Loading...
HomeMy WebLinkAboutSW8990730_Historical File_20240307 Inman, Logan W From: Colleen Teifer <carolinacolleen©gmail.com> Sent: Thursday, March 7, 2024 11:36 AM To: Inman, Logan W Cc: Johnson, Kelly Subject: Re: [External] The second file CAUTION: External email. Do not click links or open attachments unless verified.Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Thank you Logan, that's perfect.They can contact me for payment: Colleen Teifer 609-868-2393 carolinacolleenagmail.com I am a realtor and I work a lot,so I'll get up there as soon as I can after they contact me. Much appreciated! Colleen On Thu, Mar 7, 2024 at 11:28 AM Inman, Logan W<logan.inman@deq.nc.gov>wrote: Ms.Teifer, I will arrange the file to be scanned and I will drop it off at All Ways Graphics,the copy shop. From there, it will be integrated in their workload,and they will contact you for payment. Please understand that preparing the file for scanning can take 3-5 business days on our end and the scanning process at All Ways typically takes 3-5 days as well(though it has been longer before). The only thing I need is the contact information(name, phone number,email)of the individual who will be making the payment if you are still interested in pursuing this option. Note: Effective October 3'd 2023,permit fees have increased as a result of Session Law 2023-134. A full list of the fee adjustments are avaialble on the following DEQ website: Permit Fees 2023 Up_d_atesi NC DEQ The website and forms will be updated to reflect these new fees. Logan Inman Stormwater Permitting Assistant, Wilmington Regional Office Division of Energy, Mineral and Land Resources-Post Construction Storm water Program North Carolina Department of Environmental Equality Office: (910)-796-7318 Email:togar...in.m.an.(Thdeq._no.,goy 1 Address: 127 Cardinal Drive Ext.,Wilmington, NC,28405 NORTH CAROLINA Department of Environmental Duality JO. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Colleen Teifer<carolinacolleen@gmail.com> Sent:Thursday, March 7, 2024 11:21 AM To: Inman, Logan W<logan.inman@deq.nc.gov> Cc:Johnson, Kelly<kelly.p.iohnson@ded.nc.gov> Subject: Re: [External]The second file C.AiJIiOiv: External email.Do not click!inks or open attachments unless verified.Report suspicious ernais with the Report Message button located on your Outlook menu bar on the Home tab. Thank you very much for all of this information Logan, I truly appreciate it.The property has actually transferred hands again effective November, 2023, so I will let the current owner know that they must renew the permit. I would like to get the file scanned so we can have it for our records, and I have no problem paying for that.What is the best way to do that?Would someone there scan it, and then I would just pay when I come to pick it up? Thank you very much! Colleen On Thu, Mar 7, 2024 at 11:07 AM Inman, Logan W<logan.inman(adeq.nc.gov>wrote: Ms.Teifer, I was able to find a post-construction stormwater permit SW8 990730 associated with the area on the map you provided.We have plan sheets from October 7th, 1999,if you are interested in coming to view them. Our paper files are considered public record and would include things like the application documents, approved site plans, and other supporting documentation including email correspondence. The two options for accessing the file include scheduling a time to make the file available for review here in the office and/or arranging to have the file scanned at your or your client's expense.The cost to scan the entire file depends on how big the file is($35/inch 2 of file thickness).This file would cost around$35 to scan. Please let me know if you are interested in either option. You mentioned doing maintenance on your systems. I have provided the Operations and Maintenance Agreement(O&M)for the stormwater control measure(SCM)for this site. Please understand that the current permit holder for SW8 990730 is Sea Trail Corporation which has dissolved in 2013.This permit has expired as of November 18th,2013,and the property is under new ownership.The permit will need to be renewed,transferred,and updated to properly reflect the current property owner. For more questions about this process, please refer to Kelly(CC'ed) as she is more knowledgeable on the history of this site. Please let me know if you have any more questions. Thanks! Note: Effective October 3rd 2023,permit fees have increased as a result of Session Law 2023-134. A full list of , the fee adjustments are avaialble on the following DEQ website: Perrnit_Fees.2023 Updates I NC DEQ The website and forms will be updated to reflect these new fees. Logan Inman Stormwater Permitting Assistant, Wilmington Regional Office Division of Energy, Mineral and Land Resources—Post Construction Stormwater Program North Carolina Department of Environmental Equality Office:(910)—796—7318 Email:togan.inman(ade .n .gov Address: 127 Cardinal Drive Ext.,Wilmington, NC, 28405 IMMME le NORTH OAROUNA Depertmentof Emdrenmental QusNty co res;:iondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Colleen Teifer<carolinacolleen@gmail.com> Sent:Thursday, March 7, 2024 9:10 AM To: Inman, Logan W<logan.inman@deq.nc.gov> Subject: [External]The second file 3 CAUTION:EXtetrtat email.DO not Cat lies or Open attakn►renta unless verified.'Aepart?mails with the Report hilessage button located on your „imolai bar on the Home Ukis. Hi Logan, Here is the second file. Thank you, Colleen Colleen Teifer, "Carolina Colleen" Silver Coast Properties 609-868-2393 carolinacolleen Pgmail.com CarolinaColleen.com 7199 Beach Dr. SW, suite 5 Ocean Isle Beach, NC 28469 www.silvercoastnc.com 4 Inman, Logan W From: Colleen Teifer <carolinacolleen@gmail.com> Sent: Thursday, March 7, 2024 9:09 AM To: Inman, Logan W Subject: [External] Trying to make sure I have my accurate stormwater maps Attachments: Storm water 21-0729-ECEC_Champions_Drainage_Improvements_3-28-2003.