Loading...
HomeMy WebLinkAbout310863_Compliance Evaluation Inspection_20240618 Division of Water Resources Facility Number - ® 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: ('Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time:Et_.'_ J`' County: 41,47 Region: 1j'0 0 Farm Name: i/1 ew, l IZt. Owner Email: Owner Name: G6r)'lrAn11\ �/����j'�che,�Q, !.) Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: RD 5 31 - 6563 Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish La er Dairy Cow Wean to Feeder Non-Layer Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes ❑ No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE of the State other than from a discharge? Page I of 3 511212020 Continued Facility Number: / - G Date of Inspection: Z Waste Collection&Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes EDNo ❑ NA ❑ NE a.If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: D% `seer Spillway?: Designed Freeboard(in): Observed Freeboard(in): _ 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [rNo ❑ NA ❑ N F, (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a 0 Yes + No ❑ NA ❑ N I waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DW12 7.Do any of the structures need maintenance or improvement? ❑ Yes [�No ❑ NA ❑ NF. 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Eg No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [�No ❑ NA ❑ N F maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes [r No ❑ NA ❑ NE. maintenance or improvement? 11.Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes [E No ❑ N A ❑ N G ❑ Excessive Ponding ❑ Hydraulic Overload M Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): 13.Soil Type(s): 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes [fNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [2 No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [3/No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes E No ❑ NA ❑ NE Required Records& Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes �o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes,check ❑ Yes Wo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists [—]Design ❑ Maps [:] Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes E2/<o ❑ NA ❑NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and I" Rainfall Inspections ❑Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ Yes ICJ No ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes dNo ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: ( irS Date of Inspection: Z 24. Did the facility fail to calibrate waste application equipment as required by the permit? [:] Yes dNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check [:] Yes [�No ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge'? ❑ Yes E3eNo VN ❑NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑No ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes EJ/No ❑ NA ❑NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes eNo ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [q No ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes dNo ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ErNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [fNo ❑ NA ❑ NF. 34. Does the facility require a follow-up visit by the same agency? ❑ Yes 4No ❑ NA ❑ NF Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). 1Mt w kLz—C ap�,G ca br'e f 7il� a4T- 44' P 5 Reviewer/Inspector Name: / ' irij ap/ gel,Xf/Wer_ Phone: �i'd ' 6 qC,`7,21S_ Reviewer/Inspector Signature: Date: G AD2 Page 3 of 3 _/12/2020