HomeMy WebLinkAbout310031_Compliance Evaluation Inspection_20240619 Division of Water Resources
Facility Number - FT-17 FT- O Division of Soil and Water Conservation
O Other Agency
Type of Visit: C_,o/mpliance Inspection Operation Review O Structure Evaluation O Technical Assistance
(tp Reason for Visit: Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: Arrival Time: 3/,$'' Departure Time: County: OtWtA Region: Wi411)
Farm Name: �0-5G Bro4ke/'S RyNl Owner Email:
Owner Name: � Pry, 4� e4 Q>� Oj �, NC &Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative: Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
31
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish Layer Dairy Cow
19 Wean to Feeder Gp Non-Layer Dairy Calf _
Feeder to Finish Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes � No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes [:] No ❑ NA ❑ NE
b. Did the discharge reach waters of the State? (If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes [Z No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes JN No ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3 511212020 Continued
Facilit Number: 31 - 31 jDateofInspection: G 2
Waste Collection &Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [D No ❑ NA ❑ NI-,
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ N A ❑ N F.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: 2
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in):
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE
(i.e., large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ( No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR
7.Do any of the structures need maintenance or improvement? ❑ Yes � No ❑ NA ❑ Nt?
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes g No ❑ NA ❑ NF
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9.Does any part of the waste management system other than the waste structures require ❑ Yes Qa No ❑ NA ❑ N F,
maintenance or improvement?
Waste Application
10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes [2 No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes Et No ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ 'Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes W No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes LNo ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes �] No ❑ NA ❑ NE
Required Records& Documents
19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes ] No ❑ NA ❑ NF
20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes LE No ❑ NA ❑ NI,
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes No ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall []Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? [:] Yes 22 No ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA NE
Page 2 of 3 511212020 Continued
Facility Number: - Date of Inspection: l j
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes FF/VNo ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes No ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes 5] No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE
permit?(i.e.,discharge, freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA ONE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �a No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [ No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE
Comments(refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
A.A e' r'4'
Reviewer/Inspector Name: -z' P �y�� Phone: q10 - 7fr67 "lO/T
Reviewer/Inspector Signature: Date: 62,,f
Page 3 of 3 511212020