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning Logan, My name is Colleen and I am a board member for the The Champions condos that are part of Sea Trail in Sunset Beach. I was able to get two documents that appear to be our stormwater maps from our declarant in Sea Trail. I'd like to make sure that this is all there is, and the most current maps, because we are going to do some maintenance on our system. I am attaching the documents that were sent to me. It appears to me that the file name may contain the stormwater permit number.There is a number 21-0729 attached to both of them, so I don't know if that helps. I am attaching both of the documents here. If I am missing anything, I would love to be ablet o obtain it so we have complete records for future reference. Please let me know if you need me to do anything else. I see that the file sizes are large, so I am going to send one in this email and I will send another email with the other file. Thank you very much, Colleen Teifer Colleen Teifer, "Carolina Colleen" Silver Coast Properties 609-868-2393 carolinacolleen@gmail.com CarolinaColleen.com 7199 Beach Dr. SW, suite 5 Ocean Isle Beach, NC 28469 www.sil`ercoastnc.com 1 0 ID II 0E L I 2 dio.starE� ROY COOPER , � S '� i; Sit aq o7 33GovernorVII MICHAEL S.REGAN ,'4%, „so' sex BRIAN WRENN NORTH CAROLINA Director Environmental Duality October 16,2020 Via Email Only: roberayintidebuilders.com Sunrise Corporate Development Holdings,LLC Riptide Builders Development,LLC,Manager ATTN:Mr.Robert Hill,Manager 8985 Marshview Lane Sunset Beach,NC 28468 Subject: Corporate Changes—Requests for Updates/Transfers/Renewals Sea Trail Brunswick County Dear Mr.Hill: Per our recent discussions I understand that there have been corporate changes in Sea Trail. Until recently,Mr. Pan was the manger for various corporations that managed Sea Trail. I have summarized the current permittees for Sea.Trail in Attachment A of this letter. 1. Sunrise Corporate Development Holdings is now managed by Riptide Builders Development,LLC. This impacts nine(9)permits. Please submit the Permit Information Update Form so that the correct contact information will be on file. It is available online,https://deq.nc.gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. 2. Dissolved Corporations: It is my understanding that Riptide Builders Development,LLC currently manages all of Sea Trail. If so,please apply to transfer permits currently issued to the following dissolved corporations to Riptide. a. Sunrise Corporate Development Limited is dissolved,but that entity still holds thirteen(13) permits. b. Sea Trail Corporation is dissolved,but that entity holds one(1)permit. 3. There are two expired permits. Please renew these permits. D . , North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources •.) Wilmington Regional.Office 1127 Cardinal Drive Extension I Wilmington,North Carolina 28405 NORTH CAROLINA 910.796.7215 State Stormwater Permits: Sea Trail Page 2 of 3 If you have any questions,please contact me at the Wilmington Regional Office,telephone number(910)-796- 7335 or via email at kelly.p.johnson@ncdenr.gov. Sincerely, Rellv poitadoa Kelly Johnson Environmental Engineer Enclosure: Permit Transfer Application Form Permit Update Form Attachment A: Permit Summary DES\kpj: \\\Stormwater\Permits&Projects\1988\880108 LD\2020 10 Letter 880108 \\\Stormwater\Permits&Projects119881880609 LD12020 10 Letter 880609 \\\Stormwater\Permits&Projects\1991\911202 LD12020 10 Letter 911202 \\\Stormwater\Permits&Projects\1993\930901 LD\2020 10 Letter 930901 \\\Stormwater\Permits&Projects\1994\940226 LD12020 10 Letter 940226 \\\Stormwater\Permits&Projects\1994\940405 LD\2020 10 Letter 940405 \\\Stormwater\Permits&Projects\1994\940509 LD12020 10 Letter 940509 \\\Stormwater\Permits&Projects\1995\950104 LD12020 10 Letter 950104 \\\Stormwater\Permits&Projects\1995\951013 LD12020 10 Letter 951013 \\\Stormwater\Permits&Projects\1995\951108 LD12020 10 Letter 951108 \\\Stormwater\Permits&Projects\1996\960124 LD12020 10 Letter 960124 \\\Stormwater\Permits&Projects\1996\960708 LD\2020 10 Letter 960708 \\\Stormwater\Permits&Projects119971970236 LD\2020 10 Letter 970236 \\\Stormwater\Permits&Projects\1998\980122 LD\2020 10 Letter 980122 \\\Stormwater\Permits&Projects119991990237 LD12020 10 Letter 990237 \\\Stormwater\Permits&Projects\1999\990730 LD12020 10 Letter 990730 \\\Stormwater\Permits&Projects\1999\990825 LD12020 10 Letter 990825 \\\Stormwater\Permits&Projects12000\000709 LD\2020 10 Letter 000709 \\\Stormwater\Pennits&Projects\2001\010911 LD\2020 10 Letter 010911 \\\Stormwater\Permits&Projects120031031105 LD12020 10 Letter 031105 \\\Stormwater\Permits&Projects120061060426 LD\2020 10 Letter 060426 \\\Stormwater\Permits&Projects\2006\060624 LD\2020 10 Letter 060624 \\\Stormwater\Permits&Projects120071070107 LD\2020 10 Letter 070107 cc: Jim Spangler, Spangler Environmental(ipangler@spanglerenvironmental.com) Cal Reider,Spangler Environmental(cal@spanglerenvironmental.com) Ward Marotti, Spangler Environmental(ward@,spanglerenvironmental.com) Dana Connelly,Sea Trail(hresourcesAseatraiLcom) WiRO Stormwater Permit File State Stormwater Permits: Sea Trail Page 3 of 3 Attachment A Penult number Pan Storrs Penalties FadEy SW8990730 