Loading...
HomeMy WebLinkAboutSW6231111_Design Calculations_20240621 Bowman NORTH CAROL 1 N A Percival Square Apartments Laurinburg Rd (US-401) and W. Palmer St. Proposed Apartment Development and Associated Infrastructure Raeford, North Carolina COORDINATES: 34°58'24.9"N, 79°14'32.5"W Project No.: 220192-01 -001 Stormwater Management Report Prepared By: Bowman NORTH' CAROLINA 4006 Barrett Drive, Suite 104yr,., aea�r,�f� Raleigh, NC 27609 ,t!°�/y� �',=�a �d��►,J'J PREPARED FOR: sF-Al- Connelly Builders, Inc 125 Old Chapin Road Matt Lowder, PE Lexington, SC 29072 NC License No. 24434 Laura Nicholson (919) 553-6570 (803) 798-0572 mlowder@bowman.com Idn@connellybuilders.com MARCH 18, 2024 Percival Square Apartments—Raeford, NC 1 I P a g e Bowman [Von7H .AR0 LIMA TABLE OF CONTENTS Stormwater Management Narrative PAGE • Project Data 3 • Site History 3 • Project Description 4 • Design Requirements 4 • Methodology 5 • System Summary 5 • Conclusion 5 Appendix A: Figures 8 • Soil Report • Topography Map • FEMA Flood Map No. 3710942400J • Surface Water Classification Maps • Hydrologic Unit Code (HUC) • NOAA Point Precipitation Depth Estimates • NOAA Point Precipitation Intensity Estimates • Pre-Development Drainage Basin Map • Post-Development Drainage Basin Map • Wetlands Inventory Map Appendix B: Stormwater Wet Pond Calculations 9 • CN Values • Time of Concentration Calculations • Wet Pond — Design, Details, and Hydrographs • Grass Channels Appendix C: Storm Drainage System Calculations 10 • 100-System Appendix D: Erosion and Sediment Control Calculations 11 • Rip Rap Calculations • Skimmer Basin • Riser • Temporary Diversion Ditches Percival Square Apartments—Raeford, NC 2 1 Bowman [Von7H .AR0 LIMA STORMWATER MANAGEMENT NARRATIVE This report documents the hydraulic and hydrological analysis performed by Bowman Consulting for the proposed Percival Square Apartment Development in Raeford, North Carolina. The report consists of a review of available hydrologic data, methods analysis, development of existing and proposed hydraulic models, and presentation of the impacts of the proposed development in the project. PROJECT DATA Table 1:Site Information Project Name Percival Square Parcel Identification Number (PIN) 694241101044 Parcel Address Laurinburg Road and W. palmer St. River Basin Lumber Total Parcel Area 4.93 acres (±214,615 SF) EXISTING 0 acres (±0 SF) Impervious Area PROPOSED 1.96 acres (±85,508 SF) Area of Land Disturbance 4.01 acres (± 174,467 SF) TMDLs None Watershed Protection Overlay None SITE HISTORY The proposed site is located in Raeford, North Carolina and is within City of Raeford limits. The site is located at the intersection of Laurinburg Road (US-401) and W. Palmer Street, and West of Downton Raeford. The site is currently undeveloped wooded and open space area. Soils located within the project site as defined by NRCS (National Resources Conservation Service) are described in Table 2. Table 2:Hydrologic Soil Groups Group Description FaB Faceville loamy sand, 2 to 6 percent slopes Percival Square Apartments—Raeford, NC 3 1 P a g e Bowman 140RTH .A Rn L INA. The hydrologic soil group (HSG) designations for the soil group is B. Group B soils are described as coarse and having a moderate infiltration rate when thoroughly wet.This consists of moderately deep or deep and moderately well to well drained soils that have a moderate rate water transmission. A Web Soil Survey Map for the site is included in Appendix A. For the purposes of design, the same hydrologic group was utilized for both Pre- and Post- Development conditions. PROJECT DESCRIPTION Connelly Builders, Inc is proposing to develop ±4.01 acres of disturbed area within the 4.93- acre parcel. The proposed development consists of 3 apartment buildings totaling 48 units, a community center/leasing office, a playground, tot lot, outdoor eating area, mail building, stormwater control measures, and associated infrastructure, including parking areas and curbs. Watershed Protection Overlay This site is not located within a watershed protection area. Floodplains The entire site is located within Zone 'X' per the FEMA Panel 3710942400J located in Appendix A. Because the post-developed conditions will not result in a net increase in runoff from the site, no adverse downstream impacts are expected to occur. DESIGN REQUIRMENTS Stormwater design was based on the standards presented in the North Carolina Department of Environmental Quality (NCDEQ) Stormwater Design Manual. Post-development rates for the site were designed to not exceed pre-development discharge rates for the 1-year, 2-year, 10-year, and 100-year twenty-four (24)-hour duration storm events. Stormwater quantity control will be provided by the use of a new wet pond and a grass channel as part of the development. Water Quality and Water Quantity Since the project site is located in the Lumber River Basin, the following criteria below was considered for the design of SCMs in regard to water quality and quantity: 1. 100% of all impervious and built-upon-area (BUA) will be treated by a stormwater control measure. 2. High density developments must manage and attenuate the first inch of runoff for water quality in an approved Stormwater Control Measure(s) (SCM). The peak flow rate of the first inch water quality volume from the SCM must also be shown to be less than the predeveloped peak rate for the 1 year-24-hour storm event. Percival Square Apartments—Raeford, NC 4 1 P a g e Bowman [Von7H .AR0 LIMA 3. The increase in the 1-inch design volume shall be released over a 2-to-5-day period. METHODOLOGY Hydrology and storm water modeling calculations were performed using the latest version of Hydraflow modeling software. Simulations were set up based on information provided within the North Carolina Department of Environmental Quality Stormwater Design Manual. The Soil Conservation Service (NRCS TR-55) hydrologic method was utilized for the estimation of stormwater runoff peak rates and the generation of hydrographs for the routing of stormwater flows. Input and results can be found summarized in tables throughout this report and in the appendices. SYSTEM SUMMARY The post developed design of the site has been laid out in such a way to provide a drainage area that will require stormwater management.The stormwater system is comprised of a singular SCM. The primary SCM is a stormwater wet pond that is fully sized for the design storm that utilizes a storm drain pipe network to collect runoff from impervious surfaces on the site. The SCM will also utilize an additional grass channel that will collect any runoff that is coming from off the site. CONCLUSION Stormwater design was based on the standards presented in the North Carolina Department of Environmental Quality (NCDEQ) Stormwater Design Manual. Post-development discharge rates for the site were designed to not exceed pre-development discharge rates for the 1-year,2-year, 10-year.and 100-year,twenty-four(24)-hour duration storm events. Stormwater quantity control will be provided by the implementation of a new wet pond and a grass channel as part of the development. Peak Runoff Analysis • Pre-Development Conditions The existing site is currently undeveloped wooded and open space area. There is one drainage area analyzed in this report with its own study point, composite runoff curve number and single point of analysis. SCM Pre-Developed Area covers the entire 4.93 acre (±214,615 SF) parcel including the 20' easement for the existing sanitary sewer pipe. This area slopes generally from West to East, with average slopes in the range of 2-6% and consists of pervious area. Percival Square Apartments—Raeford, NC 5 1 P a g e Bowman 140RTH .A Rn L INA. The characteristics for the pre-development basin are shown below and the drainage maps can be found in Appendix A. Additional calculations for the basin can also be found in Appendix B. Table 5:Pre-Development Summaries Area Composite Time of Basin ID Curve Concentration [acres] Number (CN) (Tc) [min.] Pre-Developed Area 4.93 53.7 15.63 • Post-Development Conditions The post-development condition contains a single drainage area directed to the stormwater wet pond and one bypass drainage area from the pre-development condition. SCM Post-Developed Area consists of 3.41 acres (+148,655 SF) of the proposed apartment buildings, clubhouse, outdoor eating area, mail room, playground, tot lot, and other infrastructure required. The wet pond collects runoff with catch basins, yard inlets, and drainage pipes that connect to the stormwater wet pond. The characteristics for the post-development drainage areas are shown below and calculations can be found in Appendix B. A drainage map identifying the basin can be found in Appendix A. Table 6:Post Development Area Summaries Area Composite Time of Basin ID Curve Concentration [acres] Number (CN) (Tc) [min.] SCM Post-Developed Area 3.41 77.6 5 Table 7:Post Development By-Pass Area Summaries Area Composite Time of Basin ID [acres] Curve Concentration Number (CN) (Tc) [min.] SCM Post-Developed Bypass Area 1.52 50.6 10 • Comparison of Peak Discharges The pre- and post- development peak discharges are shown below. Full calculations and hydrographs can be found on Appendix B. Percival Square Apartments—Raeford, NC 6 1 N a Bowman [VonTH .AR0 LIMA Table 8: Total Site Downstream Impact Wet Pond SCM Pre-Dev. Total Site Peak Flow Post-Dev. Total Site Peak Flow Storm Event (cfs) (cfs) 1-yr 24-hr 0.251 0.079 2- r 24-hr 1.146 0.275 10- r 24-hr 5.946 3.015 100- r 24-hr 1 16.99 1 14.77 Site Stabilization During construction phase, the permanent stormwater wetlands will be utilized as temporary sediment basins. Skimmers will be used in the temporary sediment basins to dewater the basin from the surface. After final grading is completed, permanent vegetation shall be applied in accordance with the seeding requirements from the NCDEQ and the landscape plan for this site. Percival Square Apartments—Raeford, NC 7 1 P a g e Bowman NORTH CAROLINA APPENDIX A Figures Hydrological Soil Report Topography Map FEMA Flood Map No. 3710942400J Surface Water Classification Maps Hydrologic Unit Code (HUC) NOAA Point Precipitation Depth Estimates NOAA Point Precipitation Intensity Estimates Pre-Development Drainage Basin Map Post-Development Drainage Basin Map Wetlands Inventory Map Percival Square Apartments—Raeford, NC 8 1 P a g e Hydrologic Soil Group—Hoke County, North Carolina a (Raeford, NC) a 660370 660400 660430 660460 660490 660520 66D550 6605E0 34°58'31"N Q, 34°58'31"N m� M M - M ` - tr � o P m� ( . M 401 •y' R / , M it a li i !