No preview available
HomeMy WebLinkAboutInitial Evaluation Letter_WEI Yadkin 03_Little Cabin_SAW-2023-02304DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 June 24, 2024 Regulatory Division Action ID No. SAW-2023-02304 Re: NCIRT Initial Review of the Wildlands Yadkin 03 Umbrella Mitigation Banking Instrument and Little Cabin Mitigation Site Prospectus Mr. Tim Morris Wildlands Engineering, Inc. 1430 South Mint Street, Suite 104 Charlotte, NC 28203 Dear Mr. Morris: This letter is regarding your prospectus document dated April 5, 2024, for the proposed Wildlands Yadkin 03 Umbrella Mitigation Banking Instrument and associated Little Cabin Mitigation Site. The proposal consists of the establishment and operation of a private commercial umbrella mitigation bank, and the associated 43-acre Little Cabin Mitigation Site, located off Beeson Farm Road in Sophia, Randolph County, North Carolina (35.8174° N, -79.8784° W). The proposed Little Cabin Mitigation Site would include stream restoration, enhancement, and preservation, in addition to wetland restoration and enhancement activities within the Yadkin River watershed (8-digit hydrologic unit code (HUC): 03040103). The Corps determined the Prospectus was complete and issued a public notice (P/N # SAW-2023-02304) on May 6, 2024. The purpose of this notice was to solicit the views of interested State and Federal agencies and other parties either interested in or affected by the proposed work. Incorporated in this email and attached are comments received in response to the public notice from the North Carolina Department of Natural and Cultural Resources State Historic Preservation Office, NC Wildlife Resource Commission, US Fish and Wildlife Service, and the US Army Corps of Engineers. IRT COMMENTS TO BE ADDRESSED IN THE DRAFT MITIGATION PLAN: REPLY TO ATTENTION OF: The Corps has considered the comments received from members of the Interagency Review Team (IRT) and information that was discussed during an IRT site review on February 8, 2024. We have determined that the proposed umbrella mitigation bank appears to have the potential to restore aquatic resources within the 8-digit HUC 03040103 of the Yadkin River Basin; however, we request that you address the enclosed agency concerns in the draft mitigation plan. Please provide a response to the attached comments with your draft mitigation plan submittal. We appreciate your interest in restoring and protecting waters of the United States. If you have questions regarding this letter, please contact me at Casey.M.Haywood@usace.army.mil. Sincerely, Casey Haywood Mitigation Project Manager Regulatory Division - Wilmington District Electronic Copies Furnished: NCIRT Distribution List North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M. Bartos, Administrator Governor Roy Cooper Office of Archives and History Secretary D. Reid Wilson Deputy Secretary, Darin J. Waters, Ph.D. Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 814-6570/814-6898 June 7, 2024 Erin Davis Erin.B.Davis@usace.army.mil U.S. Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Re: Little Cabin mitigation site, 4462 Beeson Farm Road, Randolph County, SAW-2023-02304, ER 24-1263 Dear Ms. Davis: Thank you for your letter of May 6, 2024, regarding the above-referenced undertaking. We have reviewed the submission and offer the following comments. We have conducted a review of the project and are aware of no historic resources which would be affected by the project. Therefore, we have no comment on the project as proposed. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation’s Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill-Earley, environmental review coordinator, at 919-814-6579 or environmental.review@dncr.nc.gov. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, Ramona Bartos, Deputy State Historic Preservation Officer From:Munzer, Olivia To:Davis, Erin B CIV USARMY CESAW (USA) Subject:[Non-DoD Source] Re: [External] Notice of Final Prospectus Review/ Wildlands Yadkin 03 UMB- Little Cabin/ SAW-2023-023040/ Randolph County Date:Friday, June 7, 2024 10:29:31 AM Good morning Erin, I do not have any comments on the final prospectus. Have a great weekend. Olivia Munzer NC Wildlife Resources Commission 336-269-0074 From: Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil> Sent: Wednesday, May 8, 2024 8:22 AM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Steve Kichefski <Steven.l.kichefski@usace.army.mil>; Dunnigan, Emily E CIV USARMY CESAW (USA) <Emily.E.Dunnigan@usace.army.mil>; Bowers, Todd <bowers.todd@epa.gov>; kathryn_matthews@fws.gov <kathryn_matthews@fws.gov>; Causey, Caroline F <caroline_causey@fws.gov>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; Merritt, Katie <katie.merritt@deq.nc.gov>; Friedman-Herring, Andrew <andrew.friedmanherring@deq.nc.gov>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Munzer, Olivia <olivia.munzer@ncwildlife.org>; fritz.rohde@noaa.gov <fritz.rohde@noaa.gov>; tmorris@wildlandseng.com <tmorris@wildlandseng.com> Subject: [External] Notice of Final Prospectus Review/ Wildlands Yadkin 03 UMB- Little Cabin/ SAW- 2023-023040/ Randolph County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. IRT Members, The below referenced Sponsor submitted a Final Prospectus for NCIRT review. This proposal is to establish a new umbrella mitigation bank. The Final Prospectus has been posted to the bank site cyber repository on RIBITS. Please note that you must be logged in to access documents in the cyber repository. Per section 332.8(d)(4), we are initiating the IRT 30-day review of the Final Prospectus with this email. The Public Notice was posted to RIBITS on May 6, 2024 (email below), with the public notice comment deadline of June 5, 2024. Review Timeline: 30-Day IRT Comment Start Date: May 8, 2024 30-Day IRT Comment Deadline: June 7, 2024 Initial Evaluation Deadline: July 7, 2024 From:Matthews, Kathryn (Kathy) To:Davis, Erin B CIV USARMY CESAW (USA) Cc:Mann, Leigh Subject:[Non-DoD Source] Re: Public Notice for Wildlands Yadkin 03 UMB - Little Cabin Mitigation Site Action ID: SAW- 2023-02304 (USFWS Project Code 2024-0082712) Date:Monday, May 13, 2024 2:08:21 PM Hi Erin, This is in response to the public notice for the Little Cabin Mitigation Site, in Randolph County. I don't have any significant comments on the project as proposed. Based on the information provided and other information available, it appears that the proposed action is not likely to adversely affect any other federally-listed endangered or threatened species, their formally designated critical habitat, or species currently proposed for listing under the ESA at these sites. We believe that the requirements of section 7(a)(2) of the ESA have been satisfied for your project. Please remember that obligations under section 7 consultation must be reconsidered if: (1) new information reveals impacts of this identified action that may affect listed species or critical habitat in a manner not previously considered; (2) this action is subsequently modified in a manner that was not considered in this review; or, (3) a new species is listed or critical habitat determined that may be affected by the identified action. We look forward to further coordination on this project as it moves through the NC IRT review process. Thanks! We are temporarily lacking a physical office. Electronic and phone correspondence is preferred. For snail mail, please use the P.O. Box listed below, rather than our former physical address. We will update our physical courier address when we move into the new space (expected by June 2024). Thanks! Kathy Matthews NC Renewable Energy Coordinator U.S. Fish and Wildlife Service P.O. Box 33726 Raleigh, NC 27636-3726 NEW Phone! 984-308-0852 From: CESAW-PublicNoticeList <CESAW-PublicNoticeList@usace.army.mil> Sent: Monday, May 6, 2024 2:28 PM Subject: [EXTERNAL] U.S. Army Corps of Engineers Public Notice