Expired Sea Trail Corporation Champions Condominiums and Discovery Lake SW8880108 Active Sunrise Corporate Development Holdings LLC Sea Trail 2 SW8911202 Active Sunrise Corporate Development Holdings LLC Rice Mli Subdivision Phase 1 at Sea Trail SW8930901 Active Sunrise Corporate Development Holdings LLC Sea Trail Plantation Exhasition Hall SW8950104 Active Sunrise Corporate Developmert Holdings LLC Sea Trail Plantation Rice Moll Pond SWr 951013 Active Sunrise Corporate Development Holdings LLC Sea Trail Plantation Sawmill Townhomes Phase I SW8951108 Active Sunrise Corporate Developrnert Holdings LLC Planters Ridge Sea Trail Plantation SW8980122 Active Sunrise Corporate Development Holdings LLC Sea Trail_tones/B Td Ckdrhouae,Barony Place,Woodstork VI,Sugar Mill Condos,Sew Mill Townhomes and Villas on Osprey Ridge SW8060426 Active Sunrise Corporate Development Hol&igs LLC Sea Trail Plantation Brookwood Park Phase 2 SW8060624 Active Sunrise Corporate Development Holdings LLC Seehorse Estates Sea Trail Plantation SW8880609 Active Sunrise Corporate Development Limited Sea Taal Marina _ SW8940226 Active Sunrise Corporate Development Limited See Trail Plantation Master SW8940405 Active Sunrise Corporate Development Limited Sea Trail Plantation River Creek Phase 2 Club Villas SW8940509 Active Sunrise Corporate Development Limited Osprey Watch at Sea Trail Plantation SW8960124 Active Sunrise Corporate Development Linked Village on Royal Post Road Section II Sea Trail Plantation SW8960708 Active Sunrise Corporate Development Limited Sea Trail Plantation Medical Center 5W8970236 Expired Sunrise Corporate Development Limited Medical Cater Sea Trail Plantation Tract 1 SW8990 37 Active Sunrise Corporate Development Limited Brookwood Park Sea Trail Plantation SW8990825 Active Sunrise Corporate Development Limited Eastwood Park at Sea Trail Plantation SW8000709 Active Sunrise Corporate Development Limited Osprey Creek At Sea Trail Plantation SW8010911 Active Sunrise Corporate Development Limited Millpond Multi Family at Sea Trail Plantation SW8031105 Active Sunrise Corporate Development Limited Sea Trail Plantation Villas on Eastwood Bluff SW8070107 Active Sunrise Corporate Development Limited See Trail Plantation Discovery Lake Villas ROY COOPER Governor Nrc MICHAEL S. REGAN Secretary Energy,Mineral& TRACY DAVIS Director Land Resources ENVIRONMENTAL QUALITY December 1, 2017 Mr.Zhenquan Pan,Manager Sunrise Corporate Development Limited. 75A Clubhouse Road Sunset Beach,NC 28468 Subject: State Stormwater Management Permit Modification: SW8 940226 Sea Trail Plantation—Master Subdivision Plan Overall Low-Density Subdivision Project Permit Correction: SW8 911202, SW8 920609, SW8 930901, SW8 931002, SW8 931003, SW8 940226,'SW8 940509, SW8 951013, SW8 951108, SW8 980122, SW8 990237, SW8 990730, SW8 990825, SW8 000709, SW8 010911, SW8 031105, SW8 031110,SW8 040604,SW8 060426,SW8 060624,SW8 070107 Brunswick County Dear Mr. Pan: Effective August 1,2013 the State Stormwater program has been transferred from the Division of Water Quality(DWQ)to the Division of Energy,Mineral and Land Resources(DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1,2013 until they are modified. Please note that the updated permit or any updated pages to the permit will now reference DEMLR as the Division responsible for issuance of the permit. State Stormwater Management Permit Modification: SW8 940226 The Wilmington Regional Office received a complete,modified Stormwater Management Permit Application for the subject project on November 1,2017. Staff review of the plans and specifications has determined that the project,as proposed,will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 effective January 1,2017.We are forwarding modified Permit No. SW8 940226 dated December 1, 2017,for the construction, operation and maintenance of the built-upon areas and vegetated conveyance system associated with the subject project. Please replace the previously approved plan sheets with the attached modified and approved versions. 1 The following Attachments summarize the data permitted by this permit: a. Attachment A: Documentation of the overall 25%impervious area. b. Attachment B: Summary of all permits covered by the master permit, and their permitted impervious area. c. Attachment C: Summary of all permits covered by the master permit, and their respective permittees. d. Attachment D: Summary of the impervious area per lot allowed for all lots permitted under the 21 individual permits subject to this master permit, SW8 940226. e. Attachment E:Historical Summary and Future Plans 2. Tract 16: This tract was previously covered by SW8 940226,but it has been removed from the project area and will be covered by SW8 171201. Permit Correction: To Subject Permits There are 21 permits covered by this master permit that are cumulatively permitted to achieve 25% overall low density under this master permit, SW8 940226. Deed restrictions are recorded in BK2520/PG0127 and BK1941/PG764-765. As shown in Attachment A,these permits achieve that 25% with 117,647sf of impervious area available to allocate in the future. Some of these permits' impervious area inside these permits is constructed over the permitted amount as permitted under the 21 individual permits, and some are constructed below the permitted amount. The DEMLR and the permittee are working together to combine the 21 permits as shown in Attachment E. But, during this process changes to the 21 permits that are subject to this master permit, SW8 940226,cannot be modified without reflecting the modifications in the