�• a 34°58'21"N $jam• ' 34°58'21"N 660370 660400 660430 660460 660490 660520 660550 660580 3 3 �o �o v Map Scale:1:1,500 if printed on A portrait(8.5"x 11")sheet. v Meters N 0 20 40 80 120 Feet 0 50 100 200 300 Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:LF M Zone 17N WGS84 USDA Natural Resources Web Soil Survey 9/6/2023 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Hoke County, North Carolina (Raeford,NC) MAP LEGEND MAP INFORMATION Area of Interest(AOI) p C The soil surveys that comprise your AOI were mapped at Area of Interest(A01) 0 C/D 1:24,000. Soils D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed 0 B scale. Transportation 0 B/D Rails Please rely on the bar scale on each map sheet for map 0 C measurements. ti Interstate Highways 0 C/D US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts q distance and area.A projection that preserves area,such as the Aerial Photography Albers equal-area conic projection,should be used if more • A/D accurate calculations of distance or area are required. ^r B This product is generated from the USDA-NRCS certified data as .v B/D of the version date(s)listed below. . r C Soil Survey Area: Hoke County, North Carolina Survey Area Data: Version 20,Sep 8,2022 r r C/D Soil map units are labeled(as space allows)for map scales r D 1:50,000 or larger. w Not rated or not available Date(s)aerial images were photographed: Apr 17,2022—May Soil Rating Points 20,2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background 0 A/D imagery displayed on these maps.As a result,some minor B shifting of map unit boundaries may be evident. B/D USDA Natural Resources Web Soil Survey 9/6/2023 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Hoke County,North Carolina Raeford, NC Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI FaB Faceville loamy sand,2 B 6.8 100.0% to 6 percent slopes Totals for Area of Interest 6.8 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified USDA Natural Resources Web Soil Survey 9/6/2023 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Hoke County,North Carolina Raeford, NC Tie-break Rule: Higher uSDA Natural Resources Web Soil Survey 9/6/2023 Conservation Service National Cooperative Soil Survey Page 4 of 4 ' 211 - / 275 - W 6TH AVE r w PROS Z Zj W-5TH AVE - E M pFC D R ABERDEEN 1 l W-DONALDSON AVER 70` Q + to \177 �y EDINBOROUGH AVE Raeford W EL OD AVE ' W CENTRAL AVE G 1250 FA 441 QD E MCLFAH.RD - - - - E PAL ER RD f -4 \ W, illiamson National Flood Hazard Layer FIRMette FEMA _Legend 79°14'51"W 34°58'41"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT WN • , __-- •A -9 ' ' Without Base Flood Elevation(BFE) �� 1�I ,, • - Zone A,V. 1 k, . SPECIAL FLOOD With BFE or Depth zone AE,AD,aH,ve,AR •', w HAZARD AREAS Regulatory Floodway •• 0.2%Annual Chance Flood Hazard,Areas _-� ' _ • of 1%annual chance flood with average depth less than one foot or with drainage areas of less than one square mile zone x /• Future Conditions 1%Annual Chance Flood Hazard zone x Area with Reduced Flood Risk due to CITY OFIRAEFORD E TRATERRITORIAL JURISDICTIO',1 OTHER AREAS OF " Levee.See Notes.zone FLOOD HAZARD Area with Flood Risk due to Leveezone D • ! NO SCREEN Area of Minimal Flood Hazard zonex ' ��, • Q Effective LOMRs OTHER AREAS Area of Undetermined Flood Hazard zone r -I V* , GENERAL ----' Channel,Culvert,or Storm Sewer 'WAR EA OF MINIMAL FLOOD HAZARD STRUCTURES IIIIIII Levee,Dike,or Floodwall i one X f.• . F e zos Cross Sections with 1%Annual Chance 17•5 Water Surface Elevation ` •� � / e- - - Coastal Transect —sI3^^^^- Base Flood Elevation Line(BFE) sip � � Limit of Study f Jurisdiction Boundary •�_y �� —--- Coastal Transect Baseline OTHER _ Profile Baseline f FEATURES Hydrographic Feature �v ot �. \ Ml i OF RAEFORD � � ,I Digital Data Available N 1:1L ' • / ••• J` � � � No Digital Data Available • ! 3701'3� / '•✓• �•. , 1 MAP PANELS Unmapped pped • • % The pin displayed on the map is an approximate •y • point selected by the user and does not represent `% ,. • an authoritative property location. • • \ This map complies with FEMA's standards for the use of _ digital flood maps if it is not void as described below. C A, The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA.This map g�. 2 Zone AE was exported on 9/6/2023 at 4:26 PM and does not reflect changes or amendments subsequent to this date and time.The NFHL and effective information may change or become superseded by new data over time. J �' • p��� This map image is void if the one or more of the following map //•• �" __ �� elements do not appear:basemap imagery,flood zone labels, legend,scale bar,map creation date,community identifiers, 16 FIRM panel number,and FIRM effective date.Map images for Feet 1: 79014'13"W 34058'12"N unmapped and unmodernized areas cannot be used for 0 250 500 1,000 1,500 2,000 6'0�� regulatory purposes. Basemap Imagery Source:USGS National Map 2023 v � 1 (� Z /r Nrnp ke Rd W Prospect Ave E Prospect Ave E Donaldson Ave peddlers /1 C y c ��� �nboro� h Ave Rae ford r e Q E Raeford ametary :0 O __ entral Ave �}1 d L i � x!r Rd 211 C� a X O� s Surface Water Classifications: a -O Stream Index. 14 10 1-2 G G Stream Name: Toneys Creek 4 Description: From source to Raft Swamp \ N "t Classification: C:Sw '' Date of Class-: November 30, 1963 What does this Class.mean? ',VV River Basin: Lumber Cott C4fr* Rd x 11 1 •� 05 (1 of 2) �. w ; ► 12-Digit HUC(Subwatershed) } 12 Digit Name Upper Raft 5wamp A q� . > 12-Digit Code: 030402030501 10-DigitName Raft Swamp 10-Dio t Code: 0304020305 • ; - 1 1- 8-Digit Code: 03040203 River Basin: Lumber 12-Digit Area(ac): 22.624.43 .� Zoom to 9/6/23,4:17 PM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 (& Location name: Raeford,North Carolina, USA* ' Latitude:34.97380, Longitude: -79.2419° Elevation:253 ft *source:ESRI Maps V10**source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration� F 100 1 2 5 10 25 50 100 200 500 1000 5-min 0.39 -0 481 0.469-0568 0.546-0 662) (0.604-0..732)1(0.6771-0 815 0.720-0 875 0.764-0 933 0.805-0 988 0.853--1 06) (0.890-1.11 10-min 0.696 0.822 0.961 1.06 1.18 1.27 1.35 1.43 1.53 ) ( 1.60 ) (0.634-0.768) (0.750-0.908) (0.875-1.06) (0.965-1.17) (1.07-1.30) (1.15-1.39) (1.21-1.48) (1.28-1.57) (1.35-1.67 1.40-1.75 15-min 0.870 1.03 1.22 1.34 1.50 1.61 1.71 1.80 1.92 2.00 (0.793-0.960)1(0.943-1.14) (1.11-1.34) 1 (1.22-1.48) 1 (1.36-1.65) 11 (1.45-1.76) 11 (1.53-1.87) 1 (1.61-1.98) (1.70-2.10) (1.76-2.20) 30-min 1 1.19 1.43 1.73 1.95 2.22 2.62 2.81 3. 66 3.24 ( .09-1.32) (1.30-1.58) (1.57-1.91) 1 (1.77-2.14) (2.01-2.44) (2.19-2.66) 1 (2.35-2.87) 1 (2.51-3.08) (2.70-3.35) (2.85-3.56) 60-min 1.49 1.79 2.21 2.54 2.96 3.28 3.61 3.94 4.38 4.73 (1.36-1.64) (1.63-1.98) 1 (2.02-2.44) 1 (2.30-2.79) 1 (2.67-3.25) 1 (2.96-3.60) 11 (3.24-3.95) 1 (3.52-4.32) (3.88-4.80) (4.16-5.19) 2-hr 1.73 2.10 2.64 3.06 3.62 4.06 4.52 4.98 5.61 6.11 (1.57-1.94) (1.90-2.35) 1 (2.39-2.95) 1 (2.76-3.41) 1 (3.24-4.03) 1 (3.63-4.52) (4.01-5.02) (4.39-5.53) (4.90-6.23) (5.29-6.79) 3-hr 1.84 2.22 2.81 3.28 3.92 7 4.45 F 5.00 5.58 6.40 7.06 (1.66-2.06) (2.01-2.49) (2.53-3.14) (2.95-3.66) (3.51-4.37) 1 (3.96-4.96) 1 (4.41-5.56) (4.89-6.20) (5.54-7.11) (6.04-7.84) 6-hr 1 28-2.44 2.06595 3.03 3572 3.53 4134 4.215020) (4.765590) (5.3 6365) (5.91 7543 6.72 8855 7.5 9146 12-hr 2.58 3.12 3.96 4.66 5.63 6.45 [-7.32 8.24 9.59 10.7 (2.33-2.87) (2.82-3.48) (3.58-4.41) (4.19-5.18) (5.03-6.24) (5.71-7.13) (6.41-8.07) (7.16-9.09) (8.19-10.6) (9.02-11.8) 24-hr 3.04 3.68 4.66 5.44 6.52 7 7.39 8.28 9.21 10.5 11.5 (2.82-3.29) (3.42-3.98) 1 (4.32-5.04) (5.03-5.88) (6.00-7.04) (6.78-7.97 1 (7.58-8.93) (8.40-9.93) (9.52-11.3) (10.4-12.4) 2-day 3.53 4.26 5.36 6.22 F 8.38 F 9.37 F 10.4 11.8 12.9 (3.29-3.80) 1 (3.97-4.58) 1 (4.98-5.76) (5.78-6.69) (6.86-7.98) 1 (7.72-9.01) 1 (8.61-10.1) 1 (9.51-11.2) (10.7-12.7) (11.7-13.9) 3-day 3.75 4.52F 5.64 F 6.54 7.78 8.76 F 9.78 F 10.8 12.3 1 F 13.4 (3.50-4.02) (4.22-4.84) 1 (5.26-6.05) 1 (6.09-7.00) (7.21-8.32) 1 (8.10-9.37 1 (9.01-10.5) 1 (9.94-11.6) (11.2-13.2) (12.2-14.4) 4-day 3.97 4.77F 5.93 6.86 8.12 F 9.14 F 10.2 11.3 12.7 13.9(3.72-4.24) (4.47-5.10) (5.54-6.33) (6.40-7.31) (7.56-8.66) (8.47-9.74) 1 (9.41-10.9) 1 (10.4-12.0) (11.7-13.6) (12.7-14.9) 7-day 4.61 5.51 6.77 7.77 9.14 10.2 11.4 12.5 14.1 15.3 (4.31-4.92) 1 (5.16-5.89) 1 (6.33-7.24) (7.25-8.30) (8.50-9.76) (9.49-10.9) 11 (10.5-12.1) 1 (11.5-13.4) (12.9-15.1) (14.0-16.5) 10-day 4.975861 5.93 6069 7.6 8?09 8.3 9518 9.410 0.7) (1 4 11.8) (11 4�13.0 1214-4.2 13.8-5.9) (14.8-17.1) 20-day 7.11 8.42 10.0 11.3 13.0 14.3 15.6 17.0 18.8 20.2 (6.72-7.54) 1 (7.96-8.93) 1 (9.46-10.6) 1 (10.6-11.9) 1 (12.2-13.7) 1 (13.4-15.1) 1 (14.6-16.6) 1 (15.8-18.0) (17.4-20.0) (18.7-21.5) 30-day 8.83 10.4 12.2 13.6 15.4 16.7 18.1 19.5 21.3 22.7 (8.37-9.34) (9.87-11.0) (11.5-12.9) (12.8-14.3) 11 (14.5-16.2) 11 (15.7-17.7) (17.0-19.2) 11 (18.2-20.6) (19.9-22.6) (21.1-24.1) 45-day 11.2 13.1 15.1 16.6 18.6 20.1 21.5 22.9 24.8 26.2 (10.6-11.8) (12.4-13.8) (14.3-15.9) (15.7-17.5) 1 (17.5-19.6) 1 (18.9-21.2) 1 (20.3-22.7 1 (21.6-24.2) (23.2-26.3) (24.5-27.8) 60-day 13.4 15.7 17.9 19.5 =(22.8) 23.3 24.8 26.4 28.4 29.8 (12.7-14.1) (14.9-16.5) (17.0-18.8) (18.5-20.5) (22.0-24.5) (23.5-26.1) (24.9-27.8) (26.6-29.9) (28.0-31.5) Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_Printpage.html?lat=34.9738&Ion=-79.2419&data=depth&units=english&series=pds 