Loading...
HomeMy WebLinkAboutNCC230818_MODIFICATION Supporting Documents_20240701 CERTIFICATE OF PLAN APPROVAL O ,,<:. - ,,IPRU.I],1T .44i ��. '"s QUAM The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environmental Quality in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 4B.0127 (b). M-73 Cardinal to NC State Pipeline Project: WAKE-2023-040 Project Name and Location June 26, 2024 /t/Aor # 9eeo4r, // Date of Plan Approval Regional Engineer £ D_E Q , Certificate of Coverage Number \..r/