master permit. J uZrtaienliCatohna I Emil iuuetna Quality Energy,Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington.NC 23405 910i967215 State Stormwater Permit No. SW8 940226 Page 2 of 2 This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may tr, r be required. Please pay special attention to the permit conditions regarding the limitation of built-upon area,modification of the project,the operation and maintenance of the vegetated conveyance system, and the procedures for changing ownership of and/or transferring the permit. Please also pay attention to the permit conditions that requires the recordation of deed restrictions and protective covenants, easements, and the maintenance agreement,which must all be provided along with certification upon completion of the project. Failure to comply with these requirements will result in future compliance problems. If any parts,requirements, or limitations contained in this permit are unacceptable,you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee(if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh,NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com.Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter,please contact Kelly Johnson in the Wilmington Regional Office, at(910) 796-7215. Sinc r ely, 90,,Tracy sDav , P.E.,Director Division of Energy,Mineral and Land Resources GDS/kpj:\\\Stormwater\Permits&Projects\1994\940226 LD\2017 12 permit 940226(and other permit folders) enc: Attachment A Attachment B Attachment C Attachment D Attachment E cc: Robert Tucker,PE,East Coast Engineering Brunswick County Building Inspections NCDOT District Engineer Brunswick County Engineering Wilmington Regional Office Stormwater File:SW8 940226 Wilmington Regional Office Stormwater Files: SW8 911202,SW8 920609,SW8 930901,SW8 931002, SW8 931003, SW8 940226,SW8 940509,SW8 951013,SW8 951108, SW8 980122,SW8 990237,SW8 990730,SW8 990825,SW8 000709,SW8 010911,SW8 031105,SW8 031110,SW8 040604,SW8 060426, SW8 060624, SW8 070107 • State of North Carolina 1 Environmental Quality 1 Energy.Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington,NC 28405 910 796 7215 State Stormwater Management Systems Permit No. SW8 940226 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143,General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Sunrise Corporate Development Limited. Sea Trail Plantation - Master Stormwater Plan Brunswick County FOR THE construction, operation and maintenance of a 25% low density subdivision in compliance with the provisions of 15A NCAC 2H .1000, effective September 1, 1995 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (DEMLR) and considered a part of this permit for Sea Trail Plantation - Master Stormwater Plan. The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions and limitations: I. DESIGN STANDARDS 1. The following Attachments summarize the data permitted by this permit: a. Attachment A: Documentation of the overall 25% impervious area. b. Attachment B: Summary of all permits covered by the master permit, and their permitted impervious area. c. Attachment C: Summary of all permits covered by the master permit, and their respective permittees. d. Attachment D: Summary of the impervious area per lot allowed for all lots permitted under the 21 individual permits subject to this master permit, SW8 940226. e. Attachment E: Historical Summary and Future Plans 2. Each of the lots and future development tracts is limited to the maximum amount of built-upon area as shown on the application and as indicated on the approved Master Plan. 3. Individual low-density tracts within Sea Trail are permitted for a maximum of 40% built-upon area, as long as adequate sheet flow can be maintained. However, the overall built-upon area percentage for Sea Trail must be maintained at 25% or less, per the requirements of Section 1005 of the stormwater rules. Any individual tract proposing >40% built-upon area will require an engineered system to treat the runoff. 4. Approved plans and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit. Page 3 of 11 State Stormwater Management Systems Permit No. SW8 940226 Projects covered by this permit will maintain a minimum 30-foot wide vegetative buffer between all . impervious areas and surface waters. 6. The permitted impervious area is specified in Attachment A. 7. Wetlands have not been delineated for this project. Prior to any future development, a wetlands delineation map must be submitted. The permitted built-upon area may be reduced if there is a significant amount of wetlands on the site, or certain areas may be considered as high density and required to provide an engineered system to treat the runoff. II. SCHEDULE OF COMPLIANCE 1 Swales and other vegetated conveyances shall be constructed in their entirety, vegetated, and be operational for their intended use prior to the construction of any built-upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to operate the permitted stormwater management systems at optimum efficiency to include. a. Inspections b. Sediment removal. c. Mowing, and revegetating of the side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. 4. Per the covenants recorded in BK2520/PG0127 and BK1941/PG764-765, all dwelling units are subject to State Stormwater permitting. The allowable built upon area per Lot shall be restricted to a maximum number of square feet of built upon area, as provided in the Stormwater Permit applicable to said Lot. Impervious area per lot for all dwelling units is as documented in Attachment D. a. The allowable built-upon area per lot is as specified in Attachment D. This allotted amount includes any built-upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, and coquina, but does not include raised, open wood decking, dr the water surface of swimming pools. b. The covenants pertaining to stormwater regulations may not be changed or deleted without concurrence of the DEMLR. c. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the development except for average driveway crossings, is strictly prohibited by any persons. d. Each lot will maintain a 30' wide vegetated buffer between all impervious areas and surface waters. e. Lots within the Coastal Area Management Act (CAMA)Area of Environmental Concern (AEC) may have the built upon area reduced due to CAMA's jurisdiction within the AEC. 5. The permittee shall submit a copy of the recorded deed restrictions that indicate the approved built-upon area per lot within 30 days of the date of recording. 6. The permittee shall submit all information requested by the Director or his representative within the time frame specified in the written information request. 7. No piping shall be allowed except: a. That minimum amount necessary to direct runoff beneath an impervious surface such as a road. b. That minimum amount needed under driveways to provide access to lots. c. That which is shown on the approved plans for the high-density areas. Page 4 of 11 State Stormwater Management Systems Permit No. SW8 940226 8. The permittee is responsible for verifying that the proposed built-upon area does not exceed the allowable built-upon area. Once the lot transfer is complete, the built-upon area may not be revised without approval from the DEMLR, and responsibility for meeting the built-upon area limit is transferred to the individual property owner. 9. Within 30 days of completion of the project, the permittee must certify in writing that the project's stormwater controls, and impervious surfaces have been constructed within substantial intent of the approved plans and specifications. Any deviation from the approved plans must be noted on the Certification. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 1 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area. e. Further subdivision, acquisition, or selling of the project area. f. Filling in, altering or piping any vegetative conveyance shown on the approved plan. g. The construction of permeable pavement for impervious area credit. 12. The Director may determine that other revisions to the project should require a modification to the permit. 13. The permittee shall submit plans to the Division and receive approval for each low-density future development tract prior to construction. A permit application is required for each high-density future development prior to construction for an engineered system to treat the runoff. Due to the proximity of SA waters, engineered systems will be limited to infiltration systems that can store and infiltrate the runoff generated by 1.5" of rain, or alternative systems that do not discharge in response to the 1.5" design storm. 14. All streets that are curbed must provide either 100' curb outlet swales or 100' of vegetation at regular intervals to treat the road runoff. If the road runoff is collected, it must be permitted for treatment in an existing pond or a new infiltration system or alternative system that does not discharge in response to the 1.5" design storm. 15. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 16. If the use of permeable pavement for BUA credit within the lot is desired, the permittee shall direct the lot owner to submit an application with all supporting documentation and the application fee to the Division and receive a permit prior to construction of the permeable pavement. III. GENERAL CONDITIONS 1 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the DEMLR, in accordance with North Carolina General Statutes 143-215.6A to 143-215.6C. Page 5of11 State Stormwater Management Systems Permit No. SW8 940226 2. The permit issued shall continue in force and effect until revoked or terminated. 3. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance, or termination does not stay any permit condition. 4. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 15A of the North Carolina Administrative Code; Subchapter 2H.1000; and North Carolina General Statute 143-215.1 et. al. 5. This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Name/Ownership Change Form, accompanied by the supporting documentation as listed on the form, to the Division of Energy, Mineral and Land Resources at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; c. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121, e. Dissolution of the partnership or corporate entity, subject to NCGS 57D-2-01(e) and NCGS 57D-6- 07; f. A name change of the current permittee; g. A name change of the project; h. A mailing address change of the permittee; 6. . The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state and federal) which have jurisdiction. If any of those permits result in revisions to the plans, a permit • modification must be submitted. 7. The permittee grants permission to DEQ Staff to enter the property during business hours for the purposes of inspecting the stormwater control system and it's components. 8. The permittee shall notify the DEMLR of any name, ownership or mailing address changes within 30 days. 9. Any individual or entity found.to be in noncompliance with the provisions of this stormwater management permit or the requirements of the Stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 10. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. Permit modified and reissued this the 15t day of December 2017 NO TH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION .Tracy Da s, P.E., Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW8 940226 Page 6 of 11 SW8 940226: Attachment A Impervious Area Summary 12/1/17 Project Area Total 4/14/14: 36,129,971 ft2 Tract 16' 1,078,000 ft2 Remainder of Project: 35,051,971 ft2 Project Area Totals: 35,051,971 ft2 Impervious Area, Total (25%Max): 8,762,993 ft2 Impervious Area,Allocated: 8,645,345 ft2 Impervious Area,Future Available2: 117,647 ft2 Percent Impervious: 25.0% Row Labels Sum of Proposed. Facility 546,939 ft2 Multi-Family 904,121 ft2 . Road 1,635,076 ft2 Single Family 3,146,250 ft2 Tract 2,412,959 ft2 Grand Total 8,645,345 ft2 'Tract 16 has been removed from the project area and will be covered by SW8 171201 2Impervious Area,Future Available: There are 21 permits covered by this master permit that are cumulatively permitted to achieve 25% overall low density under this master permit, SW8 940226. Deed restrictions are recorded in BK2520/PG0127 and BK1941/PG764-765_ As shown in Attachment A,these permits achieve that 25%with 117,647sf of impervious area available to allocate in the future. Some of these permits' impervious area inside these permits is constructed over the permitted amount as permitted under the 21 individual permits,and some are constructed below the permitted amount. The DEMLR and the permittee are working together to combine the 21 permits as shown in Attachment E. But, during this process chances to the 21 permits that are subject to this master permit,SW8 940226,cannot be modified without reflecting the modifications in the master permit. SW8 940226: Attachment B impervious Area Details: Permitted v/s Proposed 12/1/17 Row Labels Sum of Proposed SW8 000709 118,650 SW8 010911 762,762 SW8 031105 203,242 SW8 031110 93,850 SW8 040604 84,845 SW8 060426 177,074 SW8 060624 158,252 SW8 070107 331,165 SW8 911202 318,182 SW8 920609 57,775 SW8 930901 367,706 SW8 931002 292,045 SW8 931003 138,329 SW8 940226 3,481,771 SW8 940509 80,633 SW8 951013 45,595 SW8 951108 871,748 SW8 980122 166,371 SW8 990237 156,200 SW8 990730 415,922 SW8 990825 323,228 Grand Total 8,645,345 SW8 940226: Attachment C SW8 940226- Sea Trail Master Permit Permittees 12/1/17 Permittee(Current INSERT DATE) Permit#(Current#) .. Sunrise Corporate Development Limited SW8 000709 SW8 010911 SW8 031105 SW8 031110 SW8 060426 SW8 060624 SW8 070107 SW8 911202 SW8 920609 SW8 930901 SW8 931002 SW8 931003 SW8 940509 SW8 951013 SW8 951108 SW8 990237 SW8 990825 SW8 940226 Sea Trail Corporation (dissolved) SW8 980122 SW8 990730 I CC &D Builders,LLC, (dissolved) SW8 040604 Attachment D: SW8 940226-Sea Trail Master Penult Ireed Restrictions Summary(BK2520/PG0127 and LiKIS4I/PG764-/65)-12/1/17 Permit 6 Permit Name Description 13UJA/Lot l (ft') SW8 040604 Eastwood Landing Lots 1-19 3.500:SWSW8 040604 Eastwood Landing Sidewalk_Misc. 6,651 SW8 060426 Brookwood Paric Ph 2 Lots 27-59 4,500 s`Jiot _ SW8 060624 Seahorse Estates Common Dive 25.013 SW8 060624 Seahorse Estates Lots 1-23 5793 sf/lot SW8 911202 Rice Miii Phase 1 Lot 33 8908 l SW8 911202 Rice Mill Phase i Lot 5_ 7,422 SWB 911202 Rice Mill Phase i Lots i-4 6,500 sf/lot_ SW8 911202 Rice Mill Phase 1 Lots 34-41 _ 6,500 sf/lot SWB 911202 Rice Mill Phase 1 Lots 6-32 6,500 t17iot SW8 931002 Baroney Place Lot 17 6,030 SW8 931002 Baroney Place Lot 34 6,551 SW8 931002_Baroney Place Lots 1-16 6,500 sf/lot SW8 931002 Baroney Place Lots 18-33 6,500 sf/lot . SW8 931002 Baroney Place Lots 35-39 6,500 sf/ot SW8 931003 Woodstork Village Lot 1 6,183 SW8 931003 Woodstork Village Lot 4 6,146 SW8 931003 Woodstork Village Lots 2-3 6,000 sf/lot SW8 931003 Woodstork Village Lots 5-23 6,000 sf/lot SW8 940226 Crooked Gulley Addition Lots 192-197 6,500 sf/lot SW8 940226 Crooked Gulley Circle Lot 139 6,534 SW8 940226 Crooked Gulley Circle Lot 146 6,936 SW8 940226 Crooked Gulley Circle Lot 152 6,828 SW8 940226 Crooked Gulley Circle Lot 155 7,612 SW8 940225 Crooked Gulley Circle Lot 156 6,500 SW8 940226 Crooked Gulley Circle Lot 157 8,400 SW8 940226 Crooked Gulley Circle Lot 163 8,971 SW8 940226 Crooked Gulley Circle Lot 164 6,540 SW8 940226 Crooked Gulley Circle Lot 167 6,680 SW8 940226 Crooked Gulley Circle Lot 168 6,500 SW8 940226 Crooked Gulley Circle Lot 168 6,500 SW8 940226 Crooked Gulley Circle Lot 169 7,340 SW8 940226 Crooked Gulley Circle Lot 179 8,428 SWB 940226 Crooked Gulley Circle Lot 181 8,367 SW8 940226 Crooked Gulley Circle Lots 131-138 6,500 sf/lot SW8 940226 Crooked Gulley Circle Lots 140-145 6,500 sf/lot SW8 940226 Crooked Gulley Circle Lots 147-151 6,500 sf/lot SW8 940226 Crooked Gulley Circle Lots 153-154 6,500 sf/lot SW8 940226 Croaked Gulley Circle Lots 158-162 6,500 sf/lot SW8 940226 Crooked Gulley Circle Lots 165-166 6,500 sf/lot SW8 940226 Crooked Gulley Circle Lots 170-178 6,500 sf/lot SW8 940226 Jones Byrd Court Lot 184 6,746 SW8 940226 Jones Byrd Court Lot 185 6,759 SW8 940226 Jones Byrd Court Lot 186 6,571 SW8 940226 Jones Byrd Court Lots 182-183 6,500 sf/lot SW8 940226 Jones Byrd Court Lots 187-191 6,500 sf/lot SW8 940226 Rice Mill Phase 2 Lot 42 7,064 SW8 940226 Rice Mill Phase 2 Lot 48 7,041 SW8 940226 Rice Mill Phase 2 Lot 49 7,014 SW8 940226 Rice Mill Phase 2 Lot 50 7,494 • SW8 940226 Rice Mill Phase 2 Lot 51 6,624 SW8 940226 Rice Mill Phase 2 Lot 52 6,747 SW8 940226 Rice Mill Phase 2 Lot 53 6,500 SW8 940226 Rice Mill Phase 2 Lot 54 6,641 SW8 940226 Rice Mill Phase 2 Lot 55 6,596 SW8 940226 Rice Mill Phase 2 Lot 56 6,700 SW8 940226 