1 Project Name _ _ Godwin Subdivision
2 I Project Area(ac) _ 31.53
3 I Coastal Wetland Area(ac) _ 0
4 Surface Water Area(ac) 0
6 Is this project High or Low Density? High
6 ;Does this project use an off-site SCM? No
1 COMPLIANCE WITH 02H.1003(4)
7 Width of vegetated setbacks provided(feet) 30
8 Will the vegetated setback remain vegetated? Yes
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A
10 i Is streambank stabilization proposed on this project" No
NUMBER AND TYPE OF SCMs:
_ 11 Infiltration System
12 Bioretention Cell
13 Wet Pond 1
14 I Stormwater Wetland
15 i Permeable Pavement _
16 Sand Filter
17 Rainwater Harvesting(RWH)
18 Green Roof
19 Level Spreader-Filter Strip(LS-FS)
20 Disconnected Impervious Surface(DIS)
21 Treatment Swale
22 Dry Pond
23 StormFilter
24 Silva Cell
25 Bayfilter
26 Filterra
FORMS LOADED
DESIGNER CERTIFICATION
27 j Name and Title: Donald L.Curry.Jr.,PE/Project Manager
28 Organization: Curry Engineering
29 !Street address: 205 S.Fuquay Ave.
30 'City,State,Zip: Fuquay-Varina.NC 27526
31 Phone number(s): 919-552-0849
32 Email: don@curryeng.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the
information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,
specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here
Designer
c=b0d4
Signature of Designer
•
03,
Lit . _ e• /24202
-.4411-.atiaitCOL'10/7-q 2-01-1-1
Seat Date
DRAINAGE AREAS
1_ Is this a high density project? Yes
2 _ If so,number of drainage areas/SCMs 1
3 Does this project have low density areas? No
4 If so,number of low density drainage areas 0
Is all/part of this project subject to previous rule
5 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site 1
4 ,Type of SCM Wet Pond Wet Pond
5 Total drainage area(sq ft) 1142815 1094463
6 Onsite drainage area(sq ft) 1142815 1094463
7 Offsite drainage area(sq ft) 0 0
8 Total BUA in project(sq ft) 496913 sf 496913 sf_
New BUA on subdivided lots(subject to permitting)
9 (sq ft) ; 348000 sf 348000 sf
New BUA not on subdivided lots(subject to
10 ;permitting)(sf) 148913 sf 148913 sf
11 Offsite BUA(sq ft) sf sf
12 Breakdown of new BUA not on subdivided lots:
-Parking(sq ft) 2745 sf 2745 sf
-Sidewalk(sq ft) 500 sf 500 sf
I -Roof(sq ft) sf sf
-Roadway(sq ft) 145186 sf 145186 sf
-Future(sq ft) sf sf
-Other,please specify in the comment box
below(sq ft) 500 sf 500 sf
New infiltrating permeable pavement on
13 subdivided lots(sq ft) sf sf
New infiltrating permeable pavement not on
14 'subdivided lots(sq ft) sf sf
Existing BUA that will remain(not subject to
15 permitting)(sq ft) sf sf
16 Existing BUA that is already permitted(sq ft) sf sf
17 Existing BUA that will be removed(sq ft) sf sf
18 Percent BUA 45% 45%
19 Design storm(inches) 1.0 in 1.0 in
20 Design volume of SCM(cu ft) 41829 cf 41829 cf
21 1 Calculation method for design volume Simple Simple
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
Mail kiosk accounts for values under line#12:parking and sidewalk.The
pump station yard is gravel and therefore not impervious,however,500 sf
was allocated for concrete structures in the yard itself.
DRAINAGE AREAS
I 1 I Is this a high density project? _ Yes
2 I If so,number of drainage areas/SCMs _ 1
3 _1 Does this project have low density areas? No
4 If so.number of low density drainage areas 0
Is all/part of this project subject to previous rule
L5 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site
4 Type of SCM Wet Pond
5 Total drainage area(sq ft) 1142815
6 Onsite drainage area(sq ft) 1142815
7 Offsite drainage area(sq ft) 0
8 Total BUA in project(sq ft) 496913 sf
New BUA on subdivided lots(subject to permitting)
9 (sq ft) 348000 sf
New BUA not on subdivided lots(subject to
10 !permitting)(sf) 148913 sf
11 Offsite BUA(sq ft) sf
12 Breakdown of new BUA not on subdivided lots:
-Parking(sq ft) 2745 sf
-Sidewalk(sq ft) 500 sf
-Roof(sq ft) sf
-Roadway(sq ft) 145186 sf
-Future(sq ft) sf
-Other,please specify in the comment box
below(sq ft) 500 sf
New infiltrating permeable pavement on
13 subdivided lots(sq ft) sf
New infiltrating permeable pavement not on
14 subdivided lots(sq) sf
Existing BUA that will remain(not subject to
15 permitting)(sq ft) sf
16 Existing BUA that is already permitted(sq ft) sf
17 Existing BUA that will be removed(sq ft) sf
18 Percent BUA 45%
19 Design storm(inches) 1.0 in
20 Design volume of SCM(cu ft) 41829 cf
21 Calculation method for design volume Simple
ADDITIONAL INFORMATION _
Please use this space to provide any additional information about the
22 drainage area(s): _
Mail kiosk accounts for values under line#12:parking and sidewalk.The
pump station yard is gravel and therefore not impervious,however,500 sf
was allocated for concrete structures in the yard itself.
