Loading...
HomeMy WebLinkAbout310005_Gen Permit Renewal Application_20240503State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non -Discharge General Permit On September 30, 2024, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3, 2024. Please do not leave any question unanswered. Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Certificate Of Coverage Number: AWS310005 2. Facility Name: Scott Farm Sites 1-4 3. Permittee's Name (same as on the Waste Management Plan): Murphy -Brown LLC 4. Permittee's Mailing Address: PO Box 856 City: Warsaw State: NC Telephone Number: 910-293-3434 Ext. E-mail: kwesterbeek@smithfield.com 5. Facility's Physical Address: 313 Elnin Carter Ln City: Bowdens State: NC 6. County where Facility is located: Duplin 7. Farm Manager's Name (if different from Landowner): Dave Nordi 8. Farm Manager's telephone number (include area code): 910-296-1800 Ext. 9. Integrator's Name (if there is not an Integrator, write "None"): Mumhy-Brown LLC 10. Operator Name (OIC): BaltazarPerez Arrei uin PhoneNo.: 910-271-3527 11. Lessee's Name (if there is not a Lessee, write "None"): 12. Indicate animal operation type and number: Current Permit: Operations Type Allowable Count Operation Types: Swine Wean to Finish Wean to Feeder Farrow to Finish Feeder to Finish Farrow to Wean Farrow to Feeder Boar/Stud Gilts Other Swine - Wean to Finish Cattle Dairy Calf Dairy Heifer Milk Cow Dry Cow Beef Stocker Calf Beef Feeder Beef Broad Cow Other I-F,] lJ Dry Poultry Non Laying Chickens Laying Chickens Pullets Turkeys Turkey Pullet Wet Poultr■ Non Laying Pullet Layers Zip: 28398-0856 Zip: 28398 OIC #: 1002653 Other Types Horses - Horses Horses - Other Sheep- Sheep Sheep - Other 13. Waste Treatment Lagoons, Digesters and Waste Storage Ponds (WSP): (Fill/Verify the following information. Make all necessary corrections and provide missing data.) Structure Name Structure Type I Estimated (Lagoon/Digester/ Date WSP) Built Liner Type (Clay, Synthetic, Unknown) Capacity (Cubic Feet) Estimated Surface Area (Square Feet) Design Freeboard 'Redline" (Inches) PRIMARY (SCOTTA) Lagoon 12/31/1992 Full, clay 1 L011a th 1,044, S, %'4 p) 5 ` 134,896.00..21.60 1 Q ,[, SCOTT 4 C Lagoon 12/31/1992 Full, clay SECONDARY (SCOTT B) Lagoon 12/31/1992 Full, clay 618,256.00 77,842.00 t i -fie V- r 2.o ss 1 Submit one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.10C(d), either by mailing to the address below or sending it via email to the email address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP), sinned b.- the owner and a certified technical s ecialist. containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) b. A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS. Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5.Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g. composting, digesters, solids separators, sludge drying system, waste transfers, etc.) I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for a similar offense.) Print the Name of the Permittee/Landowner/Signing Official and Sign below. (If multiple Landowners exist, all landowners should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation): Name (Print Signature: Name (Prni Signature: Name (Print): L Title: _ �� � Typ -1— Date: 3 _ ���' ;)'Caq Title: Date: Title: Signature: _ Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: E-mail: animaLoperations@deq.nc.gov NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North: Carolina 27699-1636 Facility Number: 31-0005 Grower: Scott Farm Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 1 of 12 ANAEROBIC DIGESTER DESIGN FARM INFORMATION Farm Population Nursery: Wean to Finish: ------------------- 14375 Hd. Finishing: ------------------- 0 1 ai i vvv Lv vvuanling: ------------------- Farrow to feeder: ------------------- Farrow to finish: ------------------- Boars:------------------- 25 Yr. / 24 Hr Storm Event ------------------- 7.5 In. Recycle Flush Water Volume: ------------------- 0 DIGESTER INFORMATION Is Digester Designed as an Irregular Shape? (Y/N)------------ y Was This Facility Built Prior to 9/96? (Y/N)------------ N Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ N Seasonal High Water Table Elev: ------------------- 0.00 Structural Freeboard: ------------------- 1.0 Ft. Side Slopes: ------------------- 3 :1 (H:V) From Lagoon Volume Check Contours 460.0 Ft. contour areas see sheet 2 of 7... 