HomeMy WebLinkAbout20160517 Ver 2_DCM Permit_20240703Permit Class
MODIFICATION/MINOR
Permit Number
47-87
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
er M t
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to NC State Ports Authority, PO Box 9002, Wilmington, NC 28402
Authorizing development in New Hanover County at Areas F-West and H-Yard at the Port of
Wilmington , as requested in the permittee's letter dated 3/21/23, including the
attached workplan drawings (9) Sheet 1-9 of 9 dated "received March 26, 2024"
This permit, issued on July 3, 2024 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
Bulkhead Repair and Encasement
1) Unless specifically altered herein, this Minor Modification authorizes the concrete encasement of the
existing bulkhead and replacement of an existing concrete access ramp, all as expressly and
specifically set forth in the attached letter and workplan drawings. Any additional development
activities may require a modification of this permit. [07J .0202(c); 07H .0209; G.S. 113-229(b)]
2) Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the
State. In accordance with commitments made by the permittee, a coffer dam shall be placed
waterward of the bulkhead prior to construction. [07H .0208(a)(2)(B)]
(See attached sheet for additional conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2027
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
For Tancred Miller, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
NC State Ports Authority
ADDITIONAL CONDITIONS
Permit No. 47-87
Page 2 of 3
3) The bulkhead encasement shall be constructed in accordance with the alignment depicted on the
attached workplan drawings. [07H .0208(b)(7)(D)]
4) The bulkhead encasement shall be constructed prior to any backfilling activities. [07H .0208(b)(7)(C);
07H .0209 (d)(4)]
5) The bulkhead encasement shall be structurally tight so as to prevent seepage of backfill materials
through the structure. [07H .0208(b)(7)(C); 07H .0209(d)(4)]
6) This permit does not authorize any excavation waterward of the approved alignment. [07H .0206]
Upland Development outside AEC
7) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities
associated with the development of the above referenced property, including the regrading and repaving
of an existing 13.85 acres of asphalt pavement and replacement of hi -mast lighting, fire hydrants, and an
existing stormwater system with no change to existing outfalls, all as expressly and specifically set forth
in the attached permit application and workplan drawings. [07J .0202(c); 07H .0209(d)]
Sedimentation and Erosion Control
8) In order to protect water quality, runoff from construction shall not visibly increase the amount of
suspended sediments in adjacent waters. [07H .0209(d)(4); G.S. 113A-102(a); 07H .0207; 07H .0208]
9) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. [07H
.0209(d)(4); G.S. 113A-102(a); 07H .0207; 07H .0208]
General
10) The permittee and/or his or her contractor shall meet with a representative of the Division prior to
project initiation. [07J .0209(a)]
11) All conditions and stipulations of the active permit remain in force unless specifically altered herein.
[07J.0209(a)]
NOTE: This Minor Modification shall be attached to the original Permit No. 47-87, which was issued to
the permittee on 2/17/87, as well as all subsequent modifications, refinements, and renewals, and
copies of all documents must be readily available on site when Division personnel inspect the
project for compliance.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.