HomeMy WebLinkAboutNCC242002_Site Plan or Location Map_20240702 1P
N / / / \ \, Viir
1110 DATE:�/ PAGE.
g --1 ) \
/- � Ss
V11111111.
z
N ,
It \ / / \ \ \ /' 4� __ nA. nBn Cn „D. nEn wF„ G,. nHn
b
400
, c
260 �\ �e /' ti y ROUSE �� j j HOGS HOUSE
SITE DRNa 409 ROAD \6 \I\ \88 raw I .1 _ _, L_ `1 k.�a L 1 Li 1 AY ,24...1
\� HG. RD HGA. AY
�� lDaaNLET�EDDEDPDGRB Noes
., 1
e, . ( \III\ \ $�7 1.If nerved;Tree Protection fencing s,rhz oe Installed along;12;:trAtzTo,n5.::;rnetl,
Yy yCONSTRUCIIION \\ \ LEGEND Inc d nk die eter.
ary protected ees,provitlinga atl'us ach
Inch of trunk diameter.
:b$ LIMITS \ 2.Install Sill Fence on the low elevation sides of each lot.Install Silt Fence outlets shown On
rrrr����'''' schematiddiagrem antl field atljusletl,if necessary,for placement at low points.If lots are
m'� .pyp,V11lE0.pp0 ^q 2 N mn[iguous antl M1ave tliHerent lantl owners or builtlers,eacM1 lot should have intlividual Sik
�' ot24, \ - Fences.
"I \ "G" \ I ® 3.InsUll required Silt Fence within 10 feet of property line to ensure there is no conflict with
y$ thillir
�� \ S5 ENTRANCE septic system.It is the responsibility of the builder to ensure the installation of sediment
•
g a CONDUCTION V179
10klik CURB INLET central measures does not impact the septic system and repair area(s).
"'p MITS \ Lot Plan \ 4.Al least one Construction Entrance/Exit is to be installed t
YETNEyg,L nO b A \ \"B&H CON L MI STION \ \ 5.Waste bins and other areas dedicated for managing building material waste snail be at
401 P,-,---:4'','''''
V� t m r 0 east 50 feet away from storm drain inlets or drainage dit has unless it can be shown that
1 Lot man \ L\ 12 \ \ no other alternative exists.If this separa00n cannot be achieved,these areas must be
" �2 OPEN I o[Pan Pontained behind Silt Fence.
/ °\ CO TRUCTIO \ '/G 6,Inlets downstream of disturbances should be protected;streets should be swept when
\/J�'ittl' / / 47 / \ MITS SPACE \ sediment from the Construction adivily M present.
I I ( ✓ Lot Plan/ / \ \ / DATE.\:
jpeg 7.Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are
„F„ / 21 \ provided on additional sheets.Erosion and sediment control details are not drawn to style.
/ Lot 121 \ /2020 TYPICAL LOT LAYOUT WITH CURB AND GUTTER
/ \ „H" 260 \
262 68 67 �aatTJ // �\ \ 2D \ \ \ DATE: PAGE:
5 .00�t��V//Lo48n . k: 212 / /�
35; //S a / „P„ \ \ 19 284 123 /:fF
fiY
VICINITY MAP ' 65 Lot Plan a �,
N.T.S. F y 124 j �_ �QO� 1�� 1t o
r F \ OPEN SPACE / / 80
10 Q � o ^�"°"/w°°
/ CONSTRUCTIO o51n 0
63 AND 0 AMENITIES / �._ ££ ,.
..,,,...,,,...-..............e,-,,,,,,,,,,,,,::::1
\ \ LIMITS CENTER /' �--- / WA, iy.
\ 52G I. POSTAL �x•
DATE: PAGE: 70 Lo[Elan \ �15 264 K �-_ / r'�OPEN \ 0
S' Sock/Watt 51 Sock/wattle
PLGw� n .I Arealnbe N, Other materials OT: __rc<4awempraeptmm \ \ \ // / SPACE \ =" 1c4T"��'
�I
-11,_ II ea b annalwlm'mr \ Lot Plan \ /' /' 78 \� �, `
I. - e -ra ea may a --
n'-1r guniformywmmcompost 71 „E„ \ 14
1 'I 2 2 xto the clesire0 lenge)such that cgs do no..m. \ \ \ \ /' / ConsimcM1on Ma ntenance.