Rice Mill Phase 2 Lot 57 6,500 SW8 940226 Rice Mill Phase 2 Lot 58 9,411 SW8 940226 Rice Mill Phase 2 Lots 43-47 6,500 sf/lot SW8 940226 Rice Mill Phase 3 Lot 1 10,860 SW8 940226 Rice Mill Phase 3 Lots 2-5 6,500 sf/lot SWB 940226 Rice Mill Phase 4(formerly Cotton Mill Court) Lot 76 6,700 SW8 940226 Rice Mill Phase 4(formerly Cotton Mill Court) Lots 74-75 6,500 sf/lot SW8 940226 Rice Mill Phase 4(formerly Cotton Mill Court) Lots 77-78 6,500 sf/lot SW8 940226 Rice Mill Phase 4(formerly Forest Creek) Lot 60 7,084 SW8 940226 Rice Mill Phase 4(formerly Forest Creek) Lot 63 6,757 SW8 940226 Rice Mill Phase 4(formerly Forest Creek) Lot 68 6,599 SW8 940226 Rice Mill Phase 4(formerly Forest Creek) Lot 71 7,636 SW8 940226 Rice Mill Phase 4(formerly Forest Creek) Lots 59 6,500 SW8 940226 Rice Mill Phase 4(formerly Forest Creek) Lots 61-62 6,500 sf/lot SW8 940226 Rice Mill Phase 4(formerly Forest Creek) Lots 64-67 6,500 sf/lot SW8 940226 Rice Mill Phase 4(formerly Forest Creek) Lots 69-70 6,500 sf/lot SW8 940226 Rice Mill Phase 4(formerly Forest Creek) Lots 72-73 6,500 sf/lot Attachment D-Page 1 of 2 Attachment D: SW8 940226-Sea Trail Master Permit-Deed Restrictions Summary(BK2520/PG0127 and BK1941/PG764-765)-12/1/17 Permit# Permit Name Description BUA/Lot (ft) SW8 951108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-115) Lot 10 6,044 SW8 951108 Planters Ridge Phase 1(Lots 1.55)and Phase 2(Lots 56-115) Lot 110 6,870 SW8 951108 Punters Ridge Phase i(Lots 1-55)and Phase 2(Lots 56-115) Lot 115 6,555 SW8 951108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-3 15) Lot 25 5,871 SWS 951108 Planters Ridge Phase](Lots 1-55)and Phase 2(Lots 56-115) Lot 36 5,977 SWS 951108 Planters Ridge Phase i(Lots 1-55)and Phase 2(Lots 56-115) Lot 39 5,90] SWB 951 108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-115) Lot 4 5,741 . SW8 951108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-115) Lot 80 5,977 SW8 951108 Planters Ridge Phase I(Late 1-55)and Phase 2(Lots 56-115) Lot 9 5,791 SW8 951108 Planters Ridge Phase](Lots 1-55)and Phase 2(Lots 56-115) Lot 93 6,575 SW8 951 108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-115) Lot 94 6,500 SW8 951108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-115) Lot 95 6,530 SW8 951108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-115) Lots 111-1 i4 6,500 sf/lot SW8 951108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-115) Lots 11-24 5,700 sf/lot SW8 951108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-115) Lots 1-3 5,700 sf/lot SW8 951108 Planters Ridge Phase I(Lots 1-55)and Phase 2(Lots 56-115) Lots 26-35 5,700 sf/lot SW8 951108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-115) Lots 37-38 5,700 sf/lot SWS 951108 Planters Ridge Phase 1(Lots 3-55)and Phase 2(Lots 56-115) Lots 40-44 5,700 sf/lot SW8 951108 Planters Ridge Phase i(Lots 1-55)and Phase 2(Lots 56-115) Lots 45-55 6,500 sf/lot SW8 951108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-115) Lots 56-74 6,500 sf/lot 'SW8 951108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-115) Lots 5-8 5,700 sf/lot SW8 951108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-115) Lots 75-79 5,700 sf/lot SW8 951108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-115) Lots 81-88 5,700 sf/lot SW8 951108 Planters Ridge Phase](Lots I-55)and Phase 2(Lots 56-115) Lots 89-92 6,500 sf/lot SW8 951108 Planters Ridge Phase 1(Lots 1-55)and Phase 2(Lots 56-]15) Lots 96-109 6,500 sf/lot SW8 990237 Brookwood Park Phase 1 Lot 11 6,200 SW8 990237 Brookwood Park Phase 1 Lots 1-10 6,000 sf/lot SW8 990237 Brookwood Park Phase I Lots 12-26 6,000 sf/lot SW8 990730 Discovery Lake Lot 10 8,500 SW8 990730 Discovery Lake Lot 11 6,500 SW8 990730 Discovery Lake - Lot 12 8,500 SW8 990730 Discovery Lake Lot 13 8,500 SW8 990730 Discovery Lake Lot 14 6,500 SW8 990730 Discovery Lake Lot 15 8,500 SW8 990730 Discovery Lake Lot 16 6,500 SW8 990730 Discovery Lake Lot 17 6,654 SW8 990730 Discovery Lake Lot 18 6,500 SW8 990730 Discovery Lake Lot 19 6,660 SW8 990730 Discovery Lake Lot 24 6,860 SW8 990730 Discovery Lake Lot 25 7,773 SW8 990730 Discovery Lake Lot 26 6,500 SW8 990730 Discovery Lake Lot 4 6,500 SW8 990730 Discovery Lake _ Lot 5 8,500 SW8 990730 Discovery Lake Lot 6 7,020 SW8 990730 Discovery Lake Lot 7 6,500 SW8 990730 Discovery Lake Lot B 8,500 SW8 990730 Discovery Lake Lot 9 6,500 SW8 990730 Discovery Lake Lots 1-3 8,500 sf/lot SWS 990730 Discovery Lake Lots 20-23 6,500 sf/lot SW8 990825 Eastwood Park Phase 1 Lot 15 7,000 sf/lot SW8 990825 Eastwood Park Phase 1 Lot 19 6,673 SW8 990825 Eastwood Park Phase 1 Lot 20 6,500 SW8 990825 Eastwood Park Phase 1 Lot 21 6,572 sf/lot SW8 990825 Eastwood Park Phase 1 Lot 24 7,545 SWB 990825 Eastwood Park Phase 1 Lot 25 8,531 SW8 990825 Eastwood Park Phase 1 Lot 9 7,271 SW8 990825 Eastwood Park Phase 1 Lots 10-14 6,500 sf/lot SW8 990825 Eastwood Perk Phase] Lots 16-18 6,500 sf/lot SW8 990825 Eastwood Perk Phase] Lots 1-8 6,500 af/lot SW8 990825 Eastwood Park Phase 1 Lots 22-23 6,500 sf/lot SW8 990825 Eastwood Park Phase 1 Lots 26-32 6,500 sf/lot SW8 990825 Eastwood Park Phase 2 Lot 44 9,750 SW8 990625 Eastwood Park Phase 2 Lot 46 9,886 SW8 990825 Eastwood Park Phase 2 Lots 33-43 6,500&lot SW8 990825 Eastwood Park Phase 2 Lots 47-49 6,500 slot Attachment D-Page 2 of 2 State Stormwater Management Systems Permit No. SW8 940226 Attachment E: Permit History and Future Actions Permit History: 1. 3/8/1994: Certificate of Coverage(Permit) issued to Sea Trail Corporation. 2. 1/20/2000: Permit modification issued to Sea Trail Corporation. 3. 3/28/2001: Permit modification issued to Sea Trail Corporation. 