Loading...
HomeMy WebLinkAboutLoop Road As Built Report ReviewSummary of Comments on 20201938 Ver 2_Loop Road Bank AsBuilt Report_20240401 Page: 9 Author: bhartshorn Subject: Sticky Note Date: 6/25/2024 11:11:54 AM Values in the "Total Area of Buffer Mitigation" should be 0 if they are not convertable to buffer credits (i.e. Nutrient offset 0-100 and 101-200 row) Page: 15 Author: bhartshorn Subject: Sticky Note Date: 6/25/2024 2:14:55 PM Please provide information on why the non-diffuse flow deductions are 5,611 sqft and not 4,350 sqft for both D1 and DA each if Wildlands is applying the diffuse flow memo. Page: 16 Author: bhartshorn Subject: Sticky Note Date: 6/25/2024 1:51:04 PM Features need to be labeled in the survey Author: bhartshorn Subject: Sticky Note Date: 6/25/2024 11:09:42 AM Needs official signature