Stokes Stakes 3. all u e be nsta d parallelm / 1.Clear the entrance and exit area dell vegetal on roots and other objectionable 1.Per NCG-01 inspect t k and afterM1 1inch or
a.a minimum of 10 feet beyond me toe of a \ \ 54 material and
SECTION SECTION 6D / properly grade t greater rainfall, k yrequired pimmediately.
urvuane(e)located dew \ Lot Plan \ \ 13 / \ 2.Place the Ito the apeufic grade and tl mans one shown on the lane and 2 Maintain to d- d t t t mud d ant
flat as should.cares Cr me edge of the /� gravel 9re P9 P P
land disturbance.Tlie edeafmaht ` 72 \ ,E, \ / / \ \ �... smooth from leavingtn t cfo T Thisy q p d'
f0 (1 pent �,� \ / /� / 3 Provide drainage to carry water to a sediment bapor other suitable outlet topdress gwth2nch stone.
` •ne, �0 ,s / \ 59 55 4.Use gee a Nle fabrics n order to m ro e s aft ry o the ountlahon n loco ens 3 Immetl'alely remove all objectionable materials spilled,washed or
fl- Lot Plan \ \ / / 2 / p v
W W 4 2 N
\ cP \\ „E„ \ _/ \ l- subject to seepage or high water table tracked onto publ c roatlweys
inch x 2 inch cross sedon should be driven
sock/waNe,Stvertically akes should be placedata through the center of Me SO CONSTRUCTIO• �e ¢f %� CONSTRUCTION ENTRANCE/EXIT
maximum interval of 4 feet or a maximum interval LIMITS // �l \ V
of 8 feel if thealasoci aeleisplaceama4mm I 56 e� 1 / t r0
Wood Mulch or UNTRENCHED NSTAUAATlONomg st g ntl 4 Min. 5. thesocks/wattles arent eused m Is not paveneossble nthheery /'/ QN t7
ENTRENCHED INSTALLATION. s7e\b 0�
ISOMERIC VIEW ,.,w�.,�w."tyren,m.m,m,.re,wm,.,mamam,.w,.. < adltmplace dating runoff events. \
\ \ rfJ CONSTRUCTION SCHEDULE
MAINTENANCE:
w i) FLOW H 3 1. Warn sin sock...at least weekly and after VI.\ / necessary permits an P approve ( C)permit arm Coverage
for Uneendid Socks R. znkmmeb d a \ I.murk allaobtainee d Ian approvals. occur,
Sediment Control C permit,
da da Certificate Cove must
cavosTm 1 Inch or greater raInfall.Remove
\ \ �� / mat be obtained before any land disturbing activities m.Aco yoftM1e MSC permit the COC sodahard taps of the Ian
rea
_Mulch or Compost _ be kept on site,preferably ine^ermlts box,and accessible during inspection, P
40 inch
omgn Mo., (xnm (ono°run)(50 rum)(eon am) a(]5 p clogged 2.oInstall gravel construction entrances OrsS drum It fences,reinforced'If Truce
ProteHed nm�) nmjn 76 /I outlets and wenles.c
Shen Flows �4ope a 50 10 a' , 3.Finish1 good grubbingnecessary areas on the lots as they are started.
workArea f SIIft5ock/NL.ngth`" (iesrm) (22 min) r '''I Ire! a 4 B 1 grading dex - activities
coat a (sos m) Pas m) (sopem) ' t / Begin gr gun
Hproa 7,0 (t a(i g(Ree 5.B^gin or continue with M1ous ecorastmction ream ahem
T Im;a I e't i g(3 ft s. soc
ks/wadies
ellbe inspected ethovlle lye - growdeover installed. econnlry
6.Fi E 11 h gading and ham coon edict fie.All a of dishnbed for 7 days needs to have temporary or perm
•9n ue run run) run/^') m m) /^•/"•) m m) 4. Rwau �mnaen peimarenay mhilirae. N 1 7.Install driveways,walks and patios. '.
SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION *11,10 i r� �/ g8.Begin One grading oflotareas
26D rem place mulching
I thgl dsis tabilizing
sodded f lot I throe will involve theinstallation of sod on the lot The silt fence will
grassingthestabilized and hold.
\ I / \ \ 10. IT hell d If' Pe of the - d d' control measures and complete Me following
1.
J _� combinedself-inspectionf found the°EMU b
DATE: Wire Fene Filter Fabric PAGE: \ v M1ttps:IMww d q. g /b Vdm mineral d land ra s0 air progaMnpdesca recommended
progam.
Twelvemonths f completespec forms hall b kept d available for inspection at all times It is recommended a
Steel Past e'Max.Standard S..th fob' - • copy b kept'apermits b Ref G.S.113A 541 through G.S.113A 57 S 15A NCAC 00.0101 mavgp 15A
e Max.Era strengm fabric-out wire fence Wire Fence ydre BockTll trench \ \ NCAC 04E0504 General Permit NCG 010000 NPDES for Construction Activities.
tl Compact 11 Self f d din 1 bperformed least once every seven calendar days and
e. thoroughly with 24 hours f f h.I inch.Any needed shall be made immediately to maintain measures as
Steel Post -- \
\ \ N.
. - \ designed,All FSC shall be d specified'k details on kia plan.Aain6mge shall be installed
at the
--Mope
�_ 121mp project
d 1acceptancemonitoring.
l letters theproject PI d p hall contact DE.MI.m close out the EffiSC
Plastic or A tfi24' ' 26E� � Plan After DEM inspection report fee permintt shall vital
Wire ties 20 �al \ \ / \ 'deg B vMCG01 mf bran ce electronicN nu of termination(o-NNOT).A$120 annual general Permi[ke will be charged
tit eo-NO been flied out,
•
:along the trench
L Filter Fabric t / ', \ \ ` ^ \ \ // I ASELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY
1. °nnrunmaadimen a strength or extra strengm 24 hsymm�icaaer rubrics. CROSS SECTION VIEW \ \v \ \ / I / NCGS 113A-54.1•IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR
2.Ensure that.Construction:
impound ocher.s of water um sufficient m cause failure not ofme s cture)th of the nt above
`ms ground.(Higher fences \ \ \ ` \ / - �\ / COMPLETED AS AN EXCEL SPREADSHEET.
\ \ \ /1/r-f-----------\,
/ AN ALTERNATIVE IS TO MAKENOTATIONSONTHECOPYOFTHEAPPROVEDecurel astenric 10s r r°cinth onuous lyaewppor post with 4 feet r3are'm dovveenep m the era paosk / EROSION AND
4.Support ntsrengm anerkbnc q%ire mean ras4enea eecurelym me upalope side of me perm.Eared hence: \ SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A
pa pe ninnsp.sdlment fences at least once a week and after eachl \ NCAC 048.0131 STATES THAT'...DOCUMENTATION SHALL BE ACCOMPLISHED BY
a maxmum ofareal apart.suppdoHsd uld be anven Ma snou,egNe mbdcWellsdimem m�ucouapsee1rear,Sew p \ INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE
the wire mesh support to the bottom of
5.when a wry mesh is APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING,
trench.Fasten the wire
a minimum 50
securely be grounrs immediately.
d e"meiw�mof 2eside of Me fen.post.Wire or plastic zip alechespes d s p l DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE,
6.Extrafeame'me anermbnc enreNydm foot
tyre oriplae:ipea does tessnou,e naeSmuor50 Poune fensne arorege volumefadnceor become ineffective,&k as euea.ym pmviaaaegemamoae 1 / / N PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION
S mnceVTakedceretp avoid uneermng reduce
pressure onthe 1 I I \ \ / / / •
b" CONTROL PLAN.'
