Loading...
HomeMy WebLinkAboutWQ0044950_Application (FTSE)_20240624 UUI..UJtIJII CI IVCIVFlts 1U. !UL! I im I'CVJJW UL/'1"/Yl Ju-VJI IVUVJ4r%JtJ State of North Carolina Department of Environmental Quality DWR Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION DNIslon of Water Resources FTA 10-23&SUPPORTING DOCUMENTATION Application Number:V4000 if*00 MOD(to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: l. Applicant's name: City of Sanford(company,municipality,HOA,utility,etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑General Partnership ❑ Privately-Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑Other 3. Signature authority's name: Paul M. Weeks Jr.,P.E. per 15A )s'AC 02T.0106Lb) Title: Utilities and Engineering Director JUIV 4 2024 4. Applicant's mailing address: 225 E.Weathers000n St. P,O. Box 3729 City: Sanford State:NC Zip: 27331-3729 5. Applicant's contact information: Phone number: (919)777-1122 Email Address: paul.weeks@sanfordnc.net II. PROJECT INFORMATION: 1. Project name:Ashby Village Subdivision 2. Application/Project status: ❑ Proposed(New Permit) ® Existing Permit/Project If a modification,provide the existing permit number:WQ0044950 and issued date: January 22,2024, For modifications,also attach a detailed narrative description as described in Item G of the checklist. If new construction,but part of a master plan,provide the existing permit number: WQ00 3. County where project is located: Lee 4. Approximate Coordinates(Decimal Degrees): Latitude: 35.450643 Longitude:-79.126535" 5. Parcel ID(if applicable): 9661-28-0538-00(or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Allison Stone License Number: 053562 Firm: Timmons Groun Mailing address: 5410 Trinity Road, Suite 102 City: Raleigh State: NC Zip: 27607- Phone number: (919)866-4518 Email Address: allison.stonena timmons.com IV. WASTEWATER TREATMENT FACILITY(WWTF)INFORMATION: 1. Facility Name: Big Buffalo Wastewater Treatment Plant Permit Number: NCO024147 Owner Name: City of Sanford V. RECEIVING DOWNSTREAM SEWER INFORMATION: 1. Permit Number(s): WQ unknown 2. Downstream (Receiving)Sewer Information: 12 inch ® Gravity Ll Force Main 3. System Wide Collection System Permit Number(s)(if applicable): WQCS0047 Owner Name(s):City_of Sanford FORM: FTA 10-23 Page ] of 5 Uul.Uolyll CI Ivusup"IU. rULI IJM I-LUJJ-YULP%-P%I 'UJI IUUUJCMJU Vl. GENERAL REQUIREMENTS I. if the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ® N/A 2. if the Applicant is a Developer of lots to be sold,has a Revd is Operational Agreement I FORM: DEV)been attached? ❑ Yes ❑No ® N/A 3. If the Applicant is a Home/Property Owners'Association,has an IIOAiPOA Operational Agreement(FORM: HOA)and supplementary documentation as required by 15A NCAC 02T.0115(c)been attached? ❑ Yes ❑No ®NiA 4. Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ Retail (stores,centers,malls) ❑ Car Wash ❑ Residential (Leased) ❑ Retail with food preparation-'service ❑ Hotel and/or Motels ❑ School/preschool/day care ❑ Medical/dental/veterinary facilities ❑ Swimming PoollClubhouse ❑ Food and drink facilities ❑Church ❑ Swimming Pool/Filter Backwash ❑ Businesses/offices/factories ❑Nursing Home ❑ Other(Explain in Attachment) 5. Nature of wastewater: 100%Domestic %Commercial %Industrial(See I SA NCAC 02T.0103(20)) 1f Industrial, is there a Pretreatment Program in effect?❑ Yes[] No 6. Hasa flow reduction been approved under 15A NCAC 02T.0114(f)? [:] Yes ®No ➢ If yes,provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type(see 02T.0114(f)) Daily Design Flow"I No.of Units Flow Residential Single-Family(4-bedroom) 300 gal/day 3 900 GPD gal/day GPD gal/ GPD gal/ GPD gall GPD gal/ GPD Total 900 GPD a See I SA NCAC 02T .01141b1.Id1.tel( I and(e)(21 for caveats to wastewater design flow rates (i.e. proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified(in table 15A NCAC 02T.01 141 shall be determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data. 8. Wastewater generated by project: 900 GAD(per 15A NCAC 02T.01 14 and G.S. 143-215.1) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero,please indicate why: ❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ❑Other(Explain): FORM: FTA 10-23 Page 2 of 5 UUI.uJlvi I Lt I yuluvC IU. I ULI Iie%I I VUUJLMJU VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable)-02T.0305&MDC(Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size(inches) Length(feet) Material 8 12,887 SDR 26 PVC 8 419 DIP 12 240 DIP 12 1,260 SDR 26 PVC ➢ Section II&III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305&MDC(Pump Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates(Decimal Degrees): Latitude: Longitude:- 3. Total number of pumps at the pump station: 3. Design flow of the pump station: millions gallons per day(firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s)per pump(s): gallons per minute(GPM)at feet total dynamic head(TDH) 5. Summarize the force main to be permitted(for this Pump Station): Size(inches) Length(feet) Material If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per MDCPSFM Section 2.01 C.Lb. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other(please specify) 6. Power reliability in accordance with 15A NC AC 02T.0305(h)(1): ❑ Standby power source or ❑ Standby pump ➢ Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B); ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation,quick-connection receptacle and telemetry- or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage capacities and the rotation schedule of the portable power source or pump,including travel timeframes,shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 10-23 Page 3 of 5 UuI.UJIIJI1 CIIV olive IU. IULf 1JM 1'LVJJWUL/1'/Y!JV'VJ I I UU✓JZ^JL! IX. SETBACKS& SEPARATIONS—(02B.0200 & 15A NCAC 02T.0305(f)): I. Does the project comply with all separations/alternatives found in 15A NCAC 02T.0305(f)& (k)? ® Yes ❑No 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below(vertical) 18 inches 'Water mains(vertical-water over sewer preferred,including in benched trenches) 18 inches 'Water mains(horizontal) 10 feet Reclaimed water lines(vertical-reclaimed over sewer) 18 inches Reclaimed water lines(horizontal -reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells,WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water,and associated wetlands. 100 feet **Waters classified WS(except WS-I or WS-V), B, SA,ORW, HQW,or SB from normal high water(or tide elevation)and wetlands associated with these waters(see item IX.2) 50 feet **Any other stream, lake,impoundment,or ground water lowering and surface drainage ditches,as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation(horizontal) 5 feet Any basement(horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade(vertical) J 36 inches ➢ If noncompliance with 02T.0305(f)or(g).see Section X.I of this application *15A NCAC 02T.0305(g)contains alternatives where separations in 02T.0305(fl cannot be achieved. Please check`yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webuas 2. Does this project comply with the minimum separation requirements for water mains? ® Yes [:]No ❑N!A ➢ If no,please refer to 15A NCAC 18C.0906(f)for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE,verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ® Yes [:)No ❑N!A ➢ Please provide supplementary information identifying the areas of non-conformance. ➢ See the Division's draft separation requirements for situations where separation cannot be met. ➢ No variance is required if the alternative design criteria specified is utilized in design and construction. 4. Is the project located in a river basin subject to any State buffer rules? ® Yes Basin name: Cape Fear ❑ No If yes,does the project comply with setbacks found in the river basin rules per 15A NCAC 02 B .0200? ® Yes ❑ No ➢ This includes Trout Buffered Streams per I SA NCAC 2B.0202 5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ® Yes ❑ No or 401 Water Quality Certifications? ➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 021,0105(c)(6)(additional permits/certifications)? ® Yes ❑ No Per I SA NCAC 02T.0 I 05(c)(6),directly related environmental permits or certification applications must be being prepared, have been applied for,or have been obtained. Issuance of this permit is contingent on issuance of dependent permits(erosion and sedimentation control plans,stormwater management plans,etc.). 