1/4 9/6/23,4:17 PM Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude 34.9738`, Longitude- -79.24191 30 Average recurrence mteroal (years), 25 c — � 20 2 CL — 5 v u — 10 0 15 — 25 Y — 50 a 10 — 100 V — 200 a 5 500 1000 0 — c c c c c N f�1 i0 r4 -0-0 '0 - 7 7 7 7 op N f�1 r o � M $ Duration ry 14 N rrnn -q�O 30 25 c _- Duration 20 v — 5-min — 2-day c — 10-1nn — 3-day 15 16-min — 4-day — 30-min — 7-day •0 10 — — - — — 60-min — 10-day a` — 2-hr — 20-clay 5 — — 3-hr — 30-day — 6-hr — 45-day 0 _ " — 12-hr — 60-day —, 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT)-Wed Sep 6 20:17:11 2023 Back to Top Maps & aerials Small scale terrain https:Hhdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=34.9738&Ion=-79.2419&data=depth&units=english&series=pds 2/4 916/23,4:17 PM Precipitation Frequency Data Server pump". _Ly — Raeford v; ;a a�, + Urn 2mi Large scale terrain Winston-Salem ~ • • Durham Rocky Mount Greensboro • h* Raleigh NORTH CAROLINA •Gree •Charlotte Fayet+,ille• �( I Jacksi • T H C A R O L I N A wilmn9wil s/o + • aV 100km 60mi `` Large scale map Winston-6blem Greensboro o Donc,,m Rocky h1writ Raleigh North Green © Carolina ^___�harl,Otte I Fayetteville i Ic acks< Wilma 0 _ 100km 60mi Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=34.9738&Ion=-79.2419&data=depth&units=english&series=pds 3/4 9/6/23,4:17 PM Precipitation Frequency Data Server Rocky Greensboro Durham Rateigh North Charlotte Fayetteville 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=34.9738&Ion=-79.2419&data=depth&units=english&series=pds 4/4 9/6/23,4:17 PM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 (& Location name: Raeford,North Carolina, USA* ' Latitude:34.97380, Longitude: -79.2419° Elevation:253 ft *source:ESRI Maps V10**source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 2�������� � 1 5 10 25 50 100 200 500 1000 5-min 4.76 5377 5.6316.82 6.5�094) (7.25 8878) (8.05 9078) 8.64--10.5 9.170--121.2 9.66-1.9 10.2-2.7 10. -3.3 10-min 4.18 4.93 5.77 6.38 7.09 7.63 8.12 8.57 9.16 9.57(3.80-4.61) (4.50-5.45) (5.25-6.36) (5.79-7.02) (6.41-7.79) (6.88-8.36) (7.28-8.90) (7.66-9.40) (8.10-10.0) (8.41-10.5) 15-min 3.48 4.13 4.86 5.38 6.00 6.44 6.84 7.22 7.68 8.01 (3.17-3.84) (3.77-4.56) (4.43-5.36) (4.88-5.92) (5.42-6.58) (5.81-7.06) (6.14-7.50) (6.44-7.90) (6.80-8.42) (7.04-8.78) 30-min 2.39 2.85 3.45 3.90 4.44 4.85 5.24 5.62 6.11 6.48 (2.17-2.63) 1 (2.60-3.15) (3.14-3.81) 1 (3.54-4.29) 1 (4.01-4.88) (4.37-5.32) (4.70-5.74) 1 (5.02-6.15) (5.41-6.70) (5.70-7.11) 60-min 1.49 1.79 2.21 2.54 2.96 3.28 3.61 3.94 4.38 4.73 (1.36-1.64) 1 (1.63-1.98) 1 (2.02-2.44) (2.30-2.79) 1 (2.67-3.25) 1 (2.96-3.60) (3.24-3.95) (3.52-4.32) 1 (3.88-4.80) 1 (4.16-5.19) 2-hr 0.867 1.05 1.32 1.53 1.81 2.03 2.26 2.49 2.80 3.05 (0.784-0.969) (0.950-1.17) 1 (1.19-1.47) (1.38-1.70) 1 (1.62-2.01) 1 (1.81-2.26) 1 (2.00-2.51) (2.19-2.76) 1 (2.45-3.11) (2.64-3.39) 3-hr 0.611 0.740 0.935 1.09 1.31 1- 1.66 1.86 2.13 2.35 (0.552-0.685) (0.669-0.829) (0.843-1.05) (0.982-1.22) 1 (1.17-1.46) 1 (1.32-1.65) 1 (1.47-1.85) 1 (1.63-2.06) 1 (1.84-2.37) 1 (2.01-2.61) 6-hr 0.331---0 406 0.401---0 491) (0.506-0 620) (0.589-0.723 0.703-0 867 0.794-0 985 0.889-1.11 0.986 3.24 1.2-31 43) (1.2341458 12-hr 0.213 0.258 0.329 0.386 0.467 0.535 0.607 0.684 0.795 0.887 (0.193-0.238) (0.234-0.288) (0.296-0.366) (0.347-0.429) (0.417-0.517) (0.473-0.591) (0.532-0.669) (0.593-0.754) (0.679-0.876) (0.748-0.975) 24-hr 0.126 0.153 0.194 0.226 7F 0.271 T 0.307 0.345 0.383 0.436 F 0.478 (0.117-0.136) (0.142-0.165) (0.180-0.210) (0.209-0.244) (0.250-0.293) (0.282-0.331) (0.315-0.372) (0.349-0.413) (0.396-0.471) (0.432-0.516) 2-day 0.073 0.088 0.111 0.129 0.154 0.174 0.195 0.216 0.2 55 0.268 (0.068-0.079) (0.082-0.095) (0.103-0.120) (0.120-0.139) (0.142-0.166) (0.160-0.187) (0.179-0.209) (0.198-0.232) (0.223-0.264) (0.243-0.289) 3-day 0.052 0.062 0.078 0.090 0.107 0.121 0.135 0.150 0.170 0.186 (0.048-0.055) (0.058-0.067) (0.073-0.083) (0.084-0.097) (0.100-0.115) (0.112-0.130) (0.125-0.145) (0.138-0.161) (0.155-0.182) (0.169-0.200) 4-day 0.041 0.049 0.061 0.071 0.084 0.095 0.106 0.117 F 0.132 0.144 (0.038-0.044) (0.046-0.053) (0.057-0.065) (0.066-0.076) (0.078-0.090) (0.088-0.101) (0.098-0.113) (0.108-0.125) (0.121-0.141) (0.132-0.155) 7-day 0.027 0.032 0.040 0.046 0.054 0.060 0.067 0.074 0.083 0.091 (0.025-0.029) (0.030-0.035) (0.037-0.043) (0.043-0.049) (0.050-0.058) (0.056-0.065) (0.062-0.072) (0.068-0.079) (0.076-0.089) (0.083-0.097) 10-day 0.020-0 023 0.024-0 027 0.029-0.033) (0.03 -0 038)1(0.039-0.044 0.04 -0 049 0.047--0 054 0.51--0 059 0.057--0 066) (0.61--0 071 20-day 0.014 0.017 0.020 0.023 0.027 0.029 0.032 0.035 0.039 0.042 (0.014-0.015) (0.016-0.018) (0.019-0.022) (0.022-0.024) (0.025-0.028) (0.027-0.031) (0.030-0.034) (0.032-0.037) (0.036-0.041) (0.038-0.044) 30-day 0.012 0.014 0.016 0.018 0.021 0.023 0.025 0.027 0.029 0.031 (0.011-0.012) (0.013-0.015) (0.016-0.017) (0.017-0.019) (0.020-0.022) (0.021-0.024) (0.023-0.026) (0.025-0.028) (0.027-0.031) (0.029-0.033) 45-day 0.010 0.012 0.013 0.015 0.017 0.018 0.019 0.021 0.022 0.024 (0.009-0.010) (0.011-0.012) (0.013-0.014) (0.014-0.016) (0.016-0.018) (0.017-0.019) (0.018-0.021) (0.019-0.022) (0.021-0.024) (0.022-0.025) 60-day 0.009 0.010 0.012 0.013 0.015 0.016 0.017 0.018 0.019 70.020 (0.008-0.009) (0.010-0.011) (0.011-0.013) (0.012-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) (0.019-0.021) Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_Printpage.html?lat=34.9738&Ion=-79.2419&data=intensity&units=english&series=pds 1/4 9/6/23,4:17 PM Precipitation Frequency Data Server PDS-based intensity-duration-frequency ODF) curves Latitude: 34.97380, Longitude: -79.24190 10` Average recurrence mteroal (years), L c — 1 2 10 — 5 n - y 10 c \ � — 25 c o — 50 `0 10-_ --� — 100 a — 200 V 500 D_ — 1000 10-2 N f�1 i0 ry -0-0 -0 "C7 -0 -0 -0-0 op N A4 r o � M $ Duration ry O4 N rrn -q�O 101 _ i L C _ Duration 10° - - - -- c — 5-min — 2-day c — 10-nin — 3-day 16-min — 4-day 0 — 30-min — 7-day 60-min — 10-day EL — 2fir — 20-clay CL — 3-hr — 30-day 6-hr — 45-day 10-2 —t — — rt— — 12-hr — 60-day 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GNIT► Wed Sep 6 20:17:37 2023 Back to Top Maps & aerials Small scale terrain https:Hhdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=34.9738&Ion=-79.2419&data=intensity&units=english&series=pds 2/4 916/23,4:17 PM Precipitation Frequency Data Server pump". _Ly — Raeford v; ;a a�, + Urn 2mi Large scale terrain Winston-Salem ~ • • Durham Rocky Mount Greensboro • h* Raleigh NORTH CAROLINA •Gree •Charlotte Fayet+,ille• �( I Jacksi • T H C A R O L I N A wilmn9wil s/o + • aV 100km 60mi `` Large scale map Winston-6blem Greensboro o Donc,,m Rocky h1writ Raleigh North Green © Carolina ^___�harl,Otte I Fayetteville i Ic acks< Wilma 0 _ 100km 60mi Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=34.9738&Ion=-79.2419&data=intensity&units=english&series=pds 3/4 9/6/23,4:17 PM Precipitation Frequency Data Server Rocky Greensboro Durham Rateigh North Charlotte Fayetteville 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=34.9738&Ion=-79.2419&data=intensity&units=english&series=pds 4/4 40 �° O �k � eq �6 �• �aa'� ' w W w w o•P vyk aw'Y a0vo`Y` o ¢ 0 o ao w LUa¢ ¢ PRE-DEVELOPED DRAINAGE AREA z 4.93 AC® w m o sa S g�.J a U¢ o • H / • �YS•pYYG%"�,g �0.i CiA, is\\ /x L •t''� P644 a � � t���� II\4�\ y(/ imnom• OIAW OIm iGRAPHIC 3CAU m M t°cQc•% n°` n I I I I NCO /I 'R 31 II mli PARCEL/694241201104 LOT 26, I I I g i I FRANKB BAARLETf,JR4 I /1I 14W DB 1J204.PG 982 E - I I IE 250.63 E - / I'I / 20 CENTER DRIVE I I 252 I E 25239 IE ZONED:/ 1 IR 15•RGP RIM:25338 CENTER DRIVE / 18•RCP \ \ / / / �.. \ \N 8•PVC IE 247.23 / nv --�> > > Is•R(P��\\ / \�_ �// \ WCa\DIP IE 247.18 / N575M115'-E'ML--_E�9�- RIM:H1.38 ICCO PARCEL/89424110101h = n - IN B•PVC IE: LOT 18, PARCEL/69424110164'4'''// m a OUT WPVC IE 250.28 I > $ / / \^ LOTS 19,2Q 21,22,2 /M yvD 2 / c n c a SLIDE,81,MB 4,PC 24 / I I { ._ LI�ITDDA K.HERBIN \ SS 'IflMff4,PE G zz /§ ) o Eo 0834¢,PG 4IN 11B9EPHY.PoDDLE III 2020 EAOw TRUST//// Cj g U Tj /126 W PAEIRF`STREET/ I I I I TRINA T.RIDDLE 2020 ESC1)0W TOO 8•PVC��,'II o87 N ZONED: > / -___ _D!6%-HARK TRUSTEE ^ I - / I I 11�� I \I i DB 1352.PG 740 / // c fO N IE:259.51 y I \ / I II zi ZONED:--/ f��R/ // 3 $ Q a 3 15•RCP l l I l 1 1 \ t I // / 7o av L)E IE 259.59 N 5730 5•E 10 PARCEL R 694241201104 Q Z r DONNA MAXWEFEWNGFR AND JANE EUZABETH MA%NELL,CO-TRUSTEE aF THE / LL MAXN W W IE 259.10 I i �, ', MARY kCORMICK MAXWO-L IRREVOCABLE 1 -.' / / y / TRUST Q I! I- 1 DB 1298.PG 685 Z 15•RCP 20NED: ¢ /I w O Er 11 I .•( \\ \ / / y \\\ / y SMH#1414 Z a Q Q J \CLUBHWSE j \ / / / RIM: DIP IE Q d m N B•DP IE: 24 .1 i 2 Wr e'DIP le z46.16 I II mT ILL- / � �D co %/ Z.41 A / 15•RCP IE:25876 - / ` f((A) O /��/� O .. \ CM BUILDING A // 12•RCP w r� a 1 > V l 15•RCP O Lr \ ) / Lu 11 / Ir BUILDINCIIB II \\ \\ \\ \\ 1 E 244.90 RIIM"RIM:247.86 � O > m ~ 25894 \ 15•RCP A)INIY RCP IE:-W Z O 8•PVC I 1 / 1 I I \ ! \ 1 ,/ B)IN 15•RCP IE:244.1, / U ■ I , C IN 1S RCP IE 244.11 0 /4 OUT 15•RCP E 24404 RIM:259.13 IN 8•PVC IE:24888 OUT 8•PVC IE:24B.63 I I I I I I SMH RIM:259.88 IN B•PVC IE:24818 I ( / OUT 8•P1C IE 248.13 / \ ^ , �, I / � ; PRELIMINARY L \/ IRF( / ST59'18•W 1A50' I \ \ \ 5802'12nE DO NOT / v / USE FOR (B) zrovc COMM. ---------- '-- L-_ - suITARk_-- - \ - �l CONSTRUCTION MARKER SEV�1'1PIffR---- 1 \ RIM:.. NATURAL ------ \ � \ ` SNH� \ \\ U�$.HGq WA 401 A)IN 8•PVC IE:247.9¢ GAS.MARKER \ ) \ IN 12•PVC IE 245.12 I N 8\DP IE:2-21/ ) 6)N 8•PVC IE 2473, Pe<'v0m OUT 12 PUCE 247.6q PLAN STATUS �------- Q �- � 45 MPH 10 /23 TRC 11 /23 NmEO FR09IN1 a: FIORN 0-0 V P462 -1. SMH 11483 - RIM:256.15 RIM:249.59 A)It PVC N E 245.75 A)W DIP IN IE 244.74 B)6•PVC IN IE 250.05 B)8•PVC IN IE:244.69 OUT 1z•PVC E 245.60 OUT B•DP IE:244.57 DATE DESCRIPTION )m xxx DESIGN DRAWN ICHKD SCALE :1-=40 GRAPHIC SCALE No. 22D192-01-001 DATE OCTOBER 20.2023 (IIT P661') 6 1-h-40 8L SHEET iI c I I P 1 P9 PARCEL 0 694241201104 LOT 26, 4,PIG I i qW FR DB 2 04.BBAPCRLETT,98 JR4 E 2%83 120 CENTER DRIVE - IE 250.63 ,:r/ I� I r ZONED: I IE:252.48 IE M39 IE \ \ RIM:253.38 �r ENTER DRIVE / 18•gCp \ \ / 15•RCP// j 4. \ 8•PVC IE 247.23 15'RCP��\\ / \ J/ \ dIH.QIP IE 247.18 r I �� 144.97- \ � IF RIM:H.1.26 9 I W PARCEL I r9424-0101/\ / / I ( // ., / \ \\ IN 8'PVC IE 25&36 I LOT 18, \ / ( I I I / // \I PARCEL 2 694 412444 OUT WPVC IE 250.28 I l / / \ LOTS 19,20,21,22,2 /24 D 2 /A o p a a suDE,ypel,ME a,Pc za ( 3 _ • 9mm ---oB2/6 1.PGR487 / / I I I I I \�es�RY. 