Loading...
HomeMy WebLinkAboutNC0024201_Historical information (Inspections)_20101231November 29, 2010 Deai' Mr. Brown: GWH/gwh cc: The Construction Inspection Group (CIG ) of the Construction Grants and Loans Section performed an interim inspection for the state and federally funded portion of subject project at 11:00 am Friday November 19, 2010. Monthly progress meetings until lately were normally scheduled for the 2nd Friday each month. Location of the Progress meetings is the WWTP located on Aquaduct Rd. The next scheduled progress meeting and interim inspection in December is to be determined. For loan and grant purposes the Contract completion date remains Dec. 13, 2010. You should review this report, take actions or provide responses as indicated and then file with your project records. If you have any questions please contact me at (919) 715-6219 or via e-mail gerald.horton@ncdenr.gov . Beverly Eaves Perdue Governor Subject: Interim Inspection Roanoke Rapids SD [HALIFAX] WWTP Sodium Hypochlorite System Project No. CS 370 449-04 Dee Freeman Secretary F \SHAREXProjEct Management BranchXGroup - Construction InspectionXPrDjBcts (Active)\Roanoke Rapids SRF gwh\lnt Insp 10-11-19 RDan.okeRapids.doc Construction Grants & Loans Section 1633 Mail Service Center Raleigh NC 27699-1633 Phone:919-733-6900 / FAX: 919-715-6229 / Internet: http://portal.ncdenr.org An Equal Opportunity/Affirmative Action Employer Mr. R. Daniel Brown, PE Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, North Carolina 27870 Hunter Carson, PE. Arcadis Danny Smith, Raleigh Regional DWQ Office SRF • • NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director NorthCarolinaNaturally RECEIVED NOV 3 fl 1019 NC OENR Raleigh Regional 0«ice Sincerely. ~ / / Uy [ J Gerald W. Horton. PE Environmental Engineer Construction Inspection Group 5. 18. 20. 22. 23. 24. 25. 26. 27. 28. 29. district ite System Page 2 of 3 Interim Inspection of November 19, 2010 Roanoke Rapids Sanita^Ji WWTP Sodium Hypoc^mi CS 370 449-04 GENERAL CONCERNS / RECOMMENDATIONS / ACTION ITEMS -Please note UPDATES on Comments and Concerns noted in previous progress meetings (for reference) are italicized. Nov. update: Engineer stated bolts installed per manufacturer's instructions. October- building frame has been erected. Owner questioned bolt pattern and if some were missing at perlin/column connections. Engineer to check on connections. September -building by ARCO is scheduled for start of erection on Monday Sept. 13. Erection can finally initiate now as tanks have been set in place. August - WWS anticipates constructing building in the next weeks. Pre-Engineered metal building is manufactured by ARCO and will be installed by Rabon. Nov. update: engineer stated the O&M manual would be submitted in December. October-Owner provided Engineer Section 3.13 Disinfection System O&M for Engineer to revise/update for this project. O&M yet to be submitted to CG&L for approval. September - nothing yet submitted. IMPORTANT - O&M must be approved by CG&L before reimbursements beyond 95% will be made. Submit O&M Manual to the attention of Kavitha Ambikadevi. CG&L advised Owner and Engineer an O&M Manual is required for the new work and also a closeout checklist should be provided for possible Final inspection at next meeting. CG&L sent via email: 1) closeout checklist, 2) O&M preparation guidance document and 3) Owner O&M review form. Nov. update: Owner has received letter and deems installation and manufacturers assurances acceptable. October - he faulty lift lugs on the fiberglass tanks were tested successfully. Owner and Engineer still expecting and insisting on a revised warranty letter from the tank manufacturer, and revised tank drawings. Nov. update: Owner has received manufacturer's documentation prepared by P.E. attesting to proper design. Metal building manufacturer (ARCO) delivered 8 bent and damaged structural pieces which has delayed WWS. Owner and Engineer still expecting and insisting on a revised warranty letter from ARCO the building manufacturer. Nov. update: yet to test piping due to situation with 6 chemical pumps. Testing of chemical piping and equipment is pending with two days of startup and two separate days of training and one day of follow-up specified in 6 months after completion. Nov. update: can't test waterline until sprinkler system is completed. Oct. - Owner is concerned about potential for leaks in the new 6" waterline. Owner will keep it pressurized. CG&L advised Owner and Engineer to contact DWQ regional office to notify them of startup. The level gage columns attached to the tanks appear to be mounted in a manner where the column load is supported only by the fittings. CG&L requests Engineer respond to this observation. In the event Engineer conducts final inspection before next meeting, CG&L hereby requests copy of punch list. A Final Inspection checklist was provided via email. Work remaining includes but is not limited to: testing chemical feed lines, installation of sprinkler system, manufacturer's checkout of pumps, miscellaneous training, install Saf-T diffuser, ref. drwg. C102, punch list walk through, and site work and cleanup. A Final inspection by CG&L is to be scheduled. LOAN DISBURSEMENTS As of November 18 reimbursements for the construction contract totals $806,908, which is 73% draw vs. 92% of time expended. The loan is for max. 20 years at interest rate of 2.5 %. RFPs Status none pending RFIs Status - current Project Schedule - WWS is contemplating finishing in September. Signage - Project sign has been erected and information for OSHA, wage rates etc. are posted. SUBMITTAL Status- all submittals have been approved 252 537-9132 Gregg Camp 252 536-4884 Justin Blackmon 252 537-9137 Hunter Carson, PE 919 854-1282 Billy Clinard 919 625-8864 Brandon Clinard Gerald W. Horton, PE NC Construction Grants & Loans 919 715-6291 Inspectors logs/Work Orders - CG&L requests these be available for review at all meetings. Inspection is part time and on as needed basis. Inspection logs were reviewed at this and the October meeting and deemed adequate. As-builts or Record Drawings - were not reviewed at today's meeting, but were reviewed at earlier meeting. Please have these available for review at all meetings. Roanoke Rapids San. Dist., Director dbrown@rrsd.org Roanoke Rapids San. Dist. gcamp@nsd.org Roanoke Rapids San. Dist., Constr. Obsrv. jblackmon@rrsd.org Arcadis hunter.carson @ aarcadis-us.com Water & Waste Systems Constr., Inc., bclinard@wwsys.com Water & Waste Systems Constr., Inc., Page 3 of 3 Interim Inspection of November 19, 2010 Roanoke Rapids Sanit; WWTP Sodium Hypoc CS 370 449-04 CONTRACT: WWTP Sodium Hypochlorite System - Water & Waste Systems Construction, Inc., (WWS) 9700 Ten-Ten Rd., Raleigh, NC 27603 Total $ 901,000 CHANGE ORDER UPDATE - CG&L stated if Owner wishes to have change orders considered for funding then they must submit executed change order(s). A change order checklist was provided earlier via email. List of Attendees: Dan Brown, PE Project budget: Amount Water & Waste Systems Constr., Inc. Contingency Technical Services_______________ Total Eligible Costs strict iclrorite System Eligible $ 901,000 $ 45,000 $ 164,800 $ 1,110,800 November 2, 2010 Deai' Mr. Brown: in'cerely, GWII/wh cc: You should review this report, take actions or provide responses as indicated and then file with your project records. If you have any questions please contact me at (919) 715-6219 or via e-mail gerald.horton@ncdenr.gov . Beverly Eaves Perdue Governor Dee Freeman Secretary F \SHARE\Pnj|ect Management BranchXGroup - Construction lnspection\Pro]ects (Active)\RoanoFe Rapids SRF gwhMnt Insp 10-10-08 RuanakeRapids dnc Construction Grants & Loans Section 1633 Mail Service Center Raleigh NC 27699-1633 Phone:919-733-6900 / FAX: 919-715-6229 / Internet: http://portal.ncdenr.org An Equal Opportunity/Affirmative Action Employer Mr. R. Daniel Brown, PE Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, North Carolina 27870 Hunter Carson, PE. Arcadis Danny Smith, Raleigh Regional DWQ Office SRF NCDENR 6-J Gerald W. Horton, PE Environmental Engineer Construction Inspection Group North CarolinaNaturally North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director The Construction Inspection Group (CIG) of the Construction Grants and Loans Section performed an interim inspection for the state and federally funded portion of subject project at 11:00 am Friday October 8, 2010. Monthly progress meetings are normally scheduled for the 2nd Friday each month. Location of the Progress meetings is the WWTP located on Aquaduct Rd. The next scheduled progress meeting and interim inspection is Friday October 8, 2010. Contract completion date remains December 3, 2010. Subject: Interim Inspection Roanoke Rapids SD [HALIFAX] WWTP Sodium Hypochlorite System Project No. CS 370 449-04 RECEIVED NOV' 3 NCDENR Rateigti Regional °«»ce 1. 5. 18. 20. 23. 24. CHANGE ORDER UPDATE - CG&L previously requested Change order #1. Owner and Engineer are advised - if Owner wishes for items to be eligible for funding, a change order should be submitted. This is not a guarantee it will be approved by CG&L. The same applies for CO#2 and any subsequent COs. October meeting, CG&L informed there will be a CO#3. 21. 22. Page 2 of 3 Interim Inspection of October 8. 2010 CONTRACT: WWTP Sodium Hypochlorite System - Water & Waste Systems Construction, Inc., (WWS) 9700 Ten-Ten Rd., Raleigh, NC 27603 Roanoke Rapids Sanita, WWTP Sodium Hypoci CS 370 449-04 ^fcistrict i^mte System GENERAL CONCERNS / RECOMMENDATIONS / ACTION ITEMS -Please note UPDATES on Comments and Concerns noted in previous progress meetings (for reference) are italicized. October update: a revised schedule was not provided at meeting CG&L requested being provided the revised schedule in pdf format via email. September -WWS did not provide update construction schedule at this meeting. CG&L requests the updated schedule be submitted via email. August - Water & Waste Systems, Inc. (WWS) maintains they will complete job on time or ahead of time. May - WWS proclaims to be on schedule and will finish on time if no problems encountered. October update: building frame has been erected. Owner questioned bolt pattern and if some were missing at perlin/column connections. Engineer to check on connections. September -building by ARCO is scheduled for start of erection on Monday Sept. 13. Erection can finally initiate now as tanks have been set in place. August - WWS anticipates constructing building in the next weeks. Pre-Engineered metal building is manufactured by ARCO and will be installed by Rabon. October update: Owner provided Engineer Section 3.13 Disinfection System O&M for Engineer to revise/update for this project. O&M yet to be submitted to CG&L for approval. September - nothing yet submitted. IMPORTANT - O&M must be approved by CG&L before reimbursements beyond 95% will be made. Submit O&M Manual to the attention of Kavitha Ambikadevi. CG&L advised Owner and Engineer an O&M Manual is required for the new work and also a closeout checklist should be provided for possible Final inspection at next meeting. CG&L sent via email: 1) closeout checklist, 2) O&M preparation guidance document and 3) Owner O&M review form. The faulty lift lugs on the fiberglass tanks were tested successfully. Owner and Engineer still expecting and insisting on a revised warranty letter from the tank manufacturer, and revised tank drawings. Door frames and hinge patterns do not match, doors being sent back. Metal building manufacturer (ARCO) delivered 8 bent and damaged structural pieces which has delayed WWS. Owner and Engineer still expecting and insisting on a revised warranty letter from ARCO the building manufacturer. Testing of chemical piping and equipment is pending with two days of startup and two separate days of training and one day of follow-up specified in 6 months after completion. Owner is concerned about potential for leaks in the new 6" waterline. Owner will keep it pressurized. LOAN DISBURSEMENTS As of October 19 reimbursements for the construction contract totals $719,984, 65% vs. 78% of time expended. The loan is for maximum 20 years at interest rate of 2.5 %. RFPs Status - none pending RFIs Status - WWS asked who furnishes chemicals for new tanks Project Schedule - WWS is contemplating finishing in September. Signage - Project sign has been erected and information for OSHA, wage rates etc. are posted. 252 537-9132 Justin Blackmon 252 537-9137 Hunter Carson, PE 919 854-1282 Billy Clinard 919 625-8864 Brandon Clinard Gerald W. Horton, PE 919 715-6219 Inspectors logs/Work Orders - CG&L requests these be available for review at all meetings. Inspection is part time and on as needed basis. Inspection logs were reviewed at this the October meeting and deemed adequate. SUBMITTAL Status- all submittals have been approved, but fiberglass tanks re-submittals are still outstanding. |i strict ite System Roanoke Rapids San. Disk, Director dbrown@nsd.org Roanoke Rapids San. Disk, Constr. Obsrv. j b I ac kmon @ rrsd. org Water & Waste Systems Constr., Inc., bclinard @ wwsys.com Water & Waste Systems Constr., Inc., NC Construction Grants & Loans gerald.horton @ ncdenr.gov Arcadis hunter.carson@aaicadis-us.com Page 3 of 3 Interim Inspection of October 8, 2010 List of Attendees: Dan Brown, PE Roanoke Rapids Sanitai^|i WWTP Sodium Hypocl^m CS 370 449-04 As-builts or Record Drawings - were reviewed at today's meeting. Please have these available for review at all meetings. Dear Mr. Brown: NCQQ242Q1 2. 3. 4. 5. Mr. R. Danieley Brown, CEO Roanoke Rapids Sanitary District P.O. Box 308 Roanoke Rapids, NC 27870 Beverly Eaves Perdue Governor Raleigh Regional Office 1628 Mail Service Center Phone (919)791-4200 FAX (919)788-7159 Dee Freeman Secretary North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Internet: www ncwaterquality org 1628 Mail Service Center Raleigh, NC 27699-1628 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Subject: Compliance Evaluation Inspections Roanoke Rapids Sanitary District WWTP NPDES Permit No. NC0024201 and Stormwater Permit No. NCG110091 Halifax County Mair NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director October 25, 2010 North Carolina— Naturally Customer Service 877-623-6748 A Two drying beds were in use, holding anaerobic digester solids. They will remain until early in 2011 in order to meet 503 regulations before being land applied. The secondary effluent discharge system that involves a diesel driven pump for times when high river flow covers the gravity discharge structure is exercised regularly. The engine is run monthly, and is put under a load quarterly when the effluent is discharged during the day shift via that release point. The effluent flow meter is officially calibrated more often than the annual requirement. It is calibrated quarterly and checked against a staff gage weekly by the staff of operators. Both primary clarifiers have received overhauls of the rake mechanism in recent weeks. On October 19, 2010 Myrl Nisely of the Raleigh Regional Office conducted a compliance inspection of the Sanitary District WWTP. Along with that inspection, a stormwater compliance inspection was also carried out. The assistance of Gregg Camp was appreciated. The inspection checklists are attached. The plant was in compliance with both permits. Comments are as follows: 1. The description of the WWTP will be changing. When the process of renewing the WWTP permit is undertaken at least 180 days before the permit expires in March, 2012, be sure to include a description of the new hypochlorite disinfection and dechlor system. Include the bermed unloading pad with a drain to the drying bed return line. The system is expected to go online in about a month. Delivery delays have caused the startup to be late. Page 2 of 2 cc: RRO/SWP files Central Files Myrl A. Nisely Environmental Chemist Sincerely, A 4 Roanoke Rapids Sanitary District CEI, October 2010 The stormwater program is being followed. See the attached checklist. There is a pump station near the influent pump house that is used to transfer stormwater from that area to Chockyotte Creek when the Roanoke River is high. Employee training for 2010 has not been completed. If you have any questions or comments, please call me at 919-791-4255. 