4. 1/24/2002: Permit modification issued to Sea Trail Corporation. 5. 3/24/2004: Permit modification issued to Sea Trail Corporation. 6. 5/3/2004: Plan revision issued to Sea Trail Corporation. 7. 7/17/2006: Permit modification issued to Sea Trail Corporation. 8. 4/4/2014: Permit transferred to Sunrise Corporate Development Limited. 9. 12/1/17: Permit modification issued to Sunrise Corporate Development Limited. Several areas were identified as having been built,but their configurations were not covered by the master permit. These areas were Crooked Gulley Lots 131-145, and Rice Mill Phase 3. The impervious area data has been updated to reflect the entire master permit including these areas. a. Attachment A: Documentation of the overall 25% impervious area b. Attachment B: Summary of all permits covered by the master permit, and their permitted impervious area. c. Attachment C: Summary of all permits covered by the master permit, and their respective permittees d. Attachment D: Summary of the impervious area per lot allowed for all lots permitted under the 21 individual permits subject to this master permit, SW8 940226 e. Attachment E:Historical Summary and Future Plans Future Actions: 1.) Step 1: Step 1 is two,parallel steps. a. Master Permit: This was updated on 12/1/17 to show that the total BUA for Sea Trail is 25%. b. Permit Modification to Combine Permits: Please submit this application showing data for each permit that matches the master permit. It will be processed in parallel with the master permit. i. Permits to be combined into SW8 980122 (Estimation of permit numbers): 1. SW8 980122 2. SW8 920609 3. SW8031110 4. SW8 931003 5. SW8 911002 ii. These should all be low density permits that do not expire and therefore do not need to be renewed. iii. All permits should be issued to the same entity in order to become combined. iv. Please determine which permit number you want to keep, and submit a letter from Mr.Pan requesting to rescind all of the other permit numbers that are being combined and are therefore no longer needed. v. Paperwork: 1. We need a single permit application for this signed by Mr. Pan. 2. $505 3. O&M 4. Supplements 5. We need two plans showing the project area showing the new outline of the combined permits. 6. We need two sets of each plan's details and any corrections/changes that have been made. 7. Please submit a summary of the data that is changing for each permit so that I can capture that in the cover letter of the modified/combined permit. 2.) Step 2: Transfer the combined permit to the HOA 3.) Step 3: There will be additional upcoming modifications to combine Sugar Sands Phase II, Sugar Sands Patio Subdivision, (and potentially other areas within Sea Trail)with other permits. As modifications are done,we will ensure that the drainage area of stormwater treatment ponds contain the appropriate amount of impervious area that those ponds have been designed to hold, and that the appropriate"future"area is specified per pond. 4.) Step 4: There will be additional transfers to the HOA as additional permits become eligible. Page 11 of 11 A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary March 15, 2011 Ms. Dana Connelly, President Sea Trail Corporation 279 Clubhouse Road Sunset Beach, NC 28468 Subject: Permit Extension, Session Laws 2009-406 and 2010-177 Stormwater Permit#SW8 990730 High Density— Champions Condominiums & Discovery Lake Brunswick County Dear Ms. Connelly: On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that is set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010- 177 which grants an extra year for a total of four (4) years extension. Accordingly, Stormwater Permit# SW8 990730 which has already expired on November 18, 2009, is now in effect until November 18, 2013. Please resubmit the renewal application and fee at least 180 days prior to November 18, 2013, which would be May 18, 2013. A copy of the Renewal Application can be obtained from the following website: http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. If you have any questions, please contact the Division of Water Quality in the Wilmington Regional Office at 910-796-7215. Sincerely, Georgette Scott Stormwater Supervisor Division of Water Quality S:1WQS\STORMWATERIRENEWAL\SL2009-406 2010-177\990730.marl1 cc: Wilmington Regional Office Wilminnton Regions!Office 127 Cardinal Drive Extension,Wilmington,North Carolina 28405 One Phoney910 796-72151 FAX 910-350-20041 Customer Service:1-877-623-6748 NothCa/rro'liina Internet wrvw.ncwaterquaiitrr.org latu aIiq An Equal Opportunity t Affirmative Action Fmpinyer • Upload a PDF Filing • Order a Document Online • Add Entity to My Email Notification List • View Filings • Print a Pre-Populated Annual Report form Business Corporation Legal Name Sea Trail Corporation Information Sosld: 0130555 Status: Dissolved 0 Date Formed: 1/6/1977 Citizenship: Domestic Fiscal Month: December Annual Report Due Date: April 15th Registered Agent: Williams, John Addresses Mailing Principal Office Reg Office 211 Clubhouse Rd 211 Clubhouse Rd 211 Clubhouse Rd Sunset Beach, NC 28468 Sunset Beach, NC 28468 Sunset Beach, NC 28468 Reg Mailing 211 Clubhouse Rd Sunset Beach, NC 28468 Officers President Secretary Dana Connelly Debra Johnson 358-4 Sea Trail Dr W 343 Crooked Gulley Circle Sunset Beach NC 28468 Sunset Beach NC 28468 Stock Class: CLASS D COMMON Shares: 25000 No Par Value: Yes Class: CLASS G COMMON Shares: 25000 No Par Value: Yes Class: CLASS P COMMON Shares: 25000 No Par Value: Yes Class: CLASS TW COMMON Shares: 25000 No Par Value: Yes