HomeMy WebLinkAbout310863_Compliance Evaluation Inspection_20240618 Division of Water Resources
Facility Number - ® 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: ('Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: Departure Time:Et_.'_ J`' County: 41,47 Region: 1j'0 0
Farm Name: i/1 ew, l IZt. Owner Email:
Owner Name: G6r)'lrAn11\ �/����j'�che,�Q, !.) Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative: Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
RD 5 31 - 6563
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish La er Dairy Cow
Wean to Feeder Non-Layer Dairy Calf
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes ❑ No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ❑ No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facility Number: / - G Date of Inspection: Z
Waste Collection&Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes EDNo ❑ NA ❑ NE
a.If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: D% `seer
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in): _
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [rNo ❑ NA ❑ N F,
(i.e.,large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a 0 Yes + No ❑ NA ❑ N I
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DW12
7.Do any of the structures need maintenance or improvement? ❑ Yes [�No ❑ NA ❑ NF.
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes Eg No ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes [�No ❑ NA ❑ N F
maintenance or improvement?
Waste Application
10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes [r No ❑ NA ❑ NE.
maintenance or improvement?
11.Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes [E No ❑ N A ❑ N G
❑ Excessive Ponding ❑ Hydraulic Overload M Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12.Crop Type(s):
13.Soil Type(s):
14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes [fNo ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes [2 No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes [3/No ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes E No ❑ NA ❑ NE
Required Records& Documents
19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes �o ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes,check ❑ Yes Wo ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists [—]Design ❑ Maps [:] Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes E2/<o ❑ NA ❑NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and I" Rainfall Inspections ❑Sludge Survey
22.Did the facility fail to install and maintain a rain gauge? ❑ Yes ICJ No ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes dNo ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facility Number: ( irS Date of Inspection: Z
24. Did the facility fail to calibrate waste application equipment as required by the permit? [:] Yes dNo ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check [:] Yes [�No ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge'? ❑ Yes E3eNo VN
❑NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑No ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes EJ/No ❑ NA ❑NE
and report mortality rates that were higher than normal?
29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes eNo ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [q No ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes dNo ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ErNo ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [fNo ❑ NA ❑ NF.
34. Does the facility require a follow-up visit by the same agency? ❑ Yes 4No ❑ NA ❑ NF
Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
1Mt w kLz—C ap�,G ca br'e f 7il� a4T- 44' P 5
Reviewer/Inspector Name: / ' irij ap/ gel,Xf/Wer_ Phone: �i'd ' 6 qC,`7,21S_
Reviewer/Inspector Signature: Date: G AD2
Page 3 of 3 _/12/2020