6. Gregg maintains two ORC logs - an operation log and a DMR review log. These provide evidence a good level of awareness of plant performance on a daily basis. NCG110091 EPA NPDES J11NC0024201 LI I I I I I I I I I I | | | | | | | | | | | pe Entry Time/Date Permit Effective Date 07/07/0112:45 PM 10/10/19 Exit Time/Date Permit Expiration Date Weldon NC 27890 12/03/3102:20 PM 10/10/19 Other Facility Data Alan Gregg Camp/ORC/919 536 4884/ Records/Reports Facility Site Review Effluent/Receiving Waters Section D: (See attachment summary) Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date Myrl Wisely RRO WQ//919 7914200/ Page #1 12, Roanoke Rapids WWTP 135 Aqueduct Rd United States Environmental Protection Agency Washington, D C. 20460 yr/mo/day 10/10/19 Bl71 u Contacted No QA 72LI Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Inspection Work Days 67|l 69 Facility Self-Monitoring Evaluation Rating ____ 70U Fac Type 2°U Section C: Flow Measurement | Sludge Handling Disposal Inspection Type 18LI Areas Evaluated During Inspection (Check only those areas evaluated) Operations & Maintenance J17 Inspector 19|±l3l 73| | I74 Water Compliance Inspection Report Section A: National Data System Coding (i.e., PCS) —Reserved--------------------- 75| I I I I I I I 80 Signal^of ManagemenLdA Review/ a / 7 Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete ■ Permit ■ Self-Monitoring Program Laboratory _______________________________________________Section B: Facility Data______ lndUS,rial Users Urging to POTW. also include n-,. . . . RemarksI I I I I I I I I I I I I I I I I I I I I I I Name, Address of Responsible Official/Title/Phone and Fax Number £™^<7ley Box 308 Roanoke Rapids NC 27870//252-537-9137/2525379136 Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Transaction Code 1 U 2 u Operations & Maintenance Yes No NA NE Judge, and other that are applicable? Comment: Permit Yes No NA NE O ■ ■ ODD # Are there any special conditions for the permit?O ■ Is access to the plant site restricted to the general public?■ Is the inspector granted access to all areas for inspection?■ Comment: Record Keeping Yes No NA NE Are records kept and maintained as required by the permit?■ □00 Is all required information readily available, complete and current?■ ODO ■ ODD ■ 000 Is the chain-of-custody complete?■ 000 Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs 0 Are DMRs complete: do they include all permit parameters?■ 000 Has the facility submitted its annual compliance report to users and DWQ?■ 0 00 ■ 000 ■ non Is the ORC certified at grade equal to ■ 000 Is the backup operator certified at one grade less or greater than the facility classification?■ 00 0 Is a copy of the current NPDES permit available on site?■ ODD Page #3 Permit: NC0024201 Inspection Date: 10/19/2010 Owner - Facility: Roanoke Rapids WWTP Inspection Type: Compliance Evaluation (If the facility is or > 5 MOD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? or higher than the facility classification? Is the plant generally clean with acceptable housekeeping? ■ O O O Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids. pH, DO, Sludge ■ O Record Keeping Yes No NA NE ■ O Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained?■ Are the receiving water free of foam other than trace amounts and other debris?■ ODO ■ Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting?■ Is flow meter calibrated annually?■ o Is the flow meter operational?■ o (If units are separated) Does the chart recorder match the flow meter?■ Comment:Calibrated 9/29/10 Anaerobic Digester Yes No NA NE Type of operation:Floating cover Is the capacity adequate?■ o # Is gas stored on site?■ ODO Is the digester(s) free of tilting covers?■ 0 Is the gas burner operational?■ o Is the digester heated?■ o o Is the temperature maintained constantly?■ o Is tankage available for properly waste sludge?■ o Comment: Drying Beds Yes No NA NE Is there adequate drying bed space?■ Is the sludge distribution on drying beds appropriate?■ ODD Are the drying beds free of vegetation?■ # Is the site free of dry sludge remaining in beds?O ■ O Is the site free of stockpiled sludge?0 ■ Is the filtrate from sludge drying beds returned to the front of the plant?■ 0 Page #4 Permit: NC0024201 Inspection Date: 10/19/2010 Owner - Facility: Roanoke Rapids WWTP Inspection Type: Compliance Evaluation If effluent (diffuser pipes are required) are they operating properly? Comment: Facility has copy of previous year's Annual Report on file for review? Comment: Drying Beds Yes No NA NE # Is the sludge disposed of through county landfill? ■ # Is the sludge land applied?■ (Vacuum filters) Is polymer mixing adequate? 0 ■ Two beds are in use, and sludge is stockpiled for periods until it is taken Yes No NA NE ■ ODO Is the chemical feed equipment operational?■ Is storage adequate?■ Is the site free of high level of solids in filtrate from filter presses or vacuum filters?o ■ Is the site free of sludge buildup ■ o ■ ■ o Bar Screens Yes No NA NE Type of bar screen a.Manual b.Mechanical Are the bars adequately screening debris?■ 0 Is the screen free of excessive debris?■ ODO Is disposal of screening in compliance?■ ODO Is the unit in good condition?■ 0 Comment: Grit Removal Yes No NA NE Type of grit removal a.Manual b.Mechanical Is the grit free of excessive organic matter?■ o Is the grit free of excessive odor?■ o o # Is disposal of grit in compliance?■ 0 0 Page #5 Comment: away by Synagro Permit: NC0024201 Inspection Date: 10/19/2010 Owner - Facility: Roanoke Rapids WWTP Inspection Type: Compliance Evaluation The facility has an approved sludge management plan? Comment: Solids Handling Equipment Is the equipment operational? on belts and/or rollers of filter press? Is the site free of excessive moisture in belt filter press sludge cake? Grit Removal Yes No NA NE Comment: Primary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater?■ o Is the site free of excessive buildup of solids in center well of circular clarifier?■ 0 Are weirs level?■ o Is the site free of weir blockage?■ Is the site free of evidence of short-circuiting?■ Is scum removal adequate?■ o Is the site free of excessive floating sludge?■ o Is the drive unit operational?■ o Is the sludge blanket level acceptable?■ o ■ Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater?■ Is the site free of excessive buildup of solids in center well of circular clarifier? ■ Are weirs level?■ o o Is the site free of weir blockage?■ Is the site free of evidence of short-circuiting?■ o Is scum removal adequate?■ o Is the site free of excessive floating sludge?■ o Is the drive unit operational?■ Is the return rate acceptable (low turbulence)?■ o Is the overflow clear of excessive solids/pin floc?■ ■ Trickling Filter Yes No NA NE Is the filter free of ponding?■ Is the filter free of leaks at the center column of filter's distribution arms?■ ODO Is the distribution of flow even from the distribution arms?■ o Page #6 Permit: NC0024201 Inspection Date: 10/19/2010 Owner - Facility: Roanoke Rapids WWTP Inspection Type: Compliance Evaluation Is the sludge blanket level acceptable? (Approximately 'A of the sidewall depth) Comment: Is the sludge blanket level acceptable? (Approximately 7< of the sidewall depth) Comment: Trickling Filter Yes No NA NE Is the filter free of uneven or discolored growth?■ o Is the filter free of sloughing of excessive growth?■ o Are the filter’s distribution arms orifices free of clogging?■ o Is the filter free of excessive filter flies, worms or snails?■ 0 Comment: Aeration Basins Yes No NA NE Mode of operation Plug flow Type of aeration system Diffused Is the basin free of dead spots?■ Are surface aerators and mixers operational?o ■ Are the diffusers operational?■ o Is the foam the proper color for the treatment process?■ □00 Does the foam cover less than 25% of the basin’s surface?■ 000 Is the DO level acceptable?■ 000 ■ ODD De-chlorination Yes No NA NE Type of system ?Gas Is the feed ratio proportional to chlorine amount (1 to 1)?■ n n o Is storage appropriate for cylinders?■ 0 0 0 # Is de-chlorination substance stored away from chlorine containers? ■ o Are the tablets the proper size and type? ■ Small cyclinders are in temporary use until the new hypo system is Are tablet de-chlorinators operational? o ■ o Number of tubes in use? Comment: Standby Power Yes No NA NE Is automatically activated standby power available?■ o o Is the generator tested by interrupting primary power source?■ Page #7 Comment: operational. Is the DO level acceptable?(1.0 to 3.0 mg/l) Comment: Permit: NC0024201 Inspection Date: 10/19/2010 Owner - Facility: Roanoke Rapids WWTP Inspection Type: Compliance Evaluation Standby Power Yes No NA NE ■ Is the generator tested under load? ■ Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site?■ ■ oIs there an emergency agreement with a fuel vendor for extended run on back-up power? ■ Is the generator fuel level monitored? Laboratory Yes No NA NE ■ O Are field parameters performed by certified personnel or laboratory? ■ ODDAre all other parameters(excluding field parameters) performed by a certified lab? ■ o # Is the facility using a contract lab? ■ # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? ■ ODDIncubator (Fecal Coliform) set to 44.5 degrees Celsius*/- 0.2 degrees? ■ Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? Comment: Disinfection-Liquid Yes No NA NE ■ O Is there adequate reserve supply of disinfectant? o ■ (Sodium Hypochlorite) Is pump feed system operational? ■ o Is bulk storage tank containment area adequate? (free of leaks/open drains) ■ o Is the level of chlorine residual acceptable? ■ Is the contact chamber free of growth, or sludge buildup? ■ o Is there chlorine residual prior to de-chlorination? Comment: Influent Sampling Yes No NA NE ■ # Is composite sampling flow proportional? ■ Is sample collected above side streams? ■ Is proper volume collected? ■ Is the tubing clean? ■ o # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Page #8 Owner - Facility: Roanoke Rapids WWTP Inspection Type: Compliance Evaluation Permit: NC0024201 Inspection Date: 10/19/2010 Comment: Generator engine is run monthly, tested under a load quarterly, and typically used about 20 times/yr for 7 hours per day for load shedding for Dominion Power. f Influent Sampling Yes No NA NE ■ OOOIs sampling performed according to the permit? Comment:Temperature = 2.4 deg C Effluent SampHng Yes No NA NE ■ ODOIs composite sampling flow proportional? ■ ODDIs sample collected below all treatment units? Is proper volume collected?■ ODD Is the tubing clean?■ ODD ■ ODO# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? ■ 000 Page #9 Permit: NC0024201 Inspection Date: 10/19/2010 Owner - Facility: Roanoke Rapids WWTP Inspection Type: Compliance Evaluation Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Comment: Temperature = 0.9 deg C t September 29, 2010 Dear Mr. Brown: GWILtavh cc: attachment: Project Closeout Checklist You should review this report, take actions or provide responses as indicated and then file with your project records. If you have any questions please contact me at (919) 715-6219 or via e-mail gerald.horton@ncdenr.gov. Beverly Eaves Perdue Governor Subject: Interim Inspection Roanoke Rapids SD [Halifax] WWTP Sodium Hypochlorite System Project No. CS 370 449-04 Dee Freeman Secretary Mr. R. Daniel Brown. PE Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, North Carolina 27870 Hunter Carson. PE, Arcadis Danny Smith. Raleigh Regional DWQ Office SRF HCDEHR North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director Sincerely, / cJ Gerald W. Horton, PE Environmental Engineer Construction Inspection Group NorthCarolinaNaturally FASHAREXProjBCt Management Branch\Group - Construction lnspection\Projects (ActivE)\Raanoke Rapids SRF gvAiMnt Insp 10-09-11] RnanoFeRapids doc Construction Grants & Loans Section 1633 Mail Service Center Raleigh NC 27699-1633 Phone:919-733-6900 / FAX: 919-715-6229 / Internet: http://portal.ncdenr.org An Equal Opportunity/Affirmative Action Employer The Construction Inspection Group (CIG) of the Construction Grants and Loans Section performed an interim inspection for the state and federally funded portion of subject project at 11:00 am Friday September 10, 2010. Monthly progress meetings are normally scheduled for the 2nd Friday each month. Location of the Progress meetings is the WWTP located on Aquaduct Rd. The next scheduled progress meeting and interim inspection is Friday October 8, 2010. Contract completion date remains December 3, 2010. I 1. 4. 5. 16. 17. 18. 19. RFPs Status - none pending RFIs Status - WWS asked who furnishes chemicals for new tanks Page 2 of 3 Interim Inspection of September 10, 2010 CHANGE ORDER UPDATE - CG&L previously requested Change order #1. Owner and Engineer are advised - if Owner wishes for items to be eligible for funding, a change order should be submitted. This is not a guarantee it will be approved by CG&L. The same applies for CO#2 and any subsequent COs. CONTRACT: WWTP Sodium Hypochlorite System - Water & Waste Systems Construction, Inc., (WWS) 9700 Ten-Ten Rd.. Raleigh, NC 27603 GENERAL CONCERNS / RECOMMENDATIONS / ACTION ITEMS -Please note UPDATES on Comments and Concerns noted in previous progress meetings (for reference) are italicized. September update: VVVV.S’ did not provide update construction schedule at this meeting. CG&L requests the updated schedule be submitted via email. August - Water & Waste Systems, Inc. (WWS) maintains they will complete job on time or ahead of time. May - WWS proclaims to be on schedule and will finish on time if no problems encountered. September update: tank manufacturer will be on site next week (Sept. 17-week of) to make repairs. Owner is concerned with quality of tank and warranty offered. Mr. Brown asked that he be provided written warranty adjustment and information. August - there have been numerous problems with the tanks, such as lift eyes being knocked off or damaged, damage to tank wall, access in wrong orientation. WWS must resolve these issues. Owner advised and requested WWS to expedite and pressure the FRP tank manufacturer for delivery. It was related that the tanks are delayed and anticipated in July. Effect is it restricts when prefab building and roof can be erected. September update: building by ARCO is scheduled for start of erection on Monday Sept. 13. Erection can finally initiate now as tanks have been set in place. August - WWS anticipates constructing building in the next weeks. Pre-Engineered metal building is manufactured by ARCO and will be installed by Rabon. September update: CG&L reviewed inspection logs which are kept on lap top computer. The logs were deemed adequate. Comment from earlier meetings: G&L requests Inspection logs be available for review at all meetings. September update: CG&L reviewed record drawing markups, they appeared to be complete. Comment from earlier meetings: Please have record drawing (as-builts) markups available for review at next meeting and all subsequent meetings. September update: nothing yet submitted. IMPORTANT - O&M must be approved by CG&L before reimbursements beyond 95% will be made. Submit O&M Manual to the attention ofKavitha Ambikadevi. CG&L advised Owner and Engineer an O&M Manual is required for the new work and also a closeout checklist should be provided for possible Final inspection at next meeting. CG&L sent via email: 1) closeout checklist, 2) O&M preparation guidance document and 3) Owner O&M review form. In preparation for Final inspection, attached please find Project Closeout Checklist. LOAN DISBURSEMENTS The loan is for maximum 20 years at interest rate of 2.5 %. As of Sept 20 reimbursements for the construction contract total $438,139, 49%. This compares to 73% of the time has elapsed on contract. Roanoke Rapids Sanita^Bhstrict WWTP Sodium Hypochlorite System CS 370 449-04 Project Schedule - WWS is contemplating finishing in September. Signage - Project sign has been erected and information for OSHA, wage rates etc. are posted. 252 537-9132 Gregg Camp 252 536-4884 Justin Blackmon 252 537-9137 Craig Williams 252 536-4884 Hunter Carson, PE 919 854-1282 Billy Clinard 919 625-8864 Brandon Clinard 919 715-6219Gerald W. Horton, PE ( SUBMITTAL Status- all submittals have been approved, but fiberglass re-submittals are still outstanding. Inspectors logs/Work Orders - CG&L requests these be available for review at all meetings. Inspection is part time and on as needed basis. Inspection logs were reviewed at today's meeting and deemed adequate. Roanoke Rapids San. Disk, Director dbrown@iTsd.org Roanoke Rapids San. Dist. gcamp@iTsd.org Roanoke Rapids San. Dist., Constr. Obsrv. jblackmon@rrsd.org Roanoke Rapids San. Dist.. Supv. c wi 11 iams @ rrsd. org Water & Waste Systems Constr., Inc., bclinard @ wwsys.com Water & Waste Systems Constr., Inc., NC Construction Grants & Loans gerald. horton @ ncdenr.gov Arcadis hunter.caison@aarcadis-us.com Page 3 of 3 Interim Inspection of September 10, 2010 Roanoke Rapids Sanitary District WWTP Sodium Hypochlorite System CS 370 449-04 List of Attendees: Dan Brown, PE As-builts or Record Drawings - were reviewed at today's meeting. Please have these available for review at all meetings. rr ENGINEER'S RESPONSIBILITIES: FOR EACH CONTRACT: 17. 18. 19. 22. OWNER / NAME: ENGINEER: Approved Plans and Specifications in owner’s possession. As-Built/Record Drawings (certified/sealed) provided to owner Test Reports: pipe/pressure tests recorded, concrete, compaction etc. Inspector’s Daily Logs Approved shop drawings and submittals provided to owner Warranty Information provided to owner. Spare Parts Inventory and List provided to owner. Training, training sessions done by whom, when, what subject. Release/Approval from NC-DOT and/or Rail Roads (if Applicable) Engineer's Certification Operation and Maintenance Manuals (O&M), if required (SRF Only) PROJECT NO: DESCRIPTION: 20. 