'oY oza0wus/ ) S /126 W ZONED STREET/ I I I I ® 1RINA T.RIDDIE 2020 ow Tr(usT/ // t a m 8•PVC�_,I o zaxm: E r I I I I I DB 1352,PG 740 IE:259.51 N ZONED:� / // E � ¢ a o f 15'RCP 'I y \ I I I I 1 I \ \ I / / / �Epl/T IRF(i5) m m l I I I l OFF ME IE 259.59 III \ •:.�.;. •. :Y�:;/ . , _ \ Lu a= `d°' PARCEL 1694241201104 POST DEV/t LOPED BYPASS DONNA MAXWEIL FEUINGER AND J„ DRAINAG'L AREA 1.52 AC Q � ~ i' \_- TH MAXWELL,CO-TRUSTEE OF THE W W LU MARY McCORMICK MAXN 71 IRREVOCABLE /F� Lu IE 259.10 II I I J:.._/:•v '.%• '• / / i TRUST v F i r": I ...r• r j i DB 1298.PG 685 Z rn Z \ / I \ J \\ SI/1 248. I I1 �\ \ '''•�. / �l / ! A N B•OF IE:248.20 (n mT II I '1 I' \ / o o \\ 1i/ Wi 8•DIP IE 246.16 () > _ IE:259.21 �I \ � 5 0 �1r T ? ^' /r 0 _r//m IE 2M.HRCP m IE:25&76 I / ' I\ \\ \ \ ±" I / / / �\ (B) /r LLI 12•RCP O LLI a CIS . / dCC 21k90 DIN YI3966 _ ~ i W > m E 25&94 li ' / i I \ \ \�. \ \ �� I / / 15•RCP A)N IY RCP IE 214.16 Q r\ Z U 8•PVC I I I \ \ I / B)IN 15•RCP IE:244.11CC / \.! \ C)IN 15•REP IE:244.11 ✓ WT 15•RCP E 2"..04 r U) IZ) vn m29 \ \ \\ \ �/ O IN 8•PVC IE: W g FIN:259.13 �r I ' I I I I I \ \ \ \� / w WT 8•PVC IE:24&24&6863 /i r� I 41t SNH r,W RIM:259.88 IN 8•PVC IE:ZRL 8 I !,/ WT 8•PVC IE 24&13 @('.,T. \ -_// PRELIMINARY 1 1 -------------------- --------- -- DO NOT \/ IRF( Ip / s 58T12.12•W 16L88' IRF(#5) -, \ \ \ \ RE USE FOR I MARKER ____________ _ -� CONSTRUCTION \_ �RiN:29.09 I NAlURA1 __--_-- \ 229 \ \ 5NH \ \\ U.S.HIGHWAY 401 A)IN 8•PVC IE:247.9`1 GAS.MARKER \ ) \ IN 12 PVC E.245.II2 I N 8\DP IE:245.21/ \ im aY 6)INe•PVC IE:247.71 aen.Pc za WT 12•PVC E 247.61 PLAN STATUS 45 MPH-/ 10/20123 TRC ---b,-------------------------------- -------------------SIGN-------- ^- -- --------- 11/6/23 NCDEO EROSION R FIORN v fIM2 H 11483 a3 RIM:256.15 A)12•PVC N E 245.75 A) 2DIP I 6)6•PVC IN IE 250.05 A)8•PP IN IE:24.69 OUT 12•PVC E 245.60 B)8•PVC IN IE:214.69 DATE DESCRIPTION WT 8•DP IE:244.SJ DESIGN DRAWN CHKD SCALE :I-=40 GRAPHIC SCALE No. 22DI92-M-M DATE OCTOBER 20.2023 I loch-40 BL SHEET aan'�:�. nw�ax�n�a�r� c•e 1 Wildlife National Wetlands Invento Percival Square {. • s 1 u ,e I've T 4t "tx i Ar wi Na04 '. �• 1:3,668 0 0.03 0.06 0.12 mi S.Fish and Wildlife Servi rds a 0 0.05 0.1 0.2 km A •�• eUands_team fws. ov ' t October 9, 2�23 This map is for general reference only.The US Fish and Wildlife Service is not responsible for the accuracy or currentness of the � Wetlands base data shown on this map.All wetlands related data should Freshwater Emergent Wetland = Lake be used in accordance with the layer metadata found on the I 9 Wetlands Mapper web site. Estuarine and Marine Deepwater Freshwater Forested/Shrub Wetland Other Estuarine and Marine Wetland Freshwater Pond Riverine National Wetlands Inventory(NWI) This page was produced by the NWI mapper Bowman [Von7H .AR0 LIMA APPENDIX B Stormwater Wetlands Calculations CN Values Time of Concentration Calculations Wet Pond Design, Hydrographs, and Details Grass Channels Percival Square Apartments—Raeford, NC 9 1 P a g e Bowman North Carolina, Ltd. Curve Number Calculation (CN) Pre-Developed Conditions(Overall Site) Drainage Area(acres): 4.93 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA B FaB Faceville loamy sand 4.93 100% Existing Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space- Fair B 0.56 59 6.7 Wooded -Good B 4.37 53 47.0 Cumulative Curve#= 53.7 Bowman North Carolina, Ltd. Curve Number Calculation (CN) Post-Developed Conditions(Wet Pond) Drainage Area(acres) 3.41 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA B FaB Faceville loamy sand 3.41 100% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Impervious B 1.96 98 56.3 Open Space-Good B 1.45 50 21.3 Cumulative Curve#= 77.6 Bowman North Carolina, Ltd. Curve Number Calculation (CN) Post-Developed Bypass Conditions(Wet Pond) Drainage Area(acres): 1.52 Existing Soil Groups: Soil Group Map Symbol Soil Description Acres Percent of DA B FaB Faceville loamy sand 1.52 100% Proposed Land Uses: Land Use Description Existing Soil Group Acres Curve# Weighted CN Open Space-Good B 1.24 50 40.8 Wooded -Good B 0.28 53 9.8 Cumulative Curve#= 50.6 IMPERVIOUS SUMMARY TABLE ON-SITE AREA = 214,615 SF (4.93 AC) BUILDINGS 29,736 SF 0.68 ACRE(S) 13.86 % OF AREA PAVEMENT 46,392 SF 1.07 ACRE(S) 21.62 % OF AREA SIDEWALK 9,380 SF 0.21 ACRE(S) 4.37 % OF AREA TOTAL IMPERVIOUS AREA 85,508 SF 1.96 ACRE(S) 39.85 % OF AREA GREEN/OPEN SPACE 129,107 SF 2.97 ACRE(S) 60.15 % OF AREA EXISTING IMPERVIOUS AREA 0 SF 0 ACRE(S) 0 % OF AREA INCREASE IN IMPERVIOUS AREA 85,508 SF 1.96 ACRE(S) TIME OF CONCENTRATION Existinq Conditions SCS Methodoloqv OPEN CHANNEL SHALLOW CONC FLOW: FLOW: TOTAL SHEET FLOW: SEGMENTI SEGMENT1 Manninq's Equation: Tc=(0.007(nL)^0.8)/(P2-0.5)(s"0.4) 2-year/24-hr Tc=L/60'V V=1.49Rv3S1n/n Basin Comments Length Elevt Elev2 Slope Rainfall Depth Manning's T�1 Length Elev2 Elev3 Slope Condition Vavg Ti Cross Sectional Wetted Perimeter Hydraulic Radius Length Elev3 Elev4 Slope Manning's V T.3 Tro nL Tc(minimum) Tlag Basin (ft) (ft/ft) TP-40(in) "n" (min) (ft) (ft/ft) TR-55 Fla.3-1 Wesel (min) Flow Area(tt^2) (ft) (tt) (tt) (ft/ft) "n" (fps) (min) (min) (10 min) 0.6'Tc(hrs) 1 Stream 100 60.9 59.0 0.020 3.68 0.24 13.39 391 59.0 46 0.03315 Unpaved 2.90 2.25 15.63 15.63 0.16 1 10/10rz0239:16PM G1HYDRO1proiec5\Tl.e.,P—ival.AS Proposed Wet Pond Project Information Project Name: Percival Square Project#: Designed by: RG Date: 9/27/2023 Revised by: RG Date: 3/4/2024 Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Wet Pond Drainage Area (DA) = 3.41 Acres 148,655 sf Impervious Area (IA) = 1.96 Acres 85,508 sf Percent Impervious (1) = % 57.52 % Required Surface Area Permament Pool Depth: 4.2 ft Non-Coastal County SA/DA= 1.66 Min Req'd Surface Area = 2,466 sf(at Permanent Pool) Required WQv Storage Volume Design Storm = 1 inch Non-Coastal County Determine Rv Value = 0.05 + .009 (1) = 0.568 in/in Storage Volume Required = 7,027 cf(above Permanent Pool) Elevations Top of Pond Elevation = 250.00 ft Temporary Pool Elevation = 248.10 ft Permanent Pool Elevation = 246.00 ft Shelf Begining Elevation = 246.50 ft Forebay Weir= 246.00 ft Shelf Ending Elevation = 245.50 ft Bottom Elevation = 240.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 4,420 sf Volume of Temporary Storage = 15,866 cf Is Permenant Pool Surface Area Sufficient(yes/no)? Yes ( 4420 > 2466 ) sf Volume of Storage for Design Storm = 15,866 Yes ( 15866 > 7027 ) cf Incremental Drawdown Time STORMWATER POND INCREMENTAL DRAWDOWN METHOD-Water Quality Volume Project Information Project Name: Percival Square Project#: Designed by: RG Date: 9/27/2023 Checked by: Date: Water Quality Orifice Incremental Determination of Water Quality Volume Drawdown Time Zone 3 Q3=0.0437 Cp*DZ(Z-D/24-Ei)^(1/2) 1 Zone 2 O QZ=0.372 Co"D*(Z-Ei)A(3i2) Zone 1 Q, =0 1 Orifice Diameter(D)= 1.3 in Cd= 0.6 Ei= 246 Orifice Inv. Zone 1 Range= 0.00 to 246 Zone 2 Range= 246 to 246.1 Zone 3 Range= 246.1 to 248.1 Incremental Drawdown Method Contour Incremental Drawdown Countour Area Volume Stage,Z Zone Q Time sq ft cu ft ft cfs min 246.00 5,850 0 0.00 2.00 0.000 246.50 6850 3,175 0.50 3.00 0.030 1,788 247.00 7470 3,580 0.50 3.00 0.043 1,385 248.00 8950 8,210 1.00 3.00 0.062 2,214 248.10 9070 901 0.10 3.00 0.063 237 Total 15,866 5,624 Drawdown Time=Incremental Volume/Q/60sec/min Summary Total Volume= 15,866 cf Total Time= 5,624 min Total Time= 3.91 days Between 2&5 10/19/2023 Wet Pond-new des ign-Percival.As 1 of 1 Project: Pond #1 Date: 3/4/2024 Main-Pond Contours-Volumes Elevation Main-Pond Incremental Vol. Accumulated Vol. Description 246 4,420 2,023 15,598 A2 (Perm-Pool) 245.5 3,670 1,775 13,575 Al (Bottom_Shelf) 245 3,430 3,200 11,800 244 2,970 2,755 8,600 243 2,540 2,335 5,845 242 2,130 1,940 3,510 241 1,750 1,570 1,570 240 1,390 0 0 A3 (Bottom_Pond) 239 1,070 0 0 (Sediment-Pond) Forebay Contours-Volumes Elevation FB1 FB2 FB3 Total-Areas Incremental Vol. Accumulated Vol. 246 1,280 1,280 548 2,713 245.5 910 910 425 2,165 245 790 790 690 1,740 244 590 590 500 1,050 243 410 410 340 550 242 270 270 210 210 241 150 150 0 0 Forebay Volume 17.4% *Between 15% &20% Average Depth (Option 1) 3.70 *At least 3' average depth Average Depth Calculation (Option 2) Vpp 15,598 permeter of shelf 260 Length of PPE at main pond only width of shelf 3 Al (Bottom-Shelf): 3,670 Average Depth = 4.20 Proposed Wet Pond #1 Project Information Project Name: Percival Square Project#: Designed by: RG Date: 9/27/2023 Revised by: RG Date: 3/4/2024 Checked by: Date: Site Information Sub Area Location: Drainage to Proposed Pond Drainage Area (DA) = 3.41 Acres Impervious Area (IA) = 1.96 Acres Percent Impervious (1) = 57.52 % (Drainage Area) Orifice Sizing Orifice Size = 1.30 in (Diameter) Drawdown Time = 3.91 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day(yes/no) ? yes Anti-Flotation Device 4' x 4' Outlet Structure Area: 16.0 sf Volume: 160.0 cf (Water Displaced -Top of Pond to Bottom of Pond) Weight: 9984 Ibs Factor of Safety 1.20 WT Req'd of Anti-Flotation Device: 11,981 Ibs Volume of Concrete Req'd: 79.9 cf (Unit WT of Concrete = 150 pcf) Riser Base 16.0 sf (4'x4') Riser height 2.0 f Footing Base 36.0 sf (6'x6') Footing Height 1.5 f Volume Provided: 86.0 cf NL57=5045"-F 175 00' — — �.— � •,.