230.0 Ft. Top of Dike Elevation: ---------------- Depth 153.00 Ft. Finished Bottom Elevation: ---------------• 12.00 Ft. 141.00 Ft. Start Pump Elevation: ---------------- 20 In. 151.33 Ft. Stop Pump Elevation: ---------------- 26.00 In. 150.83 Ft. Top of Sludge Elevation: ---------------- 132 In. 142.00 Ft. DIGESTER VOLUMES REQUIRED VOL. DESIGN VOLUMES % REQ'D. Freeboard = 66125 (Cu.Ft.) 66,453 (Cu.Ft.) 100.50% Temporary = 0 (Cu.Ft.) 49,168 (Cu.Ft.) 7.13% Operational = 690,000 (Cu.Ft.) 689,043 (Cu.Ft.) 99.86% Sludge = 0 (Cu.Ft.) 76,750 (Cu.Ft.) Total Volume = 690,000 (Cu.Ft.) 881,414 (Cu.Ft.) 127.74% Lagoon Surface Area: (Inside TOD) 105,800 S.F. Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Facility Number: 31-0005 Grower: Scott Farm Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 2 of 12 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: ®Cu. Ft. DIGESTER STAGE -AREA VOLUMES Contour Elevation (FT.) Area SF Incr. Vol. (Cu. FT) Cumul. Vol. (Cu. FT) 141.00 54,352 20,382 142.00 58,384 56,368 76,750 143.00 62,560 60,472 137,222 144.00 66,880 64,720 201,942 145.00 71,344 69,112 271,054 146.00 75,952 73,648 344,702 147.00 80,704 78,328 423,030 148.00 86,000 83,352 506,382 149.00 89,816 87,908 594,290 150.00 93,704 91,760 686,050 151.00 97,664 95,684 781,734 152.00 101,696 99,680 881,414 153.00 105,800 103,748 985,162 These volumes were calculated using the vertical average end area method TOTAL REQD VOL 1,355,310 CF CUMULATIVE VOL. ZONE VOL. 127.74% END PUMP = = = = 150.83 FT 765,793 CF TR'MT 689,043 0.00% START PUMP = =: 151.33 FT 814,961 CF TEMP 49,168 99.86% MAX STORAGE = 152.00 FT 881,414 CF STORM 66,453 7.13% Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Grower: Scott Farm Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 3 of 12 WASTE STORAGE POND DESIGN 2nd STAGE FARM INFORMATION Nursery: Wean to Finish: Finishing: i ai i vvv Lv vvuanling: Farrow to feeder: Farrow to finish: Boars: Storage Period: 100 Yr. / 24 Hr Storm Event "Heavy Rain" Factor Rainfall in Excess of Evaporation Additional Water Usage: Additional Drainage Area: STORAGE INFORMATION Farm Population: Not Applicable Even if Value Shown 14375 Hd. 0 180 Days 7.5 In. 0 7 In. 0 0 Is Storage Pond Designed as an Irregular Shape? (Y/N)------------ Y Does Operator Want Emergency Spillway? (Y/N)------------ N Was This Design Built Prior to 9/96? (Y/N)------------ Y Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ N Seasonal High Water Table Elev: ------------------- 0.00 Freeboard: ------------------- 1.0 Ft. Emergency Spillway Flow Depth: Not Applicable Even if Value Shown 0 Side Slopes: ------------------- 3 :1 (H:V) From Lagoon Volume Check Contours 0.0 contour areas see sheet 2 of 7... 0.0 Top of Dike Elevation: ---------------- Depth 153.00 Ft. Finished Bottom Elevation: ---------------• 10.30 Ft. 142.70 Ft. Start Pump Elevation: ---------------- 19.92 In. 151.34 Ft. Stop Pump Elevation: ---------------- 99.6 In. 144.70 Ft. CHECK PUMPING ELEVATIONS!!! STORAGE VOLUME REQUIRED VOL. DESIGN VOLUMES % REQ'D. Storm Stor = 87832 (Cu.Ft.) 87,743 (Cu.Ft.) 99.90% Temporary = 750887 (Cu.Ft.) 770,737 (Cu.Ft.) 102.64% Permanent = 0 (Cu.Ft.) 351,645 (Cu.Ft.) Total Volume = 838,719 (Cu.Ft.) 1,210,124 (Cu.Ft.) 144.28% 90 Temporary Storage Volume Elevation = 146.44 Ft. 78.72 In. Lagoon Surface Area: (Inside TOD)------------------- 140,531 S.F. Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Grower: Scott Farm #2 Lagoon (A) 3137 Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 4 of 12 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: Cu. Ft. STORAGE POND STAGE -AREA VOLUMES Contour Elevation (FT.) Area SF Incr. Vol. (Cu. FT) 142.70 91,565 143.00 92,875 27,666 144.00 97,328 95,101 145.00 101,851 99,589 146.00 106,442 104,147 147.00 111,103 108,773 148.00 115,833 113,468 149.00 120,634 118,233 150.00 125,502 123,068 151.00 130,440 127,971 152.00 135,449 132,944 153.00 140,531 137,990 Cumul. Vol. (Cu. 159,165 186,831 281,932 381,521 485,668 594,440 707,909 826,142 949,210 1,077,180 1,210,124 1,348,114 These volumes were calculated using the vertical average end area method. TOTAL READ VOL 1,355,310 CF CUMULATIVE VOL. ZONE VOL. 144.28% END PUMP = = = = 144.70 FT 351,645 CF TR'MT 351,645 START PUMP = =: 151.34 FT 1,122,381 CF TEMP 770,737 102.64% MAX STORAGE = 152.00 FT 1,210,124 CF STORM 87,743 99.90% Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Grower: Scott Farm Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 5 of 12 MINIMUM REQUIRED VOLUME CALCULATIONS DIGESTER Permanent Storage: Required Treatment Volume: Animal Type Capacity (cu.ft./hd) = Total Wean to Finish 14,375 48.00 690,000 Finishing 0 50.00 0 Total Required Treatment Volume (cu. ft.)= Sludge Storage Volume: 690,000 Animal Type Capacity ALW (cu.ft./lb) = Total Wean to Finish 14,375 115 0.00 0 Finishing 0 135 0.00 0 Total Required Sludge Storage Volume (cu. ft.)= No Storm Storage Unless a Partial Cover Digester: Vol.=(Digester Surf. Area + Addt'I Drainage Area) * 100Yr./24Hr. Storm(in) / 12in./ft. Vol.= (105800 sq.ft + 0 sq.ft.) * 7.5 in. /12 in./ft. Total Required Volume for 100Yr./24Hr. Storm Event (cu.ft)= No "Heavy Rain" Storage Unless a Partial Cover Digester: Vol.=(Digester Surf. Area + Addt'I Drainage Area) * "Heavy Rain" Factor (in) / 12in./ft. Vol.= (105800 sq.ft + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) _ (for Extended Periods of Chronic Rainfall) 0 66,125 Total Required Storm Storage (100Yr. / 24Hr. Storm +'Heavy Rain')= 66,125 (CU.FT) Total Required Permanent Storage (Treatment + Sludge) = 690,000 (CU.FT) TOTAL REQUIRED DIGESTER VOLUME = 756125 (CU.FT.) w 0 Grower: Scott Farm Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 6 of 12 Temporary Storage Volume: Manure Production: Animal Type Capacity Sto. Period = Total Wean to Finish 14,375 180 1.17 3,019,613 Finishing 0 180 1.40 0 Total Manure Production (gals.)= 3,019,613 Total Manure Production (cu.ft.)= 403,692 Excess Fresh Water: Animal Type Capacity Sto. Period = Total Wean to Finish 14,375 180 0.77 1,983,836 Finishing 0 180 0.90 0 Total Fresh Water Excess (gals.)= 1,983,836 Total Fresh Water Excess (cu.ft.)= 265,219 Grower: Scott Farm Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 7 of 12 Temporary Storage Volume: (Cont.) Rainfall in Excess of Evaporation: Only in Waste Storage Pond since digester is covered Vol.=(Digester Surface Area + Waste Storage Pond Area + Additional Drainage Area) * Rainfall / 12in./ft Vol.= (0.0 sq.ft. + 140531 sq.ft. + 0 sq.ft.) * 7.0 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= 81,976 Storm Storage: Only in Waste Storage Pond since digester is covered Vol.=(Digester Surface Area + Waste Storage Pond Area � * 100Yr./24Hr Storm (in.)/1 2in./ft. Vol.= (0.0 sq.ft. + 140531 sq.ft. + 0 sq.ft.) * 7.5 in. Total Required Volume for 100Yr./24Hr. Storm Event (cu.ft)= 87,832 "Heavy Rain" Storage: Only in Waste Storage Pond when required since digester is covered .=(Digester Surface Area + Waste Storage Pond Area + Additional Drainage Area) * Heavy Rain Factor(in) / 12in Vol.= (0.0 sq.ft. + 140531 sq.ft. + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) = 0 (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 Total Required Storm Storage (100Yr. / 24Hr. Storm +'Heavy Rain')= Total Required Temporary Storage (Manure Prod. + Excess Fr. Water + Rainfall Excess + Additional Water Storage)= Total Required Permanent Storage (Treatment + Sludge) _ 87,832 (CU.FT) 750,887 (CU.FT) 0 (CU.FT) 0 TOTAL REQUIRED 2nd STAGE VOLUME = 838719 (CU.FT.) 0 Grower: Scott Farm Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 8 of 12 Top of Dike Elevation Top of 25Yr. / 24Hr. Storm Storage Start Pump Elevation End Pump Elevation Top of Sludge Storage Seasonal High Watertable Elev. Finished Bottom Elevation Inside Top Length Inside Top Width Side Slopes Lagoon Surface Area Freeboard Depth Zone Deaths: DIGESTER DESIGN SUMMARY 139.50 FT. 152.00 FT. ------------------- 137.75 FT. ------------------- 137.25 FT. ------------------- 142.00 FT. ------------------- 128.50 FT. ------------------- 124.00 FT. ------------------- 