Loading...
HomeMy WebLinkAboutSW8990730_Historical File_20040308 DETENTION POND ANALYSIS FILE NAME: S:1WQSIPOND1990730.WK1 PROJECT#: SW8 990730 REVIEWER: arl PROJECT NAME: Jones/Byrd Condominiums DATE: 18-Dec-03 Receiving Stream: Calabash Creek Class: SA Drainage Basin: Lumber Index No. 15=25=5 Site Area acres Drainage Area 3314916.00 square feet needs to be verified Area in Acres 76.10 acres IMPERVIOUS AREA g4 Champions Condos 36154'8.00 square feet Offsite Lots Discovery Lake 182020.00 square feet 25 @7000, 1 @7020 Offsite ex. clubhouse & parking 165528.00 square feet 1475 550 Offsite roads 30492.00 square feet 13O50O Offsite Cartpaths 37026.00 square feet 37050 Future Conference Center 87120.00 square feet TOTAL 863734.00 Cc= 0.15 % IMPERVIOUS 26.06% Pond Depth: 6.0 TSS: 90 SURFACE AREA CALCULATION Rational ? If Rational is used put a SA/DA 1.44% "1" in box E26. If not, leave it blank. Req. SA 47809 square feet Prov. SA 206940 square feet [From plan Contours] VOLUME CALCULATION Perm. Pool Volume= 150783 Req. Forebay Volume= 30156.6 Bottom 19.00 MSL Provided Volume= Perm. Pool 25.00 MSL Percent= 0 Design Pool 25.50 MSL Design SA 211230 square feet Des. Storm 1.00 inches Req. Volume 78592 cubic feet Rv= 0.28450386 Prov. Volume 104543 cubic feet SA @ = Elevation= _ ORIFICE CALCULATION Avg. Head = 0;1.25 ft Flow Q2, cfs 0.455 Area, sq. in. 38.47 Flow Q5, cfs 0.182 Area, sq. in. 15.39 No. of Orifices <:>:::.:<:t ::r:::..rr::>.;v <::::.<::r:::.>:.:.:. =:<:Y<>.:::.;::<:::; #�=>'[::< Diameter, in. ' > fi ;>:<<:<> <:: :.: .. ... .. >` ... . .:.' Area - 28.274 sq. in. Q, cfs = 0.334 Drawdown V;:k.311:112741 days COMMENTS Surface Area, Volume and Orifice are within Design Guidelines. Sea Trail Plantation Master Stormwater Plan • Stormwater Permit No. SW8 940226 SUPPLEMENTAL CALCULATIONS AND SUPPORTING MATERIAL FOR EXISTING STORMWATER PONDS SERVING CHAMPIONS CONDOMINIUM/DISCOVERY LAKE EASTWOOD PARK PHASES 1 &2 O KWOOD PARK PHASE 1 OC7( R4003 RECEIVE D „..,,,it• -, OCT 14 2003 s /' r '" swe DW4vz2G, ta 01 {6 2 . . PROD# S.`��:� •s ,i'f. F�'%I��JJrr 730 i, D�;cc.ecoccce cc,,,i ,- Prepared by: ...Ai ips T • East Coast Engineering Company, P.A. Consulting Engineers Shallotte,North Carolina 28459 Post Office Box 2469 4918 Main Street Office: 910.754.8029 • Sea Trail East Coast Engineering Company, PA Champions Condos ACL Wet Detention Basin Calculations Champions Condominiums @ Sea Trail Existing Stormwater Pond Hey/ Drainage Area (DA) = 3,314,916 sf or 76.10 ac New Impervious Area (IA)= 863795 sf 19.83 ac Percent Impervious(I) IA/DA 0.26 or 26% SA/DA;90% TSS Pond Depth= 6 0.0144 or 1.44% (no vegetative filter req'd) Min. req'd SA @ PP (SA/DA)x(DA) 47,734.79 sf Min. req'd storage volume Rv=0.05+(0.009 x I)= 0.285 Volume= 1 in x(1 ft/12 in)x Rv x DA 78,596.78 cf SA provided @ PP Pond Elev= 25 206,940 sf Enough SA provided? YES Min. storage depth req'd Min. storage volume/SA provided @ PP 0.38 ft Storage depth set at 0.5 ft Elevation of temporary pool 25.5 ft SA @ Temporary pool 211,230 sf Storage volume provided Average of SA @ temp. pool& PP x storage depth 104,542.50 cf OK Outlet Sizing Q-2 day drawdown time Min. req'd storage volume x(1 in.12 days) 0.455 cfs Q-5 day drawdown time Min. req'd storage volume x(1 in./5 days) 0.182 cfs Height h (1/2 Min. Storage Depth) 0.25 ft Co Constant 0.6 Required Area for Q-2 A=Q/(C x(2gh)1/2) 27.21 in2 Required Area for Q-5 A=Q/(C x(2gh)1/2) 10.88 in2 Orifice Choosen 6.00 in CHECK Area Provided by Orifice Choosen A=nr2 28.28 in2 Area Provided by Orifice Choosen 0.196 ft2 The Average head h= 1/2(Temporary Pool depth-1/2(orifice diameter)) 1.5 in The Average head 0.125 ft Q provided Q=Ca(2gh)1r2 0.334 cfs OK .30 �d. yet14)c)or4f -k 5 Revision Date:10/10/03 TRA CANTERS RIDGE BYRD#13 17.24 I 1 g,, �� ay 13 PHASE 1N ok___,--------- 17.24 AC- s<�6 `412 J • lo LOTS 1-55 ''N\ 1 17 C BYRD#12 0 • 1. \ ) �� TRACT 2U ' . ,... �i EXISTING POND % O O � 5.11 A. + BYRD O .�.,,� i ,___________ /10,,,ef, 1 IIIM o 0 0 (� 0 ma i . til mod' riflAtTell,61, 10 \ O I50 \7pm \S ' #,5 `19 ® OUT PARCEL 0 • I!: • 48 ®l d� CEMETERY A1:111r. . 4-:,---9 •i 32m 31N .� ina .I59 �umn. � � 447 6� © oti. cu > n� 60 Vfir70 72 20 U fi 73 1 1� 61 � � �'� f ay.Ntupx • s p `1 to 010011 it 1 a gMINF°110% 40fi.� ,, 17.24AC. 1. I ��� 5- �- 95l� 4, 62 NC. �''illl 109 93 96 98 O 7 A / 97 ea O O 110tip � O 44 'a 1 , O. ,m, BYRD�id10 O FVeroeVaiN ' s�'k ; ��im r•' TRACT 4 151s7 -‘411 1404 ,. '<YRD#16 4 a: jbi� ; � 6.96 AC. ". ° -wi K ,, Ailt ,►� 0J EXISTING POND 1 ' Apo 4. 184* 88 :e i `l me: 6 . 6 ;V tiles 0 :/// /C� + r BYRD411140 it, .o lai sMTRACT 9 /:16.31 AC. �[ 1a7 °.. Via+ D ,, +►fie s-, v_, ,, ! ;= � IRMERLY BROOKWOOD i." 3 4 T >,. 404. `Y" O PARK PHASE 2) 48 L,lio �( +�M I D'` �r O M � (/// O ikg N p yR •%. i j -. 40* *- c /70 + / `' • i EXISTING POND I F ���JJ I �r 1 1 56 IF /�� �i� y �, REAL ESTATE '/ ` �71 r V , OFFICE � 155 , EXISTING '�_ POND ✓ B P' 6 JONES/BY ,�� 4101. 15s 0 CLUBHOUSE` 4 1) EXISTINQ AND CONVENTIONI o. - --/ POND CENTER ���/� GAR ILL JONES#s Th ► 1 * XISnN 182 186 185 / S#18 1 & rt C� 1111111 MIn-um•.M&_i.mI_-I- oND .e 151111e .s\\ •P A L.j F6 k, • ‘ EXISTING ila 190 73 72 71 POND O EXISTIN t• 191 O ( ' O -OND 1 70 N iI� C4h01)/bA/5 CJ A/ •`,In21 ill/Nl wri bgmAmle.. arts+.) mlv ( 6- w'e"ii .lcaes I &Iz, s) Cis By A ON s ITS ibvA TS - 4.1 s kC. Or G lidb0ba5 1 € 1ORo s ) Uncvr..cs 3.5- IIFC $TII.t s - 0 C1"IL33&ws& IP �iLw I Phri i - 3•$ kc sTizt:, - 4-Ia. he WN F + 6 t�'�,F+1 A•eskG S I peL.+AALs 1 CALT - 0.43 AC, C kY1 �it'r113 - O.SS, ?Ohm..A.t - 0.1a kC ,sAtsaTE = 8.3 hC ToPst.. o frsITe = i/-S3 hc, 4