by Camden Yard Materials LLC as the environmental consultant for this site,and found the outfall to not be discharging even though pit dewatering was taking place.This was likely due to low water levels in the dewatering pond due to low rainfall in the past several weeks.The outfall will be continually monitored and samples collected if a discharge does occur. My signed signatory authorization form for this site will be mailed today. * VA By checking the box and signing box below, I certify that: • I have given true,accurate,and complete information on this form; • I agree that submission of this Discharge Monitoring Report(DMR)Upload form is a"transaction"subject to Chapter 66, Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act"); • I understand that an electronic signature on this upload form has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit this DMR Upload form. Full Name:* Robby Atwood Name of person submitting this form Email Address:* robby.atwood@msaonline.com Phone Number:* 7574909264 Signature: Date:* 07/01/2024 Review Review Date: 07/03/2024 Confirm Permit No.* Correct the permit ID number if needed. NCG020587 Confirm DMR Year* 2024 Multiple DMRs will be automatically filed in a subfolder denoting the sampling year entered above. Can submittal be Yes accepted?* No(Explain why below) Do Central Office No staff need to be Yes alerted?* Do Regional Office No staff need to be Yes alerted? Type of Permit* General Ensures DMR(s)filed correctly.