630.00 FT. ------------------- 260.00 FT. ------------------- 3.0:1 H : V ------------------- 163,800 SF 1.00 FT TOTAL DESIGN VOLUME = 1781723 (CU.FT.) Treatment / Sludge Storage Zone Depth ----------- 13.3 FT. Temporary Storage Zone Depth ----------- 0.5 FT. Freeboard Depth ----------- 1.8 FT. Total Digester Depth ----------- 15.5 FT. P.O. Box 856, Warsaw NC 28398 Grower: Scott Farm Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 10/18/22 County: Duplin, NC Sheet 9 of 12 STORAGE POND DESIGN SUMMARY 2nd STAGE Top of Dike Elevation ------------------- 137.59 FT. Emergency Spillway Crest Elevation ------------------- Not Applicable Top of 100Yr. / 24Hr. Storm Storage ------------------- 136.59 FT. Top of "Heavy Rain" Storage ------------------- Not Applicable Start Pump Elevation ------------------- 135.98 FT. End Pump Elevation ------------------- 130.74 FT. Top of Sludge Storage ------------------- Not Applicable Seasonal High Watertable Elev.------------------- 128.50 FT. Finished Bottom Elevation ------------------- 125.38 FT. Inside Top Length ------------------- Not Applicable Inside Top Width ------------------- Not Applicable Side Slopes ------------------- 3.0:1 H:V Lagoon Surface Area ------------------- 185,011 SF Freeboard Depth ------------------- 1.00 FT. Temporary Storage Period ------------------- 180 Days Zone Depths: TOTAL DESIGN VOLUME = 1709154 (CU.FT.) Treatment / Sludge Storage Zone Depth ----------- 5.4 FT. Temporary Storage Zone Depth ----------- 5.2 FT. Freeboard / Storm Storage Zone Depth ----------- 1.6 FT. Total Storage Pond Depth ----------- 12.2 FT. Smithfield Hog Production Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 Grower: Scott Farm Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 10 of 12 ZONE ELEVATIONS DIGESTER TOP OF DIKE ELEV = 139.50 / \ TOP OF STORM ELEV = 152.00 / \ TOP OF TEMP STORAGE ELEV = 137.75 START PUMP EL.= 137.7 \ TOP OF OPERATIONAL ELEV = 137.25 END PUMP EL. = 137.25 \ \ TOP OF SLUDGE ELEV = 142.00 / FINISHED BOTTOM ELEV = 124.00 enng P.O. Box 856, Warsaw NC 28398 SHWT = 128.50 0) 2 Grower: Scott Farm Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 11 of 12 ZONE ELEVATIONS STORAGE POND TOP OF DIKE ELEV = 137.59 / \ TOP OF STORM ELEV = 136.59 / \ START PUMP EL.= 135.9 \ TOP OF TEMP STORAGE ELEV = 135.98 / END PUMP EL. = 130.74 \ TOP OF PERMANENT ELEV = 130 SHWT = 128.50 \ / FINISHED BOTTOM ELEV = 125.38 ering P.O. Box 856, Warsaw NC 28398 (910) 2 Grower: Scott Farm Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 12 of 12 This Anerobic Digester is designed in accordance with the North Carolina Natural Resources Conservation Service PRACTICE STANDARD 366- ANEROBIC DIGESTER, revised in September, 2018. The Waste Storage Pond is designed in accordance with the North Carolina Natural Resources Convservation Service PRACTICE STANDARD 313- WASTE STORAGE FACILITY, revised in December, 2017. DESIGNED:� DATE: 01 /12/2024 COMMENTS: The lagoon has been designed as an irregular shape. Actual contour areas taken from the lagoon design are used to calculate the surface area and storage volume characteristics of the lagoon. This approach ensures that rainfall capture on the lagoon is fully accounted for and that storage volumes calculated represent actual conditions. Elevations are based on an assumed benchmark and do not represent mean sea level datum. 1 certify, to the best of my professional knowledge, judgement, and belief, this design calculation is in accordance with the applicable NRCS standards. Smithfield Hog Production Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 Grower: Scott Farm Site 3 Lagoon 3138 BDesigned y: EO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 1 of 7 WASTE STORAGE POND DESIGN FARM INFORMATION Farm Population: Nursery: ------------------- Wean to Finish: ------------------- Finishing: ------------------- Farrow to weanling: ------------------- Farrow to feeder: ------------------- Farrow to finish: ------------------- Boars: ------------------- Storage Period: ------------------- 25 Yr. / 24 Hr Storm Event ------------------- "Heavy Rain" Factor Not Applicable Rainfall in Excess of Evaporation ------------------- Additional Water Usage: ------------------- Additional Drainage Area: ------------------- LAGOON INFORMATION Is Lagoon Designed as an Irregular Shape? (Y/N)------------ Does Operator Want Emergency Spillway? (Y/N)------------ Was This Design Built Prior to Sept. 1996? (Y/N)------------ Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ Seasonal High Water Table Elev: ------------------- Freeboard: ------------------- Emergency Spillway Flow Depth: Not Applicable Side Slopes: ------------------- From Lagoon Volume Check Contours contour areas see sheet 2 of 7... Top of Dike Elevation: ---------------- Depth Finished Bottom Elevation: BOTTOM E 12.30 Ft. Start Pump Elevation: ---------------- 20.16 In. Stop Pump Elevation: ---------------- 121.2 In. LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES Y N Y N 0 14375 Hd. 0 0 0 0 0 180 Days 7.5 In. 7.0 In. 0 0 0.00 1.0 Ft. 3 :1 (H:V) 0.0 0.0 144.10 Ft. 131.80 Ft. 142.42 Ft. 134.00 Ft. % REQ'D. Storm Stor = 48651 (Cu.Ft.) 48,708 (Cu.Ft.) 100.12% Temporary = 715472 (Cu.Ft.) 487,547 (Cu.Ft.) 68.14% Permanent = 0 (Cu.Ft.) 82,000 (Cu.Ft.) Total Volume = 764,124 (Cu.Ft.) 618,256 (Cu.Ft.) 80.91 % 1/2 Treatment Volume = 0 (Cu.Ft.) 1/2 Treatment Volume Elevation = 134.00 Ft. 90 Temporary Storage Volume Elevation = 138.60 Ft. Min. Required Liner Thickness ------------------- Lagoon Surface Area: (Inside TOD)------------------- 121.20 In. 65.95 In. 1.8 Ft. 77,842 S.F. Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Grower: Scott Farm Site 3 Lagoon 3138 (B) Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 2 of 7 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: ICu. Ft. LAGOON STAGE -AREA VOLUMES Contour Elevation (FT.) Area SF Incr. Vol. (Cu. FT) Cumul. Vol. (Cu. 132.10 40,854 0 133.00 42,949 37,711 37,711 134.00 45,629 44,289 82,000 135.00 48,376 47,003 129,003 136.00 51,191 49,784 178,786 137.00 54,073 52,632 231,418 138.00 57,023 55,548 286,966 139.00 60,040 58,532 345,498 140.00 63,125 61,583 407,080 141.00 66,277 64,701 471,781 142.00 69,497 67,887 539,668 143.00 72,785 71,141 610,809 144.00 76,140 74,463 685,272 144.10 77,842 7,699 692,971 These volumes were calculated using the vertical average end area method. TOTAL READ VOL 764,124 CF CUMULATIVE VOL. ZONE VOL. 80.91% END PUMP = = = = 134.00 FT 82,000 CF TR'MT 82,000 START PUMP = =: 142.42 FT 569,548 CF TEMP 487,547 68.14% MAX STORAGE = 143.10 FT 618,256 CF STORM 48,708 100.12% Murphy -Brown, LLC Engineering P.O. Box 856,Warsaw, NC 28398 (910) 293-3434 Grower: Scott Farm Site 3 Lagoon 3138 (B) Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 3 of 7 MINIMUM REQUIRED VOLUME CALCULATIONS Permanent Storage: Required Treatment Volume: Animal Type Capacity ALW (cu.ft./lb) = Total Nursery 0 30 1.00 0 Wean to Finish 14,375 115 0.00 0 Finishing 0 135 0.00 0 Farrow to weanling 0 433 1.00 0 Farrow to feeder 0 522 1.00 0 Farrow to finish 0 1,417 1.00 0 Boars 0 400 1.00 0 Total Required Treatment Volume (cu. ft.)= Sludge Storage Volume: 0 Animal Type Capacity ALW (cu.ft./lb) = Total Nursery 0 30 0.00 0 Wean to Finish 14,375 115 0.00 0 Finishing 0 135 0.00 0 Farrow to weanling 0 433 0.00 0 Farrow to feeder 0 522 0.00 0 Farrow to finish 0 1,417 0.00 0 Boars 0 400 0.000 0 Total Required Sludge Storage Volume (cu. ft.)= Temporary Storage Volume: Manure Production: 0 Animal Type Capacity * Sto. Period d./day) = Total Nursery 0 180 0.30 0 Wean to Finish 14,375 180 1.17 3,019,708 Finishing 0 180 1.37 0 Farrow to weanling 0 180 4.39 0 Farrow to feeder 0 180 5.30 0 Farrow to finish 0 180 14.38 0 Boars 0 180 4.06 0 Total Manure Production (gals.)= Total Manure Production (cu.ft.)= Excess Fresh Water: 3,019,708 403,704 Animal Type Capacity * Sto. Period d./day) = Total Nursery 0 180 0.20 0 Wean to Finish 14,375 180 0.77 1,992,375 Finishing 0 180 0.90 0 Farrow to weanling 0 180 2.90 0 Farrow to feeder 0 180 3.50 0 Farrow to finish 0 180 9.50 0 Boars 0 180 2.70 0 Total Fresh Water Excess (gals.)= Total Fresh Water Excess (cu.ft.)= 1,992,375 266,360 Grower: Scott Farm Site 3 Lagoon 3138 (B) Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 4 of 7 Temporary Storage Volume: (Cont. Rainfall in Excess of Evaporation: Vol.