HomeMy WebLinkAbout20071940 Ver 1_More Info Received_20071218Triage Check List
Date: 12/18/2007 Project Name: Abandon Lazy Lane Pump Station
DWQ#: 07-1940
County: Guilford
Sue Homewood, Winston-Salem Regional Office
To: 60-day processing time:
From: Ian McMillan
12/18/2007 - 2/16/08
Telephone: (919) 715-4631
The file attached is being forwarded to you for your evaluation.
Please call if you need assistance.
Stream length impacted
Stream determination
Wetland determination and distance to blue-line surface waters on USFW topo maps
Minimization/avoidance issues
Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
Pond fill
Mitigation Ratios
Ditching
Are the stream and or wetland mitigation sites available and viable?
Check drawings for accuracy
Is the application consistent with pre-application meetings?
Cumulative impact concern
Comments: As per our discussion regarding revision of the triage and delegation processes,
please review the attached file. Note that you are the first reviewer, so this file will need to be
reviewed for administrative as well as technical details. If you elect to place this project on hold,
please ask the applicant to provide your requested information to both the Central Office in
Raleigh as well as the Asheville Regional Office. As we discussed, this is an experimental, interim
procedure as we slowly transition to electronic applications. Please apprise me of any
complications you encounter, whether related to workload, processing times, or lack of a "second
reviewer" as the triage process in Central had previously provided. Also, if you think of ways to
improve this process, especially so that we can plan for the electronic applications, let me know.
Thanks!