Loading...
HomeMy WebLinkAbout310271_Compliance Evaluation Inspection_20240606 LQ Division of Water Resources Facility Number © - 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: om iance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: ,- Region: Farm Name: Owner Email: Owner Name: �/�C�n Lk Co-F,_ Phone: Mailing Address: Physical Address: Facility Contact: 1l Title: Phone: Onsite Representative: ��;*�� LI�N,c �- Integrator: k C Certified Operator: �I,��f�jp �6'l e/ Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish La cr = I Dairy Cow can to Feeder I JNon-Layer Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dury Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Urkey Poults Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes E 'No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ©moo ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes Ej<o ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 511212020 Continued Facility Number: - Date of Inspection: Q Waste Collection &Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes /❑ NA ❑ NE a.If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: ,_ Spillway?: Designed Freeboard(in): Observed Freeboard(in): _ �� 5.Are there any immediate threats to the integrity of any of the structures observed? [:] Yes [D-No ❑ NA ❑ NE (i.e., large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ❑D40 ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ o ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NF, maintenance or improvement? / Waste Application f 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes ❑ No ❑ NA ❑ NE maintenance or improvement? 1 1. Is there evidence of incorrect land application?If yes,check the appropriate box below. 0 Yes o ❑ NA 0 NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes Kj-l<Io ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Fj"NoKNo ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [U >o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes EjNo ❑ NA ❑ NE Required Records& Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes ❑DNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes ❑'<o ❑ NA ❑ NE the appropriate box. ❑WUP []Checklists []Design ❑Maps ❑Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes gD'Nlo ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and I" Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes � o ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes VNo ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facili Number: 3 - oZ Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes [:] No ❑ NA NE the appropriate box(es)below. ❑Failure to complete annual sludge survey [:]Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes B No ❑ NA 'o NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No LJ ' A I__I NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document 0 Yes 0_k�o NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ] Yes ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes Eb_Xi ❑ NA ❑ NF. permit?(i.e.,discharge,freeboard problems,over-application) 31. Do subsurface file drains exist at the facility?If yes,check the appropriate box below. ❑ Ycs t L1�I NA ❑ N E ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes %Kico❑ NA ❑ NE 0 34. Does the facility require a follow-up visit by the same agency? ❑ Yes 0 o ❑ NA ❑ NE Comments(refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). Reviewer/Inspector Name: J Phone: Reviewer/Inspector Signature: _ Date: (y 4 Id, Page 3 of 3 511212020