HomeMy WebLinkAboutNCG030492_Cover Letter and Inspection_20240702 ROY COOPER '
Governor "
ELIZABETH S.BISER
Secretary "
WILLIAM E. TOBY VINSON,JR NORTH CA€OLI:' A
Interim Director
n r nmenta l uaadity
July 2, 2024
Stabilus, Inc.
Attn: Erik Pena
1201 Tulip Drive
Gastonia,North Carolina 28052
Subject: Stormwater Inspection Report
NPDES Stormwater Permit Number NCG030492
Gaston County, North Carolina
Dear Sir or Madame:
Enclosed please find a copy of the Compliance Inspection Report for the inspection conducted at the
Stabilus, Inc. facility located at 1201 Tulip Drive on June 5, 2024. The report should be self-explanatory,
however,should you have any questions concerning these reports,please do not hesitate to contact William
Baummer at(704) 235-2141 or by email at william.baummer`c deq.nc.gov.
Sincerely,
Kathryn Peterson
Assistant Regional Engineer
Land Quality Section
WB/KP
Enclosure: Inspection Report
cc: Stormwater Laserfiche, NCG030492
MRO-Land Quality Section, Stormwater Files
North Carolina Department of Environmental p Quality i Division of Energy,Mineral,and Land Resources
��• Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115
704-235-2100
Compliance Inspection Report
Permit:NCG030492 Effective: 07/01/21 Expiration: 06/30/26 Owner: Stabilus
SOC: Effective: Expiration: Facility: Stabilus
County: Gaston 1201 Tulip Dr
Region: Mooresville
Gastonia NC 28052
Contact Person:Michael Sayers Title: Phone: 704-865-7444
Directions to Facility:
From Charlote take 85 South to Exit#17 Rt/321 fo left off the exit ramp onto 321 (north).At the second traffc light(approx.300Yards)
go left ont Tulip Drive. Plant is 1/2 mile on the left.
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 06/05/2024 Entry Time 12:50PM Exit Time: 02:45PM
Primary Inspector:Lily C Kay Phone: 704-663-1699
Secondary Inspector(s):
William Baummer
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Metal Fabrication Stormwater Discharge COC
Facility Status: 0 Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCG030492 Owner-Facility:Stabilus
Inspection Date: 06/05/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
On June 5, 2024, Site was inspected for compliance.After reviewing the site's Stormwater Pollution Prevention Plan, a list of
significant spills in the past 3 years was found to be missing. If there are no reported spills for the year, then report that
there were no spills and include that documentation in the SWPPP. During the inspection, all outfalls were observed and
had adequate access for sampling. It was noted that the drainage area for outfall 3 may only include employee parking. If
there is no industrial activity occuring in this outfall, it can be omitted from monitoring. Site was found to be in compliance.
Page 2 of 3
Permit: NCG030492 Owner-Facility:Stabilus
Inspection Date: 06/05/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan
Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan?
#Does the Plan include a General Location(USGS)map?
#Does the Plan include a"Narrative Description of Practices'? ❑ 1:1 El
#Does the Plan include a detailed site map including outfall locations and drainage areas?
#Does the Plan include a list of significant spills occurring during the past 3 years?
#Has the facility evaluated feasible alternatives to current practices?
#Does the facility provide all necessary secondary containment?
#Does the Plan include a BMP summary?
#Does the Plan include a Spill Prevention and Response Plan (SPRP)?
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 n ❑
# Does the facility provide and document Employee Training? 0 ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)?
#Is the Plan reviewed and updated annually?
#Does the Plan include a Stormwater Facility Inspection Program?
Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ El El
Comment:
Qualitative Monitorinq Yes No NA NE
Has the facility conducted its Qualitative Monitoring? 0 ❑ El 0
Comment:
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? E El ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑
Comment:
Permit and Outfalls Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑
#Were all outfalls observed during the inspection?
#If the facility has representative outfall status, is it properly documented by the Division? El El 0 0
#Has the facility evaluated all illicit(non stormwater)discharges? ❑ El
Comment:
Page 3 of 3