Loading...
HomeMy WebLinkAboutNCG030710_Updated Inspection Report_20240625 Compliance Inspection Report Permit:NCG030710 Effective: 08/04/21 Expiration: 06/30/26 Owner: Corning Optical Communications LLC SOC: Effective: Expiration: Facility: Trivium Cable Plant County: Catawba 1764 Trivium Pkwy Region: Mooresville Newton NC 28658 Contact Person:Carl Smith Title: Phone: 828-901-4009 Directions to Facility: The facility is located in the new Trivium Corporate Center. East of the intersection of Startown Road (Ste Road 1005)and Valleyview Drive System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 06/12/2024 Entry Time 10:OOAM Exit Time: 11:45AM Primary Inspector:Kathryn S Peterson Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030710 Owner-Facility:Corning Optical Communications LLC Inspection Date: 06/12/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: Kathryn Peterson completed a full compliance inspection of the Triviumm Cable Plant in response to a Representative Outfall Request. The facility's SWPPP was up to date (apart from the annual review), and the outfalls were observed and were cleared and accessible. Ensure that the SWPPP is reviewed annually, including documentation that the review took place. Mr. Huber sent a document stating that the plan has been updated In January of 2024 on June 24, 2024. Page 2 of 3 Permit: NCG030710 Owner-Facility:Corning Optical Communications LLC Inspection Date: 06/12/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: The most recent annual review of the plan documented was from 10/22/2022. Ensure the plan is reviewed at least once a year. Mr. Huber sent a document stating that the plan has been updated In January of 2024 on June 24, 2024. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: All qualitative monitoirng records were available on site. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: All analytical monitoring records were available on site. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ #Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ #Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑ Comment: Outfalls were observed during the inspection. Page 3 of 3