=(Lagoon Surface Area + Additional Drainage Area) * Rainfall / 12in./ft Vol.= (77842 sq.ft. + 0 sq.ft.) * 7 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= 45,408 Storm Storage: Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) * 25Yr./24Hr. Storm(in) / 12in./ft. Vol.= (77842 sq.ft + 0 sq.ft.) * 7.5 in. /12 in./ft. Total Required Volume for 25Yr./24Hr. Storm Event (cu.ft)= 48,651 "Heavy Rain" Storage: Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) * "Heavy Rain" Factor (in) / 12in./ft. Vol.= (77842 sq.ft + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) = 0 (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 0 Total Required Storm Storage (25Yr. / 24Hr. Storm +'Heavy Rain')= Total Required Temporary Storage (Manure Prod. + Excess Fr. Water + Rainfall Excess + Additional Water Storage) _ Total Required Permanent Storage (Treatment + Sludge) _ TOTAL REQUIRED VOLUME = 764124 (CU.FT.) P.O. Box 856, Warsaw NC 28398 48,651 (CU.FT) 715,472 (CU.FT) 0 (CU.FT) 10) 293-3434 Grower: Scott Farm Site 3 Lagoon 3138 (B) Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 5 of 7 LAGOON DESIGN SUMMARY Top of Dike Elevation Emergency Spillway Crest Elevation Top of 25Yr. / 24Hr. Storm Storage Top of "Heavy Rain" Storage Start Pump Elevation End Pump Elevation Top of Sludge Storage Seasonal High Watertable Elev. Finished Bottom Elevation Inside Top Length Inside Top Width Side Slopes Lagoon Surface Area Min. Liner Thickness (if required) Freeboard Depth Temporary Storage Period Zone Deaths: ------------------- 144.10 FT. ------------------- Not AI Applicable ------------------- 143.10 FT. ------------------- Not Applicable ------------------- 142.42 FT. ------------------- 134.00 FT. ------------------- Not Applicable ------------------- 0.00 ------------------- 131.80 FT. ------------------- Not Applicable ------------------- Not Applicable ------------------- 3:1 H:V ------------------- 77,842 SF ------------------- 1.8 FT. ------------------- 1.00 FT. ------------------- 180 Days TOTAL DESIGN VOLUME = 618256 (CU.FT.) Treatment / Sludge Storage Zone Depth ----------- 2.2 FT. Temporary Storage Zone Depth ----------- 8.4 FT. Freeboard / Storm Storage Zone Depth ----------- 1.7 FT. Total Lagoon Depth ----------- 12.3 FT. P.O. Box 856, Warsaw NC 28398 10) 293-3434 Grower: Scott Farm Site 3 Lagoon 3138 (B) Address: PO Box 759 Rose Hill, NC 28458 County: Duplin, NC Designe JEO Checker DSE Date: 01/12/24 Sheet 6 of 7 ZONE ELEVATIONS TOP OF DIKE ELEV = 144.10 / \ TOP OF STORM ELEV = 143.10 / \ STRT PMP EL.= 142.42 \ TOP OF TEMP STORAGE ELEV = 142.42 / END PMP EL. = 134.00 \ TOP OF TREAT ELEV = 134.00 SHWT = 0.00 \ / FINISHED BOTTOM ELEV = 131.80 wn, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910 Grower: Scott Farm Site 3 Lagoon 3138 (B) Designed By: JEO Address: PO Box 759 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin, NC Sheet 7 of 7 This livestock waste treatment lagoon is designed in accordance with the United States Natural Resources Conservation Service PRACTICE STANDARD 359- WASTE TREATMENT LAGOON, revised prior to June, 1996. Emergency Spillway: An Emergency Spillway is not required. NOTE: See attached Waste Utilization Plan DESIGNED: DATE: 01 /12/2024 COMMENTS: The lagoon has been designed as an irregular shape. This design is update of start and stop pump elevations and to show the 1/2 treatment volume level for sludge storage. This design does not supercede the original certification of the farm. Elevations are based on an assumed benchmark and do not represent mean sea level datum. / certify, to the best of my professional knowledge, judgement, and belief, this design calculation is in accordance with the applicable NRCS standards. Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 Grower: Scott Farm Site 4 Lagoon 3139Designed y: EO Address: PO Box 785 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin Sheet 1 of 7 WASTE STORAGE POND DESIGN FARM INFORMATION Farm Population: Nursery: ------------------- Wean to Finish: ------------------- Finishing: ------------------- Farrow to weanling: ------------------- Farrow to feeder: ------------------- Farrow to finish: ------------------- Boars: ------------------- Storage Period: ------------------- 25 Yr. / 24 Hr Storm Event ------------------- "Heavy Rain" Factor Not Applicable Rainfall in Excess of Evaporation ------------------- Additional Water Usage: ------------------- Additional Drainage Area: ------------------- LAGOON INFORMATION Is Lagoon Designed as an Irregular Shape? (Y/N)------------ Does Operator Want Emergency Spillway? (Y/N)------------ Was This Design Built Prior to Sept. 1996? (Y/N)------------ Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ Seasonal High Water Table Elev: ------------------- Freeboard: ------------------- Emergency Spillway Flow Depth: Not Applicable Side Slopes: ------------------- From Lagoon Volume Check Contours contour areas see sheet 2 of 7... Top of Dike Elevation: ---------------- Depth Finished Bottom Elevation: ---------------• 10.50 Ft. Start Pump Elevation: ---------------- 21.6 In. Stop Pump Elevation: ---------------- 48 In. LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES Y N Y N 0 24642 Hd. 0 0 0 0 0 180 Days 7.5 In. 7.0 In. 0 0 0.00 1.0 Ft. 3 :1 (H:V) 0.0 0.0 154.50 Ft. 144.00 Ft. 152.70 Ft. 150.50 Ft. % REQ'D. Storm Stor = 84310 (Cu.Ft.) 102,953 (Cu.Ft.) 122.11 % Temporary = 770730 (Cu.Ft.) 268,175 (Cu.Ft.) 34.79% Permanent = 0 (Cu.Ft.) 673,797 (Cu.Ft.) Total Volume = 855,040 (Cu.Ft.) 1,044,925 (Cu.Ft.) 122.21 % 1/2 Treatment Volume = 0 (Cu.Ft.) 1/2 Treatment Volume Elevation = 150.50 Ft. 90 Temporary Storage Volume Elevation = 149.30 Ft. Min. Required Liner Thickness ------------------- Lagoon Surface Area: (Inside TOD)------------------- 48.00 In. 62.43 In. 1.5 Ft. 134,896 S.F. Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO Address: PO Box 785 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 Countv: Duplin Sheet 2 of 7 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: ICu. Ft. LAGOON STAGE -AREA VOLUMES Contour Elevation (FT.) Area SF Incr. Vol. (Cu. FT) Cumul. Vol. (Cu. 144.00 90,473 0 145.00 94,400 92,437 92,437 146.00 98,385 96,392 188,829 147.00 102,435 100,410 289,238 148.00 106,551 104,493 393,731 149.00 110,733 108,642 502,373 150.00 114,980 112,856 615,229 151.00 119,292 117,136 732,365 152.00 123,671 121,482 853,847 153.00 128,115 125,893 979,740 154.00 132,625 130,370 1,110,110 154.50 134,896 66,880 1,176,990 These volumes were calculated using the vertical average end area method. TOTAL READ VOL 855,040 CF CUMULATIVE VOL. ZONE VOL. 122.21 % END PUMP = = = = 150.50 FT 673,797 CF TR'MT 673,797 START PUMP = =: 152.70 FT 941,972 CF TEMP 268,175 34.79% MAX STORAGE = 153.50 FT 1,044,925 CF STORM 102,953 122.11% Murphy -Brown, LLC Engineering P.O. Box 856,Warsaw, NC 28398 (910) 293-3434 Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO Address: PO Box 785 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 Countv: Dur lin Sheet 3 of 7 MINIMUM REQUIRED VOLUME CALCULATIONS Permanent Storage: Required Treatment Volume: Animal Type Capacity ALW (cu.ft./lb) = Total Nursery 0 30 1.00 0 Wean to Finish 24,642 115 0.00 0 Finishing 0 135 0.00 0 Farrow to weanling 0 433 1.00 0 Farrow to feeder 0 522 1.00 0 Farrow to finish 0 1,417 1.00 0 Boars 0 400 1.00 0 Total Required Treatment Volume (cu. ft.)= Sludge Storage Volume: 0 Animal Type Capacity ALW (cu.ft./lb) = Total Nursery 0 30 0.00 0 Wean to Finish 24,642 115 0.00 0 Finishing 0 135 0.00 0 Farrow to weanling 0 433 0.00 0 Farrow to feeder 0 1 522 0.00 0 Farrow to finish 0 1,417 0.00 0 Boars 0 400 0.000 0 Total Required Sludge Storage Volume (cu. ft.)= Temporary Storage Volume: Manure Production: 0 Animal Type Capacity * Sto. Period d./day) = Total Nursery 0 180 0.30 0 Wean to Finish 24,642 180 1.17 5,176,463 Finishing 0 180 1.37 0 Farrow to weanling 0 180 4.39 0 Farrow to feeder 0 180 1 5.30 1 0 Farrow to finish 0 180 14.38 0 Boars 0 180 4.06 0 Total Manure Production (gals.)= Total Manure Production (cu.ft.)= Excess Fresh Water: 5,176,463 692,040 Animal Type Capacity * Sto. Period d./day) = Total Nursery 0 180 0.00 0 Wean to Finish 24,642 180 0.00 0 Finishing 0 180 0.00 0 Farrow to weanling 0 180 0.00 0 Farrow to feeder 0 180 1 0.00 1 0 Farrow to finish 0 180 0.00 0 Boars 0 180 0.00 0 Total Fresh Water Excess (gals.)