Loading...
HomeMy WebLinkAboutNC0007064_Plan of Action_20240214(' DUKE ENERGY FEB 14 2024 Serial: RA-24-0052 Christopher Johnson, Chief Water Sciences Section North Carolina Department of Environmental Quality Division of Water Resources 1621 Mail Service Center Raleigh, North Carolina 27699-1621 Subject: Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Duke Energy Progress, LLC Brunswick Steam Electric Plant (NC0007064) Proposed Biological Monitoring Study Plan for 2024 Dear Mr. Johnson: Brunswick Nuclear Plant 8470 River Road SE Southport, NC 28461 Enclosed is the biological monitoring study plan that Duke Energy Progress, LLC, proposes to conduct at the Brunswick Steam Electric Plant (NC0007064) during 2024. The proposed studies are required by the NPDES permit to be reviewed and approved for implementation by the Water Sciences Section. No changes are proposed for the 2024 biological monitoring study plan or methods from the studies conducted during 2023. Duke Energy appreciates your review and acceptance of these proposed studies for satisfying the permit requirements for biological studies at the Brunswick Steam Electric Plant. Please refer any questions regarding this submittal to Mr. Kyle Hussey at (910) 832-3305 or Mr. Drew Petrusic at (910) 832-2728. Sincerely, Jay Ratliff Plant Manager Brunswick Steam Electric Plant Enclosure: Brunswick Steam Electric Plant 2024 Study Plan and Sampling Locations Enclosure Brunswick Steam Electric Plant 2024 Study Plan and Sampling Locations Environmental Services Water Resources Study Plans BRUNSWICK STEAM ELECTRIC PLANT 2024 Environmental Study Plan CONTACTS ® KYLE HUSSEY- Site Lead ® DREW PETRUSIC & ERIC CASION - EHS Contact ® DON SAFRIT - Permitting and Compliance Contact MONITORING PLAN DESCRIPTION Aquatic life monitoring described in this study plan will provide permit required data and environmental assessment information for the Cape Fear Estuary to support the operation of the Brunswick Steam Electric Plant. Programmatic descriptions are outlined below and described in depth in Tables 1-2 and Figure 1. Monitoring Programs NPDES PERMIT REQUIRED MONITORING and REPORTING REQUIREMENTS Permit # 0007064, expires September 30, 2028. DIVERSION FENCE — A diversion fence located at the mouth of the intake canal shall be continuously operated and maintained in such a manner as to minimize impingement. A biological monitoring program shall be continued which will provide sufficient information to allow for a continuing assessment of the impact of the Brunswick Steam Electric Plant on the Cape Fear estuary, with particular emphasis on the marine fisheries. Data shall be reported annually and shall include an interpretive summary report assessing the effectiveness of the diversion fence, and the effectiveness of flow minimization and fine mesh screens to curtail organism impingement and entrainment. The Director shall approve any major changes in the biological monitoring program. Table 1. CHANGES FROM 2023 STUDY PLAN PROGRAM None. Table 2. 2024 STUDY PLAN PROGRAM Frequency Location Procedure Reference COMPONENT NPDES Juvenile Impingement Monthly Fish Return Flume ESFP-SW-0204 Larval Impingement Monthly Fish Return Flume ESFP-SW-0204 Entrainment Monthly Discharge Weir ESFP-SW-0205 QUALITY CONTROL Information collected for programs included in the 2024 study plan will adhere to approved procedures including ESFP-AD-0100 which provides overall biological laboratory practice guidance, and various other ESFP procedures. These define requirements for training, qualification, data management, and recordkeeping, as well as task specific guidance for program components. These approved documents Duke Energy 1 Environmental Services Water Resources Study Plans support current biological and field laboratory certifications for both Duke Energy Water Resource laboratories. DELIVERABLES The following products will be generated through use of the 2024 Brunswick Steam Electric Plant environmental monitoring study plan. • Annual report outlining the effectiveness of the diversion fence, flow minimization, and fine mesh screens to curtail organism impingement and entrainment. Figurel. Brunswick Monitoring Locations 1�— r Brunswick Steam Electric Plant NORTH CAROLINA Fish Return Diversion a Structure Plant Site �-A Flume Intake Canal Discharge Weir e S rae9°Gaya\ ��'� Elizabeth River Southport Ocean Discharge Area N A 0 1 2 3 4 Miles 0 1.5 3 4.5 6 Kilometers Atlantic Ocean Duke Energy 2