Loading...
HomeMy WebLinkAboutSW1231201_Supplemental Info Review_20240626 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 6/26/2024 1:32:36 PM (Supplemental Submittal) Accept by Kaitlin Peck 6/26/2024 2:39:28 PM (Supplemental Info Submittal) • The task was assigned to DEMLR Post-Construction Team 6/26/2024 1:32:38 PM • The task was assigned to Kaitlin Peck by round robin distribution 6/26/2024 1:32:38 PM =DEQ • Submittal from 6/26/2024 Permit Information: Please provide specific permit details below. ................................................................................................................................................................................................................................................................................................................................................................................................ What Type of Permit? Choose one: * NPDES Industrial or MS4 Permit State Stormwater(Post-Construction)Permit Other Permit Number* SW1231201 Begins with"SW","NCG",or"NCS" What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact. the Primary Contact? Central Office * Washington Regional Office(Attn: Carl Dunn) Wilmington Regional Office(Attn:Christine Hall) ................................................................................................................................................................................................................................................................................................................................................................................................ Project Name* Bobby N Setzer State Fish Hatchery Renovation Owner/Operator* NC Wildlife Resources Commission(WRC) County: Transylvania Submitter Name:* Natalie Croom Who is submitting this information? E-mail Address:* natalie.croom@mcgillassociates.com Phone Number* 8284124618 Additional E-mail for (Optional) Submittal Confirmation: State Stormwater (Post-Construction) Information Uploads Choose file type and upload attachment(Reviewer may remove unnecessary submittals) File Type* Response To Comments File Upload Click the upload button,or drag and drop files to attach 1 -Response Letter.pdf 359.98KB Only PDF files are accepted. File Type* Supplement-EZ Form File Upload Click the upload button,or drag and drop files to attach 2-Supplement-EZ Form.pdf 867.48KB Only PDF files are accepted. File Type* Plansheet-SCM Detail File Upload Click the upload button,or drag and drop files to attach 3-C-143 Wetland Details.pdf 527.82KB Only PDF files are accepted. Is this project funded No with ARPA grant Yes funds?* Uploads contain NO Confidential YES Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)]. Notes about the attachments: * 0 By checking the box and signing box below, I certify that: cl I have given true,accurate,and complete information on this form; d I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act) o I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act'); cl I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Natalie Croom Signature: �Jtmw Date Submitted: 06/26/2024 Initial Review Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary. SW1231201 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Review Date* 06/26/2024