Loading...
HomeMy WebLinkAbout310683_Compliance Evaluation Inspection_20240606 ivision of Water Resources Facility Number �5� - (�'1� O Division of Soil and Water Conservation O Other Agency Type of Visit: C�om lance Inspection Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: ('Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access Date of Visit: Arrival Time: Departure Time: County: Region: bJ� (} Farm Name: '=5-kv. & Owner Email: Owner Name: f Lh C+ Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: CJur�,� (;(A,UJ{L Integrator: Certified Operator: S rt^ t• Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. W an to Finish Layer Dairy Cow can to Feeder Non-Layer Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-La ers Beef Feeder Boars jPullets Beef Brood Cow Turkeys Other Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes CVO ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes �o NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA NE of the State other than from a discharge? Page 1 of 3 511212020 Contiiiiied Facili Number: - Date of Inspection: (D Waste Collection &Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes to ❑ NA ❑ NF a. If yes, is waste level into the structural freeboard? Yes ❑ No ❑ NA ❑ N F Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: W 7 70. Spillway?: Designed Freeboard(in): Observed Freeboard(in): _ 1� � — 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes E:j 110 ❑ NA ❑ NE (i.e., large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or enviro nental threat, notify DWR 7.Do any of the structures need maintenance or improvement? Yes ❑ No ❑ NA ❑ NE 8.Do any of the structures lack adequate markers as required by the permit? Yes 0 No ❑ NA ❑ Nl (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require Yes ❑No ❑ NA ❑ N I? maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes [�24 ❑ NA ❑ NI? maintenance or improvement? 11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes E?K/o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ 'Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ©'No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes VN ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable Yes ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? Yes E j No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes E-N o ❑ NA ❑ NE Required Records& Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes E]�No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes,check ❑ Yes [No ❑ NA NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes F9TO [] NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis []Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and I" Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes N;/❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? Yes No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facilit Number: - ?. Date of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o ❑ NA ❑ NF 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes o ❑ NA ❑ N 1 the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes []J4*6 ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes EKO ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes []No ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [✓�No ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility? If yes,check the appropriate box below. ❑ Yes nNo ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes Q-No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes �o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes Fj No ❑ NA ❑ NE Comments(refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facilityto better explain situations(use additional pages as necessary). Reviewer/Inspector Name: �/� Phone: Reviewer/Inspector Signature: r Date: 02 Page 3 of 3 511212020