•, , '&O�\A— — — — — _ 6' MAINTENANCE SOD AREA ABOVE SHELF •250 249 N NOOL PROPERTY 1— m LINE 25 / 250 2sg 2Sp 2s / TOP OF EMBANKMENT ELEV=250.0 — - - - - - - - - - - \ \ CLASS B RIP-RAP / 249 FOREBAY AT FOREBAY WEIR // 248 AREA \ \ \\ N / / 247 00000 \ \ / - - - - - OooO000 o \ \ o o o X % 244 � o Y x 242 243 xx o I \ / 0 1 241 ° IT AL SH LF AR A \ 239 240 O T PORAR INUND TIO =79 o •X o F, EFER 0 DETA 0 THIS r o HT FOR PLANTIN RIP-RAP APRON _ x o #1 REFER TO I o C6.O FOR — —249— ETAIL SHEET I � N o x , N 4 I O * x 0 I \m CONSTRUCTION I I o :% ° i EQUIREMENTS OUTL T I \ CON OL \ I ` STRU TUR " • x ` \ REF TO I J \ / MAIN POND o x� c_ % x x o O o \ DET ILS 01 RIP-RAP APROV Esp \ THIS SHEE #2 REFER TO ETAIL ON SHE T C6.0 FOR \ i \ CONSTRUCTION REQUIREMENTS LITORAL SHELF AREA \ (SHALLOW REFER TO DETAIL)ON THIS \ \ INLET PIPE IWITH SHEET FOR PLANTINGS \ \ RIP-RAP APRON STORMWATER 15" OUTLET PIPE REF \ \ o ACCESS EASEMENT TO GRADING PLA m SHEET C4. \ � I � I m, GRAPHIC SCALE PLAN VIEW 20 0 10 20 40 80 ( IN FEET ) 1 inch = 20 ft. rSTORMWATER MANAGEMENT DESIGN WET DETENTION POND: RIVER BASIN: LUMBER RECEIVING STREAM: TONEYS CREEK STREAM INDEX: 14-10-1.2 STAGE/STORAGE TABLE HU EAM CLASS: 0304020305 CONTOUR AREA INCREMENTAL TOTAL STORAGE PROJECT COORDINATES: 34.973635'N, -79.242096'W STAGE (FT) ELEVATION (FT) (SF) STORAGE (CF) (CF) POND DESIGN SUMMARY 0.0 246.0 5850 0 0 DRAINAGE AREA TO POND: 3.41 ACRES 0.5 246.5 6850 3175 3175 SITE IMPERVIOUS AREA TO POND: 1.96 ACRES 1.0 247.0 7470 3580 6755 OFF-SITE DESIGN IMPERVIOUS AREA TO POND: 0.00 ACRES 2.0 248.0 8950 8210 14965 TOTAL DESIGN IMPERVIOUS AREA TO POND: 1.96 ACRES 2.1 248.1 9070 901 15866 (WOV) PRE-DEVELOPED POST-DEVELOPED POST DEVELOPED POST DEVELOPED POST DEVELOPED 3.0 249.0 10150 8649 24515 TO POND TO POND THROUGH POND BYPASS COMBINED 4.0 250.0 11410 10780 35295 DRAINAGE AREA: 4.93 AC 3.41 AC 1.52 AC CURVE NUMBER: 53.7 77.6 50.6 TIME OF CONCENTRATION: 15.6 MIN 5 MIN 10 MIN 1.0" STORM EVENT: 0.054 CFS 0.009 CFS 1-YEAR STORM EVENT: 0.251 CFS 6.579 CFS 0.053 CFS 0.026 CFS 0.079 CFS 2-YEAR STORM EVENT: 1.146 CFS 9.287 CFS 0.084 CFS 0.191 CFS 0.275 CFS 10-YEAR STORM EVENT: 5.946 CFS 17.45 CFS 1.411 CFS 1.604 CFS 3.015 CFS 0-YEAR STORM EVENT: 16.99 CFS 31.33 CFS 9.524 CFS 5.241 CFS 14.77 CFS TOP OF STRUCTURE NOT SHOWN FOR CLARITY REMOVABLE TRASH RACK rOP OF RISER STRUCTURE (REMOVABLE TRASH RACK) 4" PVC SCREW CAP �R`?495 EMERGENCY WEIR FOR CLEANING ACCESS ELEV= 249.5 <vp /HR�ED/q INTERMEDIATE WEIR ELEV= 248.1 ?4$ 12" MIN. EXTEND 4" 2.0 FT PVC THROUGH RISER STRUCTURE 20 Fr 4"x4" PVC TEE PERM. POND ELEV.= 246.0 INSTALL 4" PVC SCREW CAP AT END OF TEE 4" OPENING CORED INTO AND DRILL 1.3"DIA. SIDE OF PRECAST HOLE INTO PVC CAP STRUCTURE AT ELEV= 246.0 INV=246.0 OUTLET PIPE 12" MIN. OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR -- INV=246.0 SCALE: N.T.S. I 4"DIA.OPENING SECTION B-B PVC DRAIN OUTLET SCALE: N.T.S. 6' EMBANKMENT WIDTH 6" TOPSOIL FOR ALL AREAS ABOVE THE TRASH RACK NORMAL POND ELEVATION REFER TO DETAIL THIS SHEET 15" HDPE WITH WATER TIGHT SEAL PIPE TO BE BEDDED TOP OF EMBANKMENT ELEVATION=250.0 PER DIRECTION OF GEOTECHNICAL 6" TOPSOIL ABOVE ENGINEER 3 f 6" CLAY LINER REFER TO DETAIL 100 YEAR STORM ELEVATION=249.58 ON LIITORAL SHELF FOR INCREMENTAL 1 6" CLAY SOIL 3 WEIR LINER ON INSIDE FACE OF - 10 YEAR STORM ELEVATION=248.44 EMBANKMENT 1 II 6 _ 4�x4' PRECAST 2 YEAR STORM ELEVATION=248.11 6FT LITTORAL I 1 CONCRETE RISER SHELF = (INSTALL STEPS 1 YEAR STORM ELEVATION=247.51 AS NECESSARY) INV=246.0� 1.0-INCH STORM ELEVATION=246.09 EXISTING GRADE=249.0f �jl ';�7 NORMAL POND ELEVATION=246.0 PVC ELBOW 3' MIN �'• '"• Y SEE DETAIL 1 ELEV=244.0 p;•' 2 NOTE: PUMPS SHALL BE USED TO DRAIN 1 - 1 THE POND WHEN NECESSARY. REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. 4' IN. ASTM C-923 SEAL KEY BETWEEN BARREL&RISER. _ CUTOFF TRENCH RISER BASE TO BE FILLED INED VERT BOTTOM OF POND TOP OF SEDIMENT STORAGE=240.0 WITH CONC. TO INVERT OF �- APPROXIMATE SIZE BARREL CONCRETE SHALL BE EXCAVATE AND BACKRLL 8"XS"X1"X12" LONG ANGLE (6 TOT. REQUIRED) TO ANCHOR RISER TO PLACED IN RISER AFTER BOTTOM OF SEDIMENT STORAGE)=239.0 - BASE. PROVIDE 2-3 4 A307 BOLTS FROM ANGLE TO RISER AND ANGLES ARE SECURED - WITH COMPACTED /" TO BASE AND RISER. ---------- _ STRUCTURAL FILL AS 2-A307 V HOOKS 3/4" DIA. X 12" LONG FROM ANGLE TO BASE. ,I = - - ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT AFTER ---------- DIRECTED BY GEOTECHNICAL CONSTRUCTION. 7 HOOKS TO BE PLACED UNDER LOWER REINFORCING ENGINEER STEEL. 6" CLAY SOIL 6'x6'x1.5' CONC. BASE REINFORCE WITH #4 BARS AT 12" O.C. TOP LINER AND BOTTOM OF EACH DIRECTION PROVIDE 3" MIN. CLEARANCE MAIN POOL 60'-15" HOPE ®0.50% BETWEEN EDGE OF CONC. AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM SCALE: N.T.S. 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BERM FOREBAY TOP ELEV= 245.5 WIDTH AT TOP = 3.0 FT 6" TOPSOIL ABOVE 6" CLAY LINER 3:1 NOTE: PUMPS SHALL BE USED TO DRAIN ON LITTORAL SHELF THE FOREBAY WHEN NECESSARY. REFER TO DETAIL SEDIMENT STORAGE TOP THIS SHEET FOR DEWATERING REQUIREMENTS. FOREBAY BOTTOM 6FT LITTORAL ELEV=241.0 S1 SHELF 6:1 NORMAL POND ELEVATION 2 _ BOTTOM LITTORAL SHELF ELEV. CLASS B RIP-RAP OVER FILTER FABRIC MIN. 4' FOREBAY WEIR AT ELEV=245.0 I I 6" TOPSOIL FOR ALL FOREBAY ENTRANCE SHALL BE lil AREAS ABOVE THE DEEPER THAN FOREBAY EXIT - NORMAL POND ELEVATION BOTTOM OF SEDIMENT STORAGE/EXIT BOTTOM OF SEDIMENT ELEV=240.5 STORAGE/ENTRANCE ELEV=240.0 FOREBAY ENTRANCE SHALL BE FOREBAY DEEPER THAN FOREBAY EXIT 1 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 0.251 2 732 3,039 ------ ------ ------ BMP Pre-Developed 2 SCS Runoff 6.579 2 718 13,157 ------ ------ ------ BMP Post-Developed 3 Reservoir 0.053 2 1442 11,643 2 247.51 10,969 Post Through Pond 4 SCS Runoff 0.026 2 748 620 ------ ------ ------ Post Developed-Pond Bypass 6 SCS Runoff 0.054 2 254 626 ------ ------ ------ BMP Post-Developed 7 Reservoir 0.009 2 366 528 6 246.09 582 1.0-in Storm Thru Pond Wet Pond-Percival.gpw Return Period: 1 Year Monday, 03/4/2024 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 0.251 cfs Storm frequency = 1 yrs Time to peak = 732 min Time interval = 2 min Hyd. volume = 3,039 cuft Drainage area = 4.930 ac Curve number = 53.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.60 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 1 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 6.579 cfs Storm frequency = 1 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 13,157 cuft Drainage area = 3.410 ac Curve number = 77.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.053 cfs Storm frequency = 1 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 11,643 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 247.51 ft Reservoir name = BMP Pond Max. Storage = 10,969 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 0 Total storage used = 10,969 cuft Pond Report 5 Hydraf low Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=246.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sgft) Incr.Storage(cuft) Total storage(cuft) 0.00 246.00 5,850 0 0 0.50 246.50 6,850 3,175 3,175 1.00 247.00 7,470 3,580 6,755 2.00 248.00 8,950 8,210 14,965 2.10 248.10 9,070 901 15,866 3.00 249.00 10,150 8,649 24,515 4.00 250.00 11,410 10,780 35,295 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 15.00 1.30 0.00 0.00 Crest Len(ft) = 2.00 14.00 0.00 0.00 Span(in) = 15.00 1.30 0.00 0.00 Crest El.(ft) = 248.10 249.50 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 246.00 246.00 0.00 0.00 Weir Type = Rect Broad --- --- Length(ft) = 60.00 0.50 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 0.50 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control.Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/Discharge Elev(ft) 4.00 250.00 3.00 249.00 2.00 248.00 1.00 247.00 0.00 246.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 Total Q Discharge(cfs) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Peak discharge = 0.026 cfs Storm frequency = 1 yrs Time to peak = 748 min Time interval = 2 min Hyd. volume = 620 cuft Drainage area = 1.520 ac Curve number = 50.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.04 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed - Pond Bypass Q (cfs) Hyd. No. 4 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 6 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.054 cfs Storm frequency = 1 yrs Time to peak = 254 min Time interval = 2 min Hyd. volume = 626 cuft Drainage area = 3.410 ac Curve number = 77.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 1.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 6 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 60 120 180 240 300 360 420 Hyd No. 6 Time (min) 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.009 cfs Storm frequency = 1 yrs Time to peak = 366 min Time interval = 2 min Hyd. volume = 528 cuft Inflow hyd. No. = 6 - BMP Post-Developed Max. Elevation = 246.09 ft Reservoir name = BMP Pond Max. Storage = 582 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 7 -- 1 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 Time (min) Hyd No. 7 Hyd No. 6 Total storage used = 582 cuft Pond Report 9 Hydraf low Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Pond No. 1 - BMP Pond Pond Data Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=246.00 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sgft) Incr.Storage(cuft) Total storage(cuft) 0.00 246.00 5,850 0 0 0.50 246.50 6,850 3,175 3,175 1.00 247.00 7,470 3,580 6,755 2.00 248.00 8,950 8,210 14,965 2.10 248.10 9,070 901 15,866 3.00 249.00 10,150 8,649 24,515 4.00 250.00 11,410 10,780 35,295 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 15.00 1.30 0.00 0.00 Crest Len(ft) = 2.00 14.00 0.00 0.00 Span(in) = 15.00 1.30 0.00 0.00 Crest El.(ft) = 248.10 249.50 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El.