21. 12. 13. 14. L 2. _3- 4. 5. 6. 7. 8. .9. 10. II. 15. 16. Final adjusting Change Order (must match Final Reimbursement Request) Release of Liens & Consent of Surety to final payment Final Sales Tax Report 715-6216 (State Programs. STAG): 715-6218 (Reimbursements): At Final, CG&L inspector will wish to have available for review or discussion ALL applicable items listed above. To closeout project loan and/or grant, please provide any other documentation CG&L inspector states or requests in the Final Inspection report. OWNER (Prepare, sign, submit or confirm, as applicable, the following): Final Reimbursement Request and supporting invoices. All costs must be approved by CG&L. Owners Certification of Completion, acceptance of the completed project. (This form now satisfies the requirement for a separate Initiation of Operation Letter.) Clear Site/Easement Certification (a) by Owner & (b) by Owner’s Counsel (Done during design & prior to construction, IF easements were added or changed, this must be redone) STAG projects closeout items also include a final MBE. WBE and Quarterly Report, the Final Reimbursement Request form, and the Lobbying Certification. They can be found on our website, (www.nccgl.net). Performance Certification (is required on a few Treatment Plan Projects and is due one year after the completion date.)(SRF only) Is Closing cost Paid? If yes. provide the date of Payment. If No, forward to Leslie Rogers. ARRA Projects: Make available for review -Davis-Bacon Interviews. Standard Form 1445, Certified payroll records for ALL primes and subs as required in guidance, and Buy American documentation for all materials, equipment and manufactured goods incorporated into project. Submittal of form 6100-2, indicating actual amounts paid to DBE firms (SRF Only). Turn Over to the Owner: 1, 2, 3, 4. 5, 6, 7. 8, 9, 13, 21 Submit above items to the following Construction Grants & Loans staff: Kavitha Ambikadevi 919 715-6200 (SRF): 10, 11, 16, 17, 18, 19,20,22 or Don Evans 919 715-6216 (State Programs, STAG): 10, 11, 16, 17, 18, 19,20,22 Leslie Rogers 919 715-6218 (Reimbursements): 14, 15 and 20 if applicable. CG&L Inspector: NC Construibon Grants & Loans Prompt Closeout Checklist NCDENR Phone (919)-733-6900; FAX (919) 715-6229, Forms & other information available at http.7/portal.ncdenr.org Division of Water Quality, Construction Grants & Loans Section 1633 Mail Service Center, Raleigh, NC 27699-1633 I August 25, 2010 Dear Mr. Brown: fikerely. GWIV-wh cc: You should review this report, take actions or provide responses as indicated and then file with your project records. If you have any questions please contact me at (919) 715-6219 or via e-mail gerald.horton@ncdenr.gov. Beverly Eaves Perdue Governor F \SHARE\Prcject Management BranchXGroup - Construetinn Inspectinn\Projects (Active)\RoanoFe RapidsMnt Insp IO-08-04 RoanokeRapids doc Construction Grants & Loans Section 1633 Mail Service Center Raleigh NC 27699-1633 Phone:919-733-6900 / FAX: 919-715-6229 / Internet: http://portal.ncdenr.org An Equal Opportunity'Affirmative Action Employer Hunter Carson, PE, Arcadis Danny Smith, Raleigh Regional DWQ Office SRF Mr. R. Daniel Brown, PE Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, North Carolina 27870 NorthCarolinaNaturally Subject: Interim Inspection Roanoke Rapids SD [Halifax] WWTP Sodium Hypochlorite System Project No. CS 370 449-04 The Construction Inspection Group (CIG) of the Construction Grants and Loans Section performed an interim inspection for the state and federally funded portion of subject project at 11:00 am Wednesday August 4, 2010. There was no July meeting. This interim inspection was rescheduled from July 9. Monthly progress meetings are normally scheduled for the 2"a Friday each month. Location of the Progress meetings is the WWTP located on Aquaduct Rd. The next scheduled progress meeting and interim inspection is Friday September 10, 2010. which may be a Final inspection by CG&L. Contract completion date remains December 3, 2010. NCDENR ^0^201 North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director Dee Freeman Secretary ------ Gerald W. Horton, PE Environmental Engineer Construction Inspection Group 1. 4. 5. 8. 9. 18. RFPs Status - none pending RFIs Status - WWS asked who furnishes chemicals for new tanks Project Schedule - WWS is contemplating finishing in September. Signage - Project sign has been erected and information for OSHA, wage rates etc. are posted. SUBMITTAL Status- all submittals have been approved. CHANGE ORDER UPDATE - CG&L previously requested Change order #1. Owner and Engineer are advised - if Owner wishes for items to be eligible for funding, a change order should be submitted. This is not a guarantee it will be approved by CG&L. The same applies for CO#2 and any subsequent COs. 16. 17. Page 2 of 3 Interim Inspection of August 4, 2010 CONTRACT: WWTP Sodium Hypochlorite System - Water & Waste Systems Construction, Inc., (WWS) 9700 Ten-Ten Rd., Raleigh, NC 27603 GENERAL CONCERNS / RECOMMENDATIONS / ACTION ITEMS -Please note UPDATES on Comments and Concerns noted in previous progress meetings (for reference) are italicized. August update: Water & Waste Systems, Inc. (WWS) maintains they will complete job on time or ahead of time. May - WWS proclaims to be on schedule and will finish on time if no problems encountered. August update: there have been numerous problems with the tanks, such as lift eyes being knocked off or damaged, damage to tank wall, access in wrong orientation. WWS must resolve these issues. Owner advised and requested WWS to expedite and pressure the FRP tank manufacturer for delivery. It was related that the tanks are delayed and anticipated in July. Effect is it restricts when prefab building and roof can be erected. August update: WWS anticipates constructing building in the next weeks. Pre-Engineered metal building is manufactured by ARCO and will be installed by Rabon. August update: the correct glue/solvent was used. June - Arcadis Whit Wheeler cautioned WWS to use the correct glue on the Sched. 80 PVC pipe and the correct threads where/if necessary. August update: WL were satisfactorily tested and Bac-T tests were successful. April - Waterline to be disinfected week of May 16. CG&L requests Inspection logs be available for review at all meetings. Please have record drawing (as-builts) markups available for review at next meeting and all subsequent meetings. CG&L advised Owner and Engineer an O&M Manual is required for the new work and also a closeout checklist should be provided for possible Final inspection at next meeting. CG&L sent via email: 1) closeout checklist, 2) O&M preparation guidance document and 3) Owner O&M review form. LOAN DISBURSEMENTS The loan is for maximum 20 years at interest rate of 2.5 %. Roanoke Rapids Saniti^B)istrict WWTP Sodium Hypoc^forite System CS 370 449-04 252 537-9132 Gregg Camp 252 536-4884 Justin Blackmon 252 537-9137 Craig Williams 252 536-4884 Hunter Carson, PE 919 854-1282 Billy Clinard 919 625-8864 Gerald W. Horton, PE 919 715-6219 Inspectors logs/Work Orders - CG&L requests these be available for review at all meetings. Inspection is part time and on as needed basis. Waler & Waste Systems Constr., Inc., bclinard@wwsys.com NC Construction Grants & Loans geral d. horton @ ncde nr. go v Arcadis hunter.carson @ aarcadis-us.com Page 3 of 3 Interim Inspection of August 4, 2010 Roanoke Rapids Sanitary District WWTP Sodium Hypochlorite System CS 370 449-04 Roanoke Rapids San. Dist., Director dbrown@rrsd.org Roanoke Rapids San. Dist. gcamp@rrsd.org Roanoke Rapids San. Dist., Constr. Obsrv. jblackmon @ rrsd.org Roanoke Rapids San. Dist., Supv. c wil hams @ rrsd .org List of Attendees: Dan Brown, PE As-builts or Record Drawings - were reviewed. Please have these available for review at all meetings. ( Pi. lural Res< jrces April 22, 2010 Dear Mr. Brown : Sipcerely, cc: Beverly Eaves Perdue Governor Mr. R. Daniel Brown, PE Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, North Carolina 27870 Construction Grants & Loans Section 1633 Mail Service Center Raleigh NC 27699-1633 Phone:919-733-6900 / FAX. 919-715-6229 / Internet: www.nccgl.net An Equal Opportunity/Affirmative Action Employer Subject: Initial Interim inspection Roanoke Rapids SD [Halifax] WWTP Sodium Hypochlorite System Project No. CS 370 449-04 Gerald W. Horton, Pb Environmental Engineer Construction Inspection Group • 2^ NCDENi North Carolina Department of Environm nt and Division of Water C .ality Coleen H. Sullins Director North Carolina ^aturalhj Dee Fre<7 an Secre y You should review this report: take actions or provide responses as indicated and then file for your records. If you have any questions please contact me at * 919) 715-6219 or via e-mail gerald.horton@ncdenr.gov. Hunter Carson, PE, Arcadis Danny Smith, Raleigh Regional DWQ Office CIG - Mark Hubbard. PE SRF The Construction Inspection Group (CIG) of the Construction Grants and Loans Section performed an interim inspection for the state and federally funded portion of subject project at 10:30 am on Friday April 9, 2010. This interim inspection was conducted in conjunction with the monthly progress meeting normally scheduled for the 2" Friday each month. Location of the Progress meetings is the WWTP located on Aquaduct Rd. The next scheduled progress meeting and interim inspection is May 14. Contract completion date remains December 3, 2010. ' J o construct and install instrumentation and controls, demolition and modifications to existing building converting it to sodium­ bisulphite building, construct hypochlorite building to house related facilities. Page 2 of 3 Interim Inspection of April 9, 2010 Roanoke Rapids Sani WWTP Sodium Hype CS 370 449-04 CONTRACT: WWTP Sodium Hypochlorite System - Water & Waste Systems Construction, Inc., (WWS) 9700 Ten-Ten Rd., Raleigh, NC 27603 LOAN DISBURSEMENTS As of April 9, 2010 no reimbursements have been sought from CG&L. Closing costs are 2% of the eligible loan amount, thus $22,216. The loan is for maximum 20 years at interest rate of 2.5 %. District ;^^jrite System CONSTRUCTION INSPECTION Observations of WWS construction and progress: 1. WWS completed 6" waterline. 2. Poured SHB footings. 3. Chlorine contact pumped out in preparation for work therein. WWS is to install Owner provided equipment. All equipment has been delivered except for the pumps. Description of Eligible work : o o GENERAL CONCERNS / RECOMMENDATIONS / ACTION ITEMS -Please note UPDATES on Comments and Concerns noted in previous progress meetings (for reference) are italicized. 1. IMPORTANT: After meeting CG&L walked construction area and observed the excavation for the proposed Sodium Hypochlorite Building (SHB) had standing water. Owner and Engineer are advised to have sub-grade tested before allowing further work or pouring of concrete foundation or slab. CG&L requests being advised of results and viewing documentation at May meeting. 2. Dan Brown noted reinforcement is being bent in field. CG&L asks Engineer to respond to this concern in writing. Engineer should address shop drawings and specifications on this matter. 3. WWS will have project sign erected shortly after sign information is provided from Engineer. 4. Engineer inquired if CG&L had received Change Order #1. Upon returning to office, Horton found CO#1 was received via email March 22, 2010. An original signature page is needed. CO#1 is under review. 5. April Update: Construction Schedule was provided. Schedule lacks specificity, a revised schedule should be provided at the May 6 meeting. CG&L requests construction schedule be provided at next meeting. 6. April Update: submittal log was provided. CG&L asks updated submittal log be provided at May 6 meeting and be expanded to include all submittals, ie, listing those yet to be submitted also. Owner and Engineer are requested to have a submittal log available for review at next and all subsequent meetings until all submittals have been approved. 7. CG&L requests Inspection logs be available for review at all meetings. 8. Please have record drawing (as-builts) markups available for review at next meeting and all subsequent meetings. o o 252 537-9132 Gregg Camp 252 536-4884 Justin Blackmon 252 537-9137 Craig Williams 252 536-4884 Hunter Carson, PE 919 854-1282 Billy Clinard 919 625-8864 Gerald W. Horton. PE 919 715-6219 o o o o o Roanoke Rapids San. Exist.. Director dbro w n @ nsd.org Roanoke Rapids San. Exist. gcamp @ nsd.org Roanoke Rapids San. Exist.. Constr. Obsrv. jblackmon@iTsd.org Roanoke Rapids San. Exist.. Supv. cwi 11 iams @ rrsd.org Arcadis hunter.carson @ aarcadis-us.com Water & Waste Systems C instr., Inc., be 1 i n aid @ w w sy s .com NC Construction Grants & Loans gerald.horton@ncdenr.gov new sodium hypochlorite bulk storage and feed facility consisting of ■ two (2) 13,680 gallon bulk hypochlorite storage tanks, ■ two (2) 45 GPH metering feed pumps, and ■ two (2) 100 GPM magnetic drive hypochlorite recirculation pumps; dechlorination system consisting of a ■ 4,470 gallon bulk sodium bisulphite storage tank and ■ two (2) 3 GPH metering feed pumps; 1,645 gallon sodium hydroxide bulk storage tank and two (2) 6 GPH metering feed pumps; a contact chamber drain submersible pump, demolition of existing chlorine and sulfur dioxide disinfection system, and all necessary piping and appurtenances. Roanoke Rapids Sanitary District WWTP Sodium Hypochlorite Sysl CS 370 449-04 Page 3 of 3 Interim Inspectiv i of April 9. 2010 List of Attendees: Dan Brown, PE CHANGE ORDER UPDATE - CO#1 has been received and is under review. RFPs Status - none pending RFIs Status - none pending Project Schedule - WWS needs to provide revised Construction Schedule Signs - ARRA signs have been erected and information for OSHA. wage rates etc. are posted SUBMITTAL Status- please have complete submittal log available for review at next meeting. Inspectors logsAVork Orders - CG&L requests these be available for review' at all meetings. As-builts or Record Drawings - were reviewed. Please have these available lor review at all meetings. J PROPOSAL Date 2/11/2010 Proposal #10D1123 Sales Person DK Quantity Description Rate Amount 1 SECTION 17025 FIELD INSTRUMENTS 2 4SO.OO 960.00 5 90.00 450.00 3 2,715.00 8,145.00 1 3,115.00 3,115.00 Total: Page 2 Part 2.7 (A-E) Ultrasonic Level Transmitters Tag: LE/L1T-101, LE/L1T-102; LEA.1T-203 Manufacturer: Endress & Hauser Model (Transmitter): FMU90-R11CA111AAIA Model (Transducer): FDU91-RN IAA6" Modified Flange: Chcmtrol 1853-H60 Carolina Technical Services, Inc. Post Office Box 268 China Grove, NC 28023 704.857.1115 / 704.625.7425 Fax Federal ID: 56-2120646 Part 2.7 (A-E) Ultrasonic Level Transmitters Tag: LE/LIT-20l_LE/LIT-202 Manufacturer: Endress & Hauser Model (Transmitter): FMU90-R11CA212AA1A Model (Transducer): FDU91-RN4AA6" Modified Flange: Chenitrol 1853-H60 Part 2.6 (A-B) Chemical Emergency Hand Switches Tag: HS-101; HS-102: HS-103; HS-201; HS-202 Manufacturer: IDEC Model: l-BlW-HW1B-V411R Part 2.5 (A-D) Chemical Emergency Audio / Visual Alarm Devices Tag: A.A/VA-101; AA/AV-201 Manufacturer: Ingram Products, Inc. Model: AVS115CLX40FS Proposal for Water & Waste Systems Construction, Inc. Scott Leonard 14 Apothecary Ct. Gamer, NC 27529 Ship To Project: Roanoke Rapids WWTP Chemical Feed Imporvements Bid Date: 12-Nov-09 Engineer: Arcadis G&M of N.C. Validity: 30 Days Terms: Net 30 CTS' Conditions of Sale apply. Total is less S&H and Taxes, (unless otherwise noted above) PERFORMANCE ANNUAL REPORT 2009 ROANOKE RAPIDS SANITARY DISTRICT I.GENERAL INFORMATION B. Responsible entity: Roanoke Rapids Sanitary District, Dan Brown, CEO C. Person in charge/contact 2. D. Applicable Permit(s) 2. E. Description of C.S.: The Roanoke River Interceptor collects wastewater from basins located on the north side of Roanoke Rapids. The Gaston and Northampton basins are included in this service area. The Interceptor begins just west of NC 48 in Roanoke Rapids. There are 3 primary basin pump stations and 2 secondary pump stations along the route. Pipe sizes for the Interceptor ranges from 18” to 30”. The system has six sewer lift stations. Three stations are located in the Gaston, NC system. One of these serves a Northampton County School, one serves the Chowan Housing Projects and the other station pumps all flows from Northampton County across the NC 48 Bridge crossing the Roanoke River to the Roanoke River Interceptor. The remaining three pump stations are located within the Roanoke Rapids system. Two of the stations, Belmont and Poplar Springs, discharge to the Roanoke River Interceptor while the Greenbriar Pump Station discharges to the Chockyotte Creek Outfall. WWTP: NPDES NC0024201 Land Application (L.A.): WQ0001989 Stormwater (General): NCG110000 WWTP: Gregg Camp, Operator in Responsible Charge (ORC) Roanoke Rapids Sanitary District, WWTP 135 Aqueduct Road Weldon, NC 27890 Phone: 252-536-4884 MAR 012010 The Chockoyotte Creek Interceptor handles the south side of Roanoke Rapids and three sub-divisions, Lake View Park, Greenbriar and Lincoln Heights, outside the Roanoke Rapids city limits. The Interceptor begins east of Zoo Road. There is one primary basin pump station along the route. Pipe size ranges from 12” to 30”. A. Regulated entity: Roanoke Rapids Sanitary District, Collection Systems (C.S.) and Wastewater Treatment Plant (WWTP) The collection system consists of approximately 130 miles of sewer lines. The sewer lines within Roanoke Rapids, Gaston and all sub-divisions, which connect to the two main Interceptors, range in size from 8” to 12”. There are two main Interceptors transporting wastewater to the WWTP. DENR-WATER QUALITY POINT SOURCE BRANCH 1. C.S.: North Carolina Environmental Management Commission System-wide Wastewater Collection System Permit No. WQCS00027 1. C.S.: Charles Turner, Operator in Responsible Charge (ORC) Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, NC 27870 Phone: 252-537-9747 F. Description of WWTP: II.PERFORMANCE A. Description of overall 12 month performance, noting highlights and deficiencies: The performance of the system in 2009 was good. -2- Secondary clarification removes solids from the activated solids process. Here, solids in the presence of oxygen, ph control, and mixing, accumulate in excess. They are removed, chemically stabilized, and added to a holding facility. All stabilized solids are analyzed and land applied according to their nutrient value, ceiling and accumulative requirements. Treatment processes at the wastewater plant include grit and rag removal. This is followed by primary clarification, trickling filter biological secondary treatment, activated solids treatment, secondary clarification, final effluent chlorination/dechlorination processes, and final pH adjustment. The Fat, Oil and Grease (FOG) program initiated in 1995 has been a good tool in preventing Sanitary Sewer Overflows (SSO's). We also have a fulltime employee for the FOG Program to inspect all records and grease traps. He also educates all restaurants about grease and how it affects our sewer lines. The use of local newspaper for FOG program educational ads and the distribution of brochures to restaurants and fast food businesses have also been effective. Inspection of records and grease traps is an ongoing measure to prevent SSO’s. The wastewater treatment plant is rated at 8.34 million gallons per day (MGD). Peak flow is rated at 12.5 MGD. In 2009, the District had emergency bypass connection installed at the Housing Authority pump station. All lift stations have emergency connections. In September, the District purchased a new Preventive Maintenance of at least four hours a week cleaning sewer mains has also been a good tool in reducing sewer backups. The District replaced 25 manhole vents on the Chockyotte interceptor to be proactive in fighting Inflow and Infiltration from leaking and incorrect elevation of existing manhole vents. The use of degreasers in pump stations on a regular schedule has proven to be very effective in preventing lift station down time. Also all pumping stations are checked and cleaned a minimum of twice weekly. District staff conducted drawdown tests on 3 stations in 2009 to ensure proper performance. During these processes solids are removed from two locations. Primary clarification removes settleable solids from incoming wastewater to an anaerobic digestion unit. Here the solids, in the absence of oxygen, receive pH adjustment, mixing, and heating to produce a stabilized material. Once the solids are stable, excess water is decanted and returned to the plant for further treatment. The stabilized, thickened solids are treated with lime for odor control then removed to a holding tank to await land application. There are two pumping stations in the wastewater plant distributing wastewater into and through the plant. Of these two pump stations, one has the capacity to pump 20 MGD and the other 27 MGD respectively. Also, to aid these two pump stations; a storm water pump station has been installed. This station intercepts rainwater, an unnecessary load to the treatment plant, and removes it before entry to the plant. It has the capacity to pump 11.5 MGD. In conjunction to these two pump stations there is one pump station with capacity of 21 MGD to remove treated flows from the plant in the event of high river levels preventing normal gravity flow discharge. Various others pumps and mixers are located throughout the plant for process control. 1. C.S.: The Roanoke Rapids Sanitary District’s collection system received its inaugural permit in 2001 under the North Carolina Environmental Management Commission Department of Environment and Natural Resources system wide wastewater collection system-permitting program. 2. Some of the repairs and upgrades in 2009 include the following. -3- WWTP: Overall performance for 2009 was good. There were no NPDES permit limits violations. (See below) There were no monitoring or reporting violations. Godwin Dri-prime pump compatible with all emergency connections, with enough capacity to exceed any lift station. In 2009, the District continued to be very active in maintenance issues and concerns. The WWTP spent in excess of $739,000 on maintenance and repairs to equipment, supplies and materials necessary to operate equipment and capitalized monies to replace and upgrade equipment. The permit also contains daily maximum residual chlorine of 50 ug/1 (micrograms per liter or parts per billion). Also permitted is pH. It must be maintained between 6 and 9 units. These two samples are grab or instantaneously collected. Current plant capacity is 8.34 million gallons per day (MGD) with a peak flow of 12.5 MGD. For 2009 the yearly average low flow was 3.2MGD with minimum of 2.7MGD. The yearly average high flow was 6.5 MGD with a maximum of 13.7 MGD. The yearly average total flow was 4.1 MGD or 49% of the plant capacity. This is only a 100,000 gallon increase over the previous year or less than 1%. Rain, which can affect flows by inflow and infiltration were nearly identical for the past two years. In 2009, 46.5” of rain was recorded at the wastewater plant. The previous year 46.6” was recorded. Grit collector. The grit collector removes grit from the influent flow. Grit is removed at this location to prevent excessive wear on downstream equipment. There are two grit collectors. One is the primary collector and the other is a back-up. The primary unit, installed in the mid 90’s, uses a vortex motion to settle grit out of incoming wastewater. A pump removes the settled grit from a hopper to a screw conveyor for removal to a dumpster. The back-up collector, original equipment installed in the early 60’s, uses gravity to settle out grit. A sweeper arm moves the grit to a hopper where a pump removes the settled grit to a screw conveyor for removal to a dumpster. The pump in the back-up system failed and had to be repaired. Although much older and less efficient than the newer vortex technology, the gravity system is maintained for use during times when the vortex unit may be down for repairs. The SCADA system that monitors all lift station 24 hours a day, 365 days a year has prevented lift station overflows. In September 2009, level transducers were installed in all lift stations to show an instantaneous wet well level to the water treatment plant operators through the SCADA system. In response the District has maintained staff, critical parts inventory, equipment inventory, made plans to better address extreme conditions, upgraded critical equipment, planned back up or alternative operations, and requested better responsiveness from sub-contractors. Responses are continuous and increasing. The District is keenly aware of and has been very responsive to increasing environmental awareness. House Bill 1160, Clean Water Act of 1999, ratified by the North Carolina General Assembly on July 20th and signed into law July 21st by the governor, has heightened this awareness. This bill codified as Chapter 329 session laws became effective October 1999. Under the current permit, the District has a weekly effluent total suspended solids (TSS) limit of 45 mg/1 (milligrams per liter or parts per million) and a monthly limit of 30 mg/l. Also a weekly carbonaceous biochemical oxygen demand (CBOD) limit of 37.5 mg/1 and a monthly limit of 25 mg/1. These two samples are composite collected. They are collected over a twenty four hour period and on a flow proportional basis. The higher the flow, the more sample collected and conversely, the lower the flow, less sample is collected. The yearly average for TSS was 16.2 mg/1 and CBOD was 5.8 mg/1. Using yearly average influent values for the same parameters this calculates to a 93.0% and 98.2 % removal rate respectively. The permit requirement is 85%. -4- Primary Clarifier. The plant has two primary clarifiers, both of which are original pieces of equipment put on line in 1963. Their purpose is to settle out solids in the incoming flow. The solids are removed for additional treatment by another process. There is a surface skimming mechanism also. It collects floatable solids, mainly grease, and deposits it into a collection pit. During past drainage for maintenance, inspections revealed severe deterioration of the base support and water delivery piping. Due to the age (nearly 50 years) and style of primary clarifier, repairing was not an option. There also had been several other substantial repairs over the years and the overall condition of the entire unit was poor. Because of these reasons, it was decided to replace the primary clarifier. Budget plans were set up for this to occur in fiscal year 2009-2010. Specifications for the equipment were written up, advertised, and sent out to various vendors. Bids were received and a purchase order issued to the winning bidder. Next specifications for installation will be written up, advertised, and sent out to various contractors for installation of the primary clarifier. This should occur in early 2010. Secondary System. The Secondary System is a biological treatment system consisting of three aeration basins and two secondary clarifiers. The system is operated by the use of various valves and piping, control panels, traveling siphon bridges with skimmer arms, gear boxes, motor and pumps, and blowers. Various repairs and upgrades were done. Each aeration basin has two air lines which supplies air to the basins. All six lines have air isolation valves in line. The valves, over twenty five years old, were broken or inoperable. They were replaced to restore control of air line flow as needed. The secondary clarifier traveling siphon-bridge with skimmer arms is driven by a motor and gearbox with chain and sprocket and a pulley cable system. The gearbox also has a clutch to disengage the drive system in the event it gets in a bind. The traveling siphon bridge and skimmer arm equipment had several repairs. A gearbox, motor and sprocket and chain wore out and or failed. Associated with this was the deterioration of a clutch. A skimmer arm, which is for removing floating materials from the surface of the secondary clarifier, is designed to glide over the parts in the clarifier in performing but sometimes get out of adjustment. When this happens, they can get bent or even pulled out of position. This is what occurred with one of the four skimmer arms. It was formed back into shape, reattached and placed back in service. The skimmer arms push floatable materials into a trough that is piped and valved to be either recycled or removed. The valve on the removal line broke and was replaced. During replacement, part of the line was replaced with stronger materials. The basins and clarifiers are piped to a drain station with a pump. This pump station is used for draining the basins and clarifiers when access is required for maintenance or taken off line due to operational mode. The drain pump, over twenty five years old, stopped pumping. It was sent off for repairs but could not be repaired because of Filter Effluent Pump Station. The filter Effluent Pump Station (FEPS) collects all incoming flow that has traveled through the primary clarifiers and trickling filters. It then transfers this water on to the secondary system for further treatment. This station is equipped with four pumps. Their pumping capacities are 2.1, 7.9, 7.9, and 9.2 million gallons per day (MGD). Here as with the influent pump station, the smaller pump is the “workhorse”. At this station the two 7.9 MGD pumps alternate after equal run times to aid the 2.1 MGD pump during normal flows. The 9.2 MGD pump is the high flow pump at this station. All pumps are operated with a programmable logic controller (PLC). The PLC is equipped with a human machine interface (HMI) which allows users to make adjustments to the PLC. The HMI, which is touch screen operable, failed. The HMI had to be replaced to restore full operational capability to the PLC. Influent pump station. The influent pump station transfers all incoming flow into the plant. The station is equipped with four pumps. Their pumping capacities are 2, 4, 7, and 7 million gallons per day (MGD). The 2 and 4 MGD pumps are the “work horses” of this pump station. They handle the majority of the work on normal flow days. This spares wear and tear on the larger 7 MGD pumps which are needed in cases of higher flows. They alternate based on run time hours until flows increase to a level where both are needed together. Since these 7MGD pumps only run for high flows, they do not run regularly. To ensure proper operation when needed, these pumps are exercised regularly. During the exercising of one of these pumps, improper pump operation was observed. Upon investigation, it was discovered that the coupling which connects the pump shaft to the motor shaft was deteriorated. The coupling was replaced, making the pump available for use again. -5- Digesters and Stabilization. Digesters receive solids removed from primary clarifiers. With heat and mixing and occasional chemical addition for pH control, solids are stabilized. One of the pumps used in the process re-circulates (mixes) solids through a heater. Due to its age, 15 years, and due in part to technology advances, the pump internal components were replaced. The efficiency was improved and future repairs made simpler. Cleaning of the digester is necessary to The chlorine chemical tanks (2) are operated in parallel for the chemical feed. The feed is controlled by feed regulators. For proper operation of chemical both regulators need to work properly. Both at different times of the year failed and had to be repaired. Even though this equipment will be replaced by the chemical conversion process, it still must be maintained until conversion to maintain compliance. Disinfection. The final phase of the water treatment process is disinfection (pathogen kill) and disinfection removal. The former is done with the use of chlorine. The latter is done to remove residual chlorine because of its negative effect on stream aquatic life. The chemical used to remove chlorine is sulfur dioxide. The chemicals are injected with submersible eductor pumps. These pumps are used to create a vacuum on the chemical storage tanks and to disperse them in a manner which ensures a complete mix of wastewater and chemical. The spare chlorine eductor pump failed. Technology advancements have produced safer chemical alternatives for disinfection and disinfection removal. Chlorine can be replaced with sodium hypochlorite and sulfur dioxide can be replaced with sodium bisulfate. Plans have been completed for switching to these for safer chemicals. They have been submitted to the State of North Carolina DWQ for approval and funding. The state now has approved the plans submitted and has awarded a low interest loan to finance the alternative disinfection and disinfection removal process. Specifications were written up and advertised. Bids were received and approved by the state. The contract was then awarded. Construction is to begin in early 2010. Because of the switch, eductor pumps now used for injecting chlorine and sulfur dioxide will not be utilized. Eductor pumps or pump repairs are expensive. Therefore repairing or replacing them at this time would not be economically prudent. However, without spares, the plant is at risk of permit violations if the on-line eductors fail. After some research, a substitute pump for only the fraction of the cost of an eductor pump could be modified for chemical injection. These pumps are non-submersible. It is not as heavy duty as an educator pump and the useful life not as long but injects chemical just as well. This will prevent a permit violation in the event of an eductor failure before the system switch. Both chlorine and sulfur dioxide has this set up. However, with the