Loading...
HomeMy WebLinkAboutNCG120072_Action Plan Approval_20240515 Peterson, Kathryn S From: Caroline Funderburk <clafave@garrett-moore.com> Sent: Wednesday, May 15, 2024 4:07 PM To: Peterson, Kathryn S; Craig Fortner Cc: Josh.Davis@clevelandcountync.gov; Gene.Wright@clevelandcounty.com; gary.head@clevelandcountync.gov; Eplin, Jerry W Subject: [External] Re: Cleveland County Landfill Facility Corrective Action Plan Attachments: Outlook-tpncv5dz You don't often get email from clafave@garrett-moore.com. Learn why this is important CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Thank you, Kathryn. Yes,we have looked into this. Outfalls 004 and 005 are rock dams-identifying discharge from these outfalls has been difficult during rainfall events. Part of this corrective action plan includes adding sample pipes to these rock dams to facilitate sampling(per detail 2/2).The outlet pipe from the impoundment for SDO- 009 is in a localized low area, and often underwater during sampling events. Isaiah Reed,during his site inspection earlier this year, helped us identify a downstream alternative sample point(identified as SDO-009A on sheet 1 of the drawings)which we will attempt to sample in future rainfall events. Let me know if you have any other questions. Thankyou, Caroline L. Funderburk, P.E. GARRETT ■ & MGORE Engineering for the Powerand Waste Industries 1029 W South Street Raleigh, NC 27603 Mobile: 919.738.9583 WWW.garrett-moore.com From: Peterson, Kathryn S<kathryn.peterson@deq.nc.gov> Sent:Wednesday, May 15, 2024 2:28 PM To: Craig Fortner<cfortner@garrett-moore.com>; Caroline Funderburk<clafave@garrett-moore.com> Cc:Josh.Davis@clevelandcountync.gov<Josh.Davis@cleveIandcountync.gov>; Gene.Wright@clevelandcounty.com <Gene.Wright@clevelandcounty.com>;gary.head@clevelandcountync.gov<gary.head @clevelandcountync.gov>; Eplin, Jerry W<jerry.eplin@deq.nc.gov> Subject: Cleveland County Landfill Facility Corrective Action Plan Hi Caroline, DEQ approves of the proposed action plan for the Cleveland County Landfill Facility. Please continue to keep us updated with any new issues. i My only additional questions/concerns are the following? The action plan says that Outfalls 004, 005, and 009 have had no discharge throughout the entirety of the permit term (July 1, 2021 -June 30, 2026). Have you investigated why this may be? Thanks, Kathryn Kathryn Peterson Assistant Regional Engineer North Carolina Department of Environmental Quality Division of Energy, Mineral and Land Resources Office: (704) 235-2201 Mobile: (980) 435-7852 Email: kathryn.peterson@deq.nc.gov Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 D� E N Department of Environmental 0 y l \+l Low, Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 2