7. Does this project include any sewer collection lines that are deemed"high-priority?" ❑ Yes ®No Per 15A NCAC 02T,0402,"high-priority sewer"means any aerial sewer,sewer contacting surface waters, siphon,or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interference/conflict boxes require a variance approval. ➢ If yes,include an attachment with details for each line, including type(aerial line,size, material,and location), High priority lines shall be inspected by the permittee or its representative at least once every six-months and inspections documented per 15A NCAC 02T.0403(a)(5)or the permittee's individual System-Wide Collection permit. FORM: FTA 10-23 Page 4 of 5 vU..ubiyn ct IVttupe;tu. I oat I JAI-CVJJW DCM-MI JO-UJ I I UOUJLNJU X. CERTIFICATIONS: 1. Does the submitted system comply with ISA NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains(latest version),and the(iravity Sewer Minimum Design Criteria(latest version)as applicable? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit, and projects requiring a variance approval may be subject to longer review times.For projects reauirine two or more variances or where the variance is determined b, t�vision to be a significant portion of the project,the full technical review is reauired. 2. Professional Engineer's Certification: r' 1, N l i 5M +OY)L ,attest that this application for /)M�/1 v 111 a 2 SA bd i,41 S)00 (Professional Engineer's name from Application Item III I ) (Project Nalne from Appli ation Item If.l) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravity Sewers(latest versions,and the Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains(latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seat signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed$10,000,as well as civil penalties up to$25,000 per violation.Misrepresentation of the application information,including failure to disclose any design non-compliance with the applicable Rules and design criteria,may subject the North Carolina-licensed Professional Engineer to referral to the licensing board. (21 NgACQ %V61)i, �. North Carolina Professional Engineer's seal,signature,and date: \ O� ' ~ SEAL 9� 053562 'SON 9 3. Applicant's Certification per 15A NCAC 02T.0106(b): 1 Paul M. weeks Jr. P.E. Ashby village subdivision I, ,attest that this application for (Signature Authority Name from Application Item I.3.) (Project Name from Application Item II.I) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non-discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,injunctive relief,and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE In accordance with General Statutes 143-215-6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation, 6ocuftned by: �� f� al l., tNt as Y. �.�. 6/3/2024 Signature: o,,;.,;,�,,,,M�9___ Date:_ FORM: FTA 10-23 Page 5 of 5 UUGU00.91t ctIvusupu IV. IOJVCrYC-y oHr-vUCJ-auuy-tMtiou h Jo �. State of North Carolina JUN -4 2024 Department of Environmental Quality DW pr' Division of Water Resources Flow Tracking for Sewer Extension Applications nivicinn of Resourr— (FTSE 10-23) Application Number: FT-379 Entity Requesting Allocation: City of Santord Project Name for which flow is being requested: Ashby Village SD(MODIFIED) More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility name: Big Buffalo Wastewater Treatment Plant b. WWTP Facility Permit#: NCO024147 A11,/lows are in MGD c. WWTP facility permitted flow: 12,0000 d. Estimated obligated flow not yet tributary to the WWTP: 1.93178 e. WWTP facility's actual average flow: 4.02800 f. Total flow for this specific request: 0.00090 g. Total actual and obligated flows to the facility: 5.96068 h. Percent of permitted flow used: 50% 11. Complete this section for each pump station you are responsible for along the route of this proposed List pump stations located between the project connection point and the WWTP. (A) (B) (C) (D)-(B+C) (E)=(A-D) Pump Pump Firm Design Approx. Obligated, Total Current Available Station Station Capacity' Average Current Not Yet Flow Plus Capacity' (Name or Permit Daily Flow= Avg Daily Tributary Obligated Number) Number (Firmtnt)_ Flow, Daily Flow, Flow MGD MGD MGD MGD MGD MGD Carr Creek #001 1.2816 0.5126 0.3658 0.1811 05468 -0.0342 Gasters Creek 4 029i 1.6116 1.0195 0.4718 1.4914 0.1203 x #N A #NIA #N A #N,A #MA #N-A x #N A #N A #N,A W A #N-A #N-A 1.The Firm Capacity(design flow)of any pump station is defined as the maximum pumped now that can be achieved with the largest pump taken out of service. 