Loading...
HomeMy WebLinkAboutNCC241977_NOI Signed Certification_20240628 NCGO1 Notice of Intent (NOI) Certification Form Directions: Print this form,complete,scan and upload to the electronic NOI. Then, mail the original form to the NC DEMLR Stormwater Program (with$120 check if paying by check) at: Division of Energy, Mineral& Land Resources Stormwater Program 512 N.Salisbury Street,6th Floor(Office 640K) 1612 Mail Service Center Raleigh, NC 27699-1612 THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] Per NC General Statute 143-215.68(i), any person who knowingly makes any false statement, representation, or certification in any application, record, report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that(check all boxes to indicate your agreement): ✓❑ I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. �✓ The information submitted in this NOI is,to the best of my knowledge and belief,true,accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. 12 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. Q✓ If the approved Erosion and Sediment Control Plan is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. Q✓ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Project Name (must match Ala): Unmanned Data Storage Facility Specific Lot Numbers(must match Alb): 0784111869 Permittee (must match B1): American Tower Management, LLC Legally Responsible Person (must match 82& B3): Benjamin Caron Title of Legally Responsible Person (must match B3b): Senior Construction Manager Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person: Phone Number: 781-926-4753 7 // 6/26/24 Signature of Lei Ily Responsible Person or Authorized Individual Date Benjamin Caron,Senior Construction Manager,for American Tower Management,LLC * IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president,secretary,treasurer,or vice president, or a manager that is authorized in accordance with Part IV,Section B, Item(6)of the NCG010000 permit. * For authority to sign,please see attached. DocuSign Envelope ID:735D6F6B-0A60-46BD-8BC8-A4140C65D894 AMERICAN TOWER CORPORATION ASSISTANT SECRETARY'S CERTIFICATE I, Stephen Greene, a duly elected and acting Assistant Secretary of American Tower Corporation, a Delaware corporation(the "Company"),hereby certify that: • American Tower Management, LLC, a Delaware limited liability company, is an indirect but wholly owned subsidiary of the Company; and • pursuant to the Company's Delegation of Authority Policy, Benjamon Caron, Senior Construction Manager, has been granted the authority, to execute, on behalf of the Company and each of its directly and indirectly held subsidiaries,including,but not limited to American Tower Management, LLC, any contracts, certificates, agreements, or other documents to be executed; and • this authority includes,but is not limited to,the execution of any and all documents,to take such steps on behalf of the Company and American Tower Management,LLC that may be necessary and appropriate in connection with, and in support of any construction activities in connection with the Raleigh Data Center project, specifically, he is the person responsible for the construction activities of this project, for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. IN WITNESS WHEREOF, I have hereunto signed my name as Assistant Secretary of the Company,this 26th day of June 2024. ESDocuSigned by: ~& 4 tUAL F0B3B926F2974E3... Stephen Greene Assistant Secretary