WET POND
1.Drainage area number _ 1 21 Minimum required treatment volume(Cu ft) 41628 cf I
GENERAL MDC FROM 02H.1050
3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes
4'Is the SCM located away from contaminated soils? Yes
5'What are the side slopes of the SCM(H:V)? 3:1
6 Does the SCM have retaining walls,gabion walls or other engineered 1 Yes
__side slopes?
7 Are the inlets,outlets,and receiving stream protected from erosion Yes
1(10-year storm)?
8 Is there an overflow or bypass for inflow volume in excess of the Yes
design volume?
91What is the method for dewatering the SCM for maintenance? i Pump(preferred)
10 If applicable,will the SCM be cleaned out after construction? Yes
111 Does the maintenance access comply with General MDC(8)? Yes
121 Does the drainage easement comply with General MDC(9)? i Yes
If the SCM is on a single family lot,does(will?)the plat comply with
13 General MDC(10)? No
14 Is there an O&M Agreement that complies with General MDC(11)? Yes
15 Is there an O&M Plan that complies with General MDC(12)? Yes
16 Does the SCM follow the device specific MDC? Yes
17'Was the SCM designed by an NC licensed professional? Yes
WET POND MDC FROM 02H.E053
18'Sizing method used SA/DA
19 Has a stage/storage table been provided in the calculations? Yes
20 Elevation of the excavated main pool depth(bottom of sediment 132.50
removal)(fmsl)
21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 133.50
22 Elevation of the bottom of the vegetated shelf(fmsl) 137.50
23 Elevation of the permanent pool(fmsl) 138.00
241 Elevation of the top of the vegetated shelf(fmsl) 138.50
25'Elevation of the temporary pool(fmsl) I 139.30
26 Surface area of the main permanent pool(square feet) 25639
27 Volume of the main permanent pool(cubic feet) 113076 cf
28 Average depth of the main pool(feet) 4.94 ft
29tAverage depth equation used Equation 3
301 If using equation 3,main pool perimeter(feet) 699.0 ft
31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft
32 Volume of the forebay(cubic feet) 6286 cf
33 Is this 15-20%of the volume in the main pool? Yes
34 Clean-out depth for forebay(inches) i 12 in
351 Design volume of SCM(cu ft) 46094 cf
36 Is the outlet an orifice or a weir? Orifice
37' If orifice,orifice diameter(inches) 3 in
38 If weir,weir height(inches) I in
39 If weir,weir length(inches) in
40 Drawdown time for the temporary pool(days) 3.43
41 1Are the inlet(s)and outlet located in a manner that avoids short- Yes
circuiting?
42'Are berms or baffles provided to improve the flow path? No
43 Depth of forebay at entrance(inches) 66 in
44 Depth of forebay at exit(inches) 60 in
45'Does water flow out of the forebay in a non-erosive manner? Yes
46 Width of the vegetated shelf(feet) 6 ft
471 Slope of vegetated shelf(H:V) i 6:1
48 Does the orifice drawdown from below the top surface of the Yes
permanent pool?
49 Does the pond minimize impacts to the receiving channel from the 1- 1 Yes
yr,24-hr storm?
50 Are fountains proposed?(If Y,please provide documentation that No
MDC(9)is met.)
51 Is a trash rack or other device provided to protect the outlet system? 1 Yes
52 Are the dam and embankment planted in non-clumping turf grass? Yes
53 Species of turf that will be used on the dam and embankment Fescue or
Centipede
54 Has a planting plan been provided for the vegetated shelf? Yes
ADDITIONAL INFORMATION
55 Please use this space to provide any additional information about the
wet pond(s):
Wet Pond 4 3:58 PM 6/25/2024