].Excavate the trench barpproxlmemly4lnO ea wise and Binches seep along me proposes line Mite posts end Removes \/ ///
I \ I •
8.g c%mpe from fa trench elwithnood aoeaaog aneria.andtrenm. Remove
materials
alit ue�om e&kirM I I �\ �\ 1ca<lltoof perfor pa o�,meaaerfabnnand p Th g nnnfineban lime drew�eareahaaberoPmP dy mbil d \D��,�,Ilt�mn�pm �n�a g�. red L i 1 ) �!
ANC-Envircnrnenlol.Joey � ) I M q
FFFFFNC-E F SILT FENCE \ \ zrl \�� \ / �- J l
az
•
\ � \� \\)�\\\ ////� I I I /( / 260
DATE: PAGE:
MIN .� FENCE \I \\ J�) \ /��� ) J �� PAGE 1 of 2
\\ I // J/// TOTAL DISTURBED ACREAGE: 2.40 ACRES
MDSTBE �\v � �� / (II 1 I LOT EROSION CONTROL PLAN
LOTS 21, 23, 24, 46-55 (Sc 120
STEELr„ABOVE THE�EpAHED I �N � J�� N I /)i) I ( KIRWIN VILLAGE
HARDWAREWIRE FENCE
R 1 , i - � 2 / /, / \ ) PHASE lA
CLOTH� FRONT BURY WIRE FENCE,FILTER FABRIC,
MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION FOR
WASHED STONE _ irya If CLOTH IN TRENCH DREAM FINDERS
FILTER OP
3.FILTER FABRIC
NOTES: INTO SOLID GROUNDGeneral-All measures will be inspected and coon tions made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates,measures will be HOMES,
z57 ON GROUND 1.Hardware clan and grevel�shoMuId ovaries the sintenceoat leastAi2E relocated on the lot to insure that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. 1 IOMES, LLC
Illsinches. Gravel Construction Entrance-The ravel ad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic to dressin with 2-inch stone.After each rainfall,inspect an structure used to trap sediment and clean it out as necessary. Immediate) remove all
�<e � g p p g y q ° top dressing p y p ry' y RAEFORD TOWNSHIP HOKE COUNTY
a 2.Stone outlets should be placed on low elevation areas of silt fence objectionable materials spilled,washed,or tracked onto public roadways.
and based on field conditions. Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure SCALE:1"=100' MAY 2024
MAINTENANCE: that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. -
oP 1.PerNCG-01,inspectoutletatlestonceaweekandaftereachilnchor GRAPHIC SCALE
ter rainfall event.Complete anyrequired repairs immediate) Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth
HARDWARE CLOTH FILTER FABRIC IN TRENCH greater y. too 0 50 100 200 OD
2.Freshen stone when sediment accumulation exceeds 6 inches. and stabilization of the root bed.The sod should be limed and fertilized as per soil type recommendations and type of grass recommendations when and if possible.
3.Keep mesh free of debris to provide adequate flow. Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing has been placed,the area should be maintained as needed to insure that at areas are germinating properly.Any bare areas should be 9 = MMI 11
SECTION view 4.Remove sediment when half of stone outlet is covered. repaired,and reseeded as soon as possible.If the time of year does not permit the establishment ofa permanent grass,then a temporary grassing should be used until the growing season permits the use ofa permanent grass.
5.Replace stone as needed to facilitate de-watering.
..\NC-Envtr entotjpey Wattles-Wattles shall be inspected after significant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed ( IN FEET )
SILT FENCE OUTLET sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. 1 inch = 100 ft.
Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment Remove all MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305
fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. PHONE(910)484-5191 FAX(910)484-0388 LICENSE#F-0106
LAST SAVED:5/15/2024 4:21 PM LAST PLOTTED:5/15/2024 4:58 PM PLOTTED BY.Dennis Gilbert ncnOOut:G\CURRENT JOBS\H&H CONSTRUCTORS\23-1367-05 KIRWIN VILLAGE-EC\PLANS\KIRWINVILuAGEEC-LOTS21.23.24.46-55&120.oWe