(ft) = 246.00 246.00 0.00 0.00 Weir Type = Rect Broad --- --- Length(ft) = 60.00 0.50 0.00 0.00 Multi-Stage = Yes No No No Slope(%) = 0.50 1.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Contour) Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control.Weir risers checked for orifice conditions(ic)and submergence(s). Stage(ft) Stage/Discharge Elev(ft) 4.00 250.00 3.00 249.00 2.00 248.00 1.00 247.00 0.00 246.00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 Total Q Discharge(cfs) 10 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 1.146 2 726 6,309 ------ ------ ------ BMP Pre-Developed 2 SCS Runoff 9.287 2 718 18,652 ------ ------ ------ BMP Post-Developed 3 Reservoir 0.084 2 1442 14,982 2 248.11 15,970 Post Through Pond 4 SCS Runoff 0.191 2 726 1,476 ------ ------ ------ Post Developed-Pond Bypass 6 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post-Developed 7 Reservoir 0.000 2 n/a 0 6 246.00 0.000 1.0-in Storm Thru Pond Wet Pond-Percival.gpw Return Period: 2 Year Monday, 03/4/2024 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 1.146 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 6,309 cuft Drainage area = 4.930 ac Curve number = 53.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.60 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 2 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 9.287 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 18,652 cuft Drainage area = 3.410 ac Curve number = 77.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 2 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 0.084 cfs Storm frequency = 2 yrs Time to peak = 1442 min Time interval = 2 min Hyd. volume = 14,982 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 248.11 ft Reservoir name = BMP Pond Max. Storage = 15,970 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 2 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 Total storage used = 15,970 cuft 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Peak discharge = 0.191 cfs Storm frequency = 2 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 1,476 cuft Drainage area = 1.520 ac Curve number = 50.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 3.68 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed - Pond Bypass Q (cfs) Hyd. No. 4 -- 2 Year Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 15 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 6 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 3.410 ac Curve number = 77.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 20 40 60 80 100 120 Hyd No. 6 Time (min) 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 6 - BMP Post-Developed Max. Elevation = 246.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 7 -- 2 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 7 Hyd No. 6 0 Total storage used = 0 cuft 17 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 5.946 2 724 19,524 ------ ------ ------ BMP Pre-Developed 2 SCS Runoff 17.45 2 716 35,410 ------ ------ ------ BMP Post-Developed 3 Reservoir 1.411 2 750 31,628 2 248.44 19,174 Post Through Pond 4 SCS Runoff 1.604 2 722 5,222 ------ ------ ------ Post Developed-Pond Bypass 6 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post-Developed 7 Reservoir 0.000 2 n/a 0 6 246.00 0.000 1.0-in Storm Thru Pond Wet Pond-Percival.gpw Return Period: 10 Year Monday, 03/4/2024 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 5.946 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 19,524 cuft Drainage area = 4.930 ac Curve number = 53.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.60 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 19 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 17.45 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 35,410 cuft Drainage area = 3.410 ac Curve number = 77.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 2 Time (min) 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 1.411 cfs Storm frequency = 10 yrs Time to peak = 750 min Time interval = 2 min Hyd. volume = 31,628 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 248.44 ft Reservoir name = BMP Pond Max. Storage = 19,174 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 3 Hyd No. 2 0 Total storage used = 19,174 cuft 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Peak discharge = 1.604 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 5,222 cuft Drainage area = 1.520 ac Curve number = 50.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 5.44 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed - Pond Bypass Q (cfs) Hyd. No. 4 -- 10 Year Q (cfs) 2.00 2.00 1.00 1.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 6 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 3.410 ac Curve number = 77.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 6 -- 10 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 20 40 60 80 100 120 Hyd No. 6 Time (min) 23 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 10 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 6 - BMP Post-Developed Max. Elevation = 246.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 7 -- 10 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 7 Hyd No. 6 0 Total storage used = 0 cuft 24 Hydrograph Summary Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 16.99 2 724 49,406 ------ ------ ------ BMP Pre-Developed 2 SCS Runoff 31.33 2 716 65,020 ------ ------ ------ BMP Post-Developed 3 Reservoir 9.524 2 724 61,178 2 249.58 30,789 Post Through Pond 4 SCS Runoff 5.241 2 722 14,158 ------ ------ ------ Post Developed-Pond Bypass 6 SCS Runoff 0.000 2 n/a 0 ------ ------ ------ BMP Post-Developed 7 Reservoir 0.000 2 n/a 0 6 246.00 0.000 1.0-in Storm Thru Pond Wet Pond-Percival.gpw Return Period: 100 Year Monday, 03/4/2024 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 1 BMP Pre-Developed Hydrograph type = SCS Runoff Peak discharge = 16.99 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 49,406 cuft Drainage area = 4.930 ac Curve number = 53.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 15.60 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Pre-Developed Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 26 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 2 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 31.33 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 65,020 cuft Drainage area = 3.410 ac Curve number = 77.6 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 2 Time (min) 27 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Monday,03/4/2024 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 9.524 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 61,178 cuft Inflow hyd. No. = 2 - BMP Post-Developed Max. Elevation = 249.58 ft Reservoir name = BMP Pond Max. Storage = 30,789 cuft Storage Indication method used. Post Through Pond Q (cfs) Hyd. No. 3-- 100 Year Q (cfs) 35.00 35.00 30.00 30.00 25.00 25.00 20.00 20.00 15.00 15.00 10.00 10.00 5.00 5.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 Hyd No. 2 Total storage used = 30,789 cuft 28 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Thursday, 10/19/2023 Hyd. No. 4 Post Developed - Pond Bypass Hydrograph type = SCS Runoff Peak discharge = 5.364 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 14,471 cuft Drainage area = 1.540 ac Curve number = 50.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 10.00 min Total precip. = 8.28 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Developed - Pond Bypass Q (cfs) Hyd. No. 4 -- 100 Year Q (cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 f 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 4 Time (min) 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Thursday, 10/19/2023 Hyd. No. 6 BMP Post-Developed Hydrograph type = SCS Runoff Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Drainage area = 3.390 ac Curve number = 77.8 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 0.00 in Distribution = SCS 6-Hr Storm duration = 6.00 hrs Shape factor = 484 BMP Post-Developed Q (cfs) Hyd. No. 6-- 100 Year Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 - 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 — — 0.00 0 20 40 60 80 100 120 Hyd No. 6 Time (min) 30 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®Civil 3D®by Autodesk, Inc.v2022 Thursday, 10/19/2023 Hyd. No. 7 1.0-in Storm Thru Pond Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 100 yrs Time to peak = n/a Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 6 - BMP Post-Developed Max. Elevation = 246.00 ft Reservoir name = BMP Pond Max. Storage = 0 cuft Storage Indication method used. 1.0-in Storm Thru Pond Q (cfs) Hyd. No. 7-- 100 Year Q (cfs) 0.10 - 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 - 0.00 0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 Time (min) Hyd No. 7 Hyd No. 6 I I Total storage used = 0 cuft Bowman North Carolina,Ltd. Percival Square Apartments Raeford,NC-Grass Channel"C"calculations Rational Runoff Coefficient"C" Grass Channel#1 Drainage Area(acres): 1.03 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.04 4% 0.95 0.04 Lawn 0.17 16% 0.3 0.05 Wooded 0.83 80% 0.2 0.16 Total Area= 1.03 Cumulative"C"= 0.25 iio= 7.98 Qio= 2.02 NORTH North American Green 5401 St. Wendel-Cynthiana Rd. AMERICAN Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS > > > Grass Channel#1 Name Grass Channel#1 Discharge 2.02 Channel Slope 0.0115 Channel Bottom Width 1 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardence Class C 6-12 in Vegetation Type Sod Former Vegetation Density Good 65-79% Soil Type Sandy Loam (GM) Unreinforced Vegetation Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern Unreinforced Straight 2.02 cfs 1.05 ft/s 0.65 ft 0.079 4 lbs/ft2 0.47 lbs/ft2 8.57 STABLE -- Vegetation Underlying Straight 2.02 cfs 1.05 ft/s 0.65 ft 0.079 4 Ibs/ft2 0.27 lbs/ft2 14.85 STABLE -- Substrate DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS75 Straight 2.02 cfs 1.84 ft/s 0.46 ft 0.037 1.6 lbs/ft2 0.33 lbs/ft2 4.84 STABLE D Unvegetated Underlying Straight 2.02 cfs 1.84 ft/s 0.46 ft 0.037 1.51 lbs/ft2 0.2 lbs/ft2 7.53 STABLE D Substrate Bowman n o n x + COLJ'V n APPENDIX C Storm Drainage System Calculations 100-System Percival Square Apartments—Raeford, NC 10 ! \ C 411 Fy tY' �. os' \,,,1 , I 1.