failure of the spare chlorine eductor pump, the risk of violation increased with out a back up. Again, after some research, a standard submersible pump modified with an injector, for a fraction of the cost of an eductor, restored the back up necessary for compliance. unavailable parts. A new pump was budgeted. The new pump is now on line. The control panel for the drain pump was the same age as the pump and was in poor condition. A new panel was built and installed. It was built with stainless steel rather than carbon as the original panel was, upgraded components and a better level control system. The panel which is located outdoors was also built to seal better for more protection from the environment. One of the pumps associated with this system is used for solids recycling or removal. The pump is controlled by a variable frequency drive (VFD). This allows for more flexibility in pump usage and conserves electrical energy. The VFD became inoperable requiring replacement. Blowers are used to supply air to the aeration basins for the treatment process. There are four blowers, two 75 horsepower and two 100 horsepower. Their use is dependent on the oxygen demands of the aeration basins. One of the 75 horsepower had several repairs to it to keep it available for use. Each blower has an inlet and outlet bearing. As they fail (begin to vibrate) the blower will shut down to protect from other damage. This occurred on the blower mentioned and required replacement. Another failure with this blower was to coupling that connects the motor shaft to the blower shaft. It was replaced. And the motor that drives the blower failed and was replaced. The blowers are housed in a covered but opened aired room. This allowed indirect environmental exposure that has not been the best arrangement for protection. To improve this, the room roof was extended out to provide better overhead protection. The sides were paneled up with metal and the front and back screened. This addition has provided shade for the blowers that naturally run hot; another benefit of the enclosure. -6- Biosolids Thickening. Excess solids from the secondary treatment process are thickened by gravity settling tank and a drum concentrator with the use of polymers. Polymers create a reaction which causes solids to concentrate (floc) and water separate. The purpose is to minimize the solids removed from the treatment plant because removal charges are based on the amount of maintain proper operation. This is done on a 7-10 year cycle. It also provides an opportunity fro repairs that can not be done while in operation. Digester three was taken off-line and cleaned. While down, a pearth unit and connecting pipe were installed. The path uses methane available to mix the digester. This enhances digester operation and liberates additional gas that can be utilized by the heaters. The pearths have tubes or lances that extend down into the digester area where mixing needs to be done. The gas used by the pearth passes through the lances into the mixing zone. There are six lances spaced equally about the digester. All were replaced with the installation of the pearth. The pearths are located on the top of the digesters. They are accessed daily for operation or maintenance. Access was by an attached wall vertical ladder. This made access difficult especially if carrying items to service the pearth and also dangerous. To eliminate this, the ladder was replaced by a set of access steps with handrails. Another byproduct of the solids stabilization process is water. This water need to be removed to provide space for additional solids addition to the digester. Removal of water is accomplished with a centrally located selector pipe. The pipe is slotted for water removal and to prevent solids removal. The selector pipe had deteriorated from years of use and was replaced. The digester building is equipped with many valves. They aid in the ability to move solids through the building and out. Several were in disrepair and needed to be replaced. While the digester was empty, the only opportunity to replace these valves, without releasing solids into the building, was done. After all upgrades and repairs were complete and before the digester was returned to service, the cover was tested for integrity by floating it on water. The cover consists of a bottom, sides, and top and is designed to float on the contents of the digester tank. It does so because the volume is constantly changing and through this function, traps and stores methane, a byproduct of the digestion process. The methane in turn is used by heaters to heat the solids of the digestion process. The cover at first floated but shortly afterward sank. Apparently there were holes in the cover and the digester could not be returned to service until repairs were made to the cover. The cover is 35 feet in diameter and weighs approximately 80,000 pounds. A crane was brought in to lift the cover up and out of the digester tank. This was done to make the entire cover accessible for inspection. A metal inspection contractor was brought in. The inspection identified numerous holes in the bottom and sides. The inspection also revealed accelerated signs of deterioration of the bottom and sides. The top was in good shape because it remained coated over the years. However, the sides and bottom were in constant contact with solids and could not be re-coated. Also, unless the top is removed from the digester tank, the bottom is difficult to access and the sides are not accessible. The cover bottom and sides could only be inspected every 7-10 years during a cleaning cycle. During previous cycle approximately 10 years earlier, the cover bottom and side appeared sound. The results of the metal inspection contractor ruled out patching the holes. The next decision was to replace the metal of the bottom and side to the top that remained in good shape or replace the entire cover. After a cost comparison analysis was performed, it showed restoring the existing cover was more economical that a total replacement. The restoration process went well. While the cover repair was ongoing, some digester tank repairs were being done. When the cover sank, it broke one pipe and damaged a concrete support pillar. These repairs were done in time before the cover was replaced on the digester tank. A crane returned the cover in place and the digester tank refilled with water. The cover floated. Inspections revealed no sign of cover leakage. However, during the inspection of the cover, water used for floating was going out of the tank. The digester tank was drained and inspected. After an exhaustive search, the inspection revealed some deterioration of the concrete walls. At one of the form seams, located below ground level, ground water was noticed running in. This was the area where water was exiting when the tank was full of water. Repairs to the concrete were made and the tank was refilled with water again. This time cover and tank checked out. The unit is ready to be returned to the digestion process. The digester tanks are attached to a control building. The control building contains equipment, pumps and motors and hundreds of feet of piping with dozens of valves. The building interior was originally painted in 1963 and then again in 1983. It had been over 25 years since the last painting. The building interior was repainted. The building is color coded to distinguish the different stages of digestion, types of chemicals, gas, water, and electricity. -7- Biosolids Storage. Biosolids, waste activated and anaerobic, once stabilized are blended and stored in a tank capable of holding one million gallons. This tank is 19 and one half feet tall and is 100 feet in diameter. The solids are mixed by 3 mixers for odor control and to prevent settling until removed for land application. Even with mixing, over time settlement inevitably occurs and approximately once a year the tank needs cleaning. The tank was cleaned to remove this settlement. Cleaning also allows for access to the mixers for preventive maintenance. While accessible, one mixer that had failed was sent off for repair. The mixer, approximately 18 years old, had been repaired several times over the years, but was now obsolete and parts not available gallons removed. Excessive solids from the secondary system enter a pump station by gravity flow. From here the solids are pumped to the gravity settling tank to begin the thickening process. The pump used for this transfer wore out and was replaced with a new one. Also the piping which leads from the pump contains a check valve because the pumping is intermittent. During times when the pump is off, the valve keeps solids from draining back into the pump station that would require re-pumping of the solids. The valve wore out and was creating this problem. It was replaced thus restoring the normal function of this pump station. After gravity thickening, additional thickening, if required, is accomplished through a drum concentrator. Before entering gravity or drum thickening process, bulk concentrate polymer must be diluted and mixed. This preparation is accomplished with the use of a Dyna Blend. Sample testing determines the correct amount of polymer to water ratio. This is done to produce the correct dosage of polymer to be used, preventing wastage with the correct amount of water to produce correct concentration for producing the desired floc. Therefore the Dyna Blend is a blending, mixing, and pumping piece of equipment. From testing, the Dyna Blend can be calibrated to perform automatically. Its run time is controlled with a float level system in the tank it supplies polymer to. The internal portion of the pump through normal wear lost efficiency and was replaced. The Dyna Blend is also equipped with a low flow sensor. If the polymer/water mix flow does not flow through the pump at a normal rate, it shuts the unit down preventing accelerated wear on the pump. The flow sensor is an electronic device. It malfunctioned and was shutting the pump down when it was not necessary. The device was replaced, restoring proper function of the Dyna Blend. Because of the twenty-four hour daily use of the Dyna Blend and because of long lead times for parts delivery, it was determined for best interest that major components of the system be inventoried. Therefore, in the event of major failure, the system can be returned to service quickly. Lime Stabilization. Waste activated thickened solids are stabilized through the use of lime. Time and pH’s dictate the stabilization requirement. Lime is received in dry form and transferred to a storage/feed silo. The dry lime is then fed to a preparation tank. The feed mechanism broke and had to be replaced. Lime is fed into a tank with water and mixed with a paddle wheel to keep the mixture in solution. The gearbox that turns the paddle wheel failed and had to get replaced. Solids once mixed with lime are transferred to holding tanks to complete the stabilization process. Pumps used to make the transfer were worn and had to be rebuilt. In the process of removing the pumps for repair, the mounting rail and connecting piping had deteriorated. These parts had to be replaced before rebuilt pump could be installed and before solids transfer could occur. Once the stabilization process is complete, solids are transferred to a storage tank and held until removed for land application. The pumps for transfer to storage were approximately 15 years old and had been rebuilt on several occasions. New pumps were budgeted, purchased, and installed in place of the old pumps. Electrical wiring of this process was originally installed in a manner which made working on equipment in this area difficult. It was also not installed in the best way to protect equipment and was also unsafe. Because of these reasons and due to the age of the wiring, approximately twenty years, a portion of this work areas electrical wiring was replaced. The lime stabilization process is monitored and controlled by laboratory procedures. After mandating this process, a used trailer was purchased to house the necessary lab equipment, supplies, and documentation for process control and compliance. The trailer was used for a number of years but went through much up keep and restoration. Finally scrapped, a rental trailer was brought in for temporary use. After several years of use, funding was appropriated to build a permanent building. It was constructed of concrete slab and metal siding. The new building provides better consistent controlled environment which enables the laboratory procedure to run more smoothly and accurately. Construction of this type of building should provide many years of this building use with an easier, more accurate laboratory operation. -8- 12" pump installation. The 12 inch pump installed at the head-works of the plant in 2000 remains a valuable tool in preventing spills. In the event of high flows or maintenance repairs, water can be removed to two abandoned secondary clarifiers. These clarifiers were taken off-line in the early eighties after plant upgrades. They were originally used for stabilized biosolids storage. The capacity was increased by extending a wall up from where the weir overflows were when used as secondary clarifiers. This increased the storage capacity of the two tanks to 750,000 gallons. After a dedicated biosolids tank was constructed, the two abandoned tanks were dedicated to spill containment. Once stored, wastewater can be returned to the plant with an existing pump station. Some pipe work has been added to this station and depending on conditions, water could be returned as the tanks are filled. This further increases holding capacity or downtime, during high flows or maintenance and repairs. In 2009, 1,507,257 gallons of wastewater were stored. Since The tank now equipped with five mixers did not have adequate power supply. Larger power supply wire had to be installed. A new power panel had to be constructed. This was necessary to be large enough to accommodate extra components as well as replace a deteriorating cabinet, 18 years old also. The new cabinet was constructed of stainless steel rather than carbon to better withstand atmospheric elements. It was built to seal better protecting internal components. It was also constructed with all normally used switches and buttons on the outside of the cabinet thus negating the need to routinely open the cabinet and eliminating the possibility of accidentally leaving the internal components exposed to the outside. for repair. A new mixer was budgeted to replace the old mixer and return the tank to service with 3 mixers. It was determined that due to the size of the tank an additional 2 mixers should be added. This should lengthen the time between cleanings by keeping the solids better mixed and eliminating some non-mixed areas of the tank. Funds were budgeted and two more mixers were purchased. Installation of the additional mixers required a second cleaning of the tank in a year’s time. The tank was cleaned and the mixers installed. However, the tank constructed of glass lined metal plates seated on a concrete pad was showing signs of slight leakage. While empty and cleaned, the original erectors of the tank were contracted for repairs. The tank base and floor were sealed and a protective coating was applied. This was done to prevent a spill and extend the useful life of the tank. SCADA (Supervisor Control and Data Acquisition) system work. SCADA is a computer-based program. It brings site information into the central operations center. SCADA is a useful tool by providing monitoring information to be used for more efficient plant operation. It also brings remote site alarms into the operations center, which provides better control over plant problems. In 2009, there were no major additions of SCADA for large plant processes. However, there was some additional work added to one of the large plant processes previously set up. The biosolids thickening, lime storage, and solids storage had some additional signals added. Some additional pumps and mixers and other equipment were added. This also created some additional programming of the SCADA computer. Signal reception, on-off-alarm status, and trending of equipment and processes were added. Due to the growth of the SCADA system, now it has become necessary to initiate a scheduled preventative maintenance program to ensure proper operation and prompt repairs. Solids removed from this tank for land application is done with a gallery station equipped with pipe, valves, and pump. This same station is used to return stored wastewater to the plant. Therefore double duty is depended upon this pump. If the pump fails during solids or wastewater removal, the process is shut down for lengthy periods. This could cause problems for whichever process is on going. To eliminate this problem, this station was fitted with additional piping, valves, and a second pump. One pump is dedicated to solids removal and the