HomeMy WebLinkAboutSW6231105_Plansheet - Cover Sheet_20240701 DocuSign Envelope ID:060510C1-E606-4864-B739-73B9A5B4B841
HOUSING AUTHORITY OF THE CITY OF LUMBERTON
O
cn
HILTON HEIGHTS 72 UNIT RELOCATION >
alf
550 W . CATON RD .
LUMBERTON , NC 28358
ROBESON COUNTY, NC
1 M
N
M o
} trD O
0
N c
N c:
4=0 N ti � z Q u7
fo) C LL
_ O
'1 X N •L0
Q C
C �
N
Ll co
L Cn
Z
.. O
N
O
O
UMBF. RT01*4■ ■ Z 00
9r-
...... -H o us in Authority
LU O
Workinq Trt B : ' a Bri ht . � FuU ' � � � o
J _
DRAWING INDEX ARCHITECTURAL ILL
Q U
T001 COVER SHEET A101 STANDARD UNIT FLOOR PLANS (NOT INCLUDED) >- 00 Q
C101 BUILDING CODE SUMMARY: COMMUNITY CENTER (NOT INCLUDED) A102 HC UNIT FLOOR PLANS (NOT INCLUDED) co J W
00 C102 BUILDING CODE SUMMARY: BUILDING A (NOT INCLUDED) A103 COMMUNITY CENTER FLOOR PLAN (NOT INCLUDED) U N uJ
G103 BUILDING CODE SUMMARY: BUILDINGS B&C (NOT INCLUDED) A104 BUILDING TYPE 1 FLOOR PLANS LU U _
G104 BUILDING CODE SUMMARY: BUILDING D (NOT INCLUDED) A105 BUILDING TYPE 2 FLOOR PLANS 2 Z _ U)
( )
G105 BUILDING CODE SUMMARY: BUILDING EMT INCLUDED A106 BUILDING TYPE 3 FLOOR PLANS Z Z
G106 LIFE SAFETY PLAN: COMMUNITY CENTER (NOT INCLUDED) A107 BUILDING TYPE 4 FLOOR PLANS LL O D
G107 UNIT SEPARATION PLANS (NOT INCLUDED) A108 ROOF PLANS (NOT INCLUDED) O � (!) W
G108 UL DETAILS(NOT INCLUDED) A109 ROOF PLANS (NOT INCLUDED) } W = >
Al 10 FINISH PLAN-STANDARD UNITS (NOT INCLUDED) �_ 00 (D Q
CIVIL: RIGHT-OF-WAY (NOT INCLUDED) A111 FINISH PLAN-HC UNITS (NOT INCLUDED)
C-0.1 COVER SHEET A112 FINISH PLAN-COMM. CENTER (NOT INCLUDED) Q W C..)
Al 13 STANDARD UNIT CEILING PLANS (NOT INCLUDED) 2 J =
C-0.2 LEGEND A114 HC UNIT CEILING PLANS (NOT INCLUDED) ~ Z
C-0.3 NOTES A115 COMMUNITY CENTER CEILING PLAN (NOT INCLUDED) W OO
C-1.00 ROADWAY EXISTING CONDITIONS & DEMO Q LLJ
C-2.01 ROADWAY GRADING & DRAINAGE PLAN A201 ELEVATIONS: BUILDING 1 (D � J
C-2.02 ROADWAY GRADING & DRAINAGE PLAN A20 ELEVATIONS: BUILDING 2 Z _
C-3.00 ROADWAY CROSS SECTIONS A203 ELEVATIONS: BUILDING 3 - Q
A204 ELEVATIONS: BUILDING 4 Cn
C-3.01 ROADWAY CROSS SECTIONS D U
A205 ELEVATIONS: COMMUNITY CENTER >_
C-3.02 ROADWAY CROSS SECTIONS p U)
C-3.03 ROADWAY CROSS SECTIONS A301 BUILDING SECTIONS (NOT INCLUDED) _
C-3.04 ROADWAY CROSS SECTIONS A302 BUILDING SECTIONS (NOT INCLUDED) �
C-4.00 SIGHT DISTANCE A401 BUILDING SECTIONS & DETAILS
�= A501 BATHROOM & KITCHEN DETAILS (NOT INCLUDED)
'4 C-5.00 EROSION CONTROL PLAN A601 DOOR/WINDOW SCHEDULE & DETAILS (NOT INCLUDED)
! C-6.00 DETAILS C-6.01 TRAFFIC CONTROL DETAILS
A602 DOOR/WINDOW DETAILS (NOT INCLUDED)
•� I I,
C-6.02 EROSION CONTROL NOTES FIRE PROTECTION (NOT INCLUDED)
- - F001 FP LEGEND, NOTES, & DETAILS
7 CIVIL: SITE/LANDSCAPE 4
F002 FP DETAILS
C-0.1 LEGEND F003 FP SITE DIAGRAM
SITE C-0.2 GENERAL NOTES F101 BLDG. 1 FIRE PROTECTION PLAN
C-1.0 EXISTING CONDITIONS F102 BLDG. 2 FIRE PROTECTION PLAN