„*.t401,$01° t \ IS ,, , , \\,.\\,02'So-' -4 i ,.., \\, 0°,,A04-.'" \ CCI , \\\. e"e \ I* : V za 4 w z ya _ , ) _ 0 f CB#101 Z 0.37,AC CB#102=0.33 A: - \ eaP.,+� \ ® \ S. C0#110 g 0.03 AC 1 H ` ` z YI#111z0.06AC ��J%-- .�iN j1 o � Apr ter = . Q w .. ,•r'w+ 'ohs` -. `` �' - i I W a ca /;A ., . '. �f) �� ��a'4 \`4":: , CB#103 0.30AC ¢ \ ' ' ' ' ' <- -1,4"— \,, 4I0'`‘ '\\‘ ge.% LoL2 c'D O ilkk\y b YI#109-t- it t `` `' ,¢s* w U z u \ 'O,*Stk Aso. ` \\...\‘'" �ic1 0.36 A7,G' �`\\ 2 v~i w CB#120 x0.22AC1/4\ `g�� -AL\10\11 i 4\ oliv, \ 11 141 A; CB#121::0.14 AC \ , S * \` / ,• CB#104=0.15 AC �* \ /,/ r MH' 05 'C % / — pearsrAis— CB#108z 0.17 AC I. /' II \\ CB#106-0.23 AC LI / 10:gni61"1:4 wig I ' ,/ GRAPHIC SCALE m"u farm-m-001 `.- 1. \ > CB1:1107 =0.12AC O," m M 9EEi Bowman North Carolina,Ltd. Percival Square Apartments Raeford,NC-Storm Drain"C"calculations Rational Runoff Coefficient"C" Catch Basin #101 Drainage Area(acres): 0.368 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" Roofs 0.08 21% 0.95 0.20 Asphalt/Concrete Pavement 0.22 59% 0.95 0.56 Lawn 0.07 20% 0.3 0.06 Wooded 0.00 0% 0.2 0.00 Total Area= 0.37 Cumulative"C"= 0.82 iio= 7.98 Qio= 2.42 Catch Basin #102 Drainage Area(acres): 0.330 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" Roofs 0.17 50% 0.95 0.48 Asphalt/Concrete Pavement 0.12 36% 0.95 0.34 Lawn 0.05 14% 0.3 0.04 Wooded 0.00 0% 0.2 0.00 Total Area= 0.33 Cumulative"C"= 0.86 iio= 7.98 Qio= 2.26 Catch Basin #103 Drainage Area(acres): 0.302 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" Roofs 0.06 18% 0.95 0.17 Asphalt/Concrete Pavement 0.18 59% 0.95 0.56 Lawn 0.07 23% 0.3 0.07 Wooded 0.00 0% 0.2 0.00 Total Area= 0.30 Cumulative"C"= 0.80 iio= 7.98 Qio= 1.93 Catch Basin #104 Drainage Area(acres): 0.152 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.13 83% 0.95 0.79 Lawn 0.03 17% 0.3 0.05 Wooded 0.00 0% 0.2 0.00 Total Area= 0.15 Cumulative"C"= 0.84 iio= 7.98 Qio= 1.01 Manhole #105 Drainage Area(acres) 0.119 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" Roofs 0.12 100% 0.95 0.95 Asphalt/Concrete Pavement 0.00 0% 0.95 0.00 Lawn 0.00 0% 0.3 0.00 Wooded 0.00 0% 0.2 0.00 Total Area= 0.12 Cumulative"C"= 0.95 i10= 7.98 Q10= 0.90 Catch Basin #106 Drainage Area(acres): 0.233 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.16 69% 0.95 0.66 Lawn 0.07 31% 0.3 0.09 Wooded 0.00 0% 0.2 0.00 Total Area= 0.23 Cumulative"C"= 0.75 iio= 7.98 Qio= 1.39 Catch Basin #107 Drainage Area(acres): 0.122 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.09 74% 0.95 0.70 Lawn 0.03 26% 0.3 0.08 Wooded 0.00 0% 0.2 0.00 Total Area= 0.12 Cumulative"C"= 0.78 iio= 7.98 Qio= 0.76 Catch Basin #108 Drainage Area(acres): 0.173 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.14 81% 0.95 0.77 Lawn 0.03 19% 0.3 0.06 Wooded 0.00 0% 0.2 0.00 Total Area= 0.17 Cumulative"C"= 0.82 iio= 7.98 Qio= 1.14 Yard Inlet#109 Drainage Area(acres): 0.359 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.12 33% 0.95 0.32 Asphalt/Concrete Pavement 0.02 6% 0.95 0.05 Lawn 0.22 61% 0.3 0.18 Wooded 0.00 0% 0.2 0.00 Total Area= 0.36 Cumulative"C"= 0.55 i 10= 7.98 Qio= 1.58 Call Out#110 Drainage Area(acres): 0.027 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" "C" Roofs 0.03 100% 0.95 0.95 Asphalt/Concrete Pavement 0.00 0% 0.95 0.00 Lawn 0.00 0% 0.3 0.00 Wooded 0.00 0% 0.2 0.00 Total Area= 0.03 Cumulative"C"= 0.95 i1o= 7.98 Qio= 0.20 Yard Inlet#111 Drainaoe Area(acres): 0.062 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" Roofs 0.03 43% 0.95 0.41 Asphalt/Concrete Pavement 0.01 22% 0.95 0.21 Lawn 0.02 35% 0.3 0.10 Wooded 0.00 0% 0.2 0.00 Total Area= 0.06 Cumulative"C"= 0.72 i H o= 7.98 Q1o= 0.36 Catch Basin #120 Drainaoe Area(acres): 0.221 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" Roofs 0.04 20% 0.95 0.19 Asphalt/Concrete Pavement 0.12 57% 0.95 0.54 Lawn 0.05 23% 0.3 0.07 Wooded 0.00 0% 0.2 0.00 Total Area= 0.22 Cumulative"C"= 0.80 i1o= 7.98 Qio= 1.41 Catch Basin #121 Drainage Area(acres): 0.138 Proposed Land Uses: Land Use Description Acres %Site Runoff"C" Roofs 0.00 0% 0.95 0.00 Asphalt/Concrete Pavement 0.11 83% 0.95 0.79 Lawn 0.02 17% 0.3 0.05 Wooded 0.00 0% 0.2 0.00 Total Area= 0.14 Cumulative"C"= 0.84 iio= 7.98 Q1o= 0.92 Hydraflow Storm Sewers Extension foi .odesk® Civil 3D® Plan Outfall > 1 CB #101 2 /9 CB #102 913 �03 CB #120 ' CB #103 YI #111 11`�\`r�l �,a 10 13 12111121 YI #109 CB #104 CO #110 5 CB #121 ^° MH #105 0 6 c CB #106 CB #108 19 8 /o CB #107 Project File: Storm 100.stm Number of lines: 13 Date: 10/18/2023 Storm Sewers v2022.00 Storm Sewer Inventory Report Pagel Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J-Loss Inlet/ Line Length angle Type Q Area Coeff Time El Dn Slope El Up Size Shape Value Coeff Rim El No. (ft) (deg) (cfs) (ac) (C) (min) (ft) (%) (ft) (in) (n) (K) (ft) 1 End 25.564 56.597 Genr 2.42 0.00 0.00 0.0 244.40 0.78 244.60 24 Cir 0.012 1.50 250.80 7 2 1 75.916 -39.716 Genr 2.26 0.00 0.00 0.0 244.80 0.53 245.20 24 Cir 0.012 1.06 250.11 19 3 2 98.969 41.096 Genr 1.93 0.00 0.00 0.0 245.40 0.71 246.10 24 Cir 0.012 1.47 250.21 18 4 3 68.251 0.000 Genr 1.01 0.00 0.00 0.0 247.00 2.34 248.60 15 Cir 0.012 1.32 252.22 16 5 4 81.645 59.057 MH 0.90 0.00 0.00 0.0 248.80 0.61 249.30 15 Cir 0.012 0.70 254.53 14(1) 6 5 55.091 -41.077 Genr 1.39 0.00 0.00 0.0 249.50 0.54 249.80 15 Cir 0.012 1.44 253.41 14 7 6 176.762 72.032 Genr 0.76 0.00 0.00 0.0 250.00 1.30 252.30 15 Cir 0.012 1.24 256.08 12 8 7 90.374 52.674 Genr 1.14 0.00 0.00 0.0 252.50 0.55 253.00 15 Cir 0.012 1.00 256.04 10 9 1 178.057 85.438 Genr 1.41 0.00 0.00 0.0 247.30 2.36 251.50 15 Cir 0.012 0.72 255.84 5 10 9 106.798 -25.027 Genr 0.92 0.00 0.00 0.0 252.50 2.34 255.00 15 Cir 0.012 1.00 258.45 3 11 3 91.496 77.665 DrGrt 1.58 0.00 0.00 0.0 247.00 2.19 249.00 15 Cir 0.012 0.65 252.30 14(1)(1) 12 11 60.583 22.255 MH 0.20 0.00 0.00 0.0 250.20 0.66 250.60 8 Cir 0.012 1.00 252.81 14(1)(1)(2) 13 12 47.284 86.098 DrGrt 0.36 0.00 0.00 0.0 250.80 0.63 251.10 8 Cir 0.012 1.00 252.60 14(1)(1)(1) 1 Project File: Storm 100.stm Number of lines: 13 Date: 10/18/2023 Storm Sewers v2022.00 Storm Sewer Summary Report Pagel Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) No. 1 7 16.28 24 Cir 25.564 244.40 244.60 0.782 245.69 246.05 n/a 246.05 End Generic 2 19 11.53 24 Cir 75.916 244.80 245.20 0.527 246.05 246.42 n/a 246.42 j 1 Generic 3 18 9.27 24 Cir 98.969 245.40 246.10 0.707 246.42 247.19 n/a 247.19 2 Generic 4 16 5.20 15 Cir 68.251 247.00 248.60 2.344 247.61 249.52 0.59 249.52 3 Generic 5 14(1) 4.19 15 Cir 81.645 248.80 249.30 0.612 249.62 250.13 0.26 250.13 4 Manhole 6 14 3.29 15 Cir 55.091 249.50 249.80 0.545 250.23 250.53 n/a 250.53 5 Generic 7 12 1.90 15 Cir 176.762 250.00 252.30 1.301 250.53 252.85 n/a 252.85 6 Generic 8 10 1.14 15 Cir 90.374 252.50 253.00 0.553 252.90 253.42 n/a 253.42 7 Generic 9 5 2.33 15 Cir 178.057 247.30 251.50 2.359 247.70 252.11 n/a 252.11 1 Generic 10 3 0.92 15 Cir 106.798 252.50 255.00 2.341 252.75 255.38 0.14 255.38 9 Generic 11 14(1)(1) 2.14 15 Cir 91.496 247.00 249.00 2.186 247.39 249.58 n/a 249.58 3 DropGrate 12 14(1)(1)(2) 0.56 8 Cir 60.583 250.20 250.60 0.660 250.54 250.95 n/a 250.95 11 Manhole 13 14(1)(1)(1) 0.36 8 Cir 47.284 250.80 251.10 0.634 251.07 251.38 n/a 251.38 12 DropGrate Project File: Storm 100.stm Number of lines: 13 Run Date: 10/18/2023 NOTES: Return period= 10 Yrs. ;j-Line contains hyd.jump. Storm Sewers v2022.00 Storm Sewer Tabulation Pagel Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 25.564 0.00 0.00 0.00 0.00 0.00 0.0 5.4 0.0 16.28 21.67 7.11 24 0.78 244.40 244.60 245.69 246.05 247.57 250.80 7 2 1 75.916 0.00 0.00 0.00 0.00 0.00 0.0 5.1 0.0 11.53 17.79 5.66 24 0.53 244.80 245.20 246.05 246.42 250.80 250.11 19 3 2 98.969 0.00 0.00 0.00 0.00 0.00 0.0 4.5 0.0 9.27 20.61 5.54 24 0.71 245.40 246.10 246.42 247.19 250.11 250.21 18 4 3 68.251 0.00 0.00 0.00 0.00 0.00 0.0 4.3 0.0 5.20 10.71 7.00 15 2.34 247.00 248.60 247.61 249.52 250.21 252.22 16 5 4 81.645 0.00 0.00 0.00 0.00 0.00 0.0 3.9 0.0 4.19 5.47 4.88 15 0.61 248.80 249.30 249.62 250.13 252.22 254.53 14(1) 6 5 55.091 0.00 0.00 0.00 0.00 0.00 0.0 3.5 0.0 3.29 5.16 4.44 15 0.54 249.50 249.80 250.23 250.53 254.53 253.41 14 7 6 176.762 0.00 0.00 0.00 0.00 0.00 0.0 1.6 0.0 1.90 7.98 3.75 15 1.30 250.00 252.30 250.53 252.85 253.41 256.08 12 8 7 90.374 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 1.14 5.20 3.27 15 0.55 252.50 253.00 252.90 253.42 256.08 256.04 10 9 1 178.057 0.00 0.00 0.00 0.00 0.00 0.0 2.4 0.0 2.33 10.74 5.45 15 2.36 247.30 251.50 247.70 252.11 250.80 255.84 5 10 9 106.798 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 0.92 10.70 4.14 15 2.34 252.50 255.00 252.75 255.38 255.84 258.45 3 11 3 91.496 0.00 0.00 0.00 0.00 0.00 0.0 1.4 0.0 2.14 10.34 5.22 15 2.19 247.00 249.00 247.39 249.58 250.21 252.30 14(1)(1) 12 11 60.583 0.00 0.00 0.00 0.00 0.00 0.0 0.8 0.0 0.56 1.06 3.04 8 0.66 250.20 250.60 250.54 250.95 252.30 252.81 14(1)(1)(2) 13 12 47.284 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 0.36 1.04 2.66 8 0.63 250.80 251.10 251.07 251.38 252.81 252.60 14(1)(1)(1) Project File: Storm 100.stm Number of lines: 13 Run Date 10/18/2023 NOTES:Intensity=88.24/(Inlet time+15.50)A 0.83; Return period=Yrs. 10 ; c=cir e=ellip b=box Storm Sewers v2022 00 Hydraulic Grade Line Computations Pagel Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sgft) (ft/s) (ft) (ft) (%) (ft) (ft) (ft) (ft) (sgft) (ft/s) (ft) (ft) (%) (%) (ft) (K) (ft) 1 24 16.28 244.40 245.69 1.29 2.15 7.57 0.69 246.38 0.000 25.564 244.60 246.05 1.45** 2.45 6.66 0.69 246.74 0.000 0.000 n/a 1.50 n/a 2 24 11.53 244.80 246.05 1.25 2.00 5.56 0.52 