other for wastewater removal. However, if one pump should fail, new pipe and valving allows for switching to the other pump until the damaged pump is repaired. This now eliminates lengthy problematic downtime. Due to the new valving arrangement, new cover plates were installed. The old carbon steel plates were replaced with stainless. New holes were cut into the plate making ail valves accessible with valve handles. New valve stems were fabricated for the valves making a better fit for the valve handles. This provides better operation of the valves. -9- Since purchasing the land, investment improvements continued in 2009. Improvements have been going on for nearly six years. Improvements this year included adding more rock to the access setup in 2000, 37,875,809 gallons of wastewater have been prevented from spilling. At the average flow of 4.1 MGD in 2009, this would be 9.2 days of flow. Another means of spill control is with a back-up generator. The wastewater plant must continue to run in the event of power interruptions from the power-supply company. Power interruption can occur from equipment failure, road accidents, and weather events, such as ice storms, electrical storms, tornadoes, and hurricanes. A 750 kilo-watt generator is on site for events and can supply enough generated power to run the entire plant. In 2009, there were no power interruptions resulting in the use of the back-up generator for power supply. The emergency generator is also used to curtail. The District is under contract with Dominion Power. From May 16lh through September 30th (summer curtailment) and from December Is1 through March 31s1 (winter curtailment). Dominion can request the wastewater plant to supply its own power for parts of the day during peak demand. These requests usually come on the hottest days of summer and the coldest days of winter. Dominion can then send power that the District would normally use to other places of need. Winter requests are usually from 6am to 11am (5 hours) but can be 5pm to 10pm also possibly on the same day. However, each requests counts as one run. Summer requests are from 2pm to 9pm (7 hours). The contract is limited. In the winter requests to curtail are limited to 13 or 65 hours and summer 19 or 133 hours. In 2009 the wastewater plant was called to run 16 times during the summer curtailment. There was one winter call. The District does incur the cost of diesel fuel. However, the rate structure the wastewater plant has because of the contract off sets this cost and provides electrical energy savings. An added benefit of this program is that it provides a means to exercise the generator. This keeps the generator in better running condition and exposes any potential problem. It would be better to find out a problem during a curtailment than an actual power outage. By having the generator under a contracted quarterly preventive maintenance program hopefully problems will be minimized or eliminated. The biosolids land application program permitted by the Environmental Protection Agency (EPA) ran well in 2009. In the required annual report to North Carolina division of Water Quality (NCDWQ) and the (EPA), there were no deficiencies or spills. In 2009 there were 216 lime stabilization events at 12750 gallons per event for a total of 2,754,000 gallons. This is 59 % of the days in a year. The anaerobic digestion process produced an additional 178,500 gallons of stabilized solids. Although these solids have met all requirements for stabilization, they are also limed. This is done solely for the purpose of odor control. The wastewater plant has entered into agreement with area farmers for the use of their land for biosolids application. The farmers in tum receive the nutrient value, moisture content, soil remediation, and lime, which is a by-product of ph control in the treatment process of the biosolids. If necessary, additional lime can be applied. There are 3100 acres, consisting of 128 fields, available in Halifax, Northampton, and Warren Counties. All acreage was inspected, approved, and permitted by the State of North Carolina. Using EPA approved treatment processes, 2,966,100 gallons of stabilized biosolids were safely applied to area lands, consisting of 11 fields and 349.9 acres, for beneficial reuse. This included the use of two different farms. Cost of this application process was approximately $94,000. Cost of treatment to stabilize solids is separate. Land that grew fescue, Bermuda, rye, cotton, and soybeans were applied to. The amount applied in 2009 is down nearly 3.7 % from the previous year. Charges for application are based on gallons. In an attempt to save application costs, biosolids are thickened as much as can possibly be handled. The removed water is returned to the treatment plant. Also, once biosolids are placed in storage for land application, water is further separated. This water along with environmental water (rain, snow, etc) is decanted and returned to the treatment plant. In 2009, 505,500 gallons was decanted, at savings of $15,671. Although 3100 acres of land is permitted and storage of 1,000,000 gallons is available, at times application is difficult due to weather conditions, crop status, and crop rotation. Owning land would provide an outlet for these times. In 2004, the District purchased a suitable land application site. It is located in Northampton County where the District already has farmer owned land permitted. The land has been developed for livestock (cow) operation. The area has been split into two fields. One contains 41.8 acres of fescue and the other contains 67.2 acres of bermuda. - 10- The North Carolina Division of Water Quality performed its annual inspection of the pretreatment program on June 26, 2009. A letter of June 30, 2009 was received summarizing the inspection. Four items were listed as findings. None were violations or recommendations. The pretreatment annual report (PAR) was submitted to the state pretreatment unit on February 16, 2009. A letter, dated June 30, 2009, was received stating review of the PAR indicates the report in good order and satisfied the requirements of the North Carolina Pretreatment Program. A revision of the Emergency Response Plan was sent to the Division of Water Quality Pretreatment, Emergency Response, and Collection Systems Unit for approval in May 2009. After review by the Division, the Plan was approved August 11, 2009 and adopted by the District board on August 13, 2009. A copy was sent to each industry having a user permit. In 2009 the industrial pretreatment program had oversight of three significant industrial users. One user has a categorical discharge pipe. Four non-significant industrial users are permitted to send flow to the wastewater plant. Significant and non-significant status is determined in part by the volume of flow discharged and the pollutants in the discharge. The pollutants, carried by certain industrial wastes, determine the categorical status of an industry. Each industry whether classified as a significant or non-significant user is issued a permit with limits and monitoring requirements. In 2009 there were no significant industrial users in significant non-compliance; a status based on the number and types of violations of a permit. There were six notices of violation sent for permit violations. road between the main paved road and the application field. The road is still fairly new and is still settling in areas. More rain and heavy tanker trucks accelerated this need along with a logging operation nearby which used part of the access road. The access road is approximately 'A mile long of which 100% is rocked. By choice, the District did not apply biosolids to its fields in 2009. Therefore, no nutrients were applied through this process. However, to maintain establishment of grasses, commercial grade fertilizer was applied. The District has desired and strived to develop a model site. In an effort to achieve this, the Agricultural Soil and Conservation Service (ASCS) was contacted. A plan was developed to accomplish this. The ASCS provided the majority of the funding for the plan. The plan included fencing off waterways to keep livestock out. This required the removal of some trees that were in the line of the fenced areas. By fencing off areas, buffer zones were created. These areas were required to be seeded in an attempt to enhance wildlife attraction. Because the fencing isolated livestock from waterways, waterers were installed for their use. New water lines had to be installed to provide water for the waterers. In 2009, an access of $15,000 was spent to maintain and enhance the application site. The laboratory has two full-time and one part-time technician, a laboratory supervisor, and laboratory manager. After the laboratory obtains certification, it must complete an annual performance evaluation study and submit the results to the state certification section. This performance evaluation must be in the form of a “blind” study. Study samples are ordered from a state approved vendor. The study sample values are unknown to the laboratory. The samples are analyzed and the results are submitted back to the supplier fro grading. If the laboratory fails to achieve an acceptable rating on a parameter for three consecutive samples, the laboratory could loose certification for that parameter. If certification is lost, the laboratory must go through a recertification process as if they had never achieved certification. The District wastewater plant has an on-site monitoring laboratory. Analysis for NPDES reporting to the Division of Water Quality must be performed by a certified laboratory. The laboratory is certified by the North Carolina Division of Water Quality Laboratory Certification Section. In order to become certified the laboratory facility must meet space and equipment specifications as well as analysis performance evaluation. The laboratory is currently certified for twelve inorganic parameters and four Vector Attraction Reduction options for the treatment of biosolids. The laboratory receives samples from approximately 39 sampling points that include plant monitoring, industrial monitoring, performance evaluation studies, septage hauling, and collection system samples. -11 - The FOG ordinance allows for variance in the grease trap cleaning schedules with the completion of a variance study. In 2009, one variance study was initiated and completed that resulted in the granting of an extended pumping schedule for the restaurant. Because of space constraints, two restaurants were accessed surcharges in lieu of trap installation in 2008. One of those restaurants closed in 2009 leaving only one restaurant being surcharges in lieu of installing a grease trap. The laboratory submitted all required evaluation studies and received an acceptable rating on all in-house study parameters. The laboratory also works in association with the pretreatment program and biosolids program in that analysis of samples taken by pretreatment technicians and plant operators are brought to the laboratory for analysis. A laboratory technician is also responsible for entry of the resulting data into a spreadsheet that is used by the Pretreatment program for its Long Term Monitoring Plan. Laboratory technicians are also responsible for data entry into the plant operations spreadsheet used for NPDES permit compliance monitoring and plant process control. The laboratory works in coordination with the state certification branch to certify field testing equipment for the surrounding communities with small treatment facilities who work on limited funds. At this time, the laboratory assists six small facilities with equipment certification. The Roanoke Rapids Sanitary District adopted its first Fats, Oils and Grease (FOG) Ordinance in 2005. Since then operational issues under the ordinance arose. In 2008, the District addressed those in a revision and subsequent adoption of new ordinance language. During 2009, there were sixty-two restaurants in the District database. This included the opening of three new restaurants and the closure of five. Each of the restaurants was inspected in 2009. Updates to the database information in 2009 include updating information such as management contact information and new restaurant information. Inspections resulted in the issuance of two Notices to Correct. Each of these corrections was made by the receiving restaurant in a timely manner. Variances are also granted for inability to install an outdoor trap based on space constraints. One variance was granted to allow the installation of indoor self-cleaning traps based on space constraints. Additional requirements of the program include state inspections, quarterly in-house blind studies, maintaining a quality control program and a chemical hygiene plan, a chemical inventory plan, equipment calibration and certifications, and certification fee. The laboratory was inspected on July 9, 2009 and a letter of August 24, 2009 listed findings of the inspection. Each finding was addressed to the state September 4, 2009. No violations or deficiencies were noted. FOG public education is a requirement of the wastewater collections system permit WQCS00027. Ongoing efforts from 2008 continued in 2009 with the revision of a FOG slide that airs on local television Channel 15 and the addition of a FOG pamphlet enclosure with one billing cycle. The District also took part in the Home Builders Association Home and Garden show that took place at Becker Village Mall. FOG pamphlets were given out at the District’s booth. There was also other information available for residents to view regarding FOG and the FOG Program. The administrative staff continues to distribute a FOG ordinance package to all new Food Preparation There was one sanitary sewer overflow that was attributed to FOG in 2009. The overflows occurred in residential area. Educational information was dispersed to nearby residents to inform residents of how they can help prevent FOG accumulation in the collection system that lead to overflows. One blockage also occurred. The blockage occurred at a multi-family housing unit. Informational handouts were given to the residents and the District began performing more frequent line cleaning in the area. - 12- The wastewater treatment plant has a National Pollutant Discharge Elimination System (NPDES) permit. It is issued by the Division of Water Quality (DWQ) after final approval is granted by the Environmental Protection Agency (EPA). The permit authorizes discharge of treated wastewater to the Roanoke River. The current permit is valid through March 2012. The District has an emergency response team (ERT). Because the wastewater plant is the only location with chlorine and sulfur dioxide, now, the response van is now located here. This should help with response time in the event of an emergency. Also relocated to the plant is the chlorine The safety program within the District is very active and assertive in its approach to the protection of the employees and surrounding citizens. The program consists of a safety officer, safety committee, incident/accident committee and appeals committee. The safety officer sets up the monthly safety meetings, coordinates the activities of the safety committee, keeps up with safety regulations, and many other various safety activities. The safety committee prepares safety policy programs and updates current ones. They also do site inspections and produce potential hazard punch lists. The safety committee and safety officer also keeps up with and prepares for updating regulations and integrating new regulations of OSHA. The incident/accident committee reviews all potential accidents and accidents. The appeal committee follows up the safety committee recommendation at the request of an employee. The attempt is to minimize the seriousness of an accident and ultimately prevent accidents. As a result of the awareness and training from the safety program, there were no loss work days in 2008 at the wastewater treatment plant. Another testing requirement of the NPDES permit is the annual priority pollutant analysis (APPA). As indicated, it is an annual test that checks the effluent for conventional and non- conventional compounds, total recoverable metals, volatile organic compounds, acid-extractable compounds, and base-neutral compounds. These substances, if found in sufficient quantity, could be harmful to the wastewater plant, receiving stream, and the public. To date, no substances have been found in significant quantity to cause harm. The test is done seasonally over the term of a five year NPDES permit. Facilities when opening a new account. The administrative staff also gives out industrial waste surveys to each person who opens a commercial account that asks questions regarding food preparation and grease traps. Best management Practices (BMP) posters continued to be distributed to those contributors who have the potential to discharge FOG, but may not require installation of a grease trap. Examples of these establishments include schools, churches and daycares. Before accepting flow from a new multi-family housing development, FOG pamphlets are distributed to residents and the FOG program is discussed with the management. A requirement of the wastewater plant through its NPDES permit is quarterly chronic toxicity testing. The test involves using a predetermined amount of effluent along with a macroscopic organism. Ceriodaphnia are placed in the effluent and must survive and reproduce for a specific length of time. Results of the test are either pass or fail. A pass indicates the absence of substances in the effluent which may be harmful or threaten aquatic life. The wastewater plant has been required to test for chronic toxicity since April of 1993. To date only one test has received a fail result. This occurred in July 2001. The Division of Water Quality conducted their annual review of the wastewater plant May 19, 2009. A comprehensive site inspection was conducted. The site inspection went well. The evaluation report received on June 9, 2009 stated the plant was in compliance and well maintained. There were no recommendations or corrections. Noted too was the stormwater program. The report stated the program was implemented and compliant. The wastewater plant now has a general storm water permit. It was received through an application process as required by the North Carolina Division of Water Quality. A requirement of this permit is a written storm water management plan. The plan is used to evaluate potential pollution sources and to select and implement appropriate methods to prevent or control the discharge of pollutants to stormwater runoff. As a part of the plan, semiannual preventative maintenance evaluations and semiannual inspections of site runoff areas are required. Permit limit violation 2.WWTP: None Monitoring and Reporting Violations 2009 Sanitary Sewers Overflows (SSO) 1. 