2.Design Average Flow is the firm capacity of the pump station divided by the peaking factor(pf)not less than 2.5,per Section 2.02(A)(4)(c)of the Minimum Design Criteria. 3.A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is 5 0. Downstream Facility Name(Sewer): City of Sanford Collection System Downstream Permit Number: WQCS00047 III. Certification Statement 1, Paul Weeks,Jr. PE, certify to the best of my knowledge that the addition of the volume of Page 1 of 6 FTSE 10-23 VVbV011J11 L IVCIVPC— I UJV1'1 MI-."YI,I'11 'NVL J'OVV"1'IPIYVV IYf JV Il. wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances,given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and lI plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. DocuSigned by: k. ht. s Y. P.t, E660784489 05/21/24 Signing Official Signature Date Utilities & Engineering Director Title of Signing Official Page 2 of 6 FTSE 10-23 TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. PROJECT MODIFICATION NARRATIVE Project Name: Ashby Village Subdivision Location: Sanford, Lee County, NC PIN: 9661-19-7499-00 Owners: Ashby Village Holdings, LLC 5 Century Drive Greenville, SC 29607 1U� 4 Developer: Contender Development 5 Century Dr, Suite 210 Greenville, SC 29607 Consultant: Timmons Group Allison Stone, PE 5410 Trinity Road, Suite 102 Raleigh, NC 27607 Phone: 919-866-4518 PROJECT DESCRIPTION AND NARRATIVE: There will be a modification to existing permit WQ0044950 which was issued on January 22, 2024 for 176 single-family lots (4-bedroom) at 300 GIRD and 174 townhomes (3-bedroom) at 225 GPD for a total of 91,950 GPD. A factor of 75 GPD per bedroom was considered. The existing permit WQ0044950 also allowed for approximately 13,429 LF of 8" SDR 26 PVC and 792 LF of 8" DIP gravity sanitary sewer to be owned, operated, and maintained by the City of Sanford, NC. The modification is warranted due to three (3) additional single-family lots were added to the site plan and the addition of 12" segments of pipe added. The modification aims to factor in the addition of the following generated wastewater flows: • 3 (4-BEDROOM) SINGLE FAMILY UNITS AT 300 GPD=900 GPD The modification also requests to remove all previously permitted pipe quantities and replace with the following: • 12,887 LF of 8" SDR 26 PVC • 419 LF 8" DIP • 1,260 12"SDR 26 PVC • 240 12" DIP ROAD, 27607 • • TIMMONS GROUP YOUR VISION ACHIEVEO THROUGH OURS. The new gravity sanitary sewer system will be owned, operated, and maintained by the City of Sanford, NC. 401 &404 Approvals: 401 = DWR#20220602 404 =SAW-2021-00602 5410 TRINITY • ► . . • Sondra Janssen From: Simpson, Richard <richard.simpson@deq.nc.gov> Sent: Friday, April 12, 2024 7:31 AM To: Sondra Janssen;Allison Stone Cc: Simpson, Richard Subject: Permit No.W000449SO Ashby Village Subdivision Fast Track Sewer Extension Permit Sondra, The existing permit does not have a 12" line thus a modification is needed to include it. Also you can update the flow with the 75 GPD per bedroom which will decrease flow. Respectfully, Richard From:Sondra Janssen<Sondra.lanssen@timmons.com> Sent: Wednesday, April 10, 2024 05:16 PM To:Simpson, Richard<richard.simpson@deq.nc.gov>;Allison Stone<Allison.Stone@timmons.com> Subject: [External] RE: Permit No. WQ0044950_Ashby Village Subdivision Fast Track Sewer Extension Permit CAUTION: External email. Do not click links or open attachments unless verified.Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Richard! This project has an existing 12"sewer main that runs through the middle of the site. A portion of the existing 12" now needs to be rerouted slightly. This permit(attached) is for the approval of 14,221 LF of 8" pipe—at the time we only had 8" pipe proposed. Having rerouted a portion of the existing 12"we now have proposed 12" pipe, but the grand total between 8" and 12" pipe is 14,806 LF-or 4%more total linear feet than originally approved. Quantities are: 1,500 LF 12" pipe 13,306 LF 8" pipe Is a modification warranted solely because of the proposed 12" pipe? We are still within the 10%threshold of total LF permitted pipe. Your feedback is very much valued. Kind Regards, Sondra Janssen Project Manager TIMMONS GROUP I http://www.timmons.com 5410 