HomeMy WebLinkAboutWQ0012696_Monitoring - 04-2024_20240530 (3)Monitoring Report Submittal
Permit Number#* WQ0012696
Name of Facility:* Pamlico River Ferry Terminal
Month: * April Year: * 2024
Report Information
Type* Upload Document*
NDMR, NDAR-1, NDAR-2, NDMLR APRIL PAM RIVER NDAR-1 24.pdf 1.01MB
PDF Only
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59).
Confirmation Email Address: * wvneeland@ncdot.gov
Name of Submitter: * Bill Neeland
Signature:
Date of submittal: 5/30/2024
This will be filled in automatically
Initial Review
Reviewer: Wanda.Gerald
Is the project number correct?* W00012696
Is the monitoring report accepted?* Yes NO
Regional Office* Washington
Reviewer: _anonymous
Review Date: 6/25/2024
FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page ( of Z
Permit No.: VVQ0012696
Facility Name: Pamlico River Ferry Terminal
County: Beaufort
• irrigation occur
Field Nam
at this facility?
P1 YES EJ NO
RIPAR111 M.
Hourly Rate (in):
Annual Kate (in);:
Annual Rate
Annual Rate (in):
Annual Rate (in):
Field Irrigated?i
m
Om0-_--
®
0=0
__
-_--
----
__-_
----
mm®omm
����
�■���
�■■���
���■�
m
mmm
mm
����
■����
�■m��
����
Monthly Loading:
111
iaii�i.viiii
' 1'
12 Month Floating Total
ii�•iiii®iiiii".:iiiiiiio�iiii���������
FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page X of.11
Did the application rates exceed the limits in Attachment B of your permit?
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
Was a suitable vegetative cover maintained on all sites as specified in your permit?
Were all setbacks listed in your permit maintained for every application to each permitted site?
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
0 Compliant
❑ Non -Compliant
0 Compliant
❑ Non -Compliant
0 Compliant
❑ Non -Compliant
O Compliant
❑ Non -Compliant
0 Compliant
❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
-U Vi k.i La n OI1. !iliaM l auuMuuai aiiccw n
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: David Pharr
Permittee:
David Pharr
Certification No.: 26526, 21101
Signing Official: David Pharr
Grade: ww4, SI Phone Number: 252 725 3871
Signing Official's Title: ORC
Has the ORC changed since the previous NDAR-1? ❑ Yes 0 No
Phone Number: 252 725 3871 Permit Exp.: 9/1125
14 Wl— �1 — 5/28/24
4f J1 5/28/24
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617