2. WWTP: N/A Bypass of Treatment Facility - 13- gas detector. It has been assigned a caretaker who also does monthly calibrations. The formation of the team arose from chemicals, chlorine, and sulfur dioxide stored on site. Another factor for its formation was the lack of any other agency in the immediate area to deal with these chemicals. The team meets and has drill practices regularly. The team is fully equipped and trained to handle emergencies which may arise from the use of chlorine and sulfur dioxide. 01/26/2009 - Smith Church & Vine St. 04/13/2009 - Charles Cir. & South gate Dr. 06/04/2009 - 4th & Marshall St. 07/02/2009- 13th St.M/H42 11/12/2009 - M/H - 46 east of River Rd. 11/12/2009 - M/H B-24 at Starke Dr. 11/12/2009 - M/H B-46 at West 3rd & Starke Dr. 11/12/2009 - M/H Cl82 at Kapstone Paper Mill 12/09/2009 - M/H 54 at 4th & Laurel St. C.S.: There were 9 reportable SSO in 2009. a. b. c. d. e. f. g- h. i. C.S.: 3 Starke Dr. 11/12/2009 1st Manhole east of River Rd. 11/12/2009 Kapstone Paper Mill Yard 11/12/2009 B. By month, list of the number and type of any violations of permit conditions, environmental regulations, or environmental laws, including (but not limited to): 2. WWTP: There was one reportable bypass of the treatment facility in which wastewater reached surface waters in 2009. It occurred on November 12,h during a heavy rain event creating high flows. 2.7” of rain was recorded on the 12th with 3.2” recorded the previous two days for a total of 6.4” in three days. The flow reached nearly 18 million gallons. Last years average flow was 4.1 million gallons per day and the plants rates capacity is 8.3 million gallons per day. As a result, the plant could not handle all of the incoming flow and approximately 663,000 gallons were spilled. As required, the spill was reported to the Division of Water Quality (DWQ) within 24 hours by phone and followed up with a written report within 5 days. Due to the volume of the spill being more than 1000 gallons and greater than 15,000 gallons, the Division of Water Quality requires a press release and a public notice. Both of these requirements were met. 1. a. b. c. 1. C.S.: None 2. WWTP: None 1. C.S.: N/A C. Description of any known environmental impact of violations. D. Description of corrective measures taken to address violations or deficiencies. 1. 2. - 14- Some of the work done to prevent problems is the identification of potential spill areas. Once identified, arrangements are made to stop or minimize and contain. Chemicals are used for disinfection and toxic chemical removal. This process constantly runs year round. Eductor pumps are used to accomplish feed of the chemicals. These are submersible pumps that recycle wastewater to create a vacuum which pulls chemical into the wastewater for treatment. The process requires the use of two eductor pumps. And with the requirement of constant treatment, two backup pumps were inventoried. These pumps are in excess of $10,000 with a typical repair costing approximately half this amount. Two of the pumps are in need of repair and the system was without backup pumps. The hesitation for the repairs is that this type of system is in planning stages to be completely changed over and eductor pumps will not be utilized. In the mean time, there is still a need for backup. After investigation, it was discovered that an above water pump adapted with a blending unit could accomplish the same results as an eductor pump. Two backup pumps were installed for less than $1000 or a fraction of the cost of one eductor pump. And now the chemical feed system has backup feed pumps thus reducing the likelihood of a permit violation. In an attempt to further prevent a violation, a no flow alarm light was fitted on these pumps. If flow of chemical through these pumps ceases, a visual alarm will alert staff to repair or switch over to the other feed pump. The disinfection system is on a contracted semiannual preventative maintenance program. It is an attempt to ensure that the release of hazardous chemicals, chlorine and sulfur dioxide, are prevented. Also, the automatic tank valve closures are sent off for repairs and recertification annually. The batteries that operate these valves are replaced regularly to ensure their proper operation in the event of a leak. C.S.: Preventive maintenance cleaning with Jet Vac, and a rot cutter which is attached to the Jet Vac hose for cutting roots and using TV camera. Manhole repairs. RRSD rehabilitated 80 vertical feet of brick and mortar manholes throughout the year with an epoxy based mortar and finish coat to eliminate infiltration of the collection system Plus the Roanoke Rapids Sanitary Dist. Crews cleaned & CCTV’ed 16.5 miles of Sewerlines. MJ Price Construction cut Chockyotte Creek Outfall and Laterals which was 8 miles. Duke’s Root Control treated 3 tenths of a mile of 8” sewerline. KRG cleaned & TV’ed 7 tenths of a mile of 8” sewerline, making a total of 24.5 miles between all four companies. The district had 9 reportable spills as noted in SSO section above. The District is very active in looking for Inflow and Infiltration. During 2009, District staff engaged in visual inspection, flow tracking, and the resulting point repairs. WWTP: The WWTP is very aggressive in reacting to violations and identifying potential deficiencies. Once identified, plans are made to upgrade or replace potential deficiencies, which may result in violation. Modifying operations, training operators, laboratory training, improved equipment, maintenance inventory parts and equipment and raising awareness is also an on-going and continuous process. The wastewater plant uses chlorine for effluent disinfection. It uses sulfur dioxide to remove the chlorine after disinfection has been accomplished. Both chemicals are very effective; however, both are also very hazardous. The District has been planning to replace these dangerous chemicals; sodium hypochlorite for chlorine and sodium bisulfate for sulfur dioxide. With drawings complete, the District approached the state of North Carolina for a loan. The state approved the drawings and provided a low interest loan for construction of a new chemical feed process for converting to a safer alternative disinfection process. Upon approval, the District sought bids from contractors to construct. Bids have been received and contract awarded. The 1. C.S.: None 2. WWTP: None - 15- There are various pump station alarms throughout the plant. Some are equipped with local visual lights, some with local visual lights and audible horns or sirens, and some are even equipped with remote SCADA alarms. In an attempt to keep functioning alarms, they are tested on a regular basis. As more alarms are installed, they are added to the testing list. The plant generator is capable of powering the entire plant in the event of a power loss. Without it, spills would occur. It is on a contracted quarterly preventative maintenance program. It is also exercised monthly by plant staff. And, the curtailment program with the main power supply company assures further testing and exercise of the generator. During the process of cleaning a primary digester tank, a hole was discovered below ground level. The hole was repaired. This discovery and repair prevented digester tank contents from leaking out and entering the ground water system. During high flows or some maintenance repairs, influent flow can be diverted to equalization storage tank. Once flows lower or repairs are complete, the stored water is returned to the plant for treatment. Primary clarifier influent lines have grease collection pits located on them. As the pits collect grease and fill, the flow through the influent lines can be restricted, back up, and cause spills. To prevent this from occurring, a contracted vacuum truck company is scheduled regularly to remove the excess grease and keep he lines unrestricted. A valve exercise program is now employed. It keeps valves in good working order. In the event of routine maintenance, equipment problems, or emergencies, valves used to address these issues are in a state of readiness. As valves are repaired or replaced, they are added to the exercise list. There are several valves around the secondary system that operate backwards. What direction normally closes a valve opens it and vice versa. The valve pedestal concrete base was stenciled to indicate correct operation directions. However, the raised lettering on the metal valve handle remained incorrect. Valve placement in the correct position may have contributed to the 2009 spill. To remedy the situation, the lettering on the valve handle was ground off and the correct positioning indicating arrows stenciled on. Also, the pedestal base was re-stenciled to be more obvious. The Fat, Oil, and Grease (FOG) program continues to be a useful tool for the prevention of spills. A pretreatment technician oversees and implements the program. The technician inspects restaurants to ensure grease trap maintenance. Best Management Practices for the control of grease entrance into the collection system is also conveyed. Part of the FOG program is public A 500 gallon 25% liquid caustic tank is housed at the effluent. It is used on occasion to maintain pH levels above 6 as permit required. Liquid caustic is highly corrosive and the housing it is presently in is inadequate containment. As part of the upcoming disinfection conversion construction project, the liquid caustic will be housed in location with adequate containment. Stabilized biosolids are stored in a million gallon tank while awaiting land application. During the year some slight leakage was discovered at the base of the tank where the metal plates join the concrete base. The tank was cleaned out and the tank supplier and installer were called in for repairs. The bottom ring of metal plates and the outer portion of the concrete base were coated with a protective sealer. The tank was returned to service with no apparent leaks. Identifying and eliminating inflow and infiltration (I&I) is an on-going and difficult task. It is important to stop or minimize to take unnecessary flows off of the treatment plant. However, it is also important to address because excess I&I can “dilute” incoming waste. Diluted wastewater makes it more difficult to meet percent removal requirements (85%) of the plants permit. I&I can also hydraulically overload treatment processes making it harder to meet permit limits. In 2009, more areas were identified and addressed to help resolve this problem. state also approved the contractor. Construction will begin in a few months and plans are to complete a few months thereafter. III.NOTIFICATION IV.CERTIFICATION - 16- A. I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the users of the named system and that those users have been notified of its availability. The plant stormwater drains are blocked and gated to help control of undesirable runoff from the plant site. The initial design protruded out into the road. The ones in curves on the plant site have been struck and broken on several occasions. A new design has now been built for drains in the curves which do not protrude out into the road. As part of the SPPP, a no longer used and abandoned 7000 gallon sulfuric acid tank was removed. The tank was deteriorating. Acid had previously been removed. It was used by an agricultural processing company. However, a precipitant of sludge remained in the tank. A hazardous waste recovery company was hired to remove the sludge for proper disposal. Also, to prepare the tank for disposal, it was washed out. The water was recovered for proper disposal as well. The tank was demolished and cut up for metal recycling. There was an abandoned diesel tank on site in the same above referenced condition. The same company cleaned and removed hazardous chemical and prepped it for demolition. It was cut up for metal recycling. education. The technician is required to incorporate all users of the collection system. This is accomplished through door hangers, bill inserts, poster distribution, advertisements, public service announcement and public displays. The Stormwater Pollution Prevention Plan (SPPP) is a valuable tool in identifying deficiencies. It incorporates annual awareness and training to all plant personnel. The plan allows for scheduled identification of deficiencies before they become problems. Reduce Recycle Satisfy Develop R. Danieley Brown, PE Chief Executive Officer A. A condensed, summarized version of this report will accompany the annual water report which will be distributed to the users and customers of the Roanoke Rapids Sanitary District via mail. The full report will be available at the main office upon request. Roanoke Rapids Sanitary District February 26,2010 Re: Dear Sir: Very truly yours, Enclosures Cc: c ■J.xuncits aJ K9inj>fdb'n>i rciird.W.qs f«.’rf«aijr<e liptn lu dx North Carolina Division of Water Quality NPDES Section 1617 Mail Service Center Raleigh, N.C. 27699-1617 If these documents should be provided to additional DWQ personnel; or if additional information is required, please contact me. Gregg Camp Charles Turner File DENR-WATER QUALfTY ?OINT SOURCE BRANCH 2009 System Performance Annual Report NPDES //NC0024201 NPDES #WQC00027 NCG110000 Page: 1/1 Enclosed please find tluee (3) copies of the District’s System Performance Annual Report. This report is submitted to meet the requirements of the NCDENR/DWQ policy to promote public oversight of system performance for reduction and elimination of sanitary sewer overflows (SSO’s) from wastewater treatment works and sewer collection systems. j MAR 012010 CERTIFIED MAIL RETURN RECEIPT REQUESTED P.O. Box 308 1000 Jackson Street Roanoke Rapids, iNC 27870 (252) 537-9137 Fax: (252)537-3064 www.irsd.org 4®_ R. Danieley Brown, P.E. Chief Executive Officer re Time: I ? 8 ^537-^^ 7 -4^1 Phone Number V?