Trinity Rd., Suite 102 1 Raleigh, NC 27607 Office: 919.532.3237 1 Fax: 919.859.5663 Mobile: 408.506.58501 sondra.ianssenWimrnons,com Your Vision Achieved Through Ours To send me files greater than 20MB click here From: Simpson, Richard<richard,simpson@deq.nc.gov> Sent: Monday,January 22, 2024 11:53 AM To:Sondra Janssen <Sondra.Janssen@timmons.com>;Allison Stone <allison.stone@timmons.com>; paul.weeks@sanfordnc.net; envhealth@leecountync.gov Cc: Simpson, Richard <richard.simpson@deq.nc.gov> Subject: Permit No. WQ0044950_Ashby Village Subdivision Fast Track Sewer Extension Permit CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Please see the link below for the Sewer Extension Fast-Track Permit for your records. Please note a hard copy will NOT be mailed. https://edocs.decl.nc.goy/WaterResources/DocView.aspx?id=3114819&db__id_-0_&___repo=WaterResources&searchid=aed3e e81-be24-4923-b04b-388076293166 Please review and comply with all conditions in the permit. ENGINEERING CERTIFICATIONS: As noted in Section 11.7 of the Standard Conditions of the permit, an Engineering Certification and supporting documentation shall be submitted upon completion of construction and prior to operation of this permitted rp oiect. Any wastewater flow made tributary to the wastewater collection system extension prior to completion and submittal of the Engineer's Certification and supporting documentation shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. Final Certifications must include plan and profile views of the sewer lines and force mains, pump station design calculations, and other items noted in Part 11.7 of the permit for the entire permitted project, even if partial certifications have been previously submitted. FAILURE TO COMPLY Section II. 10 of the permit notes failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted February 12, 1996 and updated March 2008, as applicable;the Division's Minimum Design Criteria for the Fast-Track Permitting of Pump Station and Force Mains adopted June 1, 2000 and updated March 2008 as applicable; and other supporting materials may subiect the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143- 215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and or referral of the North Carolina-licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; iSA NCAC 02T .0108(b-c)] PERMITS REQUIRED You are reminded that a permit must be issued prior to construction or extension of a sewer system, and prior to entering into a contract for the construction or extension of a sewer system, pursuant to N.C.G.S. 143- 215.1(a). Please note that due to the high volume of applications that are submitted coupled with staffs other duties, it's currently taking around 6-8 weeks to review applications and issue permits. Please plan accordingly. Sorry for the delay. 2 Richard Simpson Environmental Engineer Division of Water Resources Raleigh Regional Office North Carolina Department of Environmental Quality 919.791.4239 Office richard.simgson@deq.nc.gov Email correspondence to and tram this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Sewer Extension Permitting I NC DEQ subchapter t rules.pdf I tate..nc.us Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 3 TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. TRANSMITTAL TO: Attn: Richard Simpson Date: 6/8/2023 Job #: 45609 NCDEQ DWR - Raleigh Regional Office Project: Ashby Village Subdivision 3800 Barrett Drive Reference: Raleigh, NC 27609 Copies Sent To: ❑ ENCLOSED PLEASE FIND: n 0 ❑ WE ARE SENDING UNDER SEPARATE COVER: N U m Z to COPIES DATE NUMBER DESCRIPTION 1° s 1 1 Fast Track Sewer Modification Application (Incl. Flow Acceptance Form/ Certification Statement off 0) 1 2 Flow Tracking for Sewer Extension Applications N 1 3 Check for $600 r y 1 4 Project Narrative 1 5 Email Correspondence 0 u, o � � o THESE ITEMS ARE TRANSMITTED: If enclosures are not as noted, please notify us at once. o a, � J w � COMMENTS: A modification to W00044950 is needed. See email correspondence included in packet for past vi coordination with original permit reviewer/issuer. E °1 0 Feel free to contact me with any questions at 919-532-3237 or sondra.lanssen(o-)_timmons.com 0 V 0 a, E E .Z v 3 v Thank you, N Sondra Janssen Ci Project Manager 75 L SIGNED: v E a 0 v 0 v Y