Loading...
HomeMy WebLinkAbout310031_Compliance Evaluation Inspection_20240619 Division of Water Resources Facility Number - FT-17 FT- O Division of Soil and Water Conservation O Other Agency Type of Visit: C_,o/mpliance Inspection Operation Review O Structure Evaluation O Technical Assistance (tp Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: 3/,$'' Departure Time: County: OtWtA Region: Wi411) Farm Name: �0-5G Bro4ke/'S RyNl Owner Email: Owner Name: � Pry, 4� e4 Q>� Oj �, NC &Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: 31 Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow 19 Wean to Feeder Gp Non-Layer Dairy Calf _ Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes � No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes [:] No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes [Z No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes JN No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 511212020 Continued Facilit Number: 31 - 31 jDateofInspection: G 2 Waste Collection &Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [D No ❑ NA ❑ NI-, a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ N A ❑ N F. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 2 Spillway?: Designed Freeboard(in): Observed Freeboard(in): 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ( No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes � No ❑ NA ❑ Nt? 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes g No ❑ NA ❑ NF (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes Qa No ❑ NA ❑ N F, maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes [2 No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes Et No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ 'Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes W No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes LNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �] No ❑ NA ❑ NE Required Records& Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes ] No ❑ NA ❑ NF 20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes LE No ❑ NA ❑ NI, the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall []Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? [:] Yes 22 No ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA NE Page 2 of 3 511212020 Continued Facility Number: - Date of Inspection: l j 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes FF/VNo ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes No ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 5] No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit?(i.e.,discharge, freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA ONE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �a No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments(refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). A.A e' r'4' Reviewer/Inspector Name: -z' P �y�� Phone: q10 - 7fr67 "lO/T Reviewer/Inspector Signature: Date: 62,,f Page 3 of 3 511212020