246.57 0.000 75.916 245.20 246.42 j 1.22** 2.00 5.76 0.52 246.93 0.000 0.000 n/a 1.06 n/a 3 24 9.27 245.40 246.42 1.02 1.61 5.77 0.44 246.86 0.000 98.969 246.10 247.19 1.09** 1.74 5.32 0.44 247.63 0.000 0.000 n/a 1.47 n/a 4 15 5.20 247.00 247.61 0.61* 0.60 8.66 0.44 248.06 0.000 68.251 248.60 249.52 0.92** 0.97 5.35 0.44 249.97 0.000 0.000 n/a 1.32 0.59 5 15 4.19 248.80 249.62 0.82* 0.85 4.91 0.37 249.99 0.000 81.645 249.30 250.13 0.83** 0.86 4.85 0.37 250.49 0.000 0.000 n/a 0.70 0.26 6 15 3.29 249.50 250.23 0.72* 0.74 4.46 0.30 250.53 0.000 55.091 249.80 250.53 0.73** 0.74 4.42 0.30 250.83 0.000 0.000 n/a 1.44 n/a 7 15 1.90 250.00 250.53 0.53 0.50 3.83 0.21 250.74 0.000 176.762252.30 252.85 0.55** 0.52 3.67 0.21 253.06 0.000 0.000 n/a 1.24 n/a 8 15 1.14 252.50 252.90 0.40* 0.34 3.39 0.15 253.05 0.000 90.374 253.00 253.42 0.42** 0.36 3.15 0.15 253.57 0.000 0.000 n/a 1.00 n/a 9 15 2.33 247.30 247.70 0.40* 0.33 6.99 0.24 247.93 0.000 178.057251.50 252.11 0.61** 0.59 3.92 0.24 252.35 0.000 0.000 n/a 0.72 n/a 10 15 0.92 252.50 252.75 0.25* 0.17 5.33 0.14 252.88 0.000 106.798255.00 255.38 0.38** 0.31 2.96 0.14 255.51 0.000 0.000 n/a 1.00 0.14 11 15 2.14 247.00 247.39 0.39* 0.32 6.64 0.23 247.61 0.000 91.496 249.00 249.58 0.58** 0.56 3.81 0.23 249.81 0.000 0.000 n/a 0.65 n/a 12 8 0.56 250.20 250.54 0.34* 0.18 3.08 0.14 250.68 0.000 60.583 250.60 250.95 0.35** 0.19 3.01 0.14 251.09 0.000 0.000 n/a 1.00 n/a 13 8 0.36 250.80 251.07 0.27* 0.13 2.71 0.11 251.18 0.000 47.284 251.10 251.38 0.28** 0.14 2.60 0.11 251.48 0.000 0.000 n/a 1.00 n/a Project File: Storm 100.stm Number of lines: 13 Run Date 10/18/2023 Notes:* depth assumed;**Critical depth.;j-Line contains hyd.jump ; c=cir e=ellip b=box Storm Sewers v2022.00 Storm Sewer Profile Proj. file: Storm 100.stm O co O N M 7r Lf) c0 ti O O O O O O O U) 4 * * CO W m CO CO CO 2 CO CO U 0 =O M In (O N. O u N .. R . 7 C 7 •. 7 C 7 •. 7 C 7 C 7 C 7 7 C J C C C J C C C J C J C J C J O— O. O_ O— O— O— O— 0 O ^ ��� J �Nv NO00 J NCo 0007� WOO N. OMI N OO O N 'xiN '4--4r NinC� f O N� ' W N�� Oce) N�� . N(N( N NLO0 NLrn. N6 Elev. (ft) O W N N NN .O NN O NN O NN L NN O NN co N • 0 -6W O WWW t WW W N WWW N WWW M WWW .4. WWW WWW co WW co E > as E » co E » co E» as E » (o E ;o E » y E» m E U) 0 _ u) E cc co E c c u) EaE In E-cc co E. CE !n REc co E2CC cn EE 270.00 270.00 264.00 - - 264.00 258.00 — I —258.00 / / 252.00 ------------ —252.00 ---------- Lf- 5.@ 1.3n / ,-- ....--r— — — 9o.09i LT- 15 (?5,t1 0.54% / i 90.374Lf-15"@ 0.55% 246.00 ——_ — 81.645Lf-15" 0.61% 246.00 —_-7 68.251 Lf 15"@ 2.34% _U — 98.969U-24"@ 0.71% — 75g16Lf-24"©053% 25.564Lf-24"@ 0.78% 240.00 240.00 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: Storm 100.stm 0 O , p N— CN O N— N— U) LLB CO CO CO U- U 0 0 O a) O C J OE J O C J O co ��� co �p 0 ��N V Mtn Elev. (ft) O W N N NNN NNN0 NN o -6W O WWW N III M WW cz _ > ao E > ; as E > ; m E > tn0E v) Ecc cn EFE C/)) E = 274.00 274.00 267.00 - 267.00 260.00 — 260.00 253.00 -— —_ ^ n 234% —253.00 t.. • • limmmiriff°Mliril=''''I —1.111...n'— ii.Iii.".66........s.11.11 , --------------- 246.00 — 246.00 • 26.564Lf 24"@ 0.78% 239.00 239.00 0 25 50 75 100 125 150 175 200 225 250 275 300 325 HGL EGL Reach (ft) Storm Sewers Storm Sewer Profile Proj. file: Storm 100.stm co o DO 0 U } 0 } N M 7 c S. E 7 C 7 O C J Q c J Q c J Q N �p (0 MON 0) a000 (000 OO . .f� NOO Co Nu,OO CO) Elev. (ft) 00 NNN N Lo NN CS1NNN NN oWww o Www www 0) ww mE > > ;g E » ( E. m E > CO E c c N c c c c 0) 2 c 264.00 264.00 260.00 - 260.00 256.00 256.00 252.00 252.00 = 60.583Lf 8"@ 0.66% 248.00 —__________ ----y i.496E--15" . 248.00 244.00 244.00 0 25 50 75 100 125 150 175 200 HGL EGL Reach (ft) Storm Sewers Bowman [Von7FlCAUL !!VA APPENDIX D Erosion and Sediment Control Calculations Rip Rap Calculations Skimmer Basin Riser Temporary Diversion Ditches Percival Square Apartments—Raeford, NC 11 EROSION CONTROL CALCS (RIP-RAP CALCULATIONS) Project Information Project Name: Percival Square Project#: 220192-01-001 Designed by: JNA Date: 10/25/2023 Revised by: Date: Checked by: Date: Rip-Rap Apron#1 Pipe Diameter d= 24 Pipe Slope s= 0.78 % Manning's number n= 0.013 Flow Q= 16.28 cfs Velocity V= 7.11 ft/s Dissipator Dimensions* Zone= 2 Stone Filling Class= B Entry Width(3 X Do)= 6.0 ft Length(6 X Do)= 12.0 ft Width(La+Do)= 14.0 ft Min.Thickness= 22 inches Min.Stone Diameter= 6 inches *All units are in feet **Dissipator pad designed for full flow of pipe 6.0 14.0 RIP-RAP.xls 11/3/2023 Page 1 of 2 EROSION CONTROL CALCS(SKIMMER BASINS) Project Information Project Name: Percival Square(Raeford) Project#: 220192-01-001 Designed by: JNA Date: 10/25/2023 Revised by: Date: Checked by: Date: Skimmer Basin#1 Drainage Area Total,AT= 1.36 Ac Disturbed,AD= 1.49 Ac 25-year Runoff(Q25) C= 0.50 T = 5.00 min 125= 8.90 in/hr Q25= 6.1 cfs Surface Area Required SA= 325sf x Q25 SA= 1,967 sf Volume Required Vs= 1800 cf/Ac x AD VR= 2,682 cf Sediment Trap Dimensions L= 70 ft (Spillway Length) W= 30 ft (Spillway Width) D= 2.0 ft (Depth of Storage) Side Slopes= 2:1 Ltoa= Ltoa= 78 ft Lbot= 62 ft Wtor Wbot Wtoo= 38 ft Loot= Wbot= 22 ft LIW Ratio= 2.3:1(must be 2:1 to 6:1) Elevations Description Elevation Top of Berm 247.00 (allow 1ft freeboard above spillway flow height) Emergency Spillway 245.50 Sediment Storage 245.00 Cleanout Mark 244.00 (half of storage height) Bottom 243.00 Provided SAP= 2,100 sf > 1,967 VP= 3,464.0 cf > 2,682 Emergency Spillway-10 Year Storm 125= 8.90 in/hr Q25= 6.05 cfs h= 0.5 ft Cw= 3 Lw= 10 ft EROSION CONTROL CALCS(SKIMMER BASINS) Project Information Project Name: Percival Square(Raeford) Project#: 220192-01-001 Designed by: JNA Date: 10/25/2023 Revised by: Date: Checked by: Date: Skimmer Basin#2 Drainage Area Total,AT= 3.9 Ac Disturbed,AD= 4.005 Ac 25-year Runoff(Q25) C= 0.50 To= 5.00 min 125= 8.90 in/hr Q25= 17.4 cfs Surface Area Required SA= 325sf x Q25 SA= 5,640 sf Volume Required Vs= 1800 cf/Ac x AD VR= 7,209 cf Sediment Trap Dimensions L= 142 ft (Spillway Length) W= 50 ft (Spillway Width) D= 2.0 ft (Depth of Storage) Side Slopes= 2:1 Ltoa= Ltoo= 150 ft Lbot= 134 ft Wtor Wbot Wtoo= 58 ft Lbot= Wbot= 42 ft LIW Ratio= 2.8:1(must be 2:1 to 6:1) Elevations Description Elevation Top of Berm 250.00 (allow 1ft freeboard above spillway flow height) Emergency Spillway 248.50 Sediment Storage 248.00 Cleanout Mark 247.00 (half of storage height) Bottom 246.00 Provided SAP= 7,100 sf > 5,640 VP= 12,728.0 cf > 7,209 Emergency Spillway-10 Year Storm 125= 8.90 in/hr Q25= 17.36 cfs h= 0.5 ft Cw= 3 Lw= 10 ft Calculate Skimmer Size Basin Volume in Cubic Feet 3,464 Cu.Ft Skimmer Size 1.5 Inch Days to Drain* 3 Days Orifice Radius 0.6 Inch[es] Orifice Diameter 1.2 Inch[es] *In NC assume 3 days to drain Estimate Volume of Basin Length Width Top of water surface in feet 70 30 Feet VOLUME 3464 Cu.Ft. Bottom dimensions in feet 62 22 Feet Depth in feet 2 Feet Calculate Skimmer Size Basin Volume in Cubic Feet 12,728 Cu.Ft Skimmer Size 2.5 Inch Days to Drain* 3 Days Orifice Radius 1.0 Inch[es] Orifice Diameter 2.1 Inch[es] *In NC assume 3 days to drain Estimate Volume of Basin Length Width Top of water surface in feet 142 50 Feet VOLUME 12728 Cu.Ft. Bottom dimensions in feet 134 42 Feet Depth in feet 2 Feet EROSION CONTROL CALCS (SKIMMER BASINS) Project Information Project Name: Percival Square(Raeford) Project#: 220192-01-001 Designed by: JNA Date: 10/25/2023 Revised by: Date: Checked by: Date: Anti-Flotation Device 4'x 4' Outlet Structure Area: 16.0 sf Top of Basin Elev.: 246.0 Bottom of Basin Elev.: 244.0 Volume: 32.0 cf (Water Displaced-Top of Pond to Bottom of Pond) Weight: 1997 lbs Factor of Safety 1.20 WT Req'd of Anti-Flotation Device: 2,396 lbs Volume of Concrete Req'd: 16.0 cf (Unit WT of Concrete=150 pcf) Volume Provided: 69.5 cf (4'x4'riser x 2.0'=32cf,5'x5'footing x 1.5'=37.5cf) EROSION CONTROL CALCS (TEMPORARY DITCH #1) Project Information Project Name: Percival Square (Raeford) Project#: 220192-01-001 Designed by: JNA Date: 10/25/2023 Revised by: Date: Checked by: Date: Temporary Ditch#1 Drainage Area Total,AT= 1.97 Ac 25-year Runoff(Q25) C= 0.50 Tc= 5.00 min 125= 8.90 in/hr Q25= 8.8 cfs 85645 1.966139 Actually has DA of 0.67 AC, but we will keep the 0.75 AC to be conservative-(note made 4/14/23) Length 361.7 Elev. Chan 2 Slope 0.55% NORTH North American Green 5401 St. Wendel-Cynthiana Rd. AMERICAN Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS > > > Temporary Ditch #1 Name Temporary Ditch #1 Discharge 8.8 Channel Slope 0.0055 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Silt Loam (SM) DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS75 Straight 8.8 cfs 2.21 ft/s 1.18 ft 0.037 1.6 lbs/ft2 0.41 lbs/ft2 3.94 STABLE D U nvegetated Underlying Straight 8.8 cfs 2.21 ft/s 1.18 ft 0.037 1.17 lbs/ft2 0.22 lbs/ft2 5.4 STABLE D Substrate EROSION CONTROL CALCS (TEMPORARY DITCH #2) Project Information Project Name: Percival Square (Raeford) Project#: 220192-01-001 Designed by: JNA Date: 10/25/2023 Revised by: Date: Checked by: Date: Temporary Ditch#2 Drainage Area Total,AT= 2.7 Ac 25-year Runoff(Q25) C= 0.50 Tc= 5.00 min 125= 8.90 in/hr Q25= 12.0 cfs 117535 2.698232 Length 482.6 Elev. Chan 6 Slope 1.24% NORTH North American Green 5401 St. Wendel-Cynthiana Rd. AMERICAN Poseyville, Indiana 47633 GREEN Tel. 800.772.2040 >Fax 812.867.0247 www.nagreen.com ECMDS v7.0 CHANNEL ANALYSIS > > > Temporary Ditch #2 Name Temporary Ditch #2 Discharge 12 Channel Slope 0.0124 Channel Bottom Width 1 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardence Class C 6-12 in Vegetation Type None Vegetation Density None Soil Type Silt Loam (SM) DS75 Normal Permissible Calculated Safety Staple Phase Reach Discharge Velocity Mannings N Remarks Depth Shear Stress Shear Stress Factor Pattern DS75 Straight 12 cfs 3.49 ft/s 1.09 ft 0.033 1.6 lbs/ft2 0.84 lbs/ft2 1.91 STABLE D U nvegetated Underlying Straight 12 cfs 3.49 ft/s 1.09 ft 0.033 1.17 lbs/ft2 0.45 lbs/ft2 2.58 STABLE D Substrate