HomeMy WebLinkAbout310339_Compliance Evaluation Inspection_20240606 Division of Water Resources
Facility Number �� - 33� O Division of Soil and Water Conservation
O Other Agency
Type of Visit: O Comp lance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: erRoutine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: Arrival Time:0 Departure Time: County:_D nQ118 Region: uT
Farm Name: d Owner Email: � "
Owner Narne: Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative: Ell J—i► :) Integrator: I M/741
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish La er Dairy Cow
Wean to Feeder I INon-La er I Dairy Calf
eeder to Finish Dairy Heifer
Farrow to Wean Design Current Dury Cow
Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys
Other Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NI;
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes [g o ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes EyNo ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes B/N o ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes DA/0 ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
Facility Number: - 3 Date of inspection:
Waste Collection&Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? [—] Yes /No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE
Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: a-
Spillway?:
Designed Freeboard(in):
Observed Freeboard(in): 30 _�
5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE
(i.e., large trees,severe erosion,seepage,etc.)
6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes Eg/No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes 10 ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes D<O ❑ NA ❑ NE
(not applicable to roofed pits,dry stacks,and/or wet stacks)
9.Does any part of the waste management system other than the waste structures require ❑ Yes [Dlo ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes [alo ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes QAo ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12.Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes No ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes ED/Vo ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Ejl<o ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes [2'<o ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes �lo ❑ NA ❑ NF
Required Records& Documents
19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes to ❑ NA ❑ N I?
20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes Flo1�o ❑ NA ❑ NI"
the appropriate box.
❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other:
1. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes EKO ❑ NA ❑ NE
❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ NA ❑ NE
23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE
Page 2 of 3 511212020 Continued
Facilit Number: - Date of inspection: k� 2
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes El No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes Uk o ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ["No VA
0 NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes Blo ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑No ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes to ❑ NA ❑ NE
permit?(i.e.,discharge,freeboard problems,over-application)
31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes Eg o ❑ NA ❑ N F;
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes D<o ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [�No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes D1VO ❑ NA ❑ NE
Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
68A 0-4a t15 dkc i V \ a6025
r
Reviewer/Inspector Name: 9VZU14iA Phone:
Reviewer/Inspector Signature: Date: pZ
Page 3 of 3 5/1212020