1 ? C-2.0 SITE PLAN F103 BLDG. 3 FIRE PROTECTION PLAN NEIGH,
C-2.1 SITE PLAN - ROADWAY F104 BLDG. 4 FIRE PROTECTION PLAN
C-3.0 GRADING AND DRAINAGE PLAN F105 COMM. CENTER FIRE PROTECTION PLAN
i1s4 ChAh Rd C-3.1 DRAINAGE PROFILES AND STRUCTURES F106 COMM. CENTER FIRE PROTECTION PLANCOL
C-3.1 STORMWATER MANAGEMENT PLUMBING (NOT INCLUDED)
C-4.0 UTILITY PLAN_ C-5.0 EROSION CONTROL PLAN -
PHASE 1 P001 PLUMBING LEGEND, NOTES, & DETAILS
C-5.1 EROSION CONTROL PLAN - PHASE 2 P002 PLUMBING DETAILS
C-5.2 EROSION CONTROL PLAN - PHASE 3 P101 BLDGS. 1 -4 FIRST FLOOR PLANS .,.-
C-5.3 EROSION CONTROL PLAN - ROADWAY P102 COMM. CENTER FLOOR PLANS
Lumberton C-5.4 EROSION CONTROL PLAN - SKIMMER DETAIL P401 UNIT PLUMBING PLANS
C-6.0 EROSION CONTROL DETAILS P402 UNIT PLUMBING PLANS ; '
LOCATION MAP C-6.1 EROSION CONTROL DETAILS P403 UNIT PLUMBING PLANS "'' " �
unici al r�, 4�
C-6.2 SITE DETAILS P404 UNIT PLUMBING PLANS
Airport _ MECHANICAL (NOT INCLUDED)
C-6.3 UTILITY DETAILS " '+ "` ' 1 �Zr
C 6.4 UTILITY DETAILS
_ C-6.5 STORM DRAINAGE DETAILS M001 MECHANICAL LEGEND, NOTES, & DETAILS
LP1 .1 LANDSCAPE PLAN M101 UNIT MECHANICAL PLANS E i°a" ► DESIGNED BY: RDP
.,. ,a
LP2.1 WETLAND LANDSCAPE PLAN M102 HC UNIT MECHANICAL PLANS - •. r
LP3.1 LANDSCAPE SPECIFICATIONS M 103 MECHANICAL PLANS - FIRST FLOOR < < ' a
� � ,a DRAWN BY:
LP3.2 DETAILS & MATERIALS M104 MECHANICAL PLANS - SECOND FLOOR 'F g' TSM
STRUCTURAL (NOT INCLUDED) M105 COMM. CENTER MECHANICAL PLANS � '� ~ju
M501 MECHANICAL DETAILS ' CHECKED BY:
RDP
S101 BLDG 1 FOUNDATION PLAN
M701 MECHANICAL CONTROL DIAGRAMS
S102 BLDG 2 FOUNDATION PLANry
S103 BLDG 3 FOUNDATION PLAN ELECTRICAL (NOT INCLUDED) `' PROJECT NO.:
S104 BLDG 4 FOUNDATION PLAN E000 ELECTRICAL COVER SHEET ` 3313-C
S105 COMM. CENTER FOUNDATION PLAN
E101 TYP. UNIT ELECTRICAL PLANS -� �� ti' _"" DATE:
S201 BLDG 1 SECOND FLOOR FRAMING PLAN E102 HC UNIT ELECTRICAL PLANS --
S202 BLDG 2 SECOND FLOOR FRAMING PLAN
w 08-30-2023
_ E103 COMMUNITY CENTER ELECTRICAL PLAN
S203 BLDG 3 SECOND FLOOR FRAMING PLAN �a,
E104 1 ST FLOOR BUILDING PLANS ,} '`�
SCALE
S204 BLDG 4 SECOND FLOOR FRAMING PLAN E105 2ND FLOOR BUILDING PLANS t'
S301 BLDG 1 ROOF FRAMING PLAN E200 ELECTRICAL SITE PLAN AS SHOWN
S302 BLDG 2 ROOF FRAMING PLAN E300 ELECTRICAL RISER DIAGRAM
S303 BLDG 3 ROOF FRAMING PLAN E301 ELECTRICAL RISER DIAGRAM
S304 BLDG 4 ROOF FRAMING PLAN E302 ELECTRICAL RISER DIAGRAM SHEET NO.
VICINITY MAP S305 COMM. CENTER ROOF FRAMING PLAN E303 FIRE ALARM RISER LOCATION MAP
S401 TRUSS ELEVATION AND TRUSS NOTES E400 PANEL SCHEDULES
S402 TRUSS ELEVATION AND TRUSS NOTES E401 PANEL SCHEDULES 1�� = 2,000'
S403 TRUSS ELEVATION AND TRUSS NOTES E500 ELECTRICAL DETAILS
S501 SECTIONS & DETAILS
S502 SECTIONS & DETAILS
S50 SECTIONS & DETAILS FINAL D RAW I N G S504 SECTIONS & DETAILS
T001
S505 SECTIONS & DETAILS FOR REVIEW PURPOSES ONLY
S601 GENERAL NOTES