/- -m- w 1 -5g>k-48^4CTroyCt^ t/e^ fefM ^tr\ r Oj/^C MyH Ni&l Mw • ll- " NCDENR-DWQ-RRO Surface Water Protection Meeting Attendance Roster Date: SubjectJ^Kt^moLe ^fcD) OrganizationNaipe / 4.y Ha. [I A^52>___________ c^<vum^ _________________________ March 29, 2010 Dear Mr. Brown : cc: You should review this report; take actions or provide responses as indicated and then file for your records. If you have any questions please contact me at (919) 715-6219 or via e-mail gerald.horton@ncdenr.gov. Beverly Eaves Perdue Governor Subject: Initial Interim Inspection Roanoke Rapids SD [Halifax] WWTP Sodium Hypochlorite System Project No. CS 370 449-04 Mr. R. Daniel Brown, PE Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, North Carolina 27870 Hunter Carson, PE, Arcadis Danny Smith, Raleigh Regional DWQ Office CIG - Mark Hubbard, PE SRF HCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Coleen H. Sullins Director Dee Freeman Secretary p k)Zoo2^37 The Construction Inspection Group (CIG) of the Construction Grants and Loans Section performed its first interim inspection for the state and federally funded portion of subject project at 10:30 am on Friday March 12, 2010. The meeting also allowed CG&L the opportunity to present and discuss items normally presented at the Pre-construction meeting. CG&L did not attend that meeting on January 21. This interim inspection was conducted in conjunction with the monthly progress meeting normally scheduled for the 2nd Friday each month. Location of the Progress meeting was and will continue to be at the WWTP located on Aquaduct Rd. Contract completion date is December 3, 2010. Smcerely, . , I / Gerald W. Horton, PE Environmental Engineer Construction Inspection Group FASHAREXProject ManagemEnt BrandiXGrtnip - Constructian InspectionXPnjjects (Active)XARRA (SIIMULUS) PrujectsMavlorsvillg ARRAgw^lartnsp,ltP02J'2fldanokeRapids.dnc Construction Grants & Loans Section 1633 Mail Service Center Raleigh NC 27699-1633 One Phone: 919-733-6900 / FAX: 919-715-6229 / Internet: www.nccgl.net NorthCarolina An Equal Opportunity/Affirmative Action Employer Naturally o o o o o o o o construct and install instrumentation and controls, demolition and modifications to existing building converting it to sodium­ bisulphite building, construct hypochlorite building to house related facilities, new sodium hypochlorite bulk storage and feed facility consisting of ■ two (2) 13,680 gallon bulk hypochlorite storage tanks, ■ two (2) 45 GPH metering feed pumps, and ■ two (2) 100 GPM magnetic drive hypochlorite recirculation pumps; dechlorination system consisting of a ■ 4,470 gallon bulk sodium bisulphite storage tank and ■ two (2) 3 GPH metering feed pumps; 1,645 gallon sodium hydroxide bulk storage tank and two (2) 6 GPH metering feed pumps; a contact chamber drain submersible pump, demolition of existing chlorine and sulfur dioxide disinfection system, and all necessary piping and appurtenances. Page 2 of 7 Interim Inspection of March 12,2010 Total $ 901.000 Roanoke Rapids Sanita^^>istrict WWTP Sodium Hypochlorite System CS 370 449-04 GENERAL CONCERNS / RECOMMENDATIONS / ACTION ITEMS -Please note UPDATES on Comments and Concerns noted in previous progress meetings (for reference) are italicized. 1. At end of today's meeting CG&L presented items that would have been discussed at the Preconstruction meeting had CG&L attended that meeting. Those items are contained in the remainder of this first report. 2. CG&L requests construction schedule be provided at next meeting. 3. Owner and Engineer are requested to have a submittal log available for review at next and all subsequent meetings until all submittals have been approved. 4. CG&L requests Inspection logs be available for review next meeting and at all subsequent meetings. 5. Please have record drawing (as-builts) markups available for review at next meeting and all subsequent meetings. 6. Progress meetings will be held at the WWTP, monthly for the duration of the project on Is1 Fridays, 10:00 am. LOAN DISBURSEMENTS Project budget: Total Eligible Amount Water & Waste Systems Constr., Inc. $ 901,000 $ 901.000 Contingency $ 45,000 Technical Services$ 164.800 Total Eligible Costs $ 1,110,800 Closing costs are 2% of the eligible loan amount, thus $22,216. The loan is for maximum 20 years at interest rate of 2.5 %. As of March 12, no payment reimbursements have yet been sought. CONTRACT: WWTP Sodium Hypochlorite System - Water & Waste Systems Construction, Inc., (WWS) 9700 Ten-Ten Rd., Raleigh, NC 27603, Unlimited: Public Utilities, (Water Lines & Sewer Lines), PU, (Water Pur. & Sewage Disp.) Lie. # 35745 Description of Eligible work : o o none 252 537-9132 Greg Camp 252 536-4884 Justin Blackmon 252 537-9137 Craig Williams 252 536-4884 Hunter Carson, PE 919 854-1282 Billy Clinard 919 625-8864 Gerald W. Horton, PE 919 715-6219 Pre-Construction Items normally presented follows: Arcadis hunter.carson @ aarcadis-us.com Authorized Representatives: Loan or Grant Recipient: State: Consulting Engineer: Roanoke Rapids San. Dist., Director dbrown@rrsd.org Roanoke Rapids San. Dist. gcamp@rrsd.org Roanoke Rapids San. Dist. jblackmon@nsd.org Roanoke Rapids San. Dist., Supv. cwilliams@iTsd.org Water & Waste Systems Constr., Inc., bclinaid@wwsys.com NC Construction Grants & Loans gerald.horton@ncdenr.gov List of Attendees: Dan Brown, PE 3 of 7 Interim Inspection of March 12, 2010 CONSTRUCTION INSPECTION Observations of WWS construction and progress: 1. mobilized 2. installed erosion control 3. began excavation CHANGE ORDER UPDATE - RFPs Status - none pending RFIs Status - none pending Project Schedule - WWS needs to provide Construction Schedule Signs - ARRA signs have been erected and information for OSHA, wage rates etc. are posted SUBMITTAL Status- Owner and Engineer are requested to have a submittal log available for review at next meeting. Inspectors logsAVork Orders - CG&L requests these be available for review at all meetings. As-builts or Record Drawings - were not reviewed. Please have these available for review at next meeting and all subsequent meetings. Roanoke Rapids Sanitary District WWTP Sodium Hypochlorite SystUP CS 370 449-04 Daniel Brown, Roanoke Rapids Sanitary District Mark Hubbard. PE, Gerald Horton, PE, NC-DENR, DWQ, CG&L Hunter Carson. PE, Arcadis, 801 Corporate Center Dr., Suite 300, Raleigh, NC 27607 Construction Observer Inspector: Justin Blackmon, Roanoke Rapids San. Disk, Constr. Obsvr. Date and Time of next Progress meeting: Friday April 9 10:00 am at WWTP 1. Davis Bacon interview(s) status and review Certified payroll records. Buy American documentation, files and status of shop drawings, submittals, inspector's field reports, status of record (as-built) drawings, status of: Requests for Information (RFIs), Requests for Proposals (RFPs) revised construction schedules, records of testing of materials, soils, concrete, equipment, and Page 4 of 7 Interim Inspection of March 12, 2010 Change Orders (COs) DWQ “approval” of change orders means the State determines the Grant or Loan eligibility thereof. The Loan or Grant Recipient (Owner) should notify DWQ prior to commencement of any change order work, which may change the scope of the project, except for emergency situations. Approval of each change order is the responsibility of the Owner and Contractor. Records of COs should be available for review at any time and CG&L requires being provided one original of all Role Of The Construction Inspection Group (CIG) 1. Attend progress meetings and perform periodic inspections of the project. 2. Review COs for necessity and reasonableness to determine eligibility for loan or grant funding. 3. Purpose and objectives of inspections: a. To ensure that the overall objectives of the loan or grant are realized. b. To monitor administration of the loan and/or grant to monitor that the project is executed in accordance with State regulations and loan and/or grant conditions. c. To ensure contract compliance and construction in accordance with NC DENR approved contract documents, plans and specifications and loan or grant agreement. d. To advise and offer assistance to the loan and/or grant Recipient. Roanoke Rapids Sanital^^istrict WWTP Sodium Hypochlorite System CS 370 449-04 CIG Inspections Prior notice will be given; however, unannounced inspections may also be conducted. 2. Inspections will be concerned with administrative matters and construction matters/activities. 3. During inspections, CIG may wish to review, observe and/or discuss: o o o o o o o o o pending or executed change orders for completeness, accuracy and whether justified and if reasonable. 4. The Division of Water Quality (DWQ) requests that all equipment and materials on job site be properly stored, stockpiled, and protected. Improper storage of materials and equipment may result in recommendation to reduce reimbursement amount. The job site(s) shall be maintained in an acceptable manner. 5. Safe working conditions should be maintained at all times. CIG will discuss potential or apparent safety violations, which may be life endangering or threatening of serious injury. If warranted or deemed necessary, CIG will take prompt action including notifying State and OSHA regional representatives of any noted conditions. It remains the Contractor’s sole responsibility to maintain safe working conditions and activities. 6. Results of the inspection will be discussed at the job site during or upon completion of the inspection. 7. Formal copies of the inspection report will be sent to the loan and or grant Recipient, the Engineer and only to other parties, if so requested. 8. CIG asks to be notified when the Engineer or Owner plan to schedule a pre-final and/or the final inspection(s). CG&L requests a copy of punch list(s). In order to close out the project CG&L must conduct a final inspection. 1. 2. 3. 6. □ □ 4. □ executed COs and supporting information so CG&L may determine the CO7s eligibility for the loan or grant. However, approval of COs by CG&L is not necessary on STAG projects. CG&L does however request a copy of each CO on STAG projects. Owner is advised that occasionally EPA requests the State review STAG CO(s) for efficacy and to determine if justified. Generally, at a minimum one final adjusting change order will be necessary. Also, no reimbursement payments can be made for bid items where the installed quantity exceeds bid quantity until a change order has been "approved" by CG&L for the additional quantity(ies). Also please provide attached change order checklist with all necessary documentation with each change order. ■ge 5 of 7 Interim Inspection of March 12, 2010 □ 5. Roanoke Rapids Sanitary District . WWTP Sodium Hypochlorite Systi CS 370 449-04 Owner Payment Request Before first reimbursement request will be processed, the Owner must provide NC CG&L executed engineering contiact(s) and executed Construction contract(s). It is recommended that prior to first reimbursement request, the submitter call and talk to Ms. Leslie Rogers in CG&L accounting section at (919) 715-6218, which may help to avoid submittal enors. Submittal forms may be found at CG&L's website: www.nccgl.net. Owner shall provide the NC CG&L inspector with Schedule(s) of Values (SOV) and Construction (Progress) Schedule for each construction contract. SO Vs should correlate with Bid items or construction costs or Schedule of Values breakdown, as applicable. The Contractor’s pay request should coincide with the items on the bid form or approved schedule of values. Providing the SOV to CG&L in electronic format, excel or other spreadsheet would be appreciated. Owner shall expend all of the requisitioned funds for the purpose of paying the costs of the project within three (3) banking days following receipt of the funds from the State. Owner should be aware of the following payment milestones: Before first reimbursement can be made Contract Documents must be approved. Contract document(s) with original signatures shall be provided to CG&L. contracts documents include the entire set of specifications with the AGREEMENT included. Owner shall submit or have submitted Capital Projects Ordinance (CPO) Prior to 90% Disbursement - All tax must be reported and O&Ms (if required) must be submitted and approved.. Before final reimbursement - Engineer’s Certification of Completion must be received. Loan or Grant Agreement/Amendments and all conditions placed on them, if applicable, must be satisfied prior to reimbursements. Do submit / report sales tax with each pay request. The sales tax report should indicate the time period that is covered. The reimbursement amount will be reduced by the sales tax amount at the 90% milestone. The sales tax is included in the Owner’s loan or grant amount. Therefore, the Owner should be prepared to cover this amount until they receive a disbursement or reimbursement. If the contractor makes no purchases and has no sales tax to report for the period. Recipient’s (Owner) And Engineer’s Responsibility 1. The Owner and Engineer should become familiar with their responsibilities as defined in the Code of Federal Regulations Part 40 CFR. 2. STAG grant conditions must be met and Ioan or grant objectives achieved. 3. For STAG (State and Tribal Assistance Grant) projects, the Owner shall submit Quarterly Project Progress reports and separate Quarterly MBE/WBE reports. Progress Project Quarterly report format and mailing information is attached if this is a STAG project. An electronic version is available on CG&L's web site. Project Progress Quarterly reports are to be submitted to CG&L, however the MBE/WBE quarterly reports are to be submitted directly to EPA as agreed to by Owner upon acceptance of the STAG Grant offer. Owner should refer to that documentation. 3. 4. 5. 6. < END Preconstruction Meeting Report > regardless, the sales tax report should be submitted and indicate “No sales tax to report this period.” 7. If requesting reimbursement / payment for materials stored on site, invoice(s) must be provided to document material cost. Such materials shall be stored safely and securely on site or in a bonded location(s). An affidavit from the Engineer may be requested by CG&L for items stored at a bonded location. Page 6 of 7 Interim Inspection of March 12,2010 Environmental Protection EXPECTATIONS The Owner is advised that the protection of the environment is a loan or grant requirement. It is for Owner, Contractor(s), Engineer and other participating entities to comply with all environmental pollution control programs established by Local jurisdiction, the State, or the EPA. 1. Continued proper conveyance and treatment of Owner's wastewater during construction. 2. Proper disposal of all solid and hazardous wastes encountered or generated as part of the project. Notifying the NC Division of Water Quality (DWQ) field office in Raleigh, NC, telephone: (919) 791-4200 to report an oil spill, bypass of sewage or other environmental emergency caused by any party. The responsible party should take the initiative to report the matter promptly and to initiate containment and cleanup activities. Submission of, adherence to, and compliance with the erosion and sedimentation control plan approved by the applicable State or local agency. Protection of existing trees, shrubs, and grass, practice effective measures for dust control of haul roads, excavation areas, work areas, and borrow areas and restoration of all such areas. Because this is an environmental project, it is expected that the Contractor(s) and sub contractors collect and properly dispose of litter, trash and debris generated by workmen on the project or on the site and along routes of the work. Roanoke Rapids Sanita^wstrict WWTP Sodium Hypochlorite System CS 370 449-04 □ Owner Project Name Project No. Change Order No. Contract No. Contractor The following checklist must be completed and all information must be submitted prior to approval. Incomplete submittals will not be reviewed. If CG&L requests additional information and it is not received within 14 calendar days, CG&L may return all Change order information. □ □ □ □ □ □ □ □ □ □ □ NC CONSTRUCTION GRANTS & LOANS CHANGE ORDER CHECKLIST Roanoke Rapids Sanitary District WWTP Sodium Hypochlorite Syst^^ CS 370 449-04 7 of 7 interim Inspection of March 12,2010 Change Order Documents □One properly executed change order (original signatures) shall be submitted. CG&L does not approve change orders, it determines eligibility. Justification, cost basis, time adjustments and other relevant information shall be included in order for CG&L to make a determination as to eligibility. All signatories must be clearly identified with title and printed name in proximity of original signature. For a preliminary change order review; all supporting documentation must be included; Federal and/or State Project number(s) shown on the change order; Clear description of each change; Detailed justification to identify the need for each change; Justification and documentation for any contract time extensions (Time extensions for weather should be for above-average precipitation. The average number of days with precipitation greater than 0.10" for each month can be obtained from NOAA Report No. 20); Copies of new or revised contract drawings and/or specifications for the change may be necessary. Engineer and Owner are advised that certain changes (change in scope or significant changes) may require a modification to the Permit or the Authorization to Construct. Cost Documentation Each of the following items should be considered when determining what information and documentation to submit with each change order: Revised drawings for change, if applicable; Engineer’s independent cost estimate; Justification for change and who initiated change; Contractor's proposal or detailed cost breakdown for labor, material, equipment, tax, overhead, and profit. It is recommended that for unit price and quantity change orders that an electronic spreadsheet be provided. This may be relayed via email; Copies of suppliers’ invoices for major items, if applicable; Memorandum of Negotiation which documents the negotiation process and the basis for the final negotiated settlement.