Loading...
HomeMy WebLinkAboutSW3240205_Supplement-EZ Form_20240621 FORMS LOADED DJECT INFORMATION 1 Project Name I Courtyards on the Greenway 2 Project Area(ac) 49.12 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0.41 _ 5 Is this project High or Low Density? High - 6 Does this project use an off-site SCM? No MPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 100 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? i Yes 0 Is streambank stabilization proposed on this project? No MBER AND TYPE OF SCMs: 1 Infiltration System 2 Bioretention Cell 3 Wet Pond I 2 4 Stormwater Wetland 5 Permeable Pavement 6 Sand Filter 7 Rainwater Harvesting(RWH) 8 Green Roof 9 Level Spreader-Filter Strip(LS-FS) 0 Disconnected Impervious Surface(DIS) 1 Treatment Swale _- 2 Dry Pond -_ 3 StormFilter 4 Silva Cell 5 Bayfilter 6 Filterra FORMS LOADED SIGNER CERTIFICATION 7 Name and Title: _ _ _ Andrew Allison,P.E.-Project Manager 8 Organization: Timmons Group 9 Street address: 610 East Morehead Street,Suite 250 _ 0 City,State,Zip: Charlotte,NC,28202 _ 1 Phone number(s): (704)227-1564 - 2 Email: andrew.allison@timmons.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer 11 \``\\\-Nt CArRp''''%. OF ESSjNq��Y,y'%; SEA — Signature of Designer 054749 • 94;*"�FNGINE So �` (9�21/2 uZ4 ' /irin t(11\0 Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs _ 2 3 Does this project have low density areas? _ No 4 If so,number of low density drainage areas _ 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM n/a Wet Pond Wet Pond _ 5 Total drainage area(sq ft) 1,990,692 967,032 483,516 6 Onsite drainage area(sq ft) 1,990,692 967,032 483,516 7 Offsite drainage area(sq ft) 0 0 0 8 Total BUA in project(sq ft) 758380 sf 497456 sf 260924 sf New BUA on subdivided lots(subject to 9 permitting)(sq ft) 560400 sf 351543 sf 208857 sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 199134 sf 140054 sf 52067 sf 11 Offsite BUA(sq ft) n/a n/a n/a 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) 7013 sf 7013 sf n/a -Sidewalk(sq ft) 56818 sf 42092 sf 14726 sf -Roof(sq ft) 10050 sf 3037 sf n/a -Roadway(sq ft) 125253 sf 87912 sf 37341 sf -Future(sq ft) n/a n/a n/a -Other,please specify in the comment box below(sq ft) n/a n/a n/a New infiltrating permeable pavement on 13 subdivided lots(sq ft) n/a n/a n/a New infiltrating permeable pavement not on 14 subdivided lots(sq ft) n/a n/a n/a Existing BUA that will remain(not subject to 15 permitting)(sq ft) 5859 sf 5859 sf n/a 16 Existing BUA that is already permitted(sq ft) n/a n/a n/a 17 Existing BUA that will be removed(sq ft) 31918 sf 31918 sf n/a 18 Percent BUA 38% 51% 54% 19 Design storm(inches) 2.9 in 2.9 in 20 Design volume of SCM(cu ft) 319560 cf 95852 cf 21 Calculation method for design volume Simple Method Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND I 1 Drainage area number 1 2 I 2 Minimum required treatment volume(Cu ft) 120708 cf 62919 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM(H:V)? 3:1 3:1 6 Does the SCM have retaining walls,gabion walls or other engineered No No side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC(8)? Yes Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 N/A N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM desi.ned b an NC licensed•rofessional? Yes Yes WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth(bottom of sediment 615.50 619.50 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 616.00 620.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 622.00 624.00 23 Elevation of the permanent pool(fmsl) 622.50 624.50 24 Elevation of the top of the vegetated shelf(fmsl) 623.00 625.00 25 Elevation of the temporary pool(fmsl) 626.00 628.50 26 Surface area of the main permanent pool(square feet) 35957 8228 27 Volume of the main permanent pool(cubic feet) 160682 cf 22891 cf 28 Average depth of the main pool(feet) 4.90 ft 3.40 ft 29 Average depth equation used Equation 3 Equation 3 30 If using equation 3,main pool perimeter(feet) 1026.0 ft 456.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 5.0 ft 5.0 ft 32 Volume of the forebay(cubic feet) 24526 cf 4042 cf 33 Is this 15-20%of the volume in the main pool? Yes Yes 34 Clean-out depth for forebay(inches) 78 in 54 in 35 Design volume of SCM(cu ft) 308691 cf 118174 cf 36 Is the outlet an orifice or a weir? Weir Weir 37 If orifice,orifice diameter(inches) n/a n/a 38 If weir,weir height(inches) n/a n/a 39 If weir,weir length(inches) 48 in 48 in 40 Drawdown time for the temporary pool(days) 5 3 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes Yes circuiting? 42 Are berms or baffles provided to improve the flow path? No No 43 Depth of forebay at entrance(inches) 78 in 54 in 44 Depth of forebay at exit(inches) 72 in 48 in 45 Does water flow out of the forebay in a non-erosive manner? Yes Yes 46 Width of the vegetated shelf(feet) 10 ft 10 ft 47 Slope of vegetated shelf(H:V) 10:1 10:1 48 Does the orifice drawdown from below the top surface of the No No permanent pool? 49 Does the pond minimize impacts to the receiving channel from the 1- Yes Yes yr,24-hr storm? 50 Are fountains proposed?(If Y,please provide documentation that Yes No MDC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes Yes 53 Species of turf that will be used on the dam and embankment Hybrid Bermuda Hybrid Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): 2