= Total Fresh Water Excess (cu.ft.)= 0 0 Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO Address: PO Box 785 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 County: Duplin Sheet 4 of 7 Temporary Storage Volume: (Cont. Rainfall in Excess of Evaporation: Vol.=(Lagoon Surface Area + Additional Drainage Area) * Rainfall / 12in./ft Vol.= (134896 sq.ft. + 0 sq.ft.) * 7 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= 78,689 Storm Storage: Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) * 25Yr./24Hr. Storm(in) / 12in./ft. Vol.= (134896 sq.ft + 0 sq.ft.) * 7.5 in. /12 in./ft. Total Required Volume for 25Yr./24Hr. Storm Event (cu.ft)= 84,310 "Heavy Rain" Storage: Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) * "Heavy Rain" Factor (in) / 12in./ft. Vol.= (134896 sq.ft + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) = 0 (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 0 Total Required Storm Storage (25Yr. / 24Hr. Storm +'Heavy Rain')= Total Required Temporary Storage (Manure Prod. + Excess Fr. Water + Rainfall Excess + Additional Water Storage) _ Total Required Permanent Storage (Treatment + Sludge) _ TOTAL REQUIRED VOLUME = 855040 (CU.FT.) P.O. Box 856, Warsaw NC 28398 84,310 (CU.FT) 770,730 (CU.FT) 0 (CU.FT) 10) 293-3434 Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO Address: PO Box 785 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 Countv: Dur lin Sheet 5 of 7 LAGOON DESIGN SUMMARY Top of Dike Elevation Emergency Spillway Crest Elevation Top of 25Yr. / 24Hr. Storm Storage Top of "Heavy Rain" Storage Start Pump Elevation End Pump Elevation Top of Sludge Storage Seasonal High Watertable Elev. Finished Bottom Elevation Inside Top Length Inside Top Width Side Slopes Lagoon Surface Area Min. Liner Thickness (if required) Freeboard Depth Temporary Storage Period Zone Deaths: ------------------- 154.50 FT. ------------------- Not AI Applicable ------------------- 153.50 FT. ------------------- Not Applicable ------------------- 152.70 FT. ------------------- 150.50 FT. ------------------- Not Applicable ------------------- 0.00 ------------------- 144.00 FT. ------------------- Not Applicable ------------------- Not Applicable ------------------- 3:1 H:V ------------------- 134,896 SF ------------------- 1.5 FT. ------------------- 1.00 FT. ------------------- 180 Days TOTAL DESIGN VOLUME = 1044925 (CU.FT.) Treatment / Sludge Storage Zone Depth ----------- 6.5 FT. Temporary Storage Zone Depth ----------- 2.2 FT. Freeboard / Storm Storage Zone Depth ----------- 1.8 FT. Total Lagoon Depth ----------- 10.5 FT. P.O. Box 856, Warsaw NC 28398 10) 293-3434 Grower: Scott Farm Site 4 Lagoon 3139 (C) Address: PO Box 785 Rose Hill, NC 28458 County: Duplin Designe JEO Checker DSE Date: 01/12/24 Sheet 6 of 7 ZONE ELEVATIONS TOP OF DIKE ELEV = 154.50 / \ TOP OF STORM ELEV = 153.50 / \ STRT PMP EL.= 152.70 \ TOP OF TEMP STORAGE ELEV = 152.70 / END PMP EL. = 150.50 \ TOP OF TREAT ELEV = 150.50 SHWT = 0.00 \ / FINISHED BOTTOM ELEV = 144.00 wn, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910 Grower: Scott Farm Site 4 Lagoon 3139 (C) Designed By: JEO Address: PO Box 785 Checked By: DSE Rose Hill, NC 28458 Date: 01/12/24 Countv: Duolin Sheet 7 of 7 This livestock waste treatment lagoon is designed in accordance with the United States Natural Resources Conservation Service PRACTICE STANDARD 359- WASTE TREATMENT LAGOON, revised prior to June, 1996. Emergency Spillway: An Emergency Spillway is not required. NOTE: See attached Waste Utilization Plan DESIGNED: � DATE: 01/12/2024 COMMENTS: The lagoon has been designed as an irregular shape. This design is update of start and stop pump elevations and to show the 1/2 treatment volume level for sludge storage. This design does not supercede the original certification of the farm. Elevations are based on an assumed benchmark and do not represent mean sea level datum. 1 certify, to the best of my professional knowledge, judgement, and belief, this design calculation is in accordance with the applicable NRCS standards. Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434