HomeMy WebLinkAboutNCC241937_ESC Approval Submitted_20240625 Review Completed - Lot 30 Woodview -
SFD Construction
From: City of Winston-Sa►em
noreoly_@ eooivix.corn
To: Tim Maxey tim)maxeybuiiders,corn
Sent: Monday, June 24, 8:16 AM
Application Type:04.02)Grading/Erosion Control Permit
Workflow:04.02)Grading&Erosion Control
Project:Lot 30 Woodview-SFD Construction
A/P#:EN2400168
Acreage to be Disturbed:0.50
tttttps://winaton•saiem.geocivix.com/secure/project/Ppjectid=1380578
Hello Maxey Builders,Inc.,
Thank you for submitting your project to City of Winston-Salem.Review of the
Erosion Control Plan for this project has been completed.The design is
adequate to meet the ordinance standards and the plan has been approved.
Be aware that this plan shall expire three(3)years following the date of
approval,if no land disturbing activity has been undertaken,as is required by
Title 15A NCAC 48_0129_ Also,acceptance and approval of this plan is
conditioned upon compliance with Federal and State water quality laws,
regulations,and rules_
If you have not already done so,please provide an original signed and
notarized Financial Responsibility/Ownership(FRO)form as applicable.This
document is required prior to the issuance of the Grading/Erosion Control
Permit.If this has already been provided,then please disregard this
statement. Reminder that a completed FRO form is not required in the
instance where a project qualifies to use the FIB 489 Sketch Erosion Control
Plan document.
If this project will disturb more than 1 acre or is part of a larger common plan
of development,the Grading/Erosion Control Permit cannot be issued until
documentation is provided that coverage under the NCG91 Construction
Stormwater Permit(NPDES)has been obtained_ Please obtain coverage
under the permit at the following website
(hops:lledocs.deq.nc.gov/FormsINCGO1-NOl). Once coverage is obtained,
please upload a copy of the Certificate of Coverage(COC)to the project
documents in the electronic plan review system. The Grading/Erosion
Control Permit will not be issued until proof of coverage under NCG01 is
provided. Please direct questions about the eNO1 form to NCDEQ-
DEMLR st_ 1`in the Raleigh central office. If the
owner/operator of this project changes in the future,the new responsible
party must obtain a new COC. ***This approval email serves as the
Approval Letter"that must be uploaded when filing the a-NOI application to
obtain the NCG01 Certificate of Coverage.***
As outlined in the Unified Development Ordinances(UDO)of Winston-
Salem/Forsyth County,Village of Clemmons,Town of Lewisville,and Town of
Walkertown,Erosion Control Division staff may periodically inspect sites of
land disturbing activity to determine compliance with the Erosion Control
ordinances and the approved Erosion Control Plan. No person shall willfully
resist,delay,or obstruct an authorized representative,employee,or agent of the Erosion
Control Division while that person is inspecting or attempting to inspect a land disturbing
activity under the ordinance.
Should you have any questions as you move forward please contact Kent
Wall